OOW16 - Technical Upgrade Best Practices for Oracle E-Business Suite 12.2 [CON6714]

V
OOW16 - Technical Upgrade Best Practices for Oracle E-Business Suite 12.2 [CON6714]
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Technical Upgrade Best Practices
Oracle E-Business Suite R12.2
Udayan Parvate
Senior Director, EBS Release Engineering
Samer Barakat
Senior Director, Applications Performance
Oracle E-Business Suite Development
September 22, 2016
Confidential – Oracle Internal/Restricted/Highly Restricted
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Safe Harbor Statement
The following is intended to outline our general product direction. It is intended for
information purposes only, and may not be incorporated into any contract. It is not a
commitment to deliver any material, code, or functionality, and should not be relied upon
in making purchasing decisions. The development, release, and timing of any features or
functionality described for Oracle’s products remains at the sole discretion of Oracle.
3
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Program Agenda
12.2 Upgrade Overview
12.2 Upgrade Process Flow
12.2 Upgrade Best Practices to Minimize Downtime
1
2
3
4
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Program Agenda
12.2 Upgrade Overview
12.2 Upgrade Process Flow
12.2 Upgrade Best Practices to Minimize Downtime
1
2
3
5
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
R12.2 Rapid Install (RI)
•12.2 RI is the packaged media for EBS on
Oracle Software Delivery Cloud (OSDC)
•RI contains applications code, required core technology components,
and VISION /FRESH databases
– Direct upgrade Supported from 11i MBL (Doc 883202.1) or above, 12.0.4 or
above , 12.1.1 or above
– For a high level flow chart per upgrade path + a checklist to assess readiness,
“Technical Planning, Getting Started, and Go-Live Checklist” (Doc ID 1585857.1)
R12.2 is NOT available on MOS as a Maintenance Pack
New dual file system replaces current EBS file system
Enable EBR step (13543062:R12.AD.C ) at the end of the upgrade
The EBS upgrade to R12.2 itself is NOT an Online Patch
6
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
EBS R12.2 Release Updates Since GA
• EBS R12.2.6 RUP (most recent)
– EBS R12.2.6 (21900901) RUP was released in Sept 2016 (Doc 2114016.1)
– Available at suite wide and family level granularity
– EBS 12.2.3 is the minimum baseline for consuming Family equivalent of 12.2.6
– Apply R12.2.6 RUP in “downtime” mode (against the RUN edition) when upgrading
from prior releases such as 11i, R12.0 or R12.1
– adop phase=apply apply_mode=downtime
• R12.2 Applications DBA (AD) / Technology Stack (TXK) RUPs (delta.8)
– AD/TXK products deliver patching infrastructure code to support online patching
– AD/TXK delta.8 is a pre-requisite for upgrading to 12.2.6
– It is strongly recommended to move up to the latest AD/TXK RUP, currently delta.8
(Doc 1617461.1).
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
EBS CUP and Upgrade Fixes Report
• What is an upgrade fix ?
– A patch released after 12.2 GA to address an issue in the upgrade itself, generally
for issues with upgrade failures, upgrade performance, data integrity
– Apply using “adpatch preinstall=y” option to the RI “Run” file system
– Merge the upgrade fix patch db driver with the main upgrade driver
•Consolidated upgrade patch (CUP )
– Aggregation of 12.2 upgrade fixes at periodic intervals, generally aligned with
each new EBS RUP
–For R12.2, 22742071:12.2.0 ( CUP7) is the latest CUP
•EBS level Report DOC ID 1448102.1(revised bi-monthly)
– List of upgrade fixes released beyond latest CUP for that release
– Merge the patches and the drivers with the latest CUP and apply merged driver
8
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Program Agenda
12.2 Upgrade Overview
12.2 Upgrade Process Flow
12.2 Upgrade Best Practices to Minimize Downtime
1
2
3
Oracle Confidential – Internal/Restricted/Highly Restricted 9
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
• Use Rapid Install (RI) for
target platform to lay down
12.2.0 code and tech stack
and create the Dual File
System
• Use latest StartCD
(currently StartCD 51)
• Check for missing
application tier technology
patches using ETCC
• No downtime required
• RI (startcd 51) now supports
12.1.0.2 DB OH and FMW 11.1.9
10
2. Lay Down File System
• Upgrade database to the minimum
version (11.2.0.4) OR latest certified
version (12.1.0.2). Migrate db platform if
desired.
• Database Prep guide for Release 12.2 (Doc
1349240.1)
• Apply latest database patches. Refer to
“Consolidated list of Technology patches”
(Doc 1594274.1)
• Check for missing database patches, Use
EBS Technology Codelevel Checker (ETCC
patch 17537119)
• Requires downtime
1. Prepare Database
12.2 Technical Upgrade Process
Required Pre-upgrade Steps (prior to main EBS upgrade downtime)
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
• Apply latest EBS RUP patches
• Latest AD & TXK RUP in
“hot_patch” ( i.e. against
RUN edition)
• Adsplice custom/offcycle
products
• Latest EBS 12.2.x RUP in
”downtime “ mode
• Complete post-upgrade steps
(post-12.2.0 steps followed
by post-12.2.X steps)
• Patch Wizard Recommended
Patches (Doc 1267768.1)
11
5. Upgrade to 12.2.X
• Apply updates to custom
DB code & schema based
on Readiness Reports ( Doc
1531121.1 )
• Run Enablement process
13543062:R12.AD.C :
• Fixes many coding
standards violations
• Enables editioning for EBS
and registered custom
schemas
• Generates editioning
views for EBS and custom
tables
4. Enable Online Patching
12.2 Technical Upgrade Process Continued..
Required Downtime Steps (main EBS upgrade)
3. Upgrade to 12.2.0
• Apply AD/upgrade fixes
• AD.C+ AD CUP (22742061)
• Latest EBS-wide CUP + one-
offs in –preinstall mode
• Synchup/Apply 12.2 master
driver
• Merge “pre-install” drivers
with the master driver and
apply using autopatch
• Run RI in “Configure” mode
• Do NOT bring up the system
OR perform post-12.2.0
upgrade steps
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | 12
12.2 Technical Upgrade Process Continued..
Conditional Uptime Steps
• Deploy Apps tier custom
code against RUN edition
• See Developing and
Deploying Customizations
in EBS R12.2 (Doc
1577661.1)
• Custom and Third-Party
Products integration
guidance (Doc 1916149.1)
• Deploy external
integrations per
integration-specific docs
7. Deploy Custom Code &
External Integrations
• Per sizing analysis, add nodes
(horizontal scale-up)
• 12.2 Cloning (Doc 1383621.1)
• Adding node in a Shared
applications file system (Doc
1375769.1)
• Add managed servers
(vertical scale-up)
• Configure HTTP Server and
Oacore, Oafm, Forms and
Forms-c4ws ( Doc 1905593.1)
• Load-Balancing for 12.2 (Doc
1375686.1)
8. Configure System to
Production Capacity
6. Apply Translations
• Release environment for
testing (optional)
• Apply ( 12.2 + 12.2.X NLS
patch ) merged either as
online patch OR hot_patch
OR
• Use TSP (Trans Synch Patch)
in “hot_patch” mode
• Release environment for
testing (required)
R12.2 NLS Release Notes
(Doc 1314621.1)
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Program Agenda
12.2 Upgrade Overview
12.2 Upgrade Process Flow
12.2 Upgrade Best Practices to Minimize Downtime
1
Oracle Confidential – Internal/Restricted/Highly Restricted 13
3
2
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
• As with most planned production maintenance activities, a successful upgrade is
highly dependent on how well-defined the upgrade plan is.
• Pre-production testing and validation on an comparable system prior to the actual
upgrade is key to minimizing unforeseen contingencies.
• Optimizing the upgrade process is all about making the right choices at the planning
stage and verifying these choices with a test environment before production.
Planning Your Oracle E-Business Suite (EBS) Upgrade from Release 11i to Release 12
(MOS ID 1406960.1)
Best Practices for Minimizing Oracle E-Business Suite Release 12 Upgrade Downtime
(MOS ID 1581549.1)
14
Plan, Prepare, Test and Upgrade
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Plan for Platform Migration as a Separate Down Time
• Performing a Database migration to a new platform first, if being considered as part
of an EBS upgrade, is recommended as customers would typically be able to
perform this in a separate earlier downtime
• Regardless of whether this migration is done in a separate earlier downtime or as
part of a single downtime, performance gains would be expected due to the fact
that the upgrade of the Applications to R12 will run on newer and faster hardware
Oracle E-Business Suite Upgrades and Platform Migration (MOS ID 1377213.1)
15
Plan: Prepare Platform
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Plan for Database Upgrade as a Separate Down time
• Upgrade RDBMS version to latest certified for the current APPS level.
• The latest database certified is 12.1.0.2 (11.2.0.4 is the latest for 11gR2)
https://blogs.oracle.com/stevenChan/entry/database_12_1_0_2
• Tune Init.ora Parameters:
– Ensure mandatory init.ora parameters are set correctly.
– MOS ID 396009.1 & 216205.1 (R12 & 11i respectively)
• Apply Required Patches & Fixes/Workarounds for Known Issues
– Recommended Performance Patches - MOS ID 244040.1
16
Plan: Prepare Database
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Purge Old and/or Transient Data
• Purge Portal
– Purge Portal introduced in 11i10
– Single purge/archive management console
– Purge programs can be configured, initiated and
monitored
– Set the execution frequency as well view history
of purge programs.
• Accessing the Purge Portal
– System Administrator > Oracle Applications Manager >Purging/Critical Activities
17
Plan: Manage Data Volumes
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Plan: Manage Data Volumes
Purge Old and/or Transient Data
• Use OAM to configure, initiate and monitor purge programs
– Set the execution frequency and view program history
– Programs tagged with the “Purge” program type
System Administrator >Oracle Applications Manager >Purging/Critical Activities
18
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Plan: Manage Data Volumes
Purge Old and/or Transient Data
• Archive/Purge Product Information
– Product User guides – GL/AP/AR/FA/OM
– Support Notes:
• (MOS ID 138264.1) – General Ledger Archive/Purge FAQ
• (MOD ID 144431.1) – Fixed Assets Archive/Purge FAQ
• (MOS ID 136919.1) – General Ledger Archive/Purge Setup and Usage
• (MOS ID 752322.1) : Reducing Oracle E-Business Suite Data Footprint
19
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Identify Patches/Tasks
Identify Required Patches/Tasks
• Prepare a complete list of pre and post patches and recommended code levels
– Keep the system current on AD/ATG/OAM code e.g. latest AD/ATG RUPs on 11i/R12.0 and once on
R12.2
– For 12.2, review Oracle E-Business Suite Release 12.2: Consolidated List of Patches and Technology
Bug Fixes (1594274.1)
– High priority patches from MOS.
– Consolidated Upgrade Patches (CUP)
• Latest EBS CUP for your target release
– R12.2 Release notes MOS ID 1320300.1
• Latest pre-install patches MOS ID 1448102.1
– Review “Known-issues” sections from key “living” documents such as Release notes, MP Install
Instructions
• Use TUMS (“The Upgrade Manual Script”) To avoid running tasks not relevant to your system
20
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Identify Patches/Tasks
Identify Required Patches/Tasks
• Identify and execute tasks that could be completed in a separate downtime period,
prior to the production upgrade
– Use applicable steps mentioned in the "Downtime reduction" and “Upgrade
By Request” appendices E and G of the R12.1 upgrade guide
• Minimize historical data to be upgraded as per business requirements “Upgrade By
Request”
– Post-upgrade “hot-patch” of additional historical data outlined in
MOS ID 604893.1
– Assign post upgrade jobs to specialized CM queue (by request_type)
MOS ID 399362.1
21
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Identify Patches/Tasks
Upgrade By Request (MOS ID 604893.1)
• Use this option to defer the upgrade of historical data from the initial upgrade
process (critical downtime window), to post upgrade
• Historical data can be upgraded anytime when system is up
• Implementation is a two step process:
– Set range of historical data to be upgraded before R12.1/R12.2 upgrade and run the pre-
upgrade concurrent program
– Run the post-upgrade concurrent program (as needed for additional historical data)
• Utilize Parallel Concurrent Processing (PCP) for post-upgrade concurrent jobs to
leverage the Cluster (RAC).
– For RAC and PCP refer to (MOS ID1359612.1)
– Starting from 12.1, you can define node affinity at the program level
22
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Manage Customizations
Check Custom Code
For the duration of the upgrade, consider…
• Check and review customizations that business might not be using.
• Review new Product Features or New Technology to Migrate to.
• Review and disable custom triggers and business events.
• Review and disable custom VPD policies as needed.
• Review and eliminate redundant custom indexes.
Upgrading your Customizations to Oracle E-Business Suite Release 12.1
(MOS ID: 1435894.1)
Developing and deploying Customizations in Oracle E-Business Suite Release 12.2
(MOS ID: 157766.1)
23
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Manage Customizations
Identify and fix custom code to comply to online patching standards.
• Use “Online Patching readiness Reports” to identify issues in custom data base
objects that will be fixed automatically Vs needing manual intervention.
• Use Global Standards compliance checker script to scan your file system custom
code and fix reported issues.
• Detailed instructions: “EBS Technical Planning Guide” and MOS ID 1531121.1
• Download Patch 22200487:R12.AD.X (11i, 12.0, 12.1 or 12.2), use the scripts and
generate the reports.
24
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Pre-Upgrade Tasks
Remove Unnecessary Workloads / Overheads
• Remove TDE (Transparent Data Encryption) from high volume tables (for the
duration of the upgrade)
• Review and disable all debug or logging; do this at all levels (site, responsibility,
user level etc.)
• Purge all old data that is no longer needed prior to the upgrade.
MOS ID 752322.
• Flush all the interfaces, such as Auto Invoice, Journal Entry Import, Order Import
etc.
25
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Pre-Upgrade Tasks
Remove Unnecessary Workloads / Overheads
• Drop MRC Schema if it still exists.
• Convert to OATM (Oracle Applications Tablespace Model).
MOS ID 248857.1
• Convert to the new Multiple Organizations (Multi-Org) architecture
MOS ID 210193.1
• If possible run in noarchivelog mode
• Disable flashback DB (for the duration of the upgrade).
