POLY-QUAL (INDIA) PVT.LTD . ENGINEERS  ٠ TOWER MANUFACTURERS  ٠ ERECTORS A-210, OKHLA INDUSTRIAL AREA, PHASE – I, NEW DELHI – 110020, INDIA Tel. : +91-(011) 26817236, 26814137  Fax : +91-(011) 26812231, 26811397 Email:  [email_address]  Website:  httpwww.polyqual.com
Buying a Telecommunication Tower Tower is a Capital expenditure with operational life of several decades. Hence  buying a tower needs careful determination of requirements or specifications. Important specification include 1. Survival wind Speed.  2. Physical size, Type, Number and levels of Antennas. 3. Twist & Sway requirements. While offering a product, almost all bidders, uniformly say “Complied” against all the required specifications including above i.e. wind speed, antenna loading etc. While compliance for some of the specifications is easily confirmable, the requirement of wind speed and antenna loading cannot be checked without looking into  detailed design calculations . Hence experienced and shrewd buyers always insist on design calculations, before finalization of purchase contract.  Unfortunately these two parameters are main parameters, which determine suitability of tower and are responsible for cost of tower also. Factors like size of antennas, type of antenna, level of antenna have considerable effect on the required strength (read cost) of tower. Placing antenna at mid height of tower will reduce the loading on tower by 50%. On the other hand, if the wind speed is double, the forces acting on tower are 4 times. Buying a communication tower is not the same as buying a bunch of steel angle, pipes, plates etc. Tower is matched set of its various components.
Each component of this set has a vital role to play in the strength of WHOLE tower, for example, if One small segment of the leg is slightly weaker than required, that the entire tower’s strength will be determined by this small component, because tower will fail from this point only when full loading occurs. Moreover, putting extra strength at any non-required point is wastage of materials, because strength of the tower is determined by weakest link in the structure only. Hence it becomes imperative that all members should be capable of resisting the applied loads to the same extent uniformly. To ensure that all these things have been considered properly, availability of design competency with the tower supplier is the most desirable eligibility criterion.  Design competency in supplier is a must for copying also. For example, if bolt grade changes, the joints have to be redesigned. If any member is replaced due to non availability of any section then also detailing of all adjoining members has to be changed. Approx.95% of price paid by buyer for tower, consists of materials cost. In  today’s competitive world, all bidders work  on small margins.  Hence material cost is the all encompassing component of total cost. Anybody can reduce  the cost by reducing the materials. That reduction is  normally not without  compromising on the performance or strength. The buyer has no way to  recognize this  compromise without looking into detailed calculations  and  verify  that the product is as per design calculations.
[object Object],[object Object],[object Object]
[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Materials Used Our tower designs  are based  on strengths of Indian Steels.  Certificate from a Govt. approved test laboratory certifying  the  strength  of  material  is  as  specified  in  design,  can  also be provided with  material supply.  All materials  are hot  dip galvanized  after  fabrication. The length of all members  is maintained less than  6 meters,  so that transportation of  material by truck or containers is not a problem. Fabrication of Tower Materials Tower material is fabricated using precision machinery.  Accuracy of all  drilled or punched holes  are  maintained  as  per engineering drawing. Buyer can choose any type of tower. Each  type  will  be  guaranteed  to  meet  the  performance  specifications  laid out by buyer. The design  will be certified  to meet the performance requirements by chartered  engineer   /Govt. Approved Authority. Certificates, showing.  ●   The strength of materials as per design. ●  Thickness of zinc coating as per standards will be enclosed  with supply of materials, if desired. ● An erection manual, showing location of all members & their  code is provided, when only tower materials are ordered. All members in the supply carry code in permanent punch and permanent ink as per erection manual.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
E N D

Más contenido relacionado

La actualidad más candente

Part 1 Monopole Tower Structures
Part 1 Monopole Tower Structures Part 1 Monopole Tower Structures
Part 1 Monopole Tower Structures Fred Teichman
 
Cell tower, BTS & antennas
Cell tower, BTS & antennasCell tower, BTS & antennas
Cell tower, BTS & antennasnimay1
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & PartsPower System Operation
 
Cell Phone Towers.pptx
Cell Phone Towers.pptxCell Phone Towers.pptx
Cell Phone Towers.pptxMalikMaaz6
 
