Qs. 1 What is the role of KK sub-committee ?

KK sub-committee has a team of upto 7-8 members in a large company representing
the heads of different departments and the chairman is usually the Plant Head. The
committee has following roles:

Recording, categorizing and analysing 16 losses(except break down and defect loss)
machine-wise, department-wise, unit-wise and company-wise

: Calculation/Analysis of OEE and set targets for minimizing/eliminating each loss. In
some cases, companies are also including specific losses that affect their business. In
other words the formula for OEE may be different at different stages of TPM in a
company and specific to the constraints a company may have

Based on business need, set priorities on losses and projects looking at resource
constraints.

Selecting Kaizen themes based on losses, setting targets and assigning teams to take
responsibility for each identified project.
: Identify bottleneck areas, fix targets and set priorities
: Launching of project teams with pilot projects

Helping all support functions to arrive at the Loss vs. cost matrix and the P,Q,C,D,S,M
measures.

Identifying aim and scope of KK, training requirement and guiding the facilitators to
focus losses on company performance.
Knowledge sharing through horizontal deployment activities

Develop the Master plan for KK and track progress of Kaizens and OEE

Motivate people to do Kaizens.

Giving inputs to the education and training pillar for training matrix development.

Working in close co-ordination with other sub-committees for achieving the PQCDSM
targets. This committee will meet at least once a week or month for the above
mentioned points.




                                                 1
Qs. 2 Which losses to be addressed by KK ?

KK pillar deals only with those losses that cannot be handled by any other pillar. All
16 losses have to be considered by the KK committee and make up the loss structure
for the company. (Losses due to defect/rework losses through Quality Maintenance,
failure losses through Planned Maintenance).

Next, the KK sub-committee will identify the priorities and assign project teams to
work on specific losses on different machines and areas.

Remaining losses will have to be addressed by KK sub-committee. Usually, they
address the following losses:

Each company has to make up their list and collect data. The highest losses will be the
priority for the KK pillar. In some companies this list may be different. This is only an
example:
Loss no. 2: Set-up

Loss no. 3: Tool change

Loss no. 4: Start-up loss

Loss no. 5: Minor stoppages
Loss no. 6: Reduced speed

Loss no. 9: Management Loss

Loss no. 10: Operating motion loss
Loss no. 11: Line organization loss

Loss no. 13: Measurement and adjustment loss

Loss no. 15: Tools, jigs and consumables loss

Loss no. 16: Yield loss.
Major three losses can be prioritized in each area to start the work.



Qs. 3 What is the role of operators in Kobetsu Kaizen ?

Be a member in small groups/circles and participate in circle meetings.
Improve and sustain 1 ‘s’ and 2 ‘s’ to eliminate search time losses.

Identify losses by identifying abnormalities.


                                                2
E.g. SET_UP time reduction: operators take part in the study of videos taken during
set-up activity. They discuss, give ideas and contribute for Kaizen developments in
fixing, eliminating and reducing elements in setting.

E.g. Reduction of tool change time. Operators detect and inform the early wearing out
of tools, and contribute to extending their tool-life.
Provide inputs for quantifying management losses.

Operators to maintain results by following standards built up by PM and JH pillars
which includes generating OPL’s.

They must assist the KK team to make trials and implement Kaizens when proposed
by all pillars.


Qs. 4 What training is required for doing KK ?

Training to cover:
-   Training on 16 losses

-   Calculating costs

-   Why-why analysis

-   PM analysis
-   Machine structure/Principle of working

-   SMED and setup reduction training

-   Tool technology

-   3Ms(Muri, Muda, Mura)
-   FMEA, FTA, and other analytical techniques

-   OJT, OPL

-   Industrial engineering and JIT concepts
-   Poka Yoke/fail-safing

-   QC tools and story board

-   Training operators to collect data.


                                              3
Qs. 5: How to set P,Q,C,D,S,M targets for KK?

Collect data for previous one year before kick-off. KK committee looks at P, Q, C, D,S,
and M at the company level and selects areas under each category.
(E.g.)

