Design of ogee spillwayDesign of ogee spillway
Offsets and Risers onOffsets and Risers on
Upstream Face :Upstream Face :
13/2/14
Prepared by v.h,khokhani, assistant
professor, DIET
2
PracticalProfileofSpillwaYPracticalProfileofSpillwaY
When the profile for the crest of theWhen the profile for the crest of the
ogee spillway is plotted over theogee spillway is plotted over the
triangular profile the section of atriangular profile the section of a
gravity dam (non-overflowgravity dam (non-overflow
section) ,it is found that it goessection) ,it is found that it goes
beyond vie downstream face of thebeyond vie downstream face of the
dam , thu requiring thickening ofdam , thu requiring thickening of
the section for the spillway .the section for the spillway .
However,this extra concrete can beHowever,this extra concrete can be
saved by shifting the curve of thesaved by shifting the curve of the
nappe in a backward direction untilnappe in a backward direction until
this curve becomes tangential to thethis curve becomes tangential to the
downstream face of the dam .downstream face of the dam .
Offsets and Risers onOffsets and Risers on
Upstream FaceUpstream Face
13/2/14
Prepared by v.h,khokhani, assistant
professor, DIET
7
Factors affecting on spill wayFactors affecting on spill way
Design of spillwayDesign of spillway
Design an ogee spillway forDesign an ogee spillway for
concrete gravity dam, for theconcrete gravity dam, for the
following data :following data :
(1) Average river bed level = 250.0(1) Average river bed level = 250.0
mm
(2) R.L. of spillway crest =350.0 m(2) R.L. of spillway crest =350.0 m
13/2/14
Prepared by v.h,khokhani, assistant
professor, DIET
9
(3) Slope of d/s face of gravity dam(3) Slope of d/s face of gravity dam
= 0.75 H : 1 V= 0.75 H : 1 V
(4) Design discharge = 6500 cumecs(4) Design discharge = 6500 cumecs
(5) Length of spillway = 5 spans(5) Length of spillway = 5 spans
with a clear width of 7 m each.with a clear width of 7 m each.
(6) Thickness of each pier = 2.0 m(6) Thickness of each pier = 2.0 m
13/2/14
Prepared by v.h,khokhani, assistant
professor, DIET
10
Step-1 : Computation ofStep-1 : Computation of
design headdesign head
HHdd = H= Hee + H+ Haa
Where HWhere Haa = V= Vaa
22
/2g/2g
13/2/14
Prepared by v.h,khokhani, assistant
professor, DIET
11
2/3
ee HCLQ =
[ ] eaPe HKKNLL +−= *2
357*5 === LLe
2/3
)7*5(2.26500 eH=
41.842/3
=eH
24.19=eH
50.19=eH
100250350 =−=h
33.112.5
5.19
100
≥==
dH
h
7.112.6
5.19
5.19100
≥=
+
=
+
d
d
H
Hh
VELOCITY APPROACH CAN BE NEGLECTED
EFFECT ON DISCHARGE COEFFICIENT IS NEGLECTED
[ ] eaPe HKKNLL +−= *2
[ ]201.001.0*4235 +−=eL
= 29.4
2/3
eeHCLQ =
2/3
)4.29(2.26500 eH=
6.21=eH
24.27
85.1
X
Y =
75.0
1
=
dx
dy
24.27
85.1 85.0
x
dx
dy
=
85.0
0678.0 x
dx
dy
=
Comparing both dy/dx we get x = 33.26 and Y =24.01
24.27
85.1
X
Y =
X Y
1 0.036
2 0.132
3 0.265
4 0.477
5 0.720
6 1.01
7 1.343
8 1.719
9 2.138
10 2.598
14 4.843
18 7.709
22 11.175
26 15.22
30 19.836
33.6 24.463
u/s profile :u/s profile :
625.085.1
)832.5(365.172.2)832.5(05.0 +−++= xxy
This curve will extend up to,This curve will extend up to,
X=-0.27*21.6
= - 5.832
625.085.1
)832.5(365.172.2)832.5(05.0 +−++= xxy
X Y
-0.5
-1.0
-2.0
-3.0
-4.0
-5.0
-5.832
Design of d/s bucket :Design of d/s bucket :
The radius of the bucket isThe radius of the bucket is
generally kept equal to,generally kept equal to,
The bucket will subtend an angle ofThe bucket will subtend an angle of
60° at the centre.60° at the centre.
Examples - mahajanExamples - mahajan
An ogee spillway has 2.8 m headAn ogee spillway has 2.8 m head
above the crest .Depth of flow at theabove the crest .Depth of flow at the
toe of spillway is measured equal totoe of spillway is measured equal to
0.7 m. The tail watcr depth is 4.0m.0.7 m. The tail watcr depth is 4.0m.
Suggest the type of energySuggest the type of energy
dissipater and give its dimensiondissipater and give its dimension
Assume coefficient C as 2.2 in theAssume coefficient C as 2.2 in the
equation = CHequation = CH3/23/2
DATADATA
Head over spillway H=2.8mHead over spillway H=2.8m
Initial depth y1 = 0.7mInitial depth y1 = 0.7m
Tail water depth y 2 =4.0mTail water depth y 2 =4.0m
Discharge coefficient C=2.2Discharge coefficient C=2.2
STEP 1 Will be to find outSTEP 1 Will be to find out
sequent depth.sequent depth.
q=CHq=CH3/23/2
Q = 2.2 * 2.8Q = 2.2 * 2.83/23/2
= 10.30 M= 10.30 M33
/S/M/S/M
Pre jump DepthPre jump Depth
VV11 = q/y= q/y11
= 10.30/ 0.7= 10.30/ 0.7

