SlideShare a Scribd company logo
1 of 38
Beni Asllani University of Tennessee at Chattanooga Inventory Management Operations Management - 5 th  Edition Chapter 12 Roberta Russell & Bernard W. Taylor, III
Lecture Outline ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
What Is Inventory? ,[object Object],[object Object],[object Object],[object Object]
Types of Inventory ,[object Object],[object Object],[object Object],[object Object],[object Object]
Inventory and Supply Chain Management ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Two Forms of Demand ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Inventory and Quality Management ,[object Object],[object Object]
Inventory Costs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Inventory Control Systems ,[object Object],[object Object],[object Object],[object Object]
ABC Classification ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
ABC Classification: Example 1 $ 60 90 2 350 40 3 30 130 4 80 60 5 30 100 6 20 180 7 10 170 8 320 50 9 510 60 10 20 120 PART UNIT COST ANNUAL USAGE
ABC Classification: Example (cont.) Example 10.1 1 $ 60 90 2 350 40 3 30 130 4 80 60 5 30 100 6 20 180 7 10 170 8 320 50 9 510 60 10 20 120 PART UNIT COST ANNUAL USAGE TOTAL % OF TOTAL % OF TOTAL PART VALUE VALUE QUANTITY % CUMMULATIVE 9 $30,600 35.9 6.0 6.0 8 16,000 18.7 5.0 11.0 2 14,000 16.4 4.0 15.0 1 5,400 6.3 9.0 24.0 4 4,800 5.6 6.0 30.0 3 3,900 4.6 10.0 40.0 6 3,600 4.2 18.0 58.0 5 3,000 3.5 13.0 71.0 10 2,400 2.8 12.0 83.0 7 1,700 2.0 17.0 100.0 $85,400 A B C % OF TOTAL % OF TOTAL CLASS ITEMS VALUE QUANTITY A 9, 8, 2 71.0 15.0 B 1, 4, 3 16.5 25.0 C 6, 5, 10, 7 12.5 60.0
Economic Order Quantity (EOQ) Models ,[object Object],[object Object],[object Object],[object Object]
Assumptions of Basic EOQ Model ,[object Object],[object Object],[object Object],[object Object]
Inventory Order Cycle Demand rate Time Lead time Lead time Order placed Order placed Order receipt Order receipt Inventory Level Reorder point,  R Order quantity,  Q 0
EOQ Cost Model C o  - cost of placing order D  - annual demand C c  - annual per-unit carrying cost Q  - order quantity Annual ordering cost = C o D Q Annual carrying cost = C c Q 2 Total cost =  + C o D Q C c Q 2
EOQ Cost Model TC =  + C o D Q C c Q 2 =  + C o D Q 2 C c 2  TC  Q 0 =  + C 0 D Q 2 C c 2 Q opt  = 2 C o D C c Deriving  Q opt Proving equality of costs at optimal point = C o D Q C c Q 2 Q 2   = 2 C o D C c Q opt  = 2 C o D C c
EOQ Cost Model (cont.) Order Quantity,  Q Annual cost ($) Total Cost Carrying Cost = C c Q 2 Slope = 0 Minimum total cost Optimal order Q opt Ordering Cost = C o D Q
EOQ Example Orders per year = D / Q opt = 10,000/2,000 = 5 orders/year Order cycle time = 311 days/( D / Q opt ) = 311/5 = 62.2 store days C c  = $0.75 per yard C o  = $150 D  = 10,000 yards Q opt  = 2 C o D C c Q opt  = 2(150)(10,000) (0.75) Q opt  = 2,000 yards TC min  =  + C o D Q C c Q 2 TC min  =  + (150)(10,000) 2,000 (0.75)(2,000) 2 TC min  = $750 + $750 = $1,500
Production Quantity Model ,[object Object],[object Object],[object Object],[object Object],[object Object]
Production Quantity Model (cont.) Q (1- d/p ) Inventory level (1- d/p ) Q 2 Time 0 Order receipt period Begin order receipt End order receipt Maximum inventory level Average inventory level
Production Quantity Model (cont.) p  = production rate d  = demand rate Maximum inventory level = Q  -  d = Q  1 - Q p d p Average inventory level =  1 - Q 2 d p TC  =  +  1 - d p C o D Q C c Q 2 Q opt  = 2 C o D C c   1 -  d p
