SlideShare a Scribd company logo
1 of 9
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
QSB1514 – Construction Technology 1
Singapore Gold Sand Marina Bay Hotel
April Semester 2013
Group Assignment: Group 4
Submission Date: 26th June 2013
Name Student ID Marks
Yam Yih Hwan 0305861
Tan Jia Jia 0307766
Yo Kai Sen 0310563
Teoh Tze Yoong 0314756
Background Information of Singapore Gold Sand Marina Bay Hotel
Singapore Gold Sand Marina Bay Hotel (MBS) is an Integrated Resort fronting Marina Bay
in Singapore, which operated under Las Vegas Sands Corp. (Chua, 2011)MBS is designed by
Canadian Architect named Moshe Safdie with Local Executive Architects Aedas, Pte, Ltd. In
additional, Arup Group Limited is selected as the Structural Engineering for this project whereas
the landscape of this building is designed by Peter Walker & Partners. The entire project area
used is 845,000m2
and the site area used is 154,938m2
. The estimated budget on this project is
USD $5.7 billion. (Safdie Architects, 2010)
MBS began operations on 27 April 2010, and officially opened on 23 June. MBS
comprises of three towers with 55-storey high topped by a 12,400m2
SkyPark. As for the Art
Science Museum, it is shaped like a lotus flower. (Chua, 2011) On top of its three towers, the
Marina Bay Sands was designed as a curious boat-shape and it is placed at the gateway to
Singapore's harbor with strong and highly iconic structure. (Apavisa, n.d.)
(Layout of Singapore Gold Sand Marina Bay Hotel)
Furthermore, MBS offers luxury hotel, casino, retail mall, convention facilities and
entertainment venues including theatres, nightclubs and a museum. It has 2,560 luxury rooms
across three 55-storey hotel towers, totaling 265,683 m2
. (Safdie Architects, 2010) As we know,
Marina Bay Sands is one of the biggest hotelslocated in Singapore; it’s covering 12,400 m2
, and is
over 200 meters altitude. It has a 150 meters infinity-edged swimming pool at 250 meters high
which overlook the view of Singapore skyline. There is a botanical garden which linked on top of
the three 200m high hotels of marina bays where you can find 250 types of tree and 650 species
of plants. (Apavisa, n.d.)
MBS is one of the most complex designs ever built; it is a slopping tower which its angle
as steep as 26 degrees and connecting legs at Level 23 to form a single building. The “Hanging
Gardens” provides a magnificent backdrop which the visitors can overlook the upcoming Gardens
by the Bay. (YourSingapore, 2012)
Structure & Materials used on Singapore Gold Sand Marina Bay Hotel
Shear walls are used as primary vertical and transverse structural system for all three
towers. (McCafferty, 2011) Additional of concrete core walls located within both legs of each
towers restrain the hotel in the longitudinal direction and help prevent out-of-plane buckling of the
narrow shear walls within both legs of the towers. (McCafferty, 2011) Post-tensioned 8-inch Flat
slabs span directly between the shear walls. (McCafferty, 2011) The flat slab scheme also
provides flexibility in the hotel room layout, to hold a relatively tight 9-foot 10-inch typical floor-to-
floor height, and accommodates flexibility of building services distribution and coordination
throughout each floor. (McCafferty, 2011)
(Diagram of Hotel Components)
At level 23, where the story-height steel trusses are located, mechanical floors connected
the legs of the towerto withstand the large shear forces that occur where these meet above the
central atrium. (McCafferty, 2011) The base slab at ground floor level is post-tensioned to resist
the horizontal thrusts produced by the inclined legs. (McCafferty, 2011) Each tower slab form is
also slightly changed in relation to its pair, to increase the slenderness of the buildings, resulting
in the appearance of six towers, instead of three. (Safdie, 2011) There is an energy efficient
double-glazed unit suspended at the edge of the slab and is resting on a frame. (Safdie, 2011)
Perpendicular to the façade, glass fins were installed to provide shading. (Safdie, 2011) In
order to allow it to radiate out in elevation, the glass fins are suspended out of the horizontal stack
joint. (Safdie, 2011) The glass fins are supported by a 3-sided aluminium frame, with the exposed
forward edge, the sun light is been catch, as well as reflections of the façade, to create a specials
effect. (Safdie, 2011) A 30%-reflective glass is used as the fins and to provide shading for the
façade up to 20% of all solar gain. (Safdie, 2011) The belly of the SkyPark is made of more than
9,000 silver-painted metal-composite panels, the panels encloses the mega trusses which bridge
the buildings at level 55, as well as a multitude of back of house spaces. (Safdie, 2011) Material
that mainly used to build Marina Bay Hotel are aluminium and steels as the structural frame and
reinforcement and as well as for the design. (Safdie, 2011)
The material to build the façade of the hotel was carefully chosen to ensure that the
building has a higher Envelope Thermal Transfer Value than the standard. (Mike, 2012)
Whenever possible during the hotel’s construction, the engineers try to use green materials
utilizing recycled products under Singapore’s Green Labeling Scheme – such as drainage cells,
timber decking, drywall partitions and fire-rated doors. (Mike, 2012)
Industrialized Building Systems (IBS) implemented in Singapore Gold Sand Marina Bay Hotel
Industrialized Building Systems, generally known as IBS throughout Malaysia. In
worldwide, IBS is also known as Pre-fabricated/Pre-fab Construction, Modern Method of
Construction (MMC) and Off-site Construction.Industrialized Building Systems is a method of
construction which uses techniques such as mass production of industrial components in a
controlled environment, and latertransported to construction site for further assembly onto specific
buildings. Each and every one of the pre-cast concrete and pre-fabricated timber/steel structures
are customized and standardized making it more efficient and able to maintain it’s persistent in
quality and quantity. Such pre-cast concrete and pre-fabricated timber/steel structures are
particularly useful for high rise buildings or mass housing estates whereas similar structure can be
replicated.