A mini project on the transmission tower
A mini project on the transmission towerA mini project on the transmission tower
A mini project on the transmission towernaqeeb04
 
BTS Reserves for Installation, Preventative Maintenance and Acceptance
BTS Reserves for Installation, Preventative Maintenance and AcceptanceBTS Reserves for Installation, Preventative Maintenance and Acceptance
BTS Reserves for Installation, Preventative Maintenance and Acceptanceibrahimnabil17
 
أعمال انشاءات الاتصالات - Communication Structure Works
أعمال انشاءات الاتصالات - Communication Structure Worksأعمال انشاءات الاتصالات - Communication Structure Works
أعمال انشاءات الاتصالات - Communication Structure WorksHussain Sbetan
 
Electrical Transmission Tower: Types, Design and Parts
Electrical Transmission Tower: Types, Design and  PartsElectrical Transmission Tower: Types, Design and  Parts
Electrical Transmission Tower: Types, Design and PartsDr.Raja R
 
Overhead transmission lines_ Foundation.pptx
Overhead transmission lines_ Foundation.pptxOverhead transmission lines_ Foundation.pptx
Overhead transmission lines_ Foundation.pptxEdlirPeci1
 
Transmisiion line design concept
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design conceptKumar VEL
 
Rectifiers and Back up Batteries at Telecom Sites
Rectifiers and Back up Batteries at Telecom SitesRectifiers and Back up Batteries at Telecom Sites
Rectifiers and Back up Batteries at Telecom Sitesibrahimnabil17
 
ANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABS
ANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABSANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABS
ANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABSila vamsi krishna
 
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PROAli Meer
 
Part 4 Mods - Tower and Foundation Modifications on vertical structures
Part 4 Mods  - Tower and Foundation Modifications on vertical structures Part 4 Mods  - Tower and Foundation Modifications on vertical structures
Part 4 Mods - Tower and Foundation Modifications on vertical structures Fred Teichman
 
Base Transceiver Station Equipment
Base Transceiver Station EquipmentBase Transceiver Station Equipment
Base Transceiver Station EquipmentArash Soltani
 
Implementation of-mw-link-and-bts
Implementation of-mw-link-and-btsImplementation of-mw-link-and-bts
Implementation of-mw-link-and-btsMusfiqur Rahman
 

La actualidad más candente (20)

Part 1 Monopole Tower Structures
Part 1 Monopole Tower Structures Part 1 Monopole Tower Structures
Part 1 Monopole Tower Structures
 
Cell tower, BTS & antennas
Cell tower, BTS & antennasCell tower, BTS & antennas
Cell tower, BTS & antennas
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
 
Types of-tower
Types of-towerTypes of-tower
Types of-tower
 
Cell Phone Towers.pptx
Cell Phone Towers.pptxCell Phone Towers.pptx
Cell Phone Towers.pptx
 
A mini project on the transmission tower
A mini project on the transmission towerA mini project on the transmission tower
A mini project on the transmission tower
 
BTS Reserves for Installation, Preventative Maintenance and Acceptance
BTS Reserves for Installation, Preventative Maintenance and AcceptanceBTS Reserves for Installation, Preventative Maintenance and Acceptance
BTS Reserves for Installation, Preventative Maintenance and Acceptance
 
أعمال انشاءات الاتصالات - Communication Structure Works
أعمال انشاءات الاتصالات - Communication Structure Worksأعمال انشاءات الاتصالات - Communication Structure Works
أعمال انشاءات الاتصالات - Communication Structure Works
 
Electrical Transmission Tower: Types, Design and Parts
Electrical Transmission Tower: Types, Design and  PartsElectrical Transmission Tower: Types, Design and  Parts
Electrical Transmission Tower: Types, Design and Parts
 
Overhead transmission lines_ Foundation.pptx
Overhead transmission lines_ Foundation.pptxOverhead transmission lines_ Foundation.pptx
Overhead transmission lines_ Foundation.pptx
 
Transmisiion line design concept
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design concept
 
Rectifiers and Back up Batteries at Telecom Sites
Rectifiers and Back up Batteries at Telecom SitesRectifiers and Back up Batteries at Telecom Sites
Rectifiers and Back up Batteries at Telecom Sites
 
ANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABS
ANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABSANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABS
ANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABS
 