Production Quantity Model: Example C c  = $0.75 per yard C o  = $150 D  = 10,000 yards d  = 10,000/311 = 32.2 yards per day p  = 150 yards per day Q opt  =  =  = 2,256.8 yards 2 C o D C c   1 -  d p 2(150)(10,000) 0.75  1 -  32.2 150 TC  =  +  1 -  = $1,329 d p C o D Q C c Q 2 Production run =  =  = 15.05 days per order Q p 2,256.8 150
Production Quantity Model: Example (cont.) Number of production runs =  =  = 4.43 runs/year D Q 10,000 2,256.8 Maximum inventory level = Q  1 -  = 2,256.8  1 - = 1,772 yards d p 32.2 150
Quantity Discounts Price per unit decreases as order quantity increases TC  =  +  +  PD C o D Q C c Q 2 where P  = per unit price of the item D  = annual demand
Quantity Discount Model (cont.) Q opt Carrying cost  Ordering cost  Inventory cost ($) Q ( d 1  ) = 100 Q ( d 2  ) = 200 TC  ( d 2  = $6 )  TC  ( d 1  = $8 )   TC  = ($10 )   ORDER SIZE  PRICE 0 - 99   $10 100 – 199  8 ( d 1 ) 200+  6 ( d 2 )
Quantity Discount: Example C o  = $2,500  C c  = $190 per computer  D  = 200 QUANTITY PRICE 1 - 49 $1,400 50 - 89 1,100 90+ 900 Q opt  =  =  = 72.5 PCs 2 C o D C c 2(2500)(200) 190 TC  =  +  +  PD  = $233,784  C o D Q opt C c Q opt 2 For  Q  = 72.5 TC  =  +  +  PD  = $194,105 C o D Q C c Q 2 For  Q  = 90
Reorder Point Level of inventory at which a new order is placed  R  =  dL where d  = demand rate per period L  = lead time
Reorder Point: Example Demand = 10,000 yards/year Store open 311 days/year Daily demand = 10,000 / 311 = 32.154 yards/day Lead time = L = 10 days R = dL = (32.154)(10) = 321.54 yards
Safety Stocks  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Variable Demand with  a Reorder Point Reorder point,  R Q LT Time LT Inventory level 0
Reorder Point with  a Safety Stock Reorder point,  R Q LT Time LT Inventory level 0 Safety Stock
Reorder Point With  Variable Demand R  =  dL  +  z  d   L where d = average daily demand L = lead time  d = the standard deviation of daily demand  z = number of standard deviations corresponding to the service level probability z  d   L = safety stock
Reorder Point for  a Service Level Probability of  meeting demand during  lead time = service level Probability of  a stockout R Safety stock d L Demand z  d   L
Reorder Point for  Variable Demand The carpet store wants a reorder point with a 95% service level and a 5% stockout probability For a 95% service level,  z  = 1.65 d = 30 yards per day L = 10 days  d = 5 yards per day R =  dL  +  z    d   L = 30(10) + (1.65)(5)(  10) = 326.1 yards Safety stock =  z    d   L = (1.65)(5)(  10) = 26.1 yards
Order Quantity for a  Periodic Inventory System Q  =  d ( t b  +  L ) +  z  d   t b  +  L   -  I where d = average demand rate t b = the fixed time between orders L = lead time  d = standard deviation of demand   z  d   t b  +  L = safety stock I = inventory level
Fixed-Period Model with Variable Demand d = 6 bottles per day  d = 1.2 bottles t b = 60 days L = 5 days I = 8 bottles z = 1.65 (for a 95% service level) Q =  d ( t b  +  L ) +  z  d   t b  +  L   -  I = (6)(60 + 5) + (1.65)(1.2)  60 + 5 - 8 = 397.96 bottles
Copyright 2006 John Wiley & Sons, Inc. All rights reserved.  Reproduction or translation of this work beyond that permitted in section 117 of the 1976 United States Copyright Act without express permission of the copyright owner is unlawful.  Request for further information should be addressed to the Permission Department, John Wiley & Sons, Inc.  The purchaser may make back-up copies for his/her own use only and not for distribution or resale.  The Publisher assumes no responsibility for errors, omissions, or damages caused by the use of these programs or from the use of the information herein.