• Disable auditing if enabled (for the duration of the upgrade)
26
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Database Tier
Gather Schema Statistics
• Gather CBO statistics for all Oracle E-Business Suite schemas with GATHER_AUTO option
using FND_STATS (or gather statistics concurrent program)
• If the adsstats.sql job is taking a long time during the upgrade check the following:
– Check that parallel execution is being used effectively (with parallel_max_servers set
to a suitable value, such as 2 x number of cores).
– Sample specific long running tables at a lower percentage
• If the adsstats.sql script is still taking a significant amount of time, reduce the upgrade time
by:
– Exporting schema statistics gathered during test runs (by adsstats.sql )
– Importing these statistics instead of running adsstats.sql.
– When importing statistics from test runs make sure data volumes are similar
27
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Database Tier
Gather Dictionary and Fixed Stats
• Gather dictionary object statistics when there is a significant change in dictionary,
for example, lot of new objects created.
exec dbms_stats.gather_dictionary_stats;
• Gather fixed object statistics with reasonable load on the system
exec dbms_stats.gather_fixed_objects_stats
• Dictionary and Fixed stats should be gather manually as they are not gathered
automatically in the Release 12 upgrade by adstats.sql or any other method.
28
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Database Tier
Gather Dictionary and Fixed Stats
• Fixed Object Statistics should be gathered:
– After any associated platform or database upgrade that is part of the overall
Oracle E-Business Suite upgrade.
– After any SGA/PGA parameters have changed.
– After Release 12 upgrade, when there is representative activity on the system.
• Dictionary Statistics should be gathered:
– After any associated platform or DB upgrade that is part of the overall Oracle E-
Business Suite upgrade.
– After the Release 12 upgrade.
– After move to OATM
29
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Database Tier
Properly Size SGA/PGA Memory
• Maximize SGA and PGA sizing:
– Review the Advisory sections in AWR (from test runs) to fine tune SGA & PGA.
– Some starting rules of thumb are:
• log buffer = 30 to 100 Mb
• shared pool = 1 to 4 GB
• pga target = 3 to 20 GB
• SGA/buffer cache = multi GB
•be generous without causing excessive paging.
• Use Large/Huge pages. For example on Linux HugePages – See MOS ID 744769.1
– MOS ID 361468.1, “HugePages on Oracle Linux 64-bit” describes how to configure hugepages.
When running the recommended script provided with Note 401749.1, make sure that all
database instances are started.
– Only SGA allocation benefits from large/huge pages, PGA allocation does not.
30
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Database Tier
Upgrade and Initialization Parameters
• For 32 cores or fewer initially set:
– parallel_max_servers = 2 x number of CPU cores.
– AD Parallel workers – start with 1 x number of CPU cores. Possibly increase to
1.5 x number of CPU cores.
– job_queue_processes = number of CPU cores
• For more than 32 cores, start with:
– parallel_max_servers = 1 x number of CPU cores.
– AD Parallel workers = between 0.5 and 1.0 x number of CPU cores.
• Based on the performance diagnostics, these values can be changed based on the
level of contention and resource (CPU/IO) usage (in AWR).
• Shutdown other RAC instances
31
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Database Tier
Upgrade and Initialization Parameters
• If specified, remove db_file_multiblock_read_count. This is the recommended
value for normal operation of Oracle E-Business Suite.
• Set optimizer_dynamic_sampling level to the value of 4 during the Release 12
Upgrade, revert to the default value of 2 (or remove) after the upgrade.
• The values of the initialization parameters above (except
db_file_multiblock_read_count) may be different from the values used for normal
operation. So be sure to revert after the Release 12 upgrade has
completed.
• If DB is 12c, Turn off the adaptive feature (Set optimizer_adaptive_features=false)
before the EBS upgrade (before applying R12.AD.C)
• For other initialization parameters, refer to MOS ID 396009.1, “Database
Initialization Parameters for Oracle E-Business Suite Release 12”.
32
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Prepare: Application Tier
12.2 Middle Tier Sizing Guidelines
• Managed instances JVM sizing should consider both memory and CPU domains.
• On 64bit environment, we do not recommend allocating huge heap sizes, but rather
have more managed instances in the cluster to scale up to the target concurrency
levels.
• For Admin Server sizing, the default size of 512M is not enough for most installations,
we recommend setting the XMS to at least 1 GB and the XMX to 2GB
• An initial guidance on sizing can be found in the “Oracle E-Business Suite Installation
Guide: Using Rapid Install”
http://docs.oracle.com/cd/E26401_01/doc.122/e22950/T422699i4773.htm#T610671
Managing Configuration of Oracle HTTP Server and Oacore, Oafm, Forms and Forms-c4ws Applications
in Oracle E-Business Suite Release 12.2 (Doc ID 1905593.1)
33
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Test: Pre-Production Testing
Testing and Final Run Planning
• Testing should be done on a comparable system that has the same CPU, IO and
memory capacity as the target production system
• It is critical to do multiple rounds of testing with different settings to maximize server
utilization, while considering the following
– Memory utilization (no swapping/ excessive paging)
– CPU utilization (scale down if at 100%)
– I/O response times (scale down if averages > 20 ms)
• When analyzing Release 12 Upgrade performance issues, the goal is prevent wasted
test iterations by maximizing the number of performance issues resolved.
• Testing timings along with system resource utilization should be used to plan the final
upgrade with a 20% contingency factor.
34
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Test: Pre-Production Testing
Get the Timings
• AD Job Timing Reports: The job timing report (adtimrpt.sql) reports the top 100 time
consuming jobs.
• AD Utility and Worker Logs: The AD utility and worker logs can also be useful for
diagnostics, giving you more detail about what happened and when. The AD workers logs
(adworknnn.log) will give you the activities carried out by each worker and the timings.
• AD Parallel tables: The AD_PARALLEL_UPDATES, AD_PARALLEL_UPDATE_UNITS tables can
give information on the actual rows processed, the number of batches, progress over
time, and long running batches (that might indicate locks/sleeps or data distribution
issues).
• AD_TASK_TIMING: gives start and end times of jobs and workers, which can help identify
all long running jobs, and match long running SQL and performance issues (on AWR) with
specific jobs.
35
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Test: Pre-Production Testing
Get the Diagnostic Data
• Start with Express Diagnosis of Oracle E-Business Suite Release 12 Upgrade Performance
Issues (MOS ID 1583752.1)
• Correlate AWR, system vitals and expensive SQLs. Start with the top events and top SQLs
sections in the AWR reports.
• Use the advisory sections to size SGA, and PGA Properly
36
• SQL Tuning
• Trace files
• SQLT output (MOS ID: 215187.1)
• Trace Analyzer (MOS ID: 224270.1)
• AWR Report (MOS ID: 748642.1)
• 11g SQL Monitor Report
• AWR SQL Report (awrsqrpt.sql)
• Database Tuning
• AWR Report (MOS ID: 748642.1)
• ADDM report (MOS ID: 250655.1)
• Active Session History (ASH)
• OS - OSWatcher (MOS ID: 301137.1) Q
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Test: Pre-Production Testing
Common Optimizations
• Use statistics_level=ALL during the testing/diagnosis phase. Make sure to reset
to TYPICAL afterwards. This will help capture runtime Execution plans with row
counts & row source stats.
• For long running SQLs - Display cursor report (with ALL +ALLSTATS ) can be used
to while SQL/job is running which massively speeds up the identification of sub-
optimal execution plans and their solution.
• The other alternative is SQL Trace - for which the trace can be enabled on the
Job or that particular SQL level.
37
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Test: Pre-Production Testing
Common Optimizations
• For long running jobs or SQLs, it is best to start by investigating if good execution plans
are being used. A poor execution plan (or even just one that is moderately sub-
optimal) can be the root cause of contention, especially if that contention only occurs
during a particular job.
• Create custom indexes for long running jobs where a new index could significantly
improve the execution plan and performance
• For long running jobs with high level of contention on particular index segments ,
consider dropping the index before the job and recreating afterwards. Ensure that
indexes are recreated in parallel and with exactly the same definition. And remember
to ALTER INDEX to revert the degree of parallel (NOPARALLEL).
38
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Test: Pre-Production Testing
Common Optimizations
• For long-running xdf or odf jobs creating materialized views (MV), consider
cleaning up or truncating of any large MV logs (this requires MV complete
refresh)
• For high level of waits associated with redo log, especially “log buffer space”
and “log file sync”, consider:
– Change the configuration of redo logs
– Move to faster filer
– Increase redo log file sizes, increase the number of files or increase the
log parallelism (hidden parameter _log_parallelism_max).
39
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Test: Pre-Production Testing
Common Optimizations
• Once you have identified the long running jobs and SQL, you can check My Oracle
Support for known issues and potential solutions or workarounds.
• However, bear in mind that the fix or workaround may not necessarily fix your
particular problem.
• If you cannot confirm that you have exactly the same issue (from the diagnostics)
you may still apply the fix, but should continue to gather diagnostics and search for a
solution until the issue is fully resolved.
• If you have identified that a long running job has an inefficient execution plan, you
could use an SQL Profile to apply hints that will help the CBO choose a better
execution plan. You will need SQL tuning expertise to do this.
40
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
References
41
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
References
• Oracle E-Business Suite Release 12.2 Info center (1581299.1)
• Oracle E-Business Suite Release Notes, Release 12.2 (1320300.1)
• DB Preparation Guidelines for an E-Business Suite Release 12.2
Upgrade (1349240.1)
• Using the Online Patching Readiness Report in Oracle E-Business
Suite Release 12.2 (1531121.1)
• Oracle E-Business Suite Release 12.2: Upgrade Sizing and Best
Practices (1597531.1)
• Oracle E-Business Suite Release 12.2: Consolidated List of Patches
and Technology Bug Fixes (1594274.1)
42
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Additional Resources
43
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Additional Resources
• EBS Upgrade related Reports
– EBS Data Model Comparison Report (1290886.1)
– EBS ATG Seed Data Comparison Report (1327399.1)
– EBS File Comparison Report (1446430.1)
• White paper
– Planning Your Oracle E-Business Suite Upgrade from Release 11i to Release
12 (1406960.1)
– Oracle E-Business Suite Upgrades and Platform Migration (1377213.1)
• Have Upgrade questions ? Please post on OTN R12 upgrade forum
http://forums.oracle.com/forums/forum.jspa?forumID=395&start=0
44
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Oracle E-Business Suite Technology Blog
• Direct from EBS Development
• Latest news
• Certification announcements
• Primers, FAQs, tips
• Desupport reminders
• Latest upgrade recommendations
• Statements of Direction
• Subscribe via email or RSS
blogs.oracle.com/stevenchan
45
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Oracle E-Business Suite: Applications Technology
Join us on Facebook
facebook.com/groups/EBS.SysAdmin
46
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Oracle E-Business Suite on Oracle Cloud Blog
47
blogs.oracle.com/EBSandOracleCloud
• Direct from EBS Strategy & Development
• Latest news for EBS on Oracle Cloud (IaaS
& PaaS)
 Provisioning
 Lift and Shift
 Integrations
 New enhancements and certifications
• Statements of Direction
• Subscribe via email or RSS
New
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Oracle E-Business Suite
Applications Technology
Sessions by Date, Time
Oracle OpenWorld 2016
Confidential – Oracle Internal/Restricted/Highly Restricted 48
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Related Sessions
Thursday, September 22, 2016
9:30 AM
CON6725-Maintenance Strategies for Oracle E-Business Suite
Elke Phelps, Sr. Principal Product Manager, Applications Technology, Oracle E-Business Suite
Moscone West
2004
10:45 AM
CON6710-Online Patching with Oracle E-Business Suite 12.2
Kevin Hudson, Senior Director, Applications Technology, Oracle E-Business Suite
Moscone West
2004
10:45 AM
CON6712-Ready or Not: Applying Secure Configuration to Oracle E-Business Suite
Eric Bing, Senior Director, Security, Oracle Applications Unlimited
Elke Phelps, Sr. Principal Product Manager, Applications Technology, Oracle E-Business Suite
Moscone West
2006
12:00 PM
CON6714-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2
Udayan Parvate, Senior Director, Release Engineering, Quality and Release Management,
Oracle E-Business Suite
Samer Barakat, Senior Director, Applications Performance, Oracle E-Business Suite
Moscone West
2004
12:00 PM
CON6721-Faster and Better: Oracle E-Business Suite Desktop Integration Enhancements
Senthilkumar Ramalingam, Group Manager, Applications Technology, Oracle E-Business Suite
Moscone West
2004
49
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. |
Related Sessions
Thursday, September 22, 2016
1:15 PM
CON6708-Migrating and Managing Customizations for Oracle E-Business Suite 12.2
Santiago Bastidas, Sr. Principal Product Manager, Applications Technology, Oracle E-Business Suite
Moscone West
2004
2:30 PM
CON6742-Oracle E-Business Suite Technology Certification Primer and Roadmap
Steven Chan, Senior Director, Applications Technology, Oracle E-Business Suite
Moscone West
2004
2:30 PM
CON6718-Build, Deploy and Manage Smartphone Applications for Oracle E-Business Suite
Vijay Shanmugam, Director, Applications Technology, Oracle E-Business Suite
Moscone West
2006
50
Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | 51
OOW16 - Technical Upgrade Best Practices for Oracle E-Business Suite 12.2 [CON6714]
1 de 52