Wind_Load
Wind_LoadWind_Load
Wind_Load
 
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
 
Part 4 Mods - Tower and Foundation Modifications on vertical structures
Part 4 Mods  - Tower and Foundation Modifications on vertical structures Part 4 Mods  - Tower and Foundation Modifications on vertical structures
Part 4 Mods - Tower and Foundation Modifications on vertical structures
 
Base Transceiver Station Equipment
Base Transceiver Station EquipmentBase Transceiver Station Equipment
Base Transceiver Station Equipment
 
Tes p-122.03-r0
Tes p-122.03-r0Tes p-122.03-r0
Tes p-122.03-r0
 
Implementation of-mw-link-and-bts
Implementation of-mw-link-and-btsImplementation of-mw-link-and-bts
Implementation of-mw-link-and-bts
 
How To Design Concrete Structures Using Eurocode 2
How To Design Concrete Structures Using Eurocode 2How To Design Concrete Structures Using Eurocode 2
How To Design Concrete Structures Using Eurocode 2
 

Destacado

Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towerssnookala
 
Etisalat masters management program presentation
Etisalat masters management program presentationEtisalat masters management program presentation
Etisalat masters management program presentationAbdelrahman Magdy
 
OTT TV: A Telco threat or opportunity?
OTT TV: A Telco threat or opportunity?OTT TV: A Telco threat or opportunity?
OTT TV: A Telco threat or opportunity?Mohsen Malaki
 
Telecom Industry: Networking Function Virtualization: CapEx and OpEx Savings
Telecom Industry: Networking Function Virtualization: CapEx and OpEx SavingsTelecom Industry: Networking Function Virtualization: CapEx and OpEx Savings
Telecom Industry: Networking Function Virtualization: CapEx and OpEx SavingsHarilaos Koumaras
 
Opex reduction in telecom industry qarib kazmi
Opex reduction in telecom industry qarib kazmiOpex reduction in telecom industry qarib kazmi
Opex reduction in telecom industry qarib kazmiQarib Raza
 
Network Optimization for a Telecommunication Industry Client Helps Identify C...
Network Optimization for a Telecommunication Industry Client Helps Identify C...Network Optimization for a Telecommunication Industry Client Helps Identify C...
Network Optimization for a Telecommunication Industry Client Helps Identify C...Quantzig
 
Mobile Network Infrastructure Sharing - Industry Overview & Coleago's Approach
Mobile Network Infrastructure Sharing - Industry Overview & Coleago's ApproachMobile Network Infrastructure Sharing - Industry Overview & Coleago's Approach
Mobile Network Infrastructure Sharing - Industry Overview & Coleago's ApproachColeago Consulting
 
Opex saving in transmission network
Opex saving in transmission networkOpex saving in transmission network
Opex saving in transmission networkAhmed Dafalla
 
Oracle Approach for Telecom Challenges
Oracle Approach for Telecom ChallengesOracle Approach for Telecom Challenges
Oracle Approach for Telecom ChallengesAna Galindo
 
Telecom Sector
Telecom SectorTelecom Sector
Telecom Sectorsantossb
 
telecommunication-ppt
telecommunication-ppttelecommunication-ppt
telecommunication-pptsecomps
 

Destacado (13)

Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towers
 
Etisalat masters management program presentation
Etisalat masters management program presentationEtisalat masters management program presentation
Etisalat masters management program presentation
 
OTT TV: A Telco threat or opportunity?
OTT TV: A Telco threat or opportunity?OTT TV: A Telco threat or opportunity?
OTT TV: A Telco threat or opportunity?
 
Telecom Industry: Networking Function Virtualization: CapEx and OpEx Savings
Telecom Industry: Networking Function Virtualization: CapEx and OpEx SavingsTelecom Industry: Networking Function Virtualization: CapEx and OpEx Savings
Telecom Industry: Networking Function Virtualization: CapEx and OpEx Savings
 
Technology Cost Optimization Strategies
Technology Cost Optimization StrategiesTechnology Cost Optimization Strategies
Technology Cost Optimization Strategies
 
Opex reduction in telecom industry qarib kazmi
Opex reduction in telecom industry qarib kazmiOpex reduction in telecom industry qarib kazmi
Opex reduction in telecom industry qarib kazmi
 
Network Optimization for a Telecommunication Industry Client Helps Identify C...
Network Optimization for a Telecommunication Industry Client Helps Identify C...Network Optimization for a Telecommunication Industry Client Helps Identify C...
Network Optimization for a Telecommunication Industry Client Helps Identify C...
 