More Related Content

What's hot

Single period inventory ordering
Single period inventory orderingSingle period inventory ordering
Single period inventory ordering
Fatih Mutlu
 
4. good -inventory-management-ppt
4. good  -inventory-management-ppt4. good  -inventory-management-ppt
4. good -inventory-management-ppt
shahidch44
 
3. good inventory-management-edited-ppt
3. good  inventory-management-edited-ppt3. good  inventory-management-edited-ppt
3. good inventory-management-edited-ppt
shahidch44
 
Inventory Man2
Inventory Man2Inventory Man2
Inventory Man2
ajithsrc
 
Opc least unit cost
Opc   least unit costOpc   least unit cost
Opc least unit cost
Rishabh Jain
 
Multiitemjointreplensihment
MultiitemjointreplensihmentMultiitemjointreplensihment
Multiitemjointreplensihment
Anand Ellur
 

What's hot (20)

Inventory mgmt
Inventory mgmtInventory mgmt
Inventory mgmt
 
Inventory management
Inventory managementInventory management
Inventory management
 
Eoq(p) model
Eoq(p) modelEoq(p) model
Eoq(p) model
 
Single period inventory ordering
Single period inventory orderingSingle period inventory ordering
Single period inventory ordering
 
4. good -inventory-management-ppt
4. good  -inventory-management-ppt4. good  -inventory-management-ppt
4. good -inventory-management-ppt
 
Reorder point
Reorder pointReorder point
Reorder point
 
C9 inventory management
C9 inventory managementC9 inventory management
C9 inventory management
 
3. good inventory-management-edited-ppt
3. good  inventory-management-edited-ppt3. good  inventory-management-edited-ppt
3. good inventory-management-edited-ppt
 
Inventory Man2
Inventory Man2Inventory Man2
Inventory Man2
 
Inventory management and Receivables (ABC, EOQ Model)
Inventory management and Receivables (ABC, EOQ Model)Inventory management and Receivables (ABC, EOQ Model)
Inventory management and Receivables (ABC, EOQ Model)
 
Opc least unit cost
Opc   least unit costOpc   least unit cost
Opc least unit cost
 
Planned order release
Planned order releasePlanned order release
Planned order release
 
Model eoq
Model eoqModel eoq
Model eoq
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory management
Inventory managementInventory management
Inventory management
 
Multiitemjointreplensihment
MultiitemjointreplensihmentMultiitemjointreplensihment
Multiitemjointreplensihment
 
The eoq model
The eoq modelThe eoq model
The eoq model
 
Inventorycontrol
InventorycontrolInventorycontrol
Inventorycontrol
 
PPT5 - Inventory Management Problem
PPT5 - Inventory Management ProblemPPT5 - Inventory Management Problem
PPT5 - Inventory Management Problem
 
Economic order quantity (eoq) model
Economic order quantity (eoq) modelEconomic order quantity (eoq) model
Economic order quantity (eoq) model
 

Viewers also liked

Retail merchandise management
Retail merchandise managementRetail merchandise management
Retail merchandise management
anujtoma
 
Sales forecasting
Sales forecastingSales forecasting
Sales forecasting
Wish Mrt'xa
 
Assignment [4] machining with solutions
Assignment [4]  machining with solutionsAssignment [4]  machining with solutions
Assignment [4] machining with solutions
moradmoro
 
Measurement systems analysis v1.1
Measurement systems analysis v1.1Measurement systems analysis v1.1
Measurement systems analysis v1.1
Alexander Polyakov
 

Viewers also liked (20)

Retail merchandise management
Retail merchandise managementRetail merchandise management
Retail merchandise management
 