More Related Content

What's hot (20)

Stilling basin
Stilling basinStilling basin
Stilling basin
 
L 8 stormwater sewr design
L 8 stormwater sewr designL 8 stormwater sewr design
L 8 stormwater sewr design
 
Open channel flow
Open channel flowOpen channel flow
Open channel flow
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Canal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage WorksCanal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage Works
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Hydraulic design of sewer
Hydraulic design of sewerHydraulic design of sewer
Hydraulic design of sewer
 
Weir and barrage lecture
Weir and barrage lectureWeir and barrage lecture
Weir and barrage lecture
 
Weirs on Permeable Foundations
Weirs on Permeable FoundationsWeirs on Permeable Foundations
Weirs on Permeable Foundations
 
Cross drainage work
Cross drainage workCross drainage work
Cross drainage work
 
Cross Drainage Work
Cross Drainage Work Cross Drainage Work
Cross Drainage Work
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Regulation Works
Regulation WorksRegulation Works
Regulation Works
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
Spillway
Spillway Spillway
Spillway
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
open channel flow
open channel flowopen channel flow
open channel flow
 

Similar to Design of ogee spillway for concrete gravity dams

about dam of archi that is cost effective
about dam of archi that is cost effectiveabout dam of archi that is cost effective
about dam of archi that is cost effectiveFikaduDebiso
 
Classification of weis new
Classification of weis newClassification of weis new
Classification of weis newsonukhan123
 
Prsesntation on Commercial building Project
Prsesntation on Commercial building ProjectPrsesntation on Commercial building Project
Prsesntation on Commercial building ProjectMD AFROZ ALAM
 
Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000PraveenKumar Shanmugam
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tankAamir Patni
 
Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwayssaibabu48
 
IRJET - Effect of Local Scour on Foundation of Hydraulic Structure
IRJET - Effect of Local Scour on Foundation of Hydraulic StructureIRJET - Effect of Local Scour on Foundation of Hydraulic Structure
IRJET - Effect of Local Scour on Foundation of Hydraulic StructureIRJET Journal
 
Experimental Study of Local Scour around Single Spur Dike in an Open Channel
Experimental Study of Local Scour around Single Spur Dike in an Open ChannelExperimental Study of Local Scour around Single Spur Dike in an Open Channel
Experimental Study of Local Scour around Single Spur Dike in an Open ChannelIRJET Journal
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)inventionjournals
 
1.5 class c,d,e
1.5 class c,d,e1.5 class c,d,e
1.5 class c,d,eMani Das
 
Dam outlet works lecture 1
Dam outlet works lecture 1Dam outlet works lecture 1
Dam outlet works lecture 1Vidhi Khokhani
 