Recomendados

10 Tips for Successful 12.2 Upgrade por
10 Tips for Successful 12.2 Upgrade10 Tips for Successful 12.2 Upgrade
10 Tips for Successful 12.2 UpgradeOAUGNJ
2.6K vistas39 diapositivas
10 tips for successful 12.2 upgrade por
10 tips for successful 12.2 upgrade10 tips for successful 12.2 upgrade
10 tips for successful 12.2 upgradeRavi Madabhushanam
18.2K vistas40 diapositivas
OOW15 - Planning Your Upgrade to Oracle E-Business Suite 12.2 por
OOW15 - Planning Your Upgrade to Oracle E-Business Suite 12.2OOW15 - Planning Your Upgrade to Oracle E-Business Suite 12.2
OOW15 - Planning Your Upgrade to Oracle E-Business Suite 12.2vasuballa
11K vistas118 diapositivas
EBS-technical_upgrade_best_practices 12.1 or 12.2 por
EBS-technical_upgrade_best_practices 12.1 or 12.2EBS-technical_upgrade_best_practices 12.1 or 12.2
EBS-technical_upgrade_best_practices 12.1 or 12.2Berry Clemens
18.5K vistas75 diapositivas
Oracle E-Business Suite 12.2 - The Upgrade to End All Upgrades por
Oracle E-Business Suite 12.2 - The Upgrade to End All UpgradesOracle E-Business Suite 12.2 - The Upgrade to End All Upgrades
Oracle E-Business Suite 12.2 - The Upgrade to End All UpgradesShiri Amit
2.5K vistas21 diapositivas
Oracle EBS R12.2 - The Upgrade Know-How Factory por
Oracle EBS R12.2 - The Upgrade Know-How FactoryOracle EBS R12.2 - The Upgrade Know-How Factory
Oracle EBS R12.2 - The Upgrade Know-How Factorypanayaofficial
451 vistas19 diapositivas

Más contenido relacionado

La actualidad más candente

Oracle EBS Upgrade to 12.2.5.1 por
Oracle EBS Upgrade to 12.2.5.1Oracle EBS Upgrade to 12.2.5.1
Oracle EBS Upgrade to 12.2.5.1Amit Sharma
6.4K vistas28 diapositivas
Oracle R12.1.2 and R12.1.3 features por
Oracle R12.1.2 and R12.1.3 featuresOracle R12.1.2 and R12.1.3 features
Oracle R12.1.2 and R12.1.3 featuresravisagaram
16.7K vistas60 diapositivas
Oracle Ebiz R12.2 Features -- Ravi Sagaram por
Oracle Ebiz R12.2 Features -- Ravi SagaramOracle Ebiz R12.2 Features -- Ravi Sagaram
Oracle Ebiz R12.2 Features -- Ravi Sagaramravisagaram
26.9K vistas56 diapositivas
Preparing for EBS R12.2-upgrade-full por
Preparing for EBS R12.2-upgrade-fullPreparing for EBS R12.2-upgrade-full
Preparing for EBS R12.2-upgrade-fullBerry Clemens
15.1K vistas63 diapositivas
What’s New in Oracle E-Business Suite R12.2 for Database Administrators? por
What’s New in Oracle E-Business Suite R12.2 for Database Administrators?What’s New in Oracle E-Business Suite R12.2 for Database Administrators?
What’s New in Oracle E-Business Suite R12.2 for Database Administrators?vasuballa
14.3K vistas30 diapositivas
Oracle Web ADI Implementation Steps por
Oracle Web ADI Implementation StepsOracle Web ADI Implementation Steps
Oracle Web ADI Implementation Stepsstandale
17.4K vistas16 diapositivas

La actualidad más candente(20)

Oracle EBS Upgrade to 12.2.5.1 por Amit Sharma
Oracle EBS Upgrade to 12.2.5.1Oracle EBS Upgrade to 12.2.5.1
Oracle EBS Upgrade to 12.2.5.1
Amit Sharma6.4K vistas
Oracle R12.1.2 and R12.1.3 features por ravisagaram
Oracle R12.1.2 and R12.1.3 featuresOracle R12.1.2 and R12.1.3 features
Oracle R12.1.2 and R12.1.3 features
ravisagaram16.7K vistas
Oracle Ebiz R12.2 Features -- Ravi Sagaram por ravisagaram
Oracle Ebiz R12.2 Features -- Ravi SagaramOracle Ebiz R12.2 Features -- Ravi Sagaram
Oracle Ebiz R12.2 Features -- Ravi Sagaram
ravisagaram26.9K vistas
Preparing for EBS R12.2-upgrade-full por Berry Clemens
Preparing for EBS R12.2-upgrade-fullPreparing for EBS R12.2-upgrade-full
Preparing for EBS R12.2-upgrade-full
Berry Clemens15.1K vistas
What’s New in Oracle E-Business Suite R12.2 for Database Administrators? por vasuballa
What’s New in Oracle E-Business Suite R12.2 for Database Administrators?What’s New in Oracle E-Business Suite R12.2 for Database Administrators?
What’s New in Oracle E-Business Suite R12.2 for Database Administrators?
vasuballa14.3K vistas
Oracle Web ADI Implementation Steps por standale
Oracle Web ADI Implementation StepsOracle Web ADI Implementation Steps
Oracle Web ADI Implementation Steps
standale17.4K vistas
OOW15 - technical upgrade best practices for oracle e-business suite 12.2 por vasuballa
OOW15 - technical upgrade best practices for oracle e-business suite 12.2OOW15 - technical upgrade best practices for oracle e-business suite 12.2
OOW15 - technical upgrade best practices for oracle e-business suite 12.2
vasuballa6.1K vistas
Fusion applications gl and ar suresh c-mishra por Suresh Mishra
Fusion applications   gl and ar suresh c-mishraFusion applications   gl and ar suresh c-mishra
Fusion applications gl and ar suresh c-mishra
Suresh Mishra3.5K vistas
Oracle EBS R12.1.3_Installation_linux(64bit)_Pan_Tian por Pan Tian
Oracle EBS R12.1.3_Installation_linux(64bit)_Pan_TianOracle EBS R12.1.3_Installation_linux(64bit)_Pan_Tian
Oracle EBS R12.1.3_Installation_linux(64bit)_Pan_Tian
Pan Tian12.3K vistas
Oracle R12 Upgrade Lessons Learned por bpellot
Oracle R12 Upgrade Lessons LearnedOracle R12 Upgrade Lessons Learned
Oracle R12 Upgrade Lessons Learned
bpellot21.3K vistas
Anatomy of Autoconfig in Oracle E-Business Suite por vasuballa
Anatomy of Autoconfig in Oracle E-Business SuiteAnatomy of Autoconfig in Oracle E-Business Suite
Anatomy of Autoconfig in Oracle E-Business Suite
vasuballa7.4K vistas
Fusion hcm presentation final version por Feras Ahmad
Fusion hcm presentation final versionFusion hcm presentation final version
Fusion hcm presentation final version
Feras Ahmad3.6K vistas
Asset Revaluation or Impairment – Understanding Release 12 Fixed Assets Options por eprentise
Asset Revaluation or Impairment – Understanding Release 12 Fixed Assets OptionsAsset Revaluation or Impairment – Understanding Release 12 Fixed Assets Options
Asset Revaluation or Impairment – Understanding Release 12 Fixed Assets Options
eprentise9.7K vistas
Upgrade EBS DB from 11g to 12c. por Osama Mustafa
Upgrade EBS DB from 11g to 12c.Upgrade EBS DB from 11g to 12c.
Upgrade EBS DB from 11g to 12c.
Osama Mustafa1.7K vistas
OOW16 - Advanced Architectures for Oracle E-Business Suite [CON6705] por vasuballa
OOW16 - Advanced Architectures for Oracle E-Business Suite [CON6705]OOW16 - Advanced Architectures for Oracle E-Business Suite [CON6705]
OOW16 - Advanced Architectures for Oracle E-Business Suite [CON6705]
vasuballa1.1K vistas
Oracle applications sla r12 SLA- demos por Ali Ibrahim
Oracle applications sla r12   SLA- demosOracle applications sla r12   SLA- demos
Oracle applications sla r12 SLA- demos
Ali Ibrahim9.3K vistas
Presentation oracle ebs r12 por Feras Ahmad
Presentation oracle ebs r12Presentation oracle ebs r12
Presentation oracle ebs r12
Feras Ahmad1.7K vistas