P – Productivity/production increase by

         Improvement in OEE of machines

         Improvement in attaining effective man-hours
         Improvement in labor productivity

Q – To bring defects to zero

By analyzing

         Customer complaints & warranty returns
         In-house rejections

         In-house rework

         Incoming material rejections

C – Cost reduction through
         OEE increase

         Cycle time reduction in bottleneck machines

         Reduction of inventory on cutting tools
         Reduction in consumption of cutting oils

         Enhance tool life

D – To maintain delivery performance through

         OEE increase
         Improve bottleneck machine/process

S – To achieve zero accident level

         By providing training on Machine operations



                                                   4
Identifying unsafe actions and locations and taking corrective actions to avoid

        Accidents.
        Motivation of operating personnel through Involvement and participation

        Analysis of accidents happened in the past and near miss accidents through why-
        why analysis and improves working conditions.
M – To improve morale of operators through
        Involvement and participation in circle activities
        By      encouraging      to      generate        Kaizens     and      rewarding   for
        suggestions/improvements carried out.
Usually at least a 5% cost(variable) reduction target should be set as a company
objective.
Set target for OEE and then set target for P, Q, C, and D.

In some case P targets are set using Takt time calculation or 1.5 times current
production to achieve in 3 years time.
Q targets are set in PPM range and warranty, based on last three-year trend. (Q)

D target is set for own delivery to customers and also for supplier’s performance.

Target for safety is zero accidents. Eliminate unsafe actions and locations, and make
hand injury zero in the first year.

Target for M is in line with suggestion scheme and any other schemes the organization
has like QCC etc.

The company level targets are deployed down to product-wise and from there on to
specific lines and machines.


Qs. 6 How to prioritise losses for KK ?
Prioritising losses to be based on

    1. Analyse the losses that affect OEE.

    2. No. of occurrence and time losses

    3. Type of losses(sporadic or chronic)
Quality and failure losses are not covered here.



                                                   5
Losses for each machine are calculated and the priority set for bigger losses by value. A
flowchart shows how losses can be categorized and then prioritized (Flow Chart
attached as Annexure 1 ).


Qs. 7: How to collect KK related losses ?

Machine-wise all 16 losses are calculated.

OEE related(8) losses are collected from Production and Inspection records.

Cost related losses-spare, coolant, lubricants are collected by maintenance department
and tool losses from the tool crib or tool management center. Vendor related Quality
Maintenance team, and, management loss by office TPM team report losses. Operating
motion loss and line organization loss by Industrial engineering. Logistic loss is by
Office TPM team.
Losses are compiled by the KK team into the loss structure matrix.
(see Annexure 2)



Qs. 8: How to make master plan for KK ?

After collecting losses and prioritizing them, an action plan is drawn up area and
machine wise. Based on current status as bench-mark and fixing targets:
     1. For OEE improvement in
 -    Model machines

 -    Rank A machines

 -    Other machines

     2. Productivity Improvements
        Cycle time reduction

        Man-hour utilization



Project teams/circles are selected and targets on results and time frame agreed upon.
The KK master plan is aligned to the Overall master plan. (See Annexure 3).




                                               6
Qs. 9: How to make Project teams for all losses?
Cross-functional teams with relevant knowledge

Teams structure should be in a way so that cascading/horizontal deployment can be as
fast as possible.
Vested interest/affected parties are put in KK teams/Project teams.

   1. The losses must be taken based on priorities

   2. Particular process or machine is selected for study to reduce the losses.

   3. Unit/department head where the particular machine/process is taken for study
      should be the leader and members are drawn from production, tool room, tool
      design, production engineering, quality etc. depending upon the requirements.

   4. Once the model project team is formed they should collect all relevant datas on
      losses they aim to bring down/eliminate.

   5. The action plan is to be drawn with activities, time target, person’s
      responsibilities to carryout the task, supporting help/facilities needed to carryout
      the task etc.

   6. To monitor the program meetings conducted at determined frequency on the
      shop floor/site. The necessary help can be drawn from other units/departments
      and even from external source.

   7. The team should prepare the plan and obtain the concurrence from
      management/top officials. Once the target and results are achieved this can be
      extended to other departments/units.

   8. On successful completion of the project, various teams can be formed
      throughout the company for elimination of different losses


Qs. 10: How to cover all losses by involving all people?

   1. Once the losses are identified, they can be prioritized depending in occurrence
      and time loss.

   2. The losses can be classified and allocation to be done to unit-wise/machine or
      process-wise.

   3. Monitoring is to be done by leaders and members of each pillar among with
      manager of concerned production unit/supervisor depending on importance, time

                                               7
target, technology and cost involved.



