2. DIPLOMA IN MECHANICAL ENGINEERING
(PRODUCTION) 2008
JULY 2008 TO JULY 2014-MOSER BAER INDIA
LTD. GREATER NOIDA AS DEPUTY ENGINEER
IN UTILITY & PRODUCTION DEPARTMENT
JULY 2014 TO NOW-AMUL GROUP
FARIDABAD (BANAS DAIRY) AS Sr. ENGINEER
IN UTILITY {PROJECT & ENGINEERING}
DEPARTMENT.
3. To manage the all utility (power,refrigertion & water)
operation & maintaining activity aspects.
To control & regulate skilled ,semi skilled man power.
To control & isolation of all activity accordingly
organisation pyramid.
To co-ordinate with all technical staff in order to achieve
higher productivity .
To manage all technical as well as commercial activity
which is directly or indirectly linked to achieve goal.
To aware of all operation & to observe the quality
parameter theoretically as well physically parameter also.
To achieve all goals accordingly systematically as well as
parameter data sheet also.
To observe & maintain all the productivity
parameter
4. Follow various quality parameter for optical
media production like mechanical parameter and
electrical parameter.
SOP (standard operating procedure)
Quality of compressed air is always oil-free &
moisture-free.
Meet quality parameter of water like DM
water,Soft water,Raw water,RO water.
Quality of steam always dry and saturated.
Meet temperature difference of chilled water
distribution through the operation.
Meet quality parameter of water using in
condenser to achieve higher refrigeration effect.
5. Successfully conversion of silver electro
plating to aluminium plating for DVD disc.
MAMA Platinum GOLD disc with anti-scratch
layer of lacour production for NASA.
Successfully changeover of ammonia
compressor oil cooling system from water
cooling to ammonia cooling.
100% condensate recovery from process by
installing PPPU unit.
Changeover of high stage motor to low stage
motor by new aeration system in ETP plant.
6. 1) +R/-R Re-writable DVD disc fully
automatic machine erection and
commissioning at MOSER BAER India ltd.
2) Thin film solar panel fully automatic
machine erection and commissioning at
MOSAR BAER PHOTO VOLTIC India ltd.
3)Centralised AC plant installation and
Commissioning at MBIL.
4) 510 tons SUMITOMO moulding machine
installation for DVD production.
7. 1) 50 TPH A.F.B.C. coal fired Boiler of
Thermax Erection and Commissioning at
AMUL .
2) 66KV power Substation at AMUL
3)Refrigeration Plant Expansion at AMUL,
Palanpur.
4)Erection and Commissioning of ETP
plant(by SAI ENVIRO)
5) WTP Plant Installation at AMUL, Faridabad
6) 2000 KVA DG(Perkins make) erection and
commissioning at AMUL, Faridabad
8. 7) Installation of 550 cfm capacity Air
Compressor(ATLAS COPCO Make) at
AMUL,FARIDABAD
8) Erection and commissioning of 8TPH
FO/PNG fired Steam Boiler(thermex Make)
9) Erection and Commissioning of 1410 TR
refrigeration plant at AMUL,FARIDABAD
10) 100 MTPD milk powder plant erection &
commissioning at AMUL Palanpur.
9. To choking of RO membrane due to high turbidity.
Chances of screw compressor machine getting
damaged due to liquid comes .
Chances of steam parameter equipment getting
damaged due to quality of fuel.
Alfa Laval Pump seals getting Damaged due to high
temperature of product.
Bag filter bag getting torn off due to improper
pressure regulating.
Bearing misalignment of gear box of 450 kw motor.
Air Compressor Lubrication oil Pipe getting damaged
due to cavitation.
Vibro Fluidizer improper vibration occurring.
Dehumidification not happening in MUNTERS.
10. Ammonia leakage from economiser expansion valve.
Improper ice formation in ice silo.
-15 Accumulator ammonia leakage from strainer.
To manage & maintenance of all oil rectifier as well air
purging system.
To manage all accumulator level switch as well level
transmitter equipment to avoid compressor breakdown.
To manage all maintenance activity in RO equipment.
35m3/h R O plant membranes choked due to high TDS.
Micron filter not passing accurate pressure to high stage
pump.
Activated carbon filter giving high chlorine value & fail FRC
TEST.
11. J I T- JUST IN TIME
KAIZEN
CAPA
SEGGRIGATION
5‘S
12. Some time we convert to –R DVD production
line to +R DVD production by line
qualification.
ACF & MGF qualification after SDI (silt density
index) checking procedure.
Demineralised water qualification as per
standards.
Soft water qualification as per standards.
RO water qualification for milk product
process.
13. Sensor
Level transmitter
PH meter
TDS meter
Conductivity meter
Flow meter
Pressure differential
Level gauge
Pressure gauge & RTD
14. Maintain all utility supply for process and
various departments.
Daily MIS generation of all utility units.
Daily consumption of Furnace oil,Raw
water,DM water,Soft water,RO
water,Power,Steam,Chilled water,Compressed
air.
Maintain all spares of utility department.
Maintain all daily consumable items for
utility.
15. Udham Singh Yadav
S/O-Amar Singh Yadav
Adress-Doorwani Nagar,Raebareli,U.P. (INDIA)
Marital Status-Single
D O B-27 December 1987