Destacado

Oracle E-Business Suite R12.2.6 on Database 12c: Install, Patch and Administer por
Oracle E-Business Suite R12.2.6 on Database 12c: Install, Patch and AdministerOracle E-Business Suite R12.2.6 on Database 12c: Install, Patch and Administer
Oracle E-Business Suite R12.2.6 on Database 12c: Install, Patch and AdministerAndrejs Karpovs
3.1K vistas52 diapositivas
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423] por
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]vasuballa
1.8K vistas109 diapositivas
OOW16 - Oracle E-Business Suite Integration Best Practices [CON6709] por
OOW16 - Oracle E-Business Suite Integration Best Practices [CON6709]OOW16 - Oracle E-Business Suite Integration Best Practices [CON6709]
OOW16 - Oracle E-Business Suite Integration Best Practices [CON6709]vasuballa
3.5K vistas61 diapositivas
OOW16 - Oracle E-Business Suite: What’s New in Release 12.2 Beyond Online Pat... por
OOW16 - Oracle E-Business Suite: What’s New in Release 12.2 Beyond Online Pat...OOW16 - Oracle E-Business Suite: What’s New in Release 12.2 Beyond Online Pat...
OOW16 - Oracle E-Business Suite: What’s New in Release 12.2 Beyond Online Pat...vasuballa
4K vistas139 diapositivas
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713] por
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]vasuballa
1.1K vistas52 diapositivas
OOW16 - Maintenance Strategies for Oracle E-Business Suite [CON6725] por
OOW16 - Maintenance Strategies for Oracle E-Business Suite [CON6725]OOW16 - Maintenance Strategies for Oracle E-Business Suite [CON6725]
OOW16 - Maintenance Strategies for Oracle E-Business Suite [CON6725]vasuballa
837 vistas125 diapositivas

Destacado(20)

Oracle E-Business Suite R12.2.6 on Database 12c: Install, Patch and Administer por Andrejs Karpovs
Oracle E-Business Suite R12.2.6 on Database 12c: Install, Patch and AdministerOracle E-Business Suite R12.2.6 on Database 12c: Install, Patch and Administer
Oracle E-Business Suite R12.2.6 on Database 12c: Install, Patch and Administer
Andrejs Karpovs3.1K vistas
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423] por vasuballa
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]
vasuballa1.8K vistas
OOW16 - Oracle E-Business Suite Integration Best Practices [CON6709] por vasuballa
OOW16 - Oracle E-Business Suite Integration Best Practices [CON6709]OOW16 - Oracle E-Business Suite Integration Best Practices [CON6709]
OOW16 - Oracle E-Business Suite Integration Best Practices [CON6709]
vasuballa3.5K vistas
OOW16 - Oracle E-Business Suite: What’s New in Release 12.2 Beyond Online Pat... por vasuballa
OOW16 - Oracle E-Business Suite: What’s New in Release 12.2 Beyond Online Pat...OOW16 - Oracle E-Business Suite: What’s New in Release 12.2 Beyond Online Pat...
OOW16 - Oracle E-Business Suite: What’s New in Release 12.2 Beyond Online Pat...
vasuballa4K vistas
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713] por vasuballa
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]
vasuballa1.1K vistas
OOW16 - Maintenance Strategies for Oracle E-Business Suite [CON6725] por vasuballa
OOW16 - Maintenance Strategies for Oracle E-Business Suite [CON6725]OOW16 - Maintenance Strategies for Oracle E-Business Suite [CON6725]
OOW16 - Maintenance Strategies for Oracle E-Business Suite [CON6725]
vasuballa837 vistas
Oracle e-business suite (ebs) r12.2.6 - new functionality por Matthew Bezuidenhout
Oracle e-business suite (ebs)  r12.2.6 - new functionalityOracle e-business suite (ebs)  r12.2.6 - new functionality
Oracle e-business suite (ebs) r12.2.6 - new functionality
Matthew Bezuidenhout5.2K vistas
OOW16 - Running your E-Business Suite on Oracle Cloud (IaaS + PaaS) - Why, Wh... por vasuballa
OOW16 - Running your E-Business Suite on Oracle Cloud (IaaS + PaaS) - Why, Wh...OOW16 - Running your E-Business Suite on Oracle Cloud (IaaS + PaaS) - Why, Wh...
OOW16 - Running your E-Business Suite on Oracle Cloud (IaaS + PaaS) - Why, Wh...
vasuballa2.3K vistas
Oracle e-business suite R12 step by step Installation por OraERP
Oracle e-business suite R12 step by step InstallationOracle e-business suite R12 step by step Installation
Oracle e-business suite R12 step by step Installation
OraERP6.2K vistas
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423] por vasuballa
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]
vasuballa386 vistas
OOW16 - Build, Deploy, and Manage Smartphone Applications for Oracle E-Busine... por vasuballa
OOW16 - Build, Deploy, and Manage Smartphone Applications for Oracle E-Busine...OOW16 - Build, Deploy, and Manage Smartphone Applications for Oracle E-Busine...
OOW16 - Build, Deploy, and Manage Smartphone Applications for Oracle E-Busine...
vasuballa876 vistas
OOW16 - Personalizing Oracle E-Business Suite: The Next Generation [CON6716] por vasuballa
OOW16 - Personalizing Oracle E-Business Suite: The Next Generation [CON6716]OOW16 - Personalizing Oracle E-Business Suite: The Next Generation [CON6716]
OOW16 - Personalizing Oracle E-Business Suite: The Next Generation [CON6716]
vasuballa862 vistas
OOW16 - Oracle E-Business Suite 12 Upgrade Experience for a 14 TB Oracle E-Bu... por vasuballa
OOW16 - Oracle E-Business Suite 12 Upgrade Experience for a 14 TB Oracle E-Bu...OOW16 - Oracle E-Business Suite 12 Upgrade Experience for a 14 TB Oracle E-Bu...
OOW16 - Oracle E-Business Suite 12 Upgrade Experience for a 14 TB Oracle E-Bu...
vasuballa611 vistas
OOW16 - Migrating and Managing Customizations for Oracle E-Business Suite 12.... por vasuballa
OOW16 - Migrating and Managing Customizations for Oracle E-Business Suite 12....OOW16 - Migrating and Managing Customizations for Oracle E-Business Suite 12....
OOW16 - Migrating and Managing Customizations for Oracle E-Business Suite 12....
vasuballa345 vistas
OOW16 - Oracle E-Business Suite Information Discovery: Your Journey to the Cl... por vasuballa
OOW16 - Oracle E-Business Suite Information Discovery: Your Journey to the Cl...OOW16 - Oracle E-Business Suite Information Discovery: Your Journey to the Cl...
OOW16 - Oracle E-Business Suite Information Discovery: Your Journey to the Cl...
vasuballa436 vistas
OOW15 - Advanced Architectures for Oracle E-Business Suite por vasuballa
OOW15 - Advanced Architectures for Oracle E-Business SuiteOOW15 - Advanced Architectures for Oracle E-Business Suite
OOW15 - Advanced Architectures for Oracle E-Business Suite
vasuballa6.5K vistas
OOW15 - Oracle E-Business Suite Technology: Latest Features and Roadmap por vasuballa
OOW15 - Oracle E-Business Suite Technology: Latest Features and RoadmapOOW15 - Oracle E-Business Suite Technology: Latest Features and Roadmap
OOW15 - Oracle E-Business Suite Technology: Latest Features and Roadmap
vasuballa12.3K vistas
OOW15 - Standards-Based Desktop Integration in Oracle E-Business Suite por vasuballa
OOW15 - Standards-Based Desktop Integration in Oracle E-Business SuiteOOW15 - Standards-Based Desktop Integration in Oracle E-Business Suite
OOW15 - Standards-Based Desktop Integration in Oracle E-Business Suite
vasuballa1.9K vistas
OOW15 - Maintenance Strategies for Oracle E-Business Suite por vasuballa
OOW15 - Maintenance Strategies for Oracle E-Business SuiteOOW15 - Maintenance Strategies for Oracle E-Business Suite
OOW15 - Maintenance Strategies for Oracle E-Business Suite
vasuballa1.8K vistas
OOW16 - Simplified and Touch-Friendly User Interface in Oracle E-Business Sui... por vasuballa
OOW16 - Simplified and Touch-Friendly User Interface in Oracle E-Business Sui...OOW16 - Simplified and Touch-Friendly User Interface in Oracle E-Business Sui...
OOW16 - Simplified and Touch-Friendly User Interface in Oracle E-Business Sui...
vasuballa434 vistas

Similar a OOW16 - Technical Upgrade Best Practices for Oracle E-Business Suite 12.2 [CON6714]

Ebs upgrade-to-12.2 technical-upgrade_best_practices(aioug-aug2015) por
Ebs upgrade-to-12.2 technical-upgrade_best_practices(aioug-aug2015)Ebs upgrade-to-12.2 technical-upgrade_best_practices(aioug-aug2015)
Ebs upgrade-to-12.2 technical-upgrade_best_practices(aioug-aug2015)pasalapudi123
645 vistas46 diapositivas
Ebs upgrade-to-12.2 technical-upgrade_best_practices por
Ebs upgrade-to-12.2 technical-upgrade_best_practicesEbs upgrade-to-12.2 technical-upgrade_best_practices
Ebs upgrade-to-12.2 technical-upgrade_best_practicesaioughydchapter
2.2K vistas46 diapositivas
11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese... por
11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...
11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...ssuser9dce1e1
7 vistas46 diapositivas
Con7724 ebs technical-upgrade_best_practices_oow14(1) por
Con7724 ebs technical-upgrade_best_practices_oow14(1)Con7724 ebs technical-upgrade_best_practices_oow14(1)
Con7724 ebs technical-upgrade_best_practices_oow14(1)Krishna Garaga
61 vistas76 diapositivas
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT por
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPTCOLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPTPreet Kamal Singh
455 vistas58 diapositivas
GLOC 2014 NEOOUG - R12 Upgrade Downtime Reduction por
GLOC 2014 NEOOUG - R12 Upgrade Downtime ReductionGLOC 2014 NEOOUG - R12 Upgrade Downtime Reduction
GLOC 2014 NEOOUG - R12 Upgrade Downtime ReductionBiju Thomas
1.5K vistas27 diapositivas