Mrp
MrpMrp
Mrp
 
Chapter 14, Buying Merchandise
Chapter 14, Buying MerchandiseChapter 14, Buying Merchandise
Chapter 14, Buying Merchandise
 
Sales forecasting
Sales forecastingSales forecasting
Sales forecasting
 
Sales Forecasting
Sales ForecastingSales Forecasting
Sales Forecasting
 
Planning, Sales Forecasting, and Budgeting
Planning, Sales Forecasting, and BudgetingPlanning, Sales Forecasting, and Budgeting
Planning, Sales Forecasting, and Budgeting
 
10inventorycontrolmodel 090420093732-phpapp02
10inventorycontrolmodel 090420093732-phpapp0210inventorycontrolmodel 090420093732-phpapp02
10inventorycontrolmodel 090420093732-phpapp02
 
A New Framework for Safety Stock Management
A New Framework for Safety Stock ManagementA New Framework for Safety Stock Management
A New Framework for Safety Stock Management
 
Indias 40 richest_1
Indias 40 richest_1Indias 40 richest_1
Indias 40 richest_1
 
Msa la
Msa laMsa la
Msa la
 
Dfmea.
Dfmea.Dfmea.
Dfmea.
 
Guagerr
GuagerrGuagerr
Guagerr
 
Assignment [4] machining with solutions
Assignment [4]  machining with solutionsAssignment [4]  machining with solutions
Assignment [4] machining with solutions
 
Dilshod Achilov Gage R&R
Dilshod Achilov Gage R&RDilshod Achilov Gage R&R
Dilshod Achilov Gage R&R
 
Solution manual 13 15
Solution manual 13 15Solution manual 13 15
Solution manual 13 15
 
MSA presentation
MSA presentationMSA presentation
MSA presentation
 
Measurement systems analysis v1.1
Measurement systems analysis v1.1Measurement systems analysis v1.1
Measurement systems analysis v1.1
 
Solution manual 9
Solution manual 9Solution manual 9
Solution manual 9
 
Internal auditors training programme
Internal auditors training programmeInternal auditors training programme
Internal auditors training programme
 
19 inventory management
19 inventory management19 inventory management
19 inventory management
 

Similar to Inventry..

Aminullah Assagaf_P10-Ch.13_Inventory Management-32.pptx
Aminullah Assagaf_P10-Ch.13_Inventory Management-32.pptxAminullah Assagaf_P10-Ch.13_Inventory Management-32.pptx
Aminullah Assagaf_P10-Ch.13_Inventory Management-32.pptx
Aminullah Assagaf
 
24867879 inventory-management-control-lecture-3
24867879 inventory-management-control-lecture-324867879 inventory-management-control-lecture-3
24867879 inventory-management-control-lecture-3
Harshawardhan Thakare
 
Inventory management
Inventory managementInventory management
Inventory management
Kuldeep Uttam
 
Session 6
Session 6Session 6
Session 6
thangv
 
inventory-management
inventory-managementinventory-management
inventory-management
rajesh.pal45
 

Similar to Inventry.. (20)

Inventory management
Inventory managementInventory management
Inventory management
 
Aminullah Assagaf_P10-Ch.13_Inventory Management-32.pptx
Aminullah Assagaf_P10-Ch.13_Inventory Management-32.pptxAminullah Assagaf_P10-Ch.13_Inventory Management-32.pptx
Aminullah Assagaf_P10-Ch.13_Inventory Management-32.pptx
 
Admissions in india for b.tech
Admissions in india for b.techAdmissions in india for b.tech
Admissions in india for b.tech
 
24867879 inventory-management-control-lecture-3
24867879 inventory-management-control-lecture-324867879 inventory-management-control-lecture-3
24867879 inventory-management-control-lecture-3
 
Goods16
Goods16Goods16
Goods16
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory management
Inventory managementInventory management
Inventory management
 
Eoq model
Eoq modelEoq model
Eoq model
 
Lession - 1(Inventory Management).pptx
Lession - 1(Inventory Management).pptxLession - 1(Inventory Management).pptx
Lession - 1(Inventory Management).pptx
 