    4. Periodical meetings to be conducted to review improvements made through
       Kaizens or suggestions. Kaizens to be carried out and reduction in losses to be
       recorded.


Qs. 11: How to sustain design changes in KK?

KK sub-committee should involve in introduction of new product or change in existing
product. The following are to be considered as an example:
Design of fixture/tools to minimize set-up time from one part to another

Cutting blade change time must be minimum

To minimize motion loss
Balancing of cycle time to avoid line organization losses

Design changes should be easily adopted with the shortest lead-time.

Product design to take care of:

        The use of existing toolings
Commonisation with similar product.

Updation in design records

Feedback to development management

Feedback to OEM
Feedback to Machine manufacturer

Feedback to equipment design/capital planning and procurement team.

Through Poka Yoke, training and visual/audio instructions on machines
Through tentative standards of step 3 of JH.

Through PM standards.

(For standards to be used, it is essential to establish them involving the operators, then
operators must be trained on the SOP and the usage monitored.)

                                                 8
Qs. 12: How to do cost-benefit analysis through KK?
Analyse data available on each loss.

Categorise losses on

        Loss of production

        Loss of man-hours
        Loss of material

        Loss of energy

Cost benefit is calculated by evaluating payback periods.
E.g.: Loss on changeover time.

        M/c: MW12, Cell- 1(Aluminum), Unit: Actuation. Cell hour rate: Rs. 4,000/-

Current changeover time= 4 hrs/changeover

Reduced changeover time = 1 hr/changeover
No. of changeovers in a month =10

Total hours saved = 30 hours/month

Gross saving is at the rate of Rs. 4000/- adding up to = Rs. 1.2 lakhs

Amount spent per variety for achieving reduced changeover = Rs. 2500/-
Total amount spent= Rs. 25,000/-

Payback period = 0.2 months.

Loss cost matrix(see example):




                                               9
LOSS-COST MATRIX

      FOR A RANK MACHINES                    (Prepared the Same in Excel)
     DATA(IN RUPEES) for the period(Jan-June)
S.    Cost            Material Cost     Energy       Spa   Tool   Cons   Man Hours            Tran
No                                      /fuels       res   s      umab                        sport
                                                                  les                         ation

      Losses          Incomi     Inp    F     P                          P    M      Q   S
                      ng         roc    u     o                          r    ai     u   u
                      matl.      ess    r     w                          o    n      a   p
                                 rej.   n     e                          d    t.     l   r.
                                        a     r                          n.          i
                                        c                                            t
                                        e                                            y
                                        o
                                        il
1.    Breakdown

2.    Set-up

3.    Tool change

4.    Start-up

5.    Shut-down

6.    Management

7.    Motion

8.    Line org.

9.    Distribution

10    Meas. & adj.

11    Minor stopp.

12    Speed

13    Defect/rew.     39001      419
                                 25

14    Energy

15    Yield


                                                10
Qs. 13: How to reward Kaizens?

Monetary awards:

Spot award given for every Kaizen submitted, implementable ones will enable a Rs.
100/- award to the suggester, and after implementation, an award of 10% of annual
saving(max. of Rs. 20,000/-)
Non-monetary awards:

Grading against P,Q,C,D,S,M is done for proportionately rewarding Kaizens.

 Monthly Kaizen meetings to boost the morale of good Kaizens. Awards are announced
in common forums addressed by ED/Department/Unit heads.

Presented Kaizens are displayed in common places with photographs of the Kaizen
team who have done the best Kaizen for the month is displayed in all units. Rolling
trophy for the best Kaizens


Top 3 Kaizens of each quarter will be published in the house journal.

No monetary rewards but certificates from CEO, individual recognition through
photographs on notice boards are a better approach.




                                              11
Manual No.4 : KOBETSU KAIZEN IMPLEMENTATION

    The TPM Club India, CII acknowledges the contribution of all the following
    41 companies who added great value in sharing their experience of TPM
    Implementation. This manual is the fourth in the sequence of others to
    come, covering Office TPM in this year