In the construction of MBS, the foundations system used for the three towers was barrette
piles with a number of bored piles for lighter loaded elements of the structures.Piles are driven
into the soil for transferring loads and prevent deformation. Concrete piles are also used as pre-
cast beams to be placed in the structure of the building for the purpose on supporting the building
loadings.
(Foundation of Singapore Gold Sand Marina Bay Hotel)
Furthermore,pre-cast reinforced concrete shear walls, vary from thickness of 28 inches at
the base of the tower to 20 inches of higher floor levels, and are located within 33-foor centres for
each of the three towers. Shear walls are used as primary vertical and transverse structural
system for all three towers.
(Shear walls of three towers)
On top of the MBS is where the SkyPark located. Steel structure for the SkyParkwas pre-
fabricated off-site in 14 primary segments. Then, truck the pre-fabricated steel structure to site
and lift them into place for assembly onto the top of the tower. The bridging sections extending
between adjacent towers each consist of three 400-ton bridge trusses that were pre-assembled at
grade. Totalof 7,000 tons steelwork was erected into the SkyPark to maintain and support its
weight.
(Primary Pre-Fabricated steelsegments)
Advantages of Industrialized Building Systems (IBS)
During the construction, Industrialized Building Systems (IBS) able to increase the
construction speed of MBS by providing pre-cast and pre-fabricatedcomponents. As compared to
normal build, it is much fasteras it doesn’t required labours to construct it step by step. There are
factories that provide pre-cast/pre-fabricated components, saving up time andspeed up the
process of construction. Industrialized Building Systems componentsonly work at the site,
therefore pre-cast/pre-fabricated components must be brought over to site for further assembly. It
also provides flexibility in the design of pre-cast element so that different systems
may produce their own unique pre-fabrication construction methods.
(Fabrication The podium roofs)(Fabrication Sand SkyPark)
Besides that, Industrialized Building Systems also helped to save up costs on the
construction of MBS. WithinIndustrialized Building Systems, there is aluminum, steel, timber and
other materials of formwork that can be reused while pouring the concrete. By using these
systems, itcan reduce the numbers of labours. For examples, the needs for skilled workers, bar-
benders and carpenters can be reduced.
Furthermore, Industrialized Building Systems allowed the construction of MBSto build in a
moreeco-friendly environment. The usagesof timber formwork will be lesser down andwastage of
construction materials can be reducedwhile usingIndustrialized Building Systems in the
construction. The system helps to increase the safety and neatness conditionof site. The systems
also help to avoid the delay on construction works affected by weather. Due to the components of
Industrialized Building Systems, the effects of weather on construction operation became lesser.
In conclusion, Industrialized Building Systems able to save up time, cost, and provide a
more eco-friendly environment during the construction of MBS.
References:
Background Information of Singapore Gold Sand Marina Bay Hotel
1. Chua, A. (2011). Marina Bay Sands. SingaporeInfopedia. Retrieved from
http://infopedia.nl.sg/articles/SIP_1607_2011-11-01.html
2. “Marina Bay Sands / Safdie Architects” (2010, 26 July). ArchDaily. Accessed 23 June2013.
Retrieved fromhttp://www.archdaily.com/70186
3. YourSingapore. (2012). Marina Bay Sands® Hotel and Sands SkyPark®. Retrieved from
http://www.yoursingapore.com/content/traveller/en/browse/see-and-do/arts-and-
entertainment/architecture/sky-park.html
4. Apavisa. (n.d.