Chapter 5 drop sturcutures
Chapter 5 drop sturcuturesChapter 5 drop sturcutures
Chapter 5 drop sturcuturesMohsin Siddique
 
Pillar design - a case study
Pillar design - a case studyPillar design - a case study
Pillar design - a case studyTIKESHWAR MAHTO
 
Hydraulic jump location control
Hydraulic jump location control Hydraulic jump location control
Hydraulic jump location control siddharth upadhyay
 
Turga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptxTurga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptxssuserde6364
 

Similar to Design of ogee spillway for concrete gravity dams (20)

about dam of archi that is cost effective
about dam of archi that is cost effectiveabout dam of archi that is cost effective
about dam of archi that is cost effective
 
Floating Bridge
Floating BridgeFloating Bridge
Floating Bridge
 
Classification of weis new
Classification of weis newClassification of weis new
Classification of weis new
 
Prsesntation on Commercial building Project
Prsesntation on Commercial building ProjectPrsesntation on Commercial building Project
Prsesntation on Commercial building Project
 
Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000
 
Culvertdesign
CulvertdesignCulvertdesign
Culvertdesign
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tank
 
Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillways
 
IRJET - Effect of Local Scour on Foundation of Hydraulic Structure
IRJET - Effect of Local Scour on Foundation of Hydraulic StructureIRJET - Effect of Local Scour on Foundation of Hydraulic Structure
IRJET - Effect of Local Scour on Foundation of Hydraulic Structure
 
Experimental Study of Local Scour around Single Spur Dike in an Open Channel
Experimental Study of Local Scour around Single Spur Dike in an Open ChannelExperimental Study of Local Scour around Single Spur Dike in an Open Channel
Experimental Study of Local Scour around Single Spur Dike in an Open Channel
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
1.5 class c,d,e
1.5 class c,d,e1.5 class c,d,e
1.5 class c,d,e
 
Dam outlet works lecture 1
Dam outlet works lecture 1Dam outlet works lecture 1
Dam outlet works lecture 1
 
Chapter 5 drop sturcutures
Chapter 5 drop sturcuturesChapter 5 drop sturcutures
Chapter 5 drop sturcutures
 
Pillar design
Pillar designPillar design
Pillar design
 
Pillar design - a case study
Pillar design - a case studyPillar design - a case study
Pillar design - a case study
 
Shear lug verification example
Shear lug verification exampleShear lug verification example
Shear lug verification example
 
Hydraulic jump location control
Hydraulic jump location control Hydraulic jump location control
Hydraulic jump location control
 
Chapter 10
Chapter 10Chapter 10
Chapter 10
 
Turga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptxTurga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptx
 

More from Vidhi Khokhani

2. w index and 5 index
2. w index and 5 index2. w index and 5 index
2. w index and 5 indexVidhi Khokhani
 
Drop structure lecture 4
Drop structure lecture 4Drop structure lecture 4
Drop structure lecture 4Vidhi Khokhani
 
Drop structure lecture 3
Drop structure lecture 3Drop structure lecture 3
Drop structure lecture 3Vidhi Khokhani
 
Drop structure lecture 2
Drop structure lecture 2Drop structure lecture 2
Drop structure lecture 2Vidhi Khokhani
 
Drop structure lecture 1
Drop structure lecture 1Drop structure lecture 1
Drop structure lecture 1Vidhi Khokhani
 
Dam outlet works lecture 2
Dam outlet works lecture 2Dam outlet works lecture 2
Dam outlet works lecture 2Vidhi Khokhani
 
Dam outlet works lecture 3
Dam outlet works lecture 3Dam outlet works lecture 3
Dam outlet works lecture 3Vidhi Khokhani
 
Concrete dam lecture 2
Concrete dam lecture 2Concrete dam lecture 2
Concrete dam lecture 2Vidhi Khokhani
 
Concrete dam lecture 4
Concrete dam lecture 4Concrete dam lecture 4
Concrete dam lecture 4Vidhi Khokhani
 
Concrete dam lecture 11
Concrete dam lecture 11Concrete dam lecture 11
Concrete dam lecture 11Vidhi Khokhani
 