Similar a OOW16 - Technical Upgrade Best Practices for Oracle E-Business Suite 12.2 [CON6714](20)

Ebs upgrade-to-12.2 technical-upgrade_best_practices(aioug-aug2015) por pasalapudi123
Ebs upgrade-to-12.2 technical-upgrade_best_practices(aioug-aug2015)Ebs upgrade-to-12.2 technical-upgrade_best_practices(aioug-aug2015)
Ebs upgrade-to-12.2 technical-upgrade_best_practices(aioug-aug2015)
pasalapudi123645 vistas
Ebs upgrade-to-12.2 technical-upgrade_best_practices por aioughydchapter
Ebs upgrade-to-12.2 technical-upgrade_best_practicesEbs upgrade-to-12.2 technical-upgrade_best_practices
Ebs upgrade-to-12.2 technical-upgrade_best_practices
aioughydchapter2.2K vistas
11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese... por ssuser9dce1e1
11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...
11298-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2-Prese...
ssuser9dce1e17 vistas
Con7724 ebs technical-upgrade_best_practices_oow14(1) por Krishna Garaga
Con7724 ebs technical-upgrade_best_practices_oow14(1)Con7724 ebs technical-upgrade_best_practices_oow14(1)
Con7724 ebs technical-upgrade_best_practices_oow14(1)
Krishna Garaga61 vistas
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT por Preet Kamal Singh
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPTCOLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
Preet Kamal Singh455 vistas
GLOC 2014 NEOOUG - R12 Upgrade Downtime Reduction por Biju Thomas
GLOC 2014 NEOOUG - R12 Upgrade Downtime ReductionGLOC 2014 NEOOUG - R12 Upgrade Downtime Reduction
GLOC 2014 NEOOUG - R12 Upgrade Downtime Reduction
Biju Thomas1.5K vistas
OOW16 - Online Patching with Oracle E-Business Suite 12.2 [CON6710] por vasuballa
OOW16 - Online Patching with Oracle E-Business Suite 12.2 [CON6710]OOW16 - Online Patching with Oracle E-Business Suite 12.2 [CON6710]
OOW16 - Online Patching with Oracle E-Business Suite 12.2 [CON6710]
vasuballa1.5K vistas
Collaborate 2014 OAUG - EBS 11i Upgrade to R12 - Compare versions 12.2 vs 12.1 por Biju Thomas
Collaborate 2014 OAUG - EBS 11i Upgrade to R12 - Compare versions 12.2 vs 12.1Collaborate 2014 OAUG - EBS 11i Upgrade to R12 - Compare versions 12.2 vs 12.1
Collaborate 2014 OAUG - EBS 11i Upgrade to R12 - Compare versions 12.2 vs 12.1
Biju Thomas3.9K vistas
12.1.3 Patch Baseline and Strategy por David Kelly
12.1.3 Patch Baseline and Strategy12.1.3 Patch Baseline and Strategy
12.1.3 Patch Baseline and Strategy
David Kelly2.5K vistas
Database Upgrades Automation using Enterprise Manager 12c por Hari Srinivasan
Database Upgrades Automation using Enterprise Manager 12cDatabase Upgrades Automation using Enterprise Manager 12c
Database Upgrades Automation using Enterprise Manager 12c
Hari Srinivasan1.4K vistas
12c r1 upgrade_companion_300 por Sarfraz Khan
12c r1 upgrade_companion_30012c r1 upgrade_companion_300
12c r1 upgrade_companion_300
Sarfraz Khan1.1K vistas
A journey from oracle e por ansalapi
A journey from oracle eA journey from oracle e
A journey from oracle e
ansalapi262 vistas
Oracle E-Business Suite R12.2.5 on Database 12c: Install, Patch and Administer por Andrejs Karpovs
Oracle E-Business Suite R12.2.5 on Database 12c: Install, Patch and AdministerOracle E-Business Suite R12.2.5 on Database 12c: Install, Patch and Administer
Oracle E-Business Suite R12.2.5 on Database 12c: Install, Patch and Administer
Andrejs Karpovs6K vistas
Resume_HasnathFathema_AppsDBA_PSG por Hasnath Fathema
Resume_HasnathFathema_AppsDBA_PSGResume_HasnathFathema_AppsDBA_PSG
Resume_HasnathFathema_AppsDBA_PSG
Hasnath Fathema234 vistas
Pre-Con Ed: Upgrading to CA Service Management por CA Technologies
Pre-Con Ed: Upgrading to CA Service ManagementPre-Con Ed: Upgrading to CA Service Management
Pre-Con Ed: Upgrading to CA Service Management
CA Technologies765 vistas
Staged Patching Approach in Oracle E-Business Suite por vasuballa
Staged Patching Approach in Oracle E-Business SuiteStaged Patching Approach in Oracle E-Business Suite
Staged Patching Approach in Oracle E-Business Suite
vasuballa1.6K vistas

Más de vasuballa

Oracle E-Business Suite on Kubernetes Cluster por
Oracle E-Business Suite on Kubernetes ClusterOracle E-Business Suite on Kubernetes Cluster
Oracle E-Business Suite on Kubernetes Clustervasuballa
2.5K vistas20 diapositivas
Using oracle cloud to speed up e business suite 12.2 upgrade por
Using oracle cloud to speed up e business suite 12.2 upgradeUsing oracle cloud to speed up e business suite 12.2 upgrade
Using oracle cloud to speed up e business suite 12.2 upgradevasuballa
752 vistas25 diapositivas
Securing oracle e-business suite 12.1 and 12.2 technology infrastructure por
Securing oracle e-business suite 12.1 and 12.2 technology infrastructureSecuring oracle e-business suite 12.1 and 12.2 technology infrastructure
Securing oracle e-business suite 12.1 and 12.2 technology infrastructurevasuballa
1.4K vistas23 diapositivas
Oracle EBS database upgrade to 12c por
Oracle EBS database upgrade to 12cOracle EBS database upgrade to 12c
Oracle EBS database upgrade to 12cvasuballa
1.1K vistas17 diapositivas
EBS on Oracle Cloud por
EBS on Oracle CloudEBS on Oracle Cloud
EBS on Oracle Cloudvasuballa
770 vistas21 diapositivas
OOW16 - Faster and Better: Oracle E-Business Suite Desktop Integration Enhanc... por
OOW16 - Faster and Better: Oracle E-Business Suite Desktop Integration Enhanc...OOW16 - Faster and Better: Oracle E-Business Suite Desktop Integration Enhanc...
OOW16 - Faster and Better: Oracle E-Business Suite Desktop Integration Enhanc...vasuballa
491 vistas89 diapositivas

Más de vasuballa(15)

Oracle E-Business Suite on Kubernetes Cluster por vasuballa
Oracle E-Business Suite on Kubernetes ClusterOracle E-Business Suite on Kubernetes Cluster
Oracle E-Business Suite on Kubernetes Cluster
vasuballa2.5K vistas
Using oracle cloud to speed up e business suite 12.2 upgrade por vasuballa
Using oracle cloud to speed up e business suite 12.2 upgradeUsing oracle cloud to speed up e business suite 12.2 upgrade
Using oracle cloud to speed up e business suite 12.2 upgrade
vasuballa752 vistas
Securing oracle e-business suite 12.1 and 12.2 technology infrastructure por vasuballa
Securing oracle e-business suite 12.1 and 12.2 technology infrastructureSecuring oracle e-business suite 12.1 and 12.2 technology infrastructure
Securing oracle e-business suite 12.1 and 12.2 technology infrastructure
vasuballa1.4K vistas
Oracle EBS database upgrade to 12c por vasuballa
Oracle EBS database upgrade to 12cOracle EBS database upgrade to 12c
Oracle EBS database upgrade to 12c
vasuballa1.1K vistas
EBS on Oracle Cloud por vasuballa
EBS on Oracle CloudEBS on Oracle Cloud
EBS on Oracle Cloud
vasuballa770 vistas
OOW16 - Faster and Better: Oracle E-Business Suite Desktop Integration Enhanc... por vasuballa
OOW16 - Faster and Better: Oracle E-Business Suite Desktop Integration Enhanc...OOW16 - Faster and Better: Oracle E-Business Suite Desktop Integration Enhanc...
OOW16 - Faster and Better: Oracle E-Business Suite Desktop Integration Enhanc...
vasuballa491 vistas
OOW16 - Oracle E-Business Suite in Oracle Cloud: Technical Insight [CON6723] por vasuballa
OOW16 - Oracle E-Business Suite in Oracle Cloud: Technical Insight [CON6723]OOW16 - Oracle E-Business Suite in Oracle Cloud: Technical Insight [CON6723]
OOW16 - Oracle E-Business Suite in Oracle Cloud: Technical Insight [CON6723]
vasuballa1K vistas
OOW16 - Leverage Oracle Integration Cloud Service for Oracle E-Business Suite... por vasuballa
OOW16 - Leverage Oracle Integration Cloud Service for Oracle E-Business Suite...OOW16 - Leverage Oracle Integration Cloud Service for Oracle E-Business Suite...
OOW16 - Leverage Oracle Integration Cloud Service for Oracle E-Business Suite...
vasuballa961 vistas
OOW16 - Oracle E-Business Suite: Technology Certification Primer and Roadmap ... por vasuballa
OOW16 - Oracle E-Business Suite: Technology Certification Primer and Roadmap ...OOW16 - Oracle E-Business Suite: Technology Certification Primer and Roadmap ...
OOW16 - Oracle E-Business Suite: Technology Certification Primer and Roadmap ...
vasuballa820 vistas
OOW16 - Deploying Oracle E-Business Suite for On-Premises Cloud and Oracle Cl... por vasuballa
OOW16 - Deploying Oracle E-Business Suite for On-Premises Cloud and Oracle Cl...OOW16 - Deploying Oracle E-Business Suite for On-Premises Cloud and Oracle Cl...
OOW16 - Deploying Oracle E-Business Suite for On-Premises Cloud and Oracle Cl...
vasuballa1.2K vistas
OOW16 - Oracle Enterprise Manager 13c Cloud Control for Managing Oracle E-Bus... por vasuballa
OOW16 - Oracle Enterprise Manager 13c Cloud Control for Managing Oracle E-Bus...OOW16 - Oracle Enterprise Manager 13c Cloud Control for Managing Oracle E-Bus...
OOW16 - Oracle Enterprise Manager 13c Cloud Control for Managing Oracle E-Bus...
vasuballa2.1K vistas
OOW16 - Migrating and Managing Customizations for Oracle E-Business Suite 12.... por vasuballa
OOW16 - Migrating and Managing Customizations for Oracle E-Business Suite 12....OOW16 - Migrating and Managing Customizations for Oracle E-Business Suite 12....
OOW16 - Migrating and Managing Customizations for Oracle E-Business Suite 12....
vasuballa314 vistas
OOW16 - Ready or Not: Applying Secure Configuration to Oracle E-Business Suit... por vasuballa
OOW16 - Ready or Not: Applying Secure Configuration to Oracle E-Business Suit...OOW16 - Ready or Not: Applying Secure Configuration to Oracle E-Business Suit...
OOW16 - Ready or Not: Applying Secure Configuration to Oracle E-Business Suit...
vasuballa955 vistas
OOW16 - Getting Optimal Performance from Oracle E-Business Suite [CON6711] por vasuballa
OOW16 - Getting Optimal Performance from Oracle E-Business Suite [CON6711]OOW16 - Getting Optimal Performance from Oracle E-Business Suite [CON6711]
OOW16 - Getting Optimal Performance from Oracle E-Business Suite [CON6711]
vasuballa647 vistas
My Oracle Support por vasuballa
My Oracle SupportMy Oracle Support
My Oracle Support
vasuballa973 vistas