Mobile Network Infrastructure Sharing - Industry Overview & Coleago's Approach
Mobile Network Infrastructure Sharing - Industry Overview & Coleago's ApproachMobile Network Infrastructure Sharing - Industry Overview & Coleago's Approach
Mobile Network Infrastructure Sharing - Industry Overview & Coleago's Approach
 
Opex saving in transmission network
Opex saving in transmission networkOpex saving in transmission network
Opex saving in transmission network
 
Economics of Network Sharing
Economics of Network SharingEconomics of Network Sharing
Economics of Network Sharing
 
Oracle Approach for Telecom Challenges
Oracle Approach for Telecom ChallengesOracle Approach for Telecom Challenges
Oracle Approach for Telecom Challenges
 
Telecom Sector
Telecom SectorTelecom Sector
Telecom Sector
 
telecommunication-ppt
telecommunication-ppttelecommunication-ppt
telecommunication-ppt
 

Similar a telecommunication Towers

Final Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageFinal Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageGirish Damle
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...Firdaurs Abdullah
 
Thermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureThermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureDoug Olson
 
Unistrut Construction Brochure
Unistrut Construction BrochureUnistrut Construction Brochure
Unistrut Construction BrochureRICHARD GORDON
 
STEP UP ENGINEERING SERVICES PROFILE
STEP UP ENGINEERING SERVICES PROFILESTEP UP ENGINEERING SERVICES PROFILE
STEP UP ENGINEERING SERVICES PROFILEFazal Quadir
 
Numeko Tech Presentation
Numeko Tech PresentationNumeko Tech Presentation
Numeko Tech PresentationNumeko Tech
 
Panel Built Catalog 2015
Panel Built Catalog 2015Panel Built Catalog 2015
Panel Built Catalog 2015Panel Built
 
Exeed Precast Brochure Final Web
Exeed Precast Brochure Final WebExeed Precast Brochure Final Web
Exeed Precast Brochure Final WebFaris Alwan
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a buildingTeow Beng Hur
 
Vogl Presentation
Vogl PresentationVogl Presentation
Vogl Presentationronancoffey
 
Analysis And Design Of Apartment Building
Analysis And Design Of Apartment BuildingAnalysis And Design Of Apartment Building
Analysis And Design Of Apartment BuildingTony Lisko
 

Similar a telecommunication Towers (20)

Final Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageFinal Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 Page
 
Company brochure
Company brochureCompany brochure
Company brochure
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
 
Thermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureThermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete Brochure
 
Unistrut Construction Brochure
Unistrut Construction BrochureUnistrut Construction Brochure
Unistrut Construction Brochure
 
Mermaid Telecommunication
Mermaid Telecommunication Mermaid Telecommunication
Mermaid Telecommunication
 
STEP UP ENGINEERING SERVICES PROFILE
STEP UP ENGINEERING SERVICES PROFILESTEP UP ENGINEERING SERVICES PROFILE
STEP UP ENGINEERING SERVICES PROFILE
 
OPT brouchure N
OPT brouchure NOPT brouchure N
OPT brouchure N
 
Delta Steel Structures PEB Products and Accessories
Delta Steel Structures PEB Products and AccessoriesDelta Steel Structures PEB Products and Accessories
Delta Steel Structures PEB Products and Accessories
 
Numeko Tech Presentation
Numeko Tech PresentationNumeko Tech Presentation
Numeko Tech Presentation
 
Panel Built Catalog 2015
Panel Built Catalog 2015Panel Built Catalog 2015
Panel Built Catalog 2015
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
 
Exeed Precast Brochure Final Web
Exeed Precast Brochure Final WebExeed Precast Brochure Final Web
Exeed Precast Brochure Final Web
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a building
 
Vogl Presentation
Vogl PresentationVogl Presentation
Vogl Presentation
 
STEVEN cv
STEVEN cvSTEVEN cv
STEVEN cv
 
CV
CVCV
CV
 
Analysis And Design Of Apartment Building
Analysis And Design Of Apartment BuildingAnalysis And Design Of Apartment Building
Analysis And Design Of Apartment Building
 