1     Aditya Cement                    22   Mahindra & Mahindra Limited – Auto
2     Bajaj Auto Limited               23   MM Forgings Limited
3     Bharat Seats Limited             24   Mother Diary
4     Birla Tyres                      25   QH Talbros Limited
5     BPL Limited PTI                  26   Shriram Pistons & Rings Limited
6     Brakes India Limited, Brakes     27   Sona Koyo Steering Systems Limited
      Div.
7     Brakes India Limited, Foundry    28   Sundaram Brakelinings Limited
      Division
8     Brakes India Limited, Padi       29   Sundaram-Clayton Limited
9     Brakes India Limited,            30   Tata Cummins Limited
      Pollambakam
10    Clutch Auto Limited              31   Tata Metaliks Limited
11    Electrosteel Castings Limited    32   The Tata Iron & Steel Co. Limited -
                                            Steel
12    Heavy Alloy Penetrator Project   33   The Tata Iron & Steel Co. Ltd. -
                                            Bearings
13    Hindustan Lever Limited          34   Thirumalai Chemicals Limited
14    Hi-Tech Carbon                   35   TTK-LIG Limited
15    Indian Oil Corporation Limited   36   Tube Products of India
16    Indo Gulf Corporation Limited    37   Usha Beltron Limited - Cable
      (Fertilisers)                         Division
17    Jay Yuhshin Limited              38   Usha Beltron Limited - Alloys & Steel
18    Jindal Strips Limited            39   Usha Martin Industries
19    Lakshmi Auto Components          40   Vikram Cement
20    Lakshmi Machine Works            41   Vikram Ispat, Salow
      Limited
21    Lucas TVS - FIE Division

    The TPM Club India greatly acknowledges, Mr. Yamaguchi’s leadership in
    giving the directions for making TPM a movement. Without his support, this
    would not have been possible.




                                                            Senior Counsellor
                                                              TPM Club India

                                       12

More Related Content

What's hot (20)

Tpm
TpmTpm
Tpm
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
Tpmjishu
TpmjishuTpmjishu
Tpmjishu
 
TPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) PosterTPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) Poster
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
Quality Circle Presentation Template
Quality Circle Presentation TemplateQuality Circle Presentation Template
Quality Circle Presentation Template
 
TPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARANTPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARAN
 
Gemba Walk
Gemba WalkGemba Walk
Gemba Walk
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
Total Productive Maintenance
Total Productive Maintenance Total Productive Maintenance
Total Productive Maintenance
 
Kaizen
KaizenKaizen
Kaizen
 
AUTONOMOUS MAINTENANCE
AUTONOMOUS MAINTENANCEAUTONOMOUS MAINTENANCE
AUTONOMOUS MAINTENANCE
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
OPL - One Point Lesson
OPL - One Point LessonOPL - One Point Lesson
OPL - One Point Lesson
 

Similar to Manual%204%20 kobetsu kaizen

Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementStudy Stuff
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementsmumbahelp
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementsmumbahelp
 
Om0015 – maintenance management
Om0015 – maintenance managementOm0015 – maintenance management
Om0015 – maintenance managementsmumbahelp
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET Journal
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Managementshrinivas kulkarni
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity MaintenanceGohelYash1
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance managementconsult4solutions
 
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Timothy Wooi
 
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....Naveen Kumar
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)Timothy Wooi
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance managementsmumbahelp
 
World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraDurga Prasad Mishra
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations managementsmumbahelp
 
20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction20141209_AM Pillar_Introduction
20141209_AM Pillar_IntroductionHenrik Gantzel
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceTri Dung Nguyen
 

Similar to Manual%204%20 kobetsu kaizen (20)

Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
Om0015 – maintenance management
Om0015 – maintenance managementOm0015 – maintenance management
Om0015 – maintenance management
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity Maintenance
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance management
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
Yogesh Sharma
Yogesh SharmaYogesh Sharma
Yogesh Sharma
 
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
 
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance management
 
Chapter 2. tpm
Chapter 2. tpmChapter 2. tpm
Chapter 2. tpm
 
World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishra
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations management
 
20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 

Recently uploaded

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...lizamodels9
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escortdlhescort
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 

Recently uploaded (20)