Último

"AI Startup Growth from Idea to 1M ARR", Oleksandr Uspenskyi por
"AI Startup Growth from Idea to 1M ARR", Oleksandr Uspenskyi"AI Startup Growth from Idea to 1M ARR", Oleksandr Uspenskyi
"AI Startup Growth from Idea to 1M ARR", Oleksandr UspenskyiFwdays
26 vistas9 diapositivas
"Fast Start to Building on AWS", Igor Ivaniuk por
"Fast Start to Building on AWS", Igor Ivaniuk"Fast Start to Building on AWS", Igor Ivaniuk
"Fast Start to Building on AWS", Igor IvaniukFwdays
36 vistas76 diapositivas
Micron CXL product and architecture update por
Micron CXL product and architecture updateMicron CXL product and architecture update
Micron CXL product and architecture updateCXL Forum
27 vistas7 diapositivas
Astera Labs: Intelligent Connectivity for Cloud and AI Infrastructure por
Astera Labs:  Intelligent Connectivity for Cloud and AI InfrastructureAstera Labs:  Intelligent Connectivity for Cloud and AI Infrastructure
Astera Labs: Intelligent Connectivity for Cloud and AI InfrastructureCXL Forum
125 vistas16 diapositivas
Web Dev - 1 PPT.pdf por
Web Dev - 1 PPT.pdfWeb Dev - 1 PPT.pdf
Web Dev - 1 PPT.pdfgdsczhcet
52 vistas45 diapositivas
MemVerge: Memory Viewer Software por
MemVerge: Memory Viewer SoftwareMemVerge: Memory Viewer Software
MemVerge: Memory Viewer SoftwareCXL Forum
118 vistas10 diapositivas

Último(20)

"AI Startup Growth from Idea to 1M ARR", Oleksandr Uspenskyi por Fwdays
"AI Startup Growth from Idea to 1M ARR", Oleksandr Uspenskyi"AI Startup Growth from Idea to 1M ARR", Oleksandr Uspenskyi
"AI Startup Growth from Idea to 1M ARR", Oleksandr Uspenskyi
Fwdays26 vistas
"Fast Start to Building on AWS", Igor Ivaniuk por Fwdays
"Fast Start to Building on AWS", Igor Ivaniuk"Fast Start to Building on AWS", Igor Ivaniuk
"Fast Start to Building on AWS", Igor Ivaniuk
Fwdays36 vistas
Micron CXL product and architecture update por CXL Forum
Micron CXL product and architecture updateMicron CXL product and architecture update
Micron CXL product and architecture update
CXL Forum27 vistas
Astera Labs: Intelligent Connectivity for Cloud and AI Infrastructure por CXL Forum
Astera Labs:  Intelligent Connectivity for Cloud and AI InfrastructureAstera Labs:  Intelligent Connectivity for Cloud and AI Infrastructure
Astera Labs: Intelligent Connectivity for Cloud and AI Infrastructure
CXL Forum125 vistas
Web Dev - 1 PPT.pdf por gdsczhcet
Web Dev - 1 PPT.pdfWeb Dev - 1 PPT.pdf
Web Dev - 1 PPT.pdf
gdsczhcet52 vistas
MemVerge: Memory Viewer Software por CXL Forum
MemVerge: Memory Viewer SoftwareMemVerge: Memory Viewer Software
MemVerge: Memory Viewer Software
CXL Forum118 vistas
The Importance of Cybersecurity for Digital Transformation por NUS-ISS
The Importance of Cybersecurity for Digital TransformationThe Importance of Cybersecurity for Digital Transformation
The Importance of Cybersecurity for Digital Transformation
NUS-ISS25 vistas
[2023] Putting the R! in R&D.pdf por Eleanor McHugh
[2023] Putting the R! in R&D.pdf[2023] Putting the R! in R&D.pdf
[2023] Putting the R! in R&D.pdf
Eleanor McHugh38 vistas
CXL at OCP por CXL Forum
CXL at OCPCXL at OCP
CXL at OCP
CXL Forum208 vistas
"How we switched to Kanban and how it integrates with product planning", Vady... por Fwdays
"How we switched to Kanban and how it integrates with product planning", Vady..."How we switched to Kanban and how it integrates with product planning", Vady...
"How we switched to Kanban and how it integrates with product planning", Vady...
Fwdays61 vistas
Future of Learning - Yap Aye Wee.pdf por NUS-ISS
Future of Learning - Yap Aye Wee.pdfFuture of Learning - Yap Aye Wee.pdf
Future of Learning - Yap Aye Wee.pdf
NUS-ISS38 vistas
Combining Orchestration and Choreography for a Clean Architecture por ThomasHeinrichs1
Combining Orchestration and Choreography for a Clean ArchitectureCombining Orchestration and Choreography for a Clean Architecture
Combining Orchestration and Choreography for a Clean Architecture
ThomasHeinrichs168 vistas
How to reduce cold starts for Java Serverless applications in AWS at JCON Wor... por Vadym Kazulkin
How to reduce cold starts for Java Serverless applications in AWS at JCON Wor...How to reduce cold starts for Java Serverless applications in AWS at JCON Wor...
How to reduce cold starts for Java Serverless applications in AWS at JCON Wor...
Vadym Kazulkin70 vistas
Microchip: CXL Use Cases and Enabling Ecosystem por CXL Forum
Microchip: CXL Use Cases and Enabling EcosystemMicrochip: CXL Use Cases and Enabling Ecosystem
Microchip: CXL Use Cases and Enabling Ecosystem
CXL Forum129 vistas
Understanding GenAI/LLM and What is Google Offering - Felix Goh por NUS-ISS
Understanding GenAI/LLM and What is Google Offering - Felix GohUnderstanding GenAI/LLM and What is Google Offering - Felix Goh
Understanding GenAI/LLM and What is Google Offering - Felix Goh
NUS-ISS39 vistas
Transcript: The Details of Description Techniques tips and tangents on altern... por BookNet Canada
Transcript: The Details of Description Techniques tips and tangents on altern...Transcript: The Details of Description Techniques tips and tangents on altern...
Transcript: The Details of Description Techniques tips and tangents on altern...
BookNet Canada119 vistas
.conf Go 2023 - How KPN drives Customer Satisfaction on IPTV por Splunk
.conf Go 2023 - How KPN drives Customer Satisfaction on IPTV.conf Go 2023 - How KPN drives Customer Satisfaction on IPTV
.conf Go 2023 - How KPN drives Customer Satisfaction on IPTV
Splunk86 vistas
GigaIO: The March of Composability Onward to Memory with CXL por CXL Forum
GigaIO: The March of Composability Onward to Memory with CXLGigaIO: The March of Composability Onward to Memory with CXL
GigaIO: The March of Composability Onward to Memory with CXL
CXL Forum126 vistas

OOW16 - Technical Upgrade Best Practices for Oracle E-Business Suite 12.2 [CON6714]