Concrete dam lecture 1
Concrete dam lecture 1Concrete dam lecture 1
Concrete dam lecture 1Vidhi Khokhani
 
check basin , furrow and border strip method
check basin , furrow and border strip methodcheck basin , furrow and border strip method
check basin , furrow and border strip methodVidhi Khokhani
 
Lecture 1-aerial photogrammetry
Lecture 1-aerial photogrammetryLecture 1-aerial photogrammetry
Lecture 1-aerial photogrammetryVidhi Khokhani
 
irrigation water management
irrigation water managementirrigation water management
irrigation water managementVidhi Khokhani
 

More from Vidhi Khokhani (20)

2. w index and 5 index
2. w index and 5 index2. w index and 5 index
2. w index and 5 index
 
Drop structure lecture 4
Drop structure lecture 4Drop structure lecture 4
Drop structure lecture 4
 
Drop structure lecture 3
Drop structure lecture 3Drop structure lecture 3
Drop structure lecture 3
 
Drop structure lecture 2
Drop structure lecture 2Drop structure lecture 2
Drop structure lecture 2
 
Drop structure lecture 1
Drop structure lecture 1Drop structure lecture 1
Drop structure lecture 1
 
Dam outlet works lecture 2
Dam outlet works lecture 2Dam outlet works lecture 2
Dam outlet works lecture 2
 
Dam outlet works lecture 3
Dam outlet works lecture 3Dam outlet works lecture 3
Dam outlet works lecture 3
 
Concrete dam lecture 2
Concrete dam lecture 2Concrete dam lecture 2
Concrete dam lecture 2
 
Concrete dam lecture 4
Concrete dam lecture 4Concrete dam lecture 4
Concrete dam lecture 4
 
Concrete dam lecture 11
Concrete dam lecture 11Concrete dam lecture 11
Concrete dam lecture 11
 
Concrete dam lecture 1
Concrete dam lecture 1Concrete dam lecture 1
Concrete dam lecture 1
 
check basin , furrow and border strip method
check basin , furrow and border strip methodcheck basin , furrow and border strip method
check basin , furrow and border strip method
 
Embankment lecture 12
Embankment lecture 12Embankment lecture 12
Embankment lecture 12
 
Embankment lecture 7
Embankment lecture 7Embankment lecture 7
Embankment lecture 7
 
Lecture 1-aerial photogrammetry
Lecture 1-aerial photogrammetryLecture 1-aerial photogrammetry
Lecture 1-aerial photogrammetry
 
Embankment lecture 4
Embankment lecture 4Embankment lecture 4
Embankment lecture 4
 
Embankment lecture 3
Embankment lecture 3Embankment lecture 3
Embankment lecture 3
 
Embankment lecture 2
Embankment lecture 2Embankment lecture 2
Embankment lecture 2
 
Embankment lecture 1
Embankment lecture 1Embankment lecture 1
Embankment lecture 1
 
irrigation water management
irrigation water managementirrigation water management
irrigation water management
 

Recently uploaded

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Design of ogee spillway for concrete gravity dams