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 

Manual%204%20 kobetsu kaizen

  • 1. Implementation Manual - 4 Kobetsu Kaizen Qs. 1 What is the role of KK sub-committee ? KK sub-committee has a team of upto 7-8 members in a large company representing the heads of different departments and the chairman is usually the Plant Head. The committee has following roles: Recording, categorizing and analysing 16 losses(except break down and defect loss) machine-wise, department-wise, unit-wise and company-wise : Calculation/Analysis of OEE and set targets for minimizing/eliminating each loss. In some cases, companies are also including specific losses that affect their business. In other words the formula for OEE may be different at different stages of TPM in a company and specific to the constraints a company may have Based on business need, set priorities on losses and projects looking at resource constraints. Selecting Kaizen themes based on losses, setting targets and assigning teams to take responsibility for each identified project. : Identify bottleneck areas, fix targets and set priorities : Launching of project teams with pilot projects Helping all support functions to arrive at the Loss vs. cost matrix and the P,Q,C,D,S,M measures. Identifying aim and scope of KK, training requirement and guiding the facilitators to focus losses on company performance. Knowledge sharing through horizontal deployment activities Develop the Master plan for KK and track progress of Kaizens and OEE Motivate people to do Kaizens. Giving inputs to the education and training pillar for training matrix development. Working in close co-ordination with other sub-committees for achieving the PQCDSM targets. This committee will meet at least once a week or month for the above mentioned points. 1
  • 2. Qs. 2 Which losses to be addressed by KK ? KK pillar deals only with those losses that cannot be handled by any other pillar. All 16 losses have to be considered by the KK committee and make up the loss structure for the company. (Losses due to defect/rework losses through Quality Maintenance, failure losses through Planned Maintenance). Next, the KK sub-committee will identify the priorities and assign project teams to work on specific losses on different machines and areas. Remaining losses will have to be addressed by KK sub-committee. Usually, they address the following losses: Each company has to make up their list and collect data. The highest losses will be the priority for the KK pillar. In some companies this list may be different. This is only an example: Loss no. 2: Set-up Loss no. 3: Tool change Loss no. 4: Start-up loss Loss no. 5: Minor stoppages Loss no. 6: Reduced speed Loss no. 9: Management Loss Loss no. 10: Operating motion loss Loss no. 11: Line organization loss Loss no. 13: Measurement and adjustment loss Loss no. 15: Tools, jigs and consumables loss Loss no. 16: Yield loss. Major three losses can be prioritized in each area to start the work. Qs. 3 What is the role of operators in Kobetsu Kaizen ? Be a member in small groups/circles and participate in circle meetings. Improve and sustain 1 ‘s’ and 2 ‘s’ to eliminate search time losses. Identify losses by identifying abnormalities. 2
  • 3. E.g. SET_UP time reduction: operators take part in the study of videos taken during set-up activity. They discuss, give ideas and contribute for Kaizen developments in fixing, eliminating and reducing elements in setting. E.g. Reduction of tool change time. Operators detect and inform the early wearing out of tools, and contribute to extending their tool-life. Provide inputs for quantifying management losses. Operators to maintain results by following standards built up by PM and JH pillars which includes generating OPL’s. They must assist the KK team to make trials and implement Kaizens when proposed by all pillars. Qs. 4 What training is required for doing KK ? Training to cover: - Training on 16 losses - Calculating costs - Why-why analysis - PM analysis - Machine structure/Principle of working - SMED and setup reduction training - Tool technology - 3Ms(Muri, Muda, Mura) - FMEA, FTA, and other analytical techniques - OJT, OPL - Industrial engineering and JIT concepts - Poka Yoke/fail-safing - QC tools and story board - Training operators to collect data. 3
  • 4. Qs. 5: How to set P,Q,C,D,S,M targets for KK? Collect data for previous one year before kick-off. KK committee looks at P, Q, C, D,S, and M at the company level and selects areas under each category. (E.g.) P – Productivity/production increase by Improvement in OEE of machines Improvement in attaining effective man-hours Improvement in labor productivity Q – To bring defects to zero By analyzing Customer complaints & warranty returns In-house rejections In-house rework Incoming material rejections C – Cost reduction through OEE increase Cycle time reduction in bottleneck machines Reduction of inventory on cutting tools Reduction in consumption of cutting oils Enhance tool life D – To maintain delivery performance through OEE increase Improve bottleneck machine/process S – To achieve zero accident level By providing training on Machine operations 4