  • 2. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Technical Upgrade Best Practices Oracle E-Business Suite R12.2 Udayan Parvate Senior Director, EBS Release Engineering Samer Barakat Senior Director, Applications Performance Oracle E-Business Suite Development September 22, 2016 Confidential – Oracle Internal/Restricted/Highly Restricted
  • 3. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Safe Harbor Statement The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle. 3
  • 4. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Program Agenda 12.2 Upgrade Overview 12.2 Upgrade Process Flow 12.2 Upgrade Best Practices to Minimize Downtime 1 2 3 4
  • 5. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Program Agenda 12.2 Upgrade Overview 12.2 Upgrade Process Flow 12.2 Upgrade Best Practices to Minimize Downtime 1 2 3 5
  • 6. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | R12.2 Rapid Install (RI) •12.2 RI is the packaged media for EBS on Oracle Software Delivery Cloud (OSDC) •RI contains applications code, required core technology components, and VISION /FRESH databases – Direct upgrade Supported from 11i MBL (Doc 883202.1) or above, 12.0.4 or above , 12.1.1 or above – For a high level flow chart per upgrade path + a checklist to assess readiness, “Technical Planning, Getting Started, and Go-Live Checklist” (Doc ID 1585857.1) R12.2 is NOT available on MOS as a Maintenance Pack New dual file system replaces current EBS file system Enable EBR step (13543062:R12.AD.C ) at the end of the upgrade The EBS upgrade to R12.2 itself is NOT an Online Patch 6
  • 7. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | EBS R12.2 Release Updates Since GA • EBS R12.2.6 RUP (most recent) – EBS R12.2.6 (21900901) RUP was released in Sept 2016 (Doc 2114016.1) – Available at suite wide and family level granularity – EBS 12.2.3 is the minimum baseline for consuming Family equivalent of 12.2.6 – Apply R12.2.6 RUP in “downtime” mode (against the RUN edition) when upgrading from prior releases such as 11i, R12.0 or R12.1 – adop phase=apply apply_mode=downtime • R12.2 Applications DBA (AD) / Technology Stack (TXK) RUPs (delta.8) – AD/TXK products deliver patching infrastructure code to support online patching – AD/TXK delta.8 is a pre-requisite for upgrading to 12.2.6 – It is strongly recommended to move up to the latest AD/TXK RUP, currently delta.8 (Doc 1617461.1).
  • 8. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | EBS CUP and Upgrade Fixes Report • What is an upgrade fix ? – A patch released after 12.2 GA to address an issue in the upgrade itself, generally for issues with upgrade failures, upgrade performance, data integrity – Apply using “adpatch preinstall=y” option to the RI “Run” file system – Merge the upgrade fix patch db driver with the main upgrade driver •Consolidated upgrade patch (CUP ) – Aggregation of 12.2 upgrade fixes at periodic intervals, generally aligned with each new EBS RUP –For R12.2, 22742071:12.2.0 ( CUP7) is the latest CUP •EBS level Report DOC ID 1448102.1(revised bi-monthly) – List of upgrade fixes released beyond latest CUP for that release – Merge the patches and the drivers with the latest CUP and apply merged driver 8
  • 9. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Program Agenda 12.2 Upgrade Overview 12.2 Upgrade Process Flow 12.2 Upgrade Best Practices to Minimize Downtime 1 2 3 Oracle Confidential – Internal/Restricted/Highly Restricted 9
  • 10. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | • Use Rapid Install (RI) for target platform to lay down 12.2.0 code and tech stack and create the Dual File System • Use latest StartCD (currently StartCD 51) • Check for missing application tier technology patches using ETCC • No downtime required • RI (startcd 51) now supports 12.1.0.2 DB OH and FMW 11.1.9 10 2. Lay Down File System • Upgrade database to the minimum version (11.2.0.4) OR latest certified version (12.1.0.2). Migrate db platform if desired. • Database Prep guide for Release 12.2 (Doc 1349240.1) • Apply latest database patches. Refer to “Consolidated list of Technology patches” (Doc 1594274.1) • Check for missing database patches, Use EBS Technology Codelevel Checker (ETCC patch 17537119) • Requires downtime 1. Prepare Database 12.2 Technical Upgrade Process Required Pre-upgrade Steps (prior to main EBS upgrade downtime)
  • 11. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | • Apply latest EBS RUP patches • Latest AD & TXK RUP in “hot_patch” ( i.e. against RUN edition) • Adsplice custom/offcycle products • Latest EBS 12.2.x RUP in ”downtime “ mode • Complete post-upgrade steps (post-12.2.0 steps followed by post-12.2.X steps) • Patch Wizard Recommended Patches (Doc 1267768.1) 11 5. Upgrade to 12.2.X • Apply updates to custom DB code & schema based on Readiness Reports ( Doc 1531121.1 ) • Run Enablement process 13543062:R12.AD.C : • Fixes many coding standards violations • Enables editioning for EBS and registered custom schemas • Generates editioning views for EBS and custom tables 4. Enable Online Patching 12.2 Technical Upgrade Process Continued.. Required Downtime Steps (main EBS upgrade) 3. Upgrade to 12.2.0 • Apply AD/upgrade fixes • AD.C+ AD CUP (22742061) • Latest EBS-wide CUP + one- offs in –preinstall mode • Synchup/Apply 12.2 master driver • Merge “pre-install” drivers with the master driver and apply using autopatch • Run RI in “Configure” mode • Do NOT bring up the system OR perform post-12.2.0 upgrade steps
  • 12. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | 12 12.2 Technical Upgrade Process Continued.. Conditional Uptime Steps • Deploy Apps tier custom code against RUN edition • See Developing and Deploying Customizations in EBS R12.2 (Doc 1577661.1) • Custom and Third-Party Products integration guidance (Doc 1916149.1) • Deploy external integrations per integration-specific docs 7. Deploy Custom Code & External Integrations • Per sizing analysis, add nodes (horizontal scale-up) • 12.2 Cloning (Doc 1383621.1) • Adding node in a Shared applications file system (Doc 1375769.1) • Add managed servers (vertical scale-up) • Configure HTTP Server and Oacore, Oafm, Forms and Forms-c4ws ( Doc 1905593.1) • Load-Balancing for 12.2 (Doc 1375686.1) 8. Configure System to Production Capacity 6. Apply Translations • Release environment for testing (optional) • Apply ( 12.2 + 12.2.X NLS patch ) merged either as online patch OR hot_patch OR • Use TSP (Trans Synch Patch) in “hot_patch” mode • Release environment for testing (required) R12.2 NLS Release Notes (Doc 1314621.1)
  • 13. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Program Agenda 12.2 Upgrade Overview 12.2 Upgrade Process Flow 12.2 Upgrade Best Practices to Minimize Downtime 1 Oracle Confidential – Internal/Restricted/Highly Restricted 13 3 2
  • 14. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | • As with most planned production maintenance activities, a successful upgrade is highly dependent on how well-defined the upgrade plan is. • Pre-production testing and validation on an comparable system prior to the actual upgrade is key to minimizing unforeseen contingencies. • Optimizing the upgrade process is all about making the right choices at the planning stage and verifying these choices with a test environment before production. Planning Your Oracle E-Business Suite (EBS) Upgrade from Release 11i to Release 12 (MOS ID 1406960.1) Best Practices for Minimizing Oracle E-Business Suite Release 12 Upgrade Downtime (MOS ID 1581549.1) 14 Plan, Prepare, Test and Upgrade
  • 15. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Plan for Platform Migration as a Separate Down Time • Performing a Database migration to a new platform first, if being considered as part of an EBS upgrade, is recommended as customers would typically be able to perform this in a separate earlier downtime • Regardless of whether this migration is done in a separate earlier downtime or as part of a single downtime, performance gains would be expected due to the fact that the upgrade of the Applications to R12 will run on newer and faster hardware Oracle E-Business Suite Upgrades and Platform Migration (MOS ID 1377213.1) 15 Plan: Prepare Platform
  • 16. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Plan for Database Upgrade as a Separate Down time • Upgrade RDBMS version to latest certified for the current APPS level. • The latest database certified is 12.1.0.2 (11.2.0.4 is the latest for 11gR2) https://blogs.oracle.com/stevenChan/entry/database_12_1_0_2 • Tune Init.ora Parameters: – Ensure mandatory init.ora parameters are set correctly. – MOS ID 396009.1 & 216205.1 (R12 & 11i respectively) • Apply Required Patches & Fixes/Workarounds for Known Issues – Recommended Performance Patches - MOS ID 244040.1 16 Plan: Prepare Database
  • 17. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Purge Old and/or Transient Data • Purge Portal – Purge Portal introduced in 11i10 – Single purge/archive management console – Purge programs can be configured, initiated and monitored – Set the execution frequency as well view history of purge programs. • Accessing the Purge Portal – System Administrator > Oracle Applications Manager >Purging/Critical Activities 17 Plan: Manage Data Volumes
  • 18. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Plan: Manage Data Volumes Purge Old and/or Transient Data • Use OAM to configure, initiate and monitor purge programs – Set the execution frequency and view program history – Programs tagged with the “Purge” program type System Administrator >Oracle Applications Manager >Purging/Critical Activities 18
  • 19. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Plan: Manage Data Volumes Purge Old and/or Transient Data • Archive/Purge Product Information – Product User guides – GL/AP/AR/FA/OM – Support Notes: • (MOS ID 138264.1) – General Ledger Archive/Purge FAQ • (MOD ID 144431.1) – Fixed Assets Archive/Purge FAQ • (MOS ID 136919.1) – General Ledger Archive/Purge Setup and Usage • (MOS ID 752322.1) : Reducing Oracle E-Business Suite Data Footprint 19
  • 20. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Identify Patches/Tasks Identify Required Patches/Tasks • Prepare a complete list of pre and post patches and recommended code levels – Keep the system current on AD/ATG/OAM code e.g. latest AD/ATG RUPs on 11i/R12.0 and once on R12.2 – For 12.2, review Oracle E-Business Suite Release 12.2: Consolidated List of Patches and Technology Bug Fixes (1594274.1) – High priority patches from MOS. – Consolidated Upgrade Patches (CUP) • Latest EBS CUP for your target release – R12.2 Release notes MOS ID 1320300.1 • Latest pre-install patches MOS ID 1448102.1 – Review “Known-issues” sections from key “living” documents such as Release notes, MP Install Instructions • Use TUMS (“The Upgrade Manual Script”) To avoid running tasks not relevant to your system 20
  • 21. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Identify Patches/Tasks Identify Required Patches/Tasks • Identify and execute tasks that could be completed in a separate downtime period, prior to the production upgrade – Use applicable steps mentioned in the "Downtime reduction" and “Upgrade By Request” appendices E and G of the R12.1 upgrade guide • Minimize historical data to be upgraded as per business requirements “Upgrade By Request” – Post-upgrade “hot-patch” of additional historical data outlined in MOS ID 604893.1 – Assign post upgrade jobs to specialized CM queue (by request_type) MOS ID 399362.1 21
  • 22. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Identify Patches/Tasks Upgrade By Request (MOS ID 604893.1) • Use this option to defer the upgrade of historical data from the initial upgrade process (critical downtime window), to post upgrade • Historical data can be upgraded anytime when system is up • Implementation is a two step process: – Set range of historical data to be upgraded before R12.1/R12.2 upgrade and run the pre- upgrade concurrent program – Run the post-upgrade concurrent program (as needed for additional historical data) • Utilize Parallel Concurrent Processing (PCP) for post-upgrade concurrent jobs to leverage the Cluster (RAC). – For RAC and PCP refer to (MOS ID1359612.1) – Starting from 12.1, you can define node affinity at the program level 22
  • 23. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Manage Customizations Check Custom Code For the duration of the upgrade, consider… • Check and review customizations that business might not be using. • Review new Product Features or New Technology to Migrate to. • Review and disable custom triggers and business events. • Review and disable custom VPD policies as needed. • Review and eliminate redundant custom indexes. Upgrading your Customizations to Oracle E-Business Suite Release 12.1 (MOS ID: 1435894.1) Developing and deploying Customizations in Oracle E-Business Suite Release 12.2 (MOS ID: 157766.1) 23
  • 24. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Manage Customizations Identify and fix custom code to comply to online patching standards. • Use “Online Patching readiness Reports” to identify issues in custom data base objects that will be fixed automatically Vs needing manual intervention. • Use Global Standards compliance checker script to scan your file system custom code and fix reported issues. • Detailed instructions: “EBS Technical Planning Guide” and MOS ID 1531121.1 • Download Patch 22200487:R12.AD.X (11i, 12.0, 12.1 or 12.2), use the scripts and generate the reports. 24
  • 25. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Pre-Upgrade Tasks Remove Unnecessary Workloads / Overheads • Remove TDE (Transparent Data Encryption) from high volume tables (for the duration of the upgrade) • Review and disable all debug or logging; do this at all levels (site, responsibility, user level etc.) • Purge all old data that is no longer needed prior to the upgrade. MOS ID 752322. • Flush all the interfaces, such as Auto Invoice, Journal Entry Import, Order Import etc. 25
  • 26. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Pre-Upgrade Tasks Remove Unnecessary Workloads / Overheads • Drop MRC Schema if it still exists. • Convert to OATM (Oracle Applications Tablespace Model). MOS ID 248857.1 • Convert to the new Multiple Organizations (Multi-Org) architecture MOS ID 210193.1 • If possible run in noarchivelog mode • Disable flashback DB (for the duration of the upgrade). • Disable auditing if enabled (for the duration of the upgrade) 26
