1. PetroleumProduction Engineer C.V(14 year exp.)
PERSONAL INFORMATION:
Name : Walaa Ahmed Ahmed
: +2-0100887 81 76 (Egypt)
:+2-010-921 31 816 (Egypt)
E.MailAddress : walaa_ahmed1977@yahoo.com
Nationality : Egyptian
Birth Date : 30th
June,1977
Marital Status : Married.
Employer :West Bakr Petroleum Co. (Egypt). Jv withTrans-globe
(Canda) &Epedeco Japan earlier.
Present Position : ProductionDepartment Head
Supervisor Experience : 14 Years
Notice Period: : 2Months
EDUCATION:
Bsc in Petroleum engineering , Al-Azhar University ,Egypt , 2001 .Very good with
honor degree (graduation).
Excellent in the project.
POST GRADUATE STUDIES IN Production improvementwith very good.
Shared in SPE ,15th international Engineering conference with Paper of heavy oil Production
improvement, post graduate studies in petroleum Engineering.
Lecturer in faculty of petroleum engineering for artificial lift systems.
COMPUTER SKILLS:
Microsoft Office( Word , Excel & Power Point)
WORK HISTORY:
Jan. 2003 – Aug. 2004 : Petroleum Engineering For General Petroleum .
Co.,Egypt
-Review Daily production reports & well intevention reports for 8 fields in eastern
desert in Egypt, discuss and share well intervention plans (serviecing , workover &
recompletion) i.e. artificial lift system desigen & running into the wells, well
production performance , production budjet planning & acheivement.
Rigs up to HP 700 , well depths up to 10, 000 ft oil quality range ( 10 - 46 ), high
viscous oil ( asphaltinic- 14 % wt percent & parrafinic ) .
PCP, ESP,Suckerrod, Jet pump & Gas lift Systems.
2. Sep. 2004 – Nov.2006 : ProductionSenior engineer For West Bakr Petroleum Co.,
Egypt
-Supervising Workover , Well intervention operations , setting and drilling B.plugs,
logging , correlating depths.
- perforating under balance and over balance wire line and on tubing & TCP .
- prepare and analys the well oil , Gas & water production performance and
recommend
Dec. 2006 – April 2008 : Consultant workover & productionSupervisor For some of
Egyptians oil Companies ( Khalda Drillig Co. ( Apache ) , Agiba Oil Co. , Vegas Oil
Co. & Dover Oil Co.)
-Supervising WO operations at some of land rigs up to 700 HP for shallow and deep
wells.
Run artificial lift systems .
Supervise various workover operations pluging producing zones by cement and Bridge
Plugs , clean out accumulated sand and d/out cement by power sweivel equipped rigs,
Rotary table, top drive , mounted rigs & by coiled tube ( gel & nitrogen for deplated
low pressure reservires ,well stimulation by acid , hudraulic frac. For carbonate and
sandstonereservoirs, recored pressure survy .
May 2008 – July 2009 : production section head in West For West Bakr Petroleum
Co., Egypt JV EPEDECO (Japanese international company) but worked as Operation
General Manager .
Follow up all fields Operations , prepared Gantee chart , costestimation for all jobs,
AFEs, Contract ducments for all services i.e logging , fluid analysis, bottom hole syrvey
, slick line , perforation , well matrix stimulation , bottomhole equipments, rental of
seperators, artificial lift systems materials ( rods, pony reds, rotors, stators, plungers
barrelels, standing valves , traviling valves , pumping units , drive heads , VSDs ,
filtration systems , water injection systems, chemical oxygen scavenger, biocide scale
inhibitor, demulsifiers….
Run software for all artifcial lift systems ( rod star , load cala,….).
August. 20011 – till date: Production department head for West Bakr Petroleum
Co. JV. Transglobe international Canadian company.
3. Prepare Operation & Production Budjet .
Follow up all fields Operations.
Revise all invoices .
Negotiate all services companies.
Follow up all processes , Dehydration Operations, Tanks, Pump room, Heaters, Flow
line Construction , maintenance .
Supervise constructing of wells flow lines , Remote Manifolds, Treated oil Delivery
lines.
Water Disposal projects, water evaporation pits , water disposalwells , water treatment .
COURSES & VALID CERTIFICATES :
Well stimulation
Production improvement
Artificial lift systems.
PCP
Sucker rod Pumping System.
ESP Systems
Production Engineering courses part1 & 2 in Dubi
Heavy oil Production Technology.
Petroleum Engineering courses 1& 2
HSE courses.
Workover experinces.
Advanced Production Technology
IADC Well Cap VALID
H2S VALID
WORK SKILLS
Monitor and evaluate the productionand efficiency of an oil or gas well.
Develop methods to improve extraction, oversee drilling activities and will determine
the need for new or improved tools.
Evaluate the flow between the reservoir and the wellbore.
Monitor the entire productionprocess and will design completion systems and select
equipment that will increase productionrates.
4. Handle the daily management of oil and gas production operations and help to
maximize profitability by increasing revenue and lowering operating expenses.