  • 5. Identifying unsafe actions and locations and taking corrective actions to avoid Accidents. Motivation of operating personnel through Involvement and participation Analysis of accidents happened in the past and near miss accidents through why- why analysis and improves working conditions. M – To improve morale of operators through Involvement and participation in circle activities By encouraging to generate Kaizens and rewarding for suggestions/improvements carried out. Usually at least a 5% cost(variable) reduction target should be set as a company objective. Set target for OEE and then set target for P, Q, C, and D. In some case P targets are set using Takt time calculation or 1.5 times current production to achieve in 3 years time. Q targets are set in PPM range and warranty, based on last three-year trend. (Q) D target is set for own delivery to customers and also for supplier’s performance. Target for safety is zero accidents. Eliminate unsafe actions and locations, and make hand injury zero in the first year. Target for M is in line with suggestion scheme and any other schemes the organization has like QCC etc. The company level targets are deployed down to product-wise and from there on to specific lines and machines. Qs. 6 How to prioritise losses for KK ? Prioritising losses to be based on 1. Analyse the losses that affect OEE. 2. No. of occurrence and time losses 3. Type of losses(sporadic or chronic) Quality and failure losses are not covered here. 5
  • 6. Losses for each machine are calculated and the priority set for bigger losses by value. A flowchart shows how losses can be categorized and then prioritized (Flow Chart attached as Annexure 1 ). Qs. 7: How to collect KK related losses ? Machine-wise all 16 losses are calculated. OEE related(8) losses are collected from Production and Inspection records. Cost related losses-spare, coolant, lubricants are collected by maintenance department and tool losses from the tool crib or tool management center. Vendor related Quality Maintenance team, and, management loss by office TPM team report losses. Operating motion loss and line organization loss by Industrial engineering. Logistic loss is by Office TPM team. Losses are compiled by the KK team into the loss structure matrix. (see Annexure 2) Qs. 8: How to make master plan for KK ? After collecting losses and prioritizing them, an action plan is drawn up area and machine wise. Based on current status as bench-mark and fixing targets: 1. For OEE improvement in - Model machines - Rank A machines - Other machines 2. Productivity Improvements Cycle time reduction Man-hour utilization Project teams/circles are selected and targets on results and time frame agreed upon. The KK master plan is aligned to the Overall master plan. (See Annexure 3). 6
  • 7. Qs. 9: How to make Project teams for all losses? Cross-functional teams with relevant knowledge Teams structure should be in a way so that cascading/horizontal deployment can be as fast as possible. Vested interest/affected parties are put in KK teams/Project teams. 1. The losses must be taken based on priorities 2. Particular process or machine is selected for study to reduce the losses. 3. Unit/department head where the particular machine/process is taken for study should be the leader and members are drawn from production, tool room, tool design, production engineering, quality etc. depending upon the requirements. 4. Once the model project team is formed they should collect all relevant datas on losses they aim to bring down/eliminate. 5. The action plan is to be drawn with activities, time target, person’s responsibilities to carryout the task, supporting help/facilities needed to carryout the task etc. 6. To monitor the program meetings conducted at determined frequency on the shop floor/site. The necessary help can be drawn from other units/departments and even from external source. 7. The team should prepare the plan and obtain the concurrence from management/top officials. Once the target and results are achieved this can be extended to other departments/units. 8. On successful completion of the project, various teams can be formed throughout the company for elimination of different losses Qs. 10: How to cover all losses by involving all people? 1. Once the losses are identified, they can be prioritized depending in occurrence and time loss. 2. The losses can be classified and allocation to be done to unit-wise/machine or process-wise. 3. Monitoring is to be done by leaders and members of each pillar among with manager of concerned production unit/supervisor depending on importance, time 7
