1. FMT313: As A Facilities Manager, You Are Tasked To Manage
Questiona) As a facilities manager, you are tasked to manage the spaces and assets of a 3-
story office building with one basement. Refer to the Revit project template file. The internal
layout for the building is partially completed. You are to examine and complete the internal
layout for all levels using the BIM application with the requirement as indicated below. With
the completed BIM model generate a report describing the project information and a
snapshot of all floorplans with appropriate labeling.Basement 18 Mechanical SpacesInclude
appropriate mechanical and electrical equipmentLevel 110 Enclosed Office Rooms1
Enclosed Printing Room10 Open Office Cubicles1 PantryInclude office furniture such as
chairs and tables to 4 of the enclosed officeroomsLevel 210 Enclosed Office Rooms2 Open
Meeting Cubicles12 Open Office CubiclesInclude office furniture such as chairs and tables in
4 of the enclosed officeroomsLevel 310 Enclosed Office Rooms1 Enclosed Conference
Room2 Open Meeting Cubicles12 Open Office CubiclesInclude office furniture such as chairs
and desks in all rooms and cubicles to 4of the enclosed office roomsThere are no
requirements for the size of the room and office cubicle. The enclosed room should be a full-
height gypsum partition while the open office cubicles should 1.5 m high system partition.
Label the spaces to all levels and the basement with an appropriate name. Equipment and
Furniture should be populated with appropriate attributes.b) Appraise the benefits of using
BIM in setting up data information for spacedevelopment.c) Describe TWO (2) ways on the
use BIM in the operation and maintenance of the building.