Selecting optimal tubing size and suitable equipment in the well for different
functions.
Designing the completion, pump type, pump depth,Tbg size, Rode type&size,Surface
pumping type , well head connections for heavy & light oil.
designing systems that help the well to flow, for example using submersible pumps;
Managing problems of fluid behavior and productionchemistry;
Evaluating and recommending flow rate enhancement by using, for example,
hydraulic fracturing (to force fluid into a well and fracture the rock) and acid treatment
(to erode the rock and improve flow path);
managing and controlling wells with branches at the bottom (horizontal and
multilateral wells);
using well and reservoir remote sensing technology and surveillance data to manage
the value of the reservoir and decide on appropriate engineering interventions;
Understanding and managing how a set of wells interact;
Managing contractorrelationships in relation to health, safety and environmental
performance;
supervising well-site operations personnel and managing staff at all levels, including
the training and supervision of crew members, to ensure that everyone works as a team
in order to meet deadlines to clients' satisfaction;
liaising with separate departments to ensure correct progress with projects;
taking responsibility for the maintenance of equipment;
liaising withclients to keep them informed of progress.
Conducts engineering analysis of production and operations and prepares engineering
reports under the direction of the Production Operations Section Chief and/or the
District Manager.
Devise methods to improve oil and gas extraction and production and determine the
need for new or modified tool designs.
Assist engineering and other personnel to solve operating problems.
Confer with scientific, engineering, and technical personnel to resolve design,
research, and testing problems.
Direct and monitor the completion and evaluation of wells, well testing, or well
surveys.
Monitor productionrates, and plan rework processes to improve production.
Analyze data to recommend placement of wells and supplementary processesto
enhance production.
Interpret drilling and testing information for personnel.
Develop plans for oil and gas field drilling, and for productrecovery and treatment.
5. Write technical reports for engineering and management personnel.
Assess costs and estimate the production capabilities and economic value of oil and
gas wells, to evaluate the economic viability of potential drilling sites.
Maintain records of drilling and production operations.
Specify and supervise well modification and stimulation programs to maximize oil
and gas recovery.
Evaluate findings to develop, design, or test equipment or processes.
Assign work to staff to obtain maximum utilization of personnel.
Coordinate the installation, maintenance, and operation of mining and oil field
equipment.
Design and implement environmental controls on oil and gas operations.
Take samples to assess the amount and quality of oil, the depth at which resources
lie, and the equipment needed to properly extract them.
Conductengineering research experiments to improve or modify oil machinery and
operations.
Inspect oil and gas wells to determine that installations are completed.
Coordinate activities of workers engaged in research, planning, and development.
Supervise the removal of drilling equipment, the removal of any waste, and the safe
return of land to structural stability when wells are exhausted.
Test machinery and equipment to ensure that it is safe and conforms to performance
specifications.
Attempts to maximize production(or injection) in a cost-effective manner.
Focus is accelerating and maximizing production, have to work with national oil
companies, whose main concerns are to manage reserves and long-term
exploitation strategies.
Familiar with Productionengineering technologies and methods of application,
i.e. sucker rode, PCP,ESP,Gaslift&Jet pump.
Replacing/changing & maintenance the artificial lift & completion system
(PKRS, NIPPLS, SSD & BP.)
Performing and supervising cement, perforation & logs jobs On 450 & 550
Hp Pulling Unit.
Performing logs correlations for perforation, plugs & data interpretation.
Designing new completion & re-completion well.
Supervising E.Wire line & slick line coiled tubing operation. .
Supervise all workover operations (start from site preparation till rig move
and acceptanceto rig release.)
Supervise Rig inspection as per check list.
Supervise and follow-up hole cleaning efficiency in Dir.& Horiz. Hole.
6. Follow-up drlg sand & cement plugs
Parameters[W.O.B,RPM,GPM,PUMP.PRESS,TOURQUE,DRAG,&etc ].
Supervise using different type of mud system.
Supervise using different types of PDC Bit 12 ,8 ,6. ”
Supervise running logging in deviated horizontal holes[ HLS,BAKER
ATLAS & SCHLUMBERGEER.]
Supervise all killing operations of oil& gas wells.
Supervise all fishing, milling operations on drilling& workover.
Supervise coiled tbg operation.
Supervise all remedial cement jobs for zonal isolation, Evaluate
qualitative cement bond log[CBL,VDL,CCL,GR,USIT .]
Experience in different types of perforation gun[Csg gun,Tcp gun,through
tbg guns.]
Supervise rung all types of pumps [ESP, Jet pump, Sucker rod pump, pcp.]
Supervise monthly rig safety inspection.
ADDITIONAL SKILLS
Effective Communication, HSE awareness, Report writing & Commitment to team working.
REFRANCES:_
Eng. Mostafa Shames Dara Petroleum company JV Transglobe (Mostafa_Shames1986@yahoo.com).
Eng. Karim Dara Petroleum company JV Transglobe ( Pet_Eng_Karim@hotmail.com)