  • 27. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Database Tier Gather Schema Statistics • Gather CBO statistics for all Oracle E-Business Suite schemas with GATHER_AUTO option using FND_STATS (or gather statistics concurrent program) • If the adsstats.sql job is taking a long time during the upgrade check the following: – Check that parallel execution is being used effectively (with parallel_max_servers set to a suitable value, such as 2 x number of cores). – Sample specific long running tables at a lower percentage • If the adsstats.sql script is still taking a significant amount of time, reduce the upgrade time by: – Exporting schema statistics gathered during test runs (by adsstats.sql ) – Importing these statistics instead of running adsstats.sql. – When importing statistics from test runs make sure data volumes are similar 27
  • 28. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Database Tier Gather Dictionary and Fixed Stats • Gather dictionary object statistics when there is a significant change in dictionary, for example, lot of new objects created. exec dbms_stats.gather_dictionary_stats; • Gather fixed object statistics with reasonable load on the system exec dbms_stats.gather_fixed_objects_stats • Dictionary and Fixed stats should be gather manually as they are not gathered automatically in the Release 12 upgrade by adstats.sql or any other method. 28
  • 29. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Database Tier Gather Dictionary and Fixed Stats • Fixed Object Statistics should be gathered: – After any associated platform or database upgrade that is part of the overall Oracle E-Business Suite upgrade. – After any SGA/PGA parameters have changed. – After Release 12 upgrade, when there is representative activity on the system. • Dictionary Statistics should be gathered: – After any associated platform or DB upgrade that is part of the overall Oracle E- Business Suite upgrade. – After the Release 12 upgrade. – After move to OATM 29
  • 30. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Database Tier Properly Size SGA/PGA Memory • Maximize SGA and PGA sizing: – Review the Advisory sections in AWR (from test runs) to fine tune SGA & PGA. – Some starting rules of thumb are: • log buffer = 30 to 100 Mb • shared pool = 1 to 4 GB • pga target = 3 to 20 GB • SGA/buffer cache = multi GB •be generous without causing excessive paging. • Use Large/Huge pages. For example on Linux HugePages – See MOS ID 744769.1 – MOS ID 361468.1, “HugePages on Oracle Linux 64-bit” describes how to configure hugepages. When running the recommended script provided with Note 401749.1, make sure that all database instances are started. – Only SGA allocation benefits from large/huge pages, PGA allocation does not. 30
  • 31. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Database Tier Upgrade and Initialization Parameters • For 32 cores or fewer initially set: – parallel_max_servers = 2 x number of CPU cores. – AD Parallel workers – start with 1 x number of CPU cores. Possibly increase to 1.5 x number of CPU cores. – job_queue_processes = number of CPU cores • For more than 32 cores, start with: – parallel_max_servers = 1 x number of CPU cores. – AD Parallel workers = between 0.5 and 1.0 x number of CPU cores. • Based on the performance diagnostics, these values can be changed based on the level of contention and resource (CPU/IO) usage (in AWR). • Shutdown other RAC instances 31
  • 32. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Database Tier Upgrade and Initialization Parameters • If specified, remove db_file_multiblock_read_count. This is the recommended value for normal operation of Oracle E-Business Suite. • Set optimizer_dynamic_sampling level to the value of 4 during the Release 12 Upgrade, revert to the default value of 2 (or remove) after the upgrade. • The values of the initialization parameters above (except db_file_multiblock_read_count) may be different from the values used for normal operation. So be sure to revert after the Release 12 upgrade has completed. • If DB is 12c, Turn off the adaptive feature (Set optimizer_adaptive_features=false) before the EBS upgrade (before applying R12.AD.C) • For other initialization parameters, refer to MOS ID 396009.1, “Database Initialization Parameters for Oracle E-Business Suite Release 12”. 32
  • 33. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Prepare: Application Tier 12.2 Middle Tier Sizing Guidelines • Managed instances JVM sizing should consider both memory and CPU domains. • On 64bit environment, we do not recommend allocating huge heap sizes, but rather have more managed instances in the cluster to scale up to the target concurrency levels. • For Admin Server sizing, the default size of 512M is not enough for most installations, we recommend setting the XMS to at least 1 GB and the XMX to 2GB • An initial guidance on sizing can be found in the “Oracle E-Business Suite Installation Guide: Using Rapid Install” http://docs.oracle.com/cd/E26401_01/doc.122/e22950/T422699i4773.htm#T610671 Managing Configuration of Oracle HTTP Server and Oacore, Oafm, Forms and Forms-c4ws Applications in Oracle E-Business Suite Release 12.2 (Doc ID 1905593.1) 33
  • 34. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Test: Pre-Production Testing Testing and Final Run Planning • Testing should be done on a comparable system that has the same CPU, IO and memory capacity as the target production system • It is critical to do multiple rounds of testing with different settings to maximize server utilization, while considering the following – Memory utilization (no swapping/ excessive paging) – CPU utilization (scale down if at 100%) – I/O response times (scale down if averages > 20 ms) • When analyzing Release 12 Upgrade performance issues, the goal is prevent wasted test iterations by maximizing the number of performance issues resolved. • Testing timings along with system resource utilization should be used to plan the final upgrade with a 20% contingency factor. 34
  • 35. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Test: Pre-Production Testing Get the Timings • AD Job Timing Reports: The job timing report (adtimrpt.sql) reports the top 100 time consuming jobs. • AD Utility and Worker Logs: The AD utility and worker logs can also be useful for diagnostics, giving you more detail about what happened and when. The AD workers logs (adworknnn.log) will give you the activities carried out by each worker and the timings. • AD Parallel tables: The AD_PARALLEL_UPDATES, AD_PARALLEL_UPDATE_UNITS tables can give information on the actual rows processed, the number of batches, progress over time, and long running batches (that might indicate locks/sleeps or data distribution issues). • AD_TASK_TIMING: gives start and end times of jobs and workers, which can help identify all long running jobs, and match long running SQL and performance issues (on AWR) with specific jobs. 35
  • 36. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Test: Pre-Production Testing Get the Diagnostic Data • Start with Express Diagnosis of Oracle E-Business Suite Release 12 Upgrade Performance Issues (MOS ID 1583752.1) • Correlate AWR, system vitals and expensive SQLs. Start with the top events and top SQLs sections in the AWR reports. • Use the advisory sections to size SGA, and PGA Properly 36 • SQL Tuning • Trace files • SQLT output (MOS ID: 215187.1) • Trace Analyzer (MOS ID: 224270.1) • AWR Report (MOS ID: 748642.1) • 11g SQL Monitor Report • AWR SQL Report (awrsqrpt.sql) • Database Tuning • AWR Report (MOS ID: 748642.1) • ADDM report (MOS ID: 250655.1) • Active Session History (ASH) • OS - OSWatcher (MOS ID: 301137.1) Q
  • 37. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Test: Pre-Production Testing Common Optimizations • Use statistics_level=ALL during the testing/diagnosis phase. Make sure to reset to TYPICAL afterwards. This will help capture runtime Execution plans with row counts & row source stats. • For long running SQLs - Display cursor report (with ALL +ALLSTATS ) can be used to while SQL/job is running which massively speeds up the identification of sub- optimal execution plans and their solution. • The other alternative is SQL Trace - for which the trace can be enabled on the Job or that particular SQL level. 37
  • 38. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Test: Pre-Production Testing Common Optimizations • For long running jobs or SQLs, it is best to start by investigating if good execution plans are being used. A poor execution plan (or even just one that is moderately sub- optimal) can be the root cause of contention, especially if that contention only occurs during a particular job. • Create custom indexes for long running jobs where a new index could significantly improve the execution plan and performance • For long running jobs with high level of contention on particular index segments , consider dropping the index before the job and recreating afterwards. Ensure that indexes are recreated in parallel and with exactly the same definition. And remember to ALTER INDEX to revert the degree of parallel (NOPARALLEL). 38
  • 39. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Test: Pre-Production Testing Common Optimizations • For long-running xdf or odf jobs creating materialized views (MV), consider cleaning up or truncating of any large MV logs (this requires MV complete refresh) • For high level of waits associated with redo log, especially “log buffer space” and “log file sync”, consider: – Change the configuration of redo logs – Move to faster filer – Increase redo log file sizes, increase the number of files or increase the log parallelism (hidden parameter _log_parallelism_max). 39
  • 40. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Test: Pre-Production Testing Common Optimizations • Once you have identified the long running jobs and SQL, you can check My Oracle Support for known issues and potential solutions or workarounds. • However, bear in mind that the fix or workaround may not necessarily fix your particular problem. • If you cannot confirm that you have exactly the same issue (from the diagnostics) you may still apply the fix, but should continue to gather diagnostics and search for a solution until the issue is fully resolved. • If you have identified that a long running job has an inefficient execution plan, you could use an SQL Profile to apply hints that will help the CBO choose a better execution plan. You will need SQL tuning expertise to do this. 40
  • 41. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | References 41
  • 42. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | References • Oracle E-Business Suite Release 12.2 Info center (1581299.1) • Oracle E-Business Suite Release Notes, Release 12.2 (1320300.1) • DB Preparation Guidelines for an E-Business Suite Release 12.2 Upgrade (1349240.1) • Using the Online Patching Readiness Report in Oracle E-Business Suite Release 12.2 (1531121.1) • Oracle E-Business Suite Release 12.2: Upgrade Sizing and Best Practices (1597531.1) • Oracle E-Business Suite Release 12.2: Consolidated List of Patches and Technology Bug Fixes (1594274.1) 42
  • 43. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Additional Resources 43
  • 44. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Additional Resources • EBS Upgrade related Reports – EBS Data Model Comparison Report (1290886.1) – EBS ATG Seed Data Comparison Report (1327399.1) – EBS File Comparison Report (1446430.1) • White paper – Planning Your Oracle E-Business Suite Upgrade from Release 11i to Release 12 (1406960.1) – Oracle E-Business Suite Upgrades and Platform Migration (1377213.1) • Have Upgrade questions ? Please post on OTN R12 upgrade forum http://forums.oracle.com/forums/forum.jspa?forumID=395&start=0 44
  • 45. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Oracle E-Business Suite Technology Blog • Direct from EBS Development • Latest news • Certification announcements • Primers, FAQs, tips • Desupport reminders • Latest upgrade recommendations • Statements of Direction • Subscribe via email or RSS blogs.oracle.com/stevenchan 45
  • 46. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Oracle E-Business Suite: Applications Technology Join us on Facebook facebook.com/groups/EBS.SysAdmin 46
  • 47. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Oracle E-Business Suite on Oracle Cloud Blog 47 blogs.oracle.com/EBSandOracleCloud • Direct from EBS Strategy & Development • Latest news for EBS on Oracle Cloud (IaaS & PaaS)  Provisioning  Lift and Shift  Integrations  New enhancements and certifications • Statements of Direction • Subscribe via email or RSS New
  • 48. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Oracle E-Business Suite Applications Technology Sessions by Date, Time Oracle OpenWorld 2016 Confidential – Oracle Internal/Restricted/Highly Restricted 48
  • 49. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Related Sessions Thursday, September 22, 2016 9:30 AM CON6725-Maintenance Strategies for Oracle E-Business Suite Elke Phelps, Sr. Principal Product Manager, Applications Technology, Oracle E-Business Suite Moscone West 2004 10:45 AM CON6710-Online Patching with Oracle E-Business Suite 12.2 Kevin Hudson, Senior Director, Applications Technology, Oracle E-Business Suite Moscone West 2004 10:45 AM CON6712-Ready or Not: Applying Secure Configuration to Oracle E-Business Suite Eric Bing, Senior Director, Security, Oracle Applications Unlimited Elke Phelps, Sr. Principal Product Manager, Applications Technology, Oracle E-Business Suite Moscone West 2006 12:00 PM CON6714-Technical Upgrade Best Practices for Oracle E-Business Suite 12.2 Udayan Parvate, Senior Director, Release Engineering, Quality and Release Management, Oracle E-Business Suite Samer Barakat, Senior Director, Applications Performance, Oracle E-Business Suite Moscone West 2004 12:00 PM CON6721-Faster and Better: Oracle E-Business Suite Desktop Integration Enhancements Senthilkumar Ramalingam, Group Manager, Applications Technology, Oracle E-Business Suite Moscone West 2004 49
  • 50. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | Related Sessions Thursday, September 22, 2016 1:15 PM CON6708-Migrating and Managing Customizations for Oracle E-Business Suite 12.2 Santiago Bastidas, Sr. Principal Product Manager, Applications Technology, Oracle E-Business Suite Moscone West 2004 2:30 PM CON6742-Oracle E-Business Suite Technology Certification Primer and Roadmap Steven Chan, Senior Director, Applications Technology, Oracle E-Business Suite Moscone West 2004 2:30 PM CON6718-Build, Deploy and Manage Smartphone Applications for Oracle E-Business Suite Vijay Shanmugam, Director, Applications Technology, Oracle E-Business Suite Moscone West 2006 50
  • 51. Copyright © 2016, Oracle and/or its affiliates. All rights reserved. | 51