  • 8. target, technology and cost involved. 4. Periodical meetings to be conducted to review improvements made through Kaizens or suggestions. Kaizens to be carried out and reduction in losses to be recorded. Qs. 11: How to sustain design changes in KK? KK sub-committee should involve in introduction of new product or change in existing product. The following are to be considered as an example: Design of fixture/tools to minimize set-up time from one part to another Cutting blade change time must be minimum To minimize motion loss Balancing of cycle time to avoid line organization losses Design changes should be easily adopted with the shortest lead-time. Product design to take care of: The use of existing toolings Commonisation with similar product. Updation in design records Feedback to development management Feedback to OEM Feedback to Machine manufacturer Feedback to equipment design/capital planning and procurement team. Through Poka Yoke, training and visual/audio instructions on machines Through tentative standards of step 3 of JH. Through PM standards. (For standards to be used, it is essential to establish them involving the operators, then operators must be trained on the SOP and the usage monitored.) 8
  • 9. Qs. 12: How to do cost-benefit analysis through KK? Analyse data available on each loss. Categorise losses on Loss of production Loss of man-hours Loss of material Loss of energy Cost benefit is calculated by evaluating payback periods. E.g.: Loss on changeover time. M/c: MW12, Cell- 1(Aluminum), Unit: Actuation. Cell hour rate: Rs. 4,000/- Current changeover time= 4 hrs/changeover Reduced changeover time = 1 hr/changeover No. of changeovers in a month =10 Total hours saved = 30 hours/month Gross saving is at the rate of Rs. 4000/- adding up to = Rs. 1.2 lakhs Amount spent per variety for achieving reduced changeover = Rs. 2500/- Total amount spent= Rs. 25,000/- Payback period = 0.2 months. Loss cost matrix(see example): 9
  • 10. LOSS-COST MATRIX FOR A RANK MACHINES (Prepared the Same in Excel) DATA(IN RUPEES) for the period(Jan-June) S. Cost Material Cost Energy Spa Tool Cons Man Hours Tran No /fuels res s umab sport les ation Losses Incomi Inp F P P M Q S ng roc u o r ai u u matl. ess r w o n a p rej. n e d t. l r. a r n. i c t e y o il 1. Breakdown 2. Set-up 3. Tool change 4. Start-up 5. Shut-down 6. Management 7. Motion 8. Line org. 9. Distribution 10 Meas. & adj. 11 Minor stopp. 12 Speed 13 Defect/rew. 39001 419 25 14 Energy 15 Yield 10
  • 11. Qs. 13: How to reward Kaizens? Monetary awards: Spot award given for every Kaizen submitted, implementable ones will enable a Rs. 100/- award to the suggester, and after implementation, an award of 10% of annual saving(max. of Rs. 20,000/-) Non-monetary awards: Grading against P,Q,C,D,S,M is done for proportionately rewarding Kaizens. Monthly Kaizen meetings to boost the morale of good Kaizens. Awards are announced in common forums addressed by ED/Department/Unit heads. Presented Kaizens are displayed in common places with photographs of the Kaizen team who have done the best Kaizen for the month is displayed in all units. Rolling trophy for the best Kaizens Top 3 Kaizens of each quarter will be published in the house journal. No monetary rewards but certificates from CEO, individual recognition through photographs on notice boards are a better approach. 11
  • 12. Manual No.4 : KOBETSU KAIZEN IMPLEMENTATION The TPM Club India, CII acknowledges the contribution of all the following 41 companies who added great value in sharing their experience of TPM Implementation. This manual is the fourth in the sequence of others to come, covering Office TPM in this year 1 Aditya Cement 22 Mahindra & Mahindra Limited – Auto 2 Bajaj Auto Limited 23 MM Forgings Limited 3 Bharat Seats Limited 24 Mother Diary 4 Birla Tyres 25 QH Talbros Limited 5 BPL Limited PTI 26 Shriram Pistons & Rings Limited 6 Brakes India Limited, Brakes 27 Sona Koyo Steering Systems Limited Div. 7 Brakes India Limited, Foundry 28 Sundaram Brakelinings Limited Division 8 Brakes India Limited, Padi 29 Sundaram-Clayton Limited 9 Brakes India Limited, 30 Tata Cummins Limited Pollambakam 10 Clutch Auto Limited 31 Tata Metaliks Limited 11 Electrosteel Castings Limited 32 The Tata Iron & Steel Co. Limited - Steel 12 Heavy Alloy Penetrator Project 33 The Tata Iron & Steel Co. Ltd. - Bearings 13 Hindustan Lever Limited 34 Thirumalai Chemicals Limited 14 Hi-Tech Carbon 35 TTK-LIG Limited 15 Indian Oil Corporation Limited 36 Tube Products of India 16 Indo Gulf Corporation Limited 37 Usha Beltron Limited - Cable (Fertilisers) Division 17 Jay Yuhshin Limited 38 Usha Beltron Limited - Alloys & Steel 18 Jindal Strips Limited 39 Usha Martin Industries 19 Lakshmi Auto Components 40 Vikram Cement 20 Lakshmi Machine Works 41 Vikram Ispat, Salow Limited 21 Lucas TVS - FIE Division The TPM Club India greatly acknowledges, Mr. Yamaguchi’s leadership in giving the directions for making TPM a movement. Without his support, this would not have been possible. Senior Counsellor TPM Club India 12