  • 1. Design of ogee spillwayDesign of ogee spillway
  • 2. Offsets and Risers onOffsets and Risers on Upstream Face :Upstream Face : 13/2/14 Prepared by v.h,khokhani, assistant professor, DIET 2
  • 3. PracticalProfileofSpillwaYPracticalProfileofSpillwaY When the profile for the crest of theWhen the profile for the crest of the ogee spillway is plotted over theogee spillway is plotted over the triangular profile the section of atriangular profile the section of a gravity dam (non-overflowgravity dam (non-overflow section) ,it is found that it goessection) ,it is found that it goes beyond vie downstream face of thebeyond vie downstream face of the dam , thu requiring thickening ofdam , thu requiring thickening of the section for the spillway .the section for the spillway .
  • 4.
  • 5. However,this extra concrete can beHowever,this extra concrete can be saved by shifting the curve of thesaved by shifting the curve of the nappe in a backward direction untilnappe in a backward direction until this curve becomes tangential to thethis curve becomes tangential to the downstream face of the dam .downstream face of the dam .
  • 6.
  • 7. Offsets and Risers onOffsets and Risers on Upstream FaceUpstream Face 13/2/14 Prepared by v.h,khokhani, assistant professor, DIET 7
  • 8. Factors affecting on spill wayFactors affecting on spill way
  • 9. Design of spillwayDesign of spillway Design an ogee spillway forDesign an ogee spillway for concrete gravity dam, for theconcrete gravity dam, for the following data :following data : (1) Average river bed level = 250.0(1) Average river bed level = 250.0 mm (2) R.L. of spillway crest =350.0 m(2) R.L. of spillway crest =350.0 m 13/2/14 Prepared by v.h,khokhani, assistant professor, DIET 9
  • 10. (3) Slope of d/s face of gravity dam(3) Slope of d/s face of gravity dam = 0.75 H : 1 V= 0.75 H : 1 V (4) Design discharge = 6500 cumecs(4) Design discharge = 6500 cumecs (5) Length of spillway = 5 spans(5) Length of spillway = 5 spans with a clear width of 7 m each.with a clear width of 7 m each. (6) Thickness of each pier = 2.0 m(6) Thickness of each pier = 2.0 m 13/2/14 Prepared by v.h,khokhani, assistant professor, DIET 10
  • 11. Step-1 : Computation ofStep-1 : Computation of design headdesign head HHdd = H= Hee + H+ Haa Where HWhere Haa = V= Vaa 22 /2g/2g 13/2/14 Prepared by v.h,khokhani, assistant professor, DIET 11
  • 12. 2/3 ee HCLQ = [ ] eaPe HKKNLL +−= *2 357*5 === LLe 2/3 )7*5(2.26500 eH= 41.842/3 =eH 24.19=eH
  • 14. [ ] eaPe HKKNLL +−= *2 [ ]201.001.0*4235 +−=eL = 29.4 2/3 eeHCLQ = 2/3 )4.29(2.26500 eH=
  • 16. 24.27 85.1 85.0 x dx dy = 85.0 0678.0 x dx dy = Comparing both dy/dx we get x = 33.26 and Y =24.01 24.27 85.1 X Y =
  • 17. X Y 1 0.036 2 0.132 3 0.265 4 0.477 5 0.720 6 1.01 7 1.343 8 1.719 9 2.138 10 2.598 14 4.843 18 7.709 22 11.175 26 15.22 30 19.836 33.6 24.463
  • 18. u/s profile :u/s profile : 625.085.1 )832.5(365.172.2)832.5(05.0 +−++= xxy
  • 19. This curve will extend up to,This curve will extend up to, X=-0.27*21.6 = - 5.832 625.085.1 )832.5(365.172.2)832.5(05.0 +−++= xxy
  • 21.
  • 22. Design of d/s bucket :Design of d/s bucket : The radius of the bucket isThe radius of the bucket is generally kept equal to,generally kept equal to, The bucket will subtend an angle ofThe bucket will subtend an angle of 60° at the centre.60° at the centre.
  • 23. Examples - mahajanExamples - mahajan An ogee spillway has 2.8 m headAn ogee spillway has 2.8 m head above the crest .Depth of flow at theabove the crest .Depth of flow at the toe of spillway is measured equal totoe of spillway is measured equal to 0.7 m. The tail watcr depth is 4.0m.0.7 m. The tail watcr depth is 4.0m. Suggest the type of energySuggest the type of energy dissipater and give its dimensiondissipater and give its dimension Assume coefficient C as 2.2 in theAssume coefficient C as 2.2 in the equation = CHequation = CH3/23/2
  • 24. DATADATA Head over spillway H=2.8mHead over spillway H=2.8m Initial depth y1 = 0.7mInitial depth y1 = 0.7m Tail water depth y 2 =4.0mTail water depth y 2 =4.0m Discharge coefficient C=2.2Discharge coefficient C=2.2
  • 25. STEP 1 Will be to find outSTEP 1 Will be to find out sequent depth.sequent depth. q=CHq=CH3/23/2 Q = 2.2 * 2.8Q = 2.2 * 2.83/23/2 = 10.30 M= 10.30 M33 /S/M/S/M Pre jump DepthPre jump Depth VV11 = q/y= q/y11 = 10.30/ 0.7= 10.30/ 0.7