Último

AI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarAI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarPrecisely
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopBachir Benyammi
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Commit University
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaborationbruanjhuli
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-pyJamie (Taka) Wang
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsSeth Reyes
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostMatt Ray
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IES VE
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URLRuncy Oommen
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintMahmoud Rabie
 
Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024D Cloud Solutions
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Websitedgelyza
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesDavid Newbury
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureEric D. Schabell
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
AI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just MinutesAI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just MinutesMd Hossain Ali
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioChristian Posta
 
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDEADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDELiveplex
 

Último (20)

AI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarAI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity Webinar
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 Workshop
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
 
201610817 - edge part1
201610817 - edge part1201610817 - edge part1
201610817 - edge part1
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-py
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and Hazards
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URL
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership Blueprint
 
Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Website
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond Ontologies
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability Adventure
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
AI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just MinutesAI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just Minutes
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and Istio
 
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDEADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
 

telecommunication Towers

  • 1. POLY-QUAL (INDIA) PVT.LTD . ENGINEERS ٠ TOWER MANUFACTURERS ٠ ERECTORS A-210, OKHLA INDUSTRIAL AREA, PHASE – I, NEW DELHI – 110020, INDIA Tel. : +91-(011) 26817236, 26814137 Fax : +91-(011) 26812231, 26811397 Email: [email_address] Website: httpwww.polyqual.com
  • 2. Buying a Telecommunication Tower Tower is a Capital expenditure with operational life of several decades. Hence buying a tower needs careful determination of requirements or specifications. Important specification include 1. Survival wind Speed. 2. Physical size, Type, Number and levels of Antennas. 3. Twist & Sway requirements. While offering a product, almost all bidders, uniformly say “Complied” against all the required specifications including above i.e. wind speed, antenna loading etc. While compliance for some of the specifications is easily confirmable, the requirement of wind speed and antenna loading cannot be checked without looking into detailed design calculations . Hence experienced and shrewd buyers always insist on design calculations, before finalization of purchase contract. Unfortunately these two parameters are main parameters, which determine suitability of tower and are responsible for cost of tower also. Factors like size of antennas, type of antenna, level of antenna have considerable effect on the required strength (read cost) of tower. Placing antenna at mid height of tower will reduce the loading on tower by 50%. On the other hand, if the wind speed is double, the forces acting on tower are 4 times. Buying a communication tower is not the same as buying a bunch of steel angle, pipes, plates etc. Tower is matched set of its various components.
  • 3. Each component of this set has a vital role to play in the strength of WHOLE tower, for example, if One small segment of the leg is slightly weaker than required, that the entire tower’s strength will be determined by this small component, because tower will fail from this point only when full loading occurs. Moreover, putting extra strength at any non-required point is wastage of materials, because strength of the tower is determined by weakest link in the structure only. Hence it becomes imperative that all members should be capable of resisting the applied loads to the same extent uniformly. To ensure that all these things have been considered properly, availability of design competency with the tower supplier is the most desirable eligibility criterion. Design competency in supplier is a must for copying also. For example, if bolt grade changes, the joints have to be redesigned. If any member is replaced due to non availability of any section then also detailing of all adjoining members has to be changed. Approx.95% of price paid by buyer for tower, consists of materials cost. In today’s competitive world, all bidders work on small margins. Hence material cost is the all encompassing component of total cost. Anybody can reduce the cost by reducing the materials. That reduction is normally not without compromising on the performance or strength. The buyer has no way to recognize this compromise without looking into detailed calculations and verify that the product is as per design calculations.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. Materials Used Our tower designs are based on strengths of Indian Steels. Certificate from a Govt. approved test laboratory certifying the strength of material is as specified in design, can also be provided with material supply. All materials are hot dip galvanized after fabrication. The length of all members is maintained less than 6 meters, so that transportation of material by truck or containers is not a problem. Fabrication of Tower Materials Tower material is fabricated using precision machinery. Accuracy of all drilled or punched holes are maintained as per engineering drawing. Buyer can choose any type of tower. Each type will be guaranteed to meet the performance specifications laid out by buyer. The design will be certified to meet the performance requirements by chartered engineer /Govt. Approved Authority. Certificates, showing. ● The strength of materials as per design. ● Thickness of zinc coating as per standards will be enclosed with supply of materials, if desired. ● An erection manual, showing location of all members & their code is provided, when only tower materials are ordered. All members in the supply carry code in permanent punch and permanent ink as per erection manual.