Productions & Operations Management Chapter 12
Productions & Operations Management Chapter 12Productions & Operations Management Chapter 12
Productions & Operations Management Chapter 12
 
ECONOMIC ORDER QTY
ECONOMIC ORDER QTYECONOMIC ORDER QTY
ECONOMIC ORDER QTY
 
EOQ_EDITED (1).ppt
EOQ_EDITED (1).pptEOQ_EDITED (1).ppt
EOQ_EDITED (1).ppt
 
Chapter 6_OM
Chapter 6_OMChapter 6_OM
Chapter 6_OM
 
Session 6
Session 6Session 6
Session 6
 
Inventory control
Inventory controlInventory control
Inventory control
 
inventory-management
inventory-managementinventory-management
inventory-management
 
Inventory notes
Inventory notesInventory notes
Inventory notes
 
Operations research : Inventory/Production Managemet and Queueing Theory
Operations research : Inventory/Production Managemet and Queueing TheoryOperations research : Inventory/Production Managemet and Queueing Theory
Operations research : Inventory/Production Managemet and Queueing Theory
 
Operations Analytics using R Software.pptx
Operations Analytics using R Software.pptxOperations Analytics using R Software.pptx
Operations Analytics using R Software.pptx
 

More from VIBHASH SINGH (9)

Fire & safety training
Fire & safety trainingFire & safety training
Fire & safety training
 
Spc training
Spc training Spc training
Spc training
 
Fmea handbook
Fmea handbookFmea handbook
Fmea handbook
 
FMEA
FMEAFMEA
FMEA
 
Logistics term
Logistics termLogistics term
Logistics term
 
Warehouse management guide
Warehouse management guideWarehouse management guide
Warehouse management guide
 
28 additional tax_notification_[1]
28 additional tax_notification_[1]28 additional tax_notification_[1]
28 additional tax_notification_[1]
 
Welding
WeldingWelding
Welding
 
Mrp inventory management
Mrp inventory managementMrp inventory management
Mrp inventory management
 

Recently uploaded

Call Girls in Yamuna Vihar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in  Yamuna Vihar  (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in  Yamuna Vihar  (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in Yamuna Vihar (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Female Russian Escorts Mumbai Call Girls-((ANdheri))9833754194-Jogeshawri Fre...
Female Russian Escorts Mumbai Call Girls-((ANdheri))9833754194-Jogeshawri Fre...Female Russian Escorts Mumbai Call Girls-((ANdheri))9833754194-Jogeshawri Fre...
Female Russian Escorts Mumbai Call Girls-((ANdheri))9833754194-Jogeshawri Fre...
 
Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024
 
Pension dashboards forum 1 May 2024 (1).pdf
Pension dashboards forum 1 May 2024 (1).pdfPension dashboards forum 1 May 2024 (1).pdf
Pension dashboards forum 1 May 2024 (1).pdf
 
Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...
Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...
Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...
 
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Certified Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil ba...
Certified Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil ba...Certified Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil ba...
Certified Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil ba...
 
Thane Call Girls , 07506202331 Kalyan Call Girls
Thane Call Girls , 07506202331 Kalyan Call GirlsThane Call Girls , 07506202331 Kalyan Call Girls
Thane Call Girls , 07506202331 Kalyan Call Girls
 
Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...
 
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call GirlsKurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
 
✂️ 👅 Independent Bhubaneswar Escorts Odisha Call Girls With Room Bhubaneswar ...
✂️ 👅 Independent Bhubaneswar Escorts Odisha Call Girls With Room Bhubaneswar ...✂️ 👅 Independent Bhubaneswar Escorts Odisha Call Girls With Room Bhubaneswar ...
✂️ 👅 Independent Bhubaneswar Escorts Odisha Call Girls With Room Bhubaneswar ...
 
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
 
Fixed exchange rate and flexible exchange rate.pptx
Fixed exchange rate and flexible exchange rate.pptxFixed exchange rate and flexible exchange rate.pptx
Fixed exchange rate and flexible exchange rate.pptx
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
 
7 steps to achieve financial freedom.pdf
7 steps to achieve financial freedom.pdf7 steps to achieve financial freedom.pdf
7 steps to achieve financial freedom.pdf
 
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
 
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
 
Call Girls in Yamuna Vihar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in  Yamuna Vihar  (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in  Yamuna Vihar  (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in Yamuna Vihar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdf
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdfSeeman_Fiintouch_LLP_Newsletter_May-2024.pdf
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdf
 
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
 
GIFT City Overview India's Gateway to Global Finance
GIFT City Overview  India's Gateway to Global FinanceGIFT City Overview  India's Gateway to Global Finance
GIFT City Overview India's Gateway to Global Finance
 

Inventry..

  • 1. Beni Asllani University of Tennessee at Chattanooga Inventory Management Operations Management - 5 th Edition Chapter 12 Roberta Russell & Bernard W. Taylor, III
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. ABC Classification: Example 1 $ 60 90 2 350 40 3 30 130 4 80 60 5 30 100 6 20 180 7 10 170 8 320 50 9 510 60 10 20 120 PART UNIT COST ANNUAL USAGE
  • 12. ABC Classification: Example (cont.) Example 10.1 1 $ 60 90 2 350 40 3 30 130 4 80 60 5 30 100 6 20 180 7 10 170 8 320 50 9 510 60 10 20 120 PART UNIT COST ANNUAL USAGE TOTAL % OF TOTAL % OF TOTAL PART VALUE VALUE QUANTITY % CUMMULATIVE 9 $30,600 35.9 6.0 6.0 8 16,000 18.7 5.0 11.0 2 14,000 16.4 4.0 15.0 1 5,400 6.3 9.0 24.0 4 4,800 5.6 6.0 30.0 3 3,900 4.6 10.0 40.0 6 3,600 4.2 18.0 58.0 5 3,000 3.5 13.0 71.0 10 2,400 2.8 12.0 83.0 7 1,700 2.0 17.0 100.0 $85,400 A B C % OF TOTAL % OF TOTAL CLASS ITEMS VALUE QUANTITY A 9, 8, 2 71.0 15.0 B 1, 4, 3 16.5 25.0 C 6, 5, 10, 7 12.5 60.0
  • 13.
  • 14.
  • 15. Inventory Order Cycle Demand rate Time Lead time Lead time Order placed Order placed Order receipt Order receipt Inventory Level Reorder point, R Order quantity, Q 0
  • 16. EOQ Cost Model C o - cost of placing order D - annual demand C c - annual per-unit carrying cost Q - order quantity Annual ordering cost = C o D Q Annual carrying cost = C c Q 2 Total cost = + C o D Q C c Q 2
  • 17. EOQ Cost Model TC = + C o D Q C c Q 2 = + C o D Q 2 C c 2  TC  Q 0 = + C 0 D Q 2 C c 2 Q opt = 2 C o D C c Deriving Q opt Proving equality of costs at optimal point = C o D Q C c Q 2 Q 2 = 2 C o D C c Q opt = 2 C o D C c
  • 18. EOQ Cost Model (cont.) Order Quantity, Q Annual cost ($) Total Cost Carrying Cost = C c Q 2 Slope = 0 Minimum total cost Optimal order Q opt Ordering Cost = C o D Q
  • 19. EOQ Example Orders per year = D / Q opt = 10,000/2,000 = 5 orders/year Order cycle time = 311 days/( D / Q opt ) = 311/5 = 62.2 store days C c = $0.75 per yard C o = $150 D = 10,000 yards Q opt = 2 C o D C c Q opt = 2(150)(10,000) (0.75) Q opt = 2,000 yards TC min = + C o D Q C c Q 2 TC min = + (150)(10,000) 2,000 (0.75)(2,000) 2 TC min = $750 + $750 = $1,500
  • 20.
  • 21. Production Quantity Model (cont.) Q (1- d/p ) Inventory level (1- d/p ) Q 2 Time 0 Order receipt period Begin order receipt End order receipt Maximum inventory level Average inventory level
  • 22. Production Quantity Model (cont.) p = production rate d = demand rate Maximum inventory level = Q - d = Q 1 - Q p d p Average inventory level = 1 - Q 2 d p TC = + 1 - d p C o D Q C c Q 2 Q opt = 2 C o D C c 1 - d p
  • 23. Production Quantity Model: Example C c = $0.75 per yard C o = $150 D = 10,000 yards d = 10,000/311 = 32.2 yards per day p = 150 yards per day Q opt = = = 2,256.8 yards 2 C o D C c 1 - d p 2(150)(10,000) 0.75 1 - 32.2 150 TC = + 1 - = $1,329 d p C o D Q C c Q 2 Production run = = = 15.05 days per order Q p 2,256.8 150
  • 24. Production Quantity Model: Example (cont.) Number of production runs = = = 4.43 runs/year D Q 10,000 2,256.8 Maximum inventory level = Q 1 - = 2,256.8 1 - = 1,772 yards d p 32.2 150
  • 25. Quantity Discounts Price per unit decreases as order quantity increases TC = + + PD C o D Q C c Q 2 where P = per unit price of the item D = annual demand
  • 26. Quantity Discount Model (cont.) Q opt Carrying cost Ordering cost Inventory cost ($) Q ( d 1 ) = 100 Q ( d 2 ) = 200 TC ( d 2 = $6 ) TC ( d 1 = $8 ) TC = ($10 ) ORDER SIZE PRICE 0 - 99 $10 100 – 199 8 ( d 1 ) 200+ 6 ( d 2 )
  • 27. Quantity Discount: Example C o = $2,500 C c = $190 per computer D = 200 QUANTITY PRICE 1 - 49 $1,400 50 - 89 1,100 90+ 900 Q opt = = = 72.5 PCs 2 C o D C c 2(2500)(200) 190 TC = + + PD = $233,784 C o D Q opt C c Q opt 2 For Q = 72.5 TC = + + PD = $194,105 C o D Q C c Q 2 For Q = 90
  • 28. Reorder Point Level of inventory at which a new order is placed R = dL where d = demand rate per period L = lead time
  • 29. Reorder Point: Example Demand = 10,000 yards/year Store open 311 days/year Daily demand = 10,000 / 311 = 32.154 yards/day Lead time = L = 10 days R = dL = (32.154)(10) = 321.54 yards
  • 30.
  • 31. Variable Demand with a Reorder Point Reorder point, R Q LT Time LT Inventory level 0
  • 32. Reorder Point with a Safety Stock Reorder point, R Q LT Time LT Inventory level 0 Safety Stock
  • 33. Reorder Point With Variable Demand R = dL + z  d L where d = average daily demand L = lead time  d = the standard deviation of daily demand z = number of standard deviations corresponding to the service level probability z  d L = safety stock
  • 34. Reorder Point for a Service Level Probability of meeting demand during lead time = service level Probability of a stockout R Safety stock d L Demand z  d L
  • 35. Reorder Point for Variable Demand The carpet store wants a reorder point with a 95% service level and a 5% stockout probability For a 95% service level, z = 1.65 d = 30 yards per day L = 10 days  d = 5 yards per day R = dL + z  d L = 30(10) + (1.65)(5)( 10) = 326.1 yards Safety stock = z  d L = (1.65)(5)( 10) = 26.1 yards
  • 36. Order Quantity for a Periodic Inventory System Q = d ( t b + L ) + z  d t b + L - I where d = average demand rate t b = the fixed time between orders L = lead time  d = standard deviation of demand z  d t b + L = safety stock I = inventory level
  • 37. Fixed-Period Model with Variable Demand d = 6 bottles per day  d = 1.2 bottles t b = 60 days L = 5 days I = 8 bottles z = 1.65 (for a 95% service level) Q = d ( t b + L ) + z  d t b + L - I = (6)(60 + 5) + (1.65)(1.2) 60 + 5 - 8 = 397.96 bottles
  • 38. Copyright 2006 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in section 117 of the 1976 United States Copyright Act without express permission of the copyright owner is unlawful. Request for further information should be addressed to the Permission Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages caused by the use of these programs or from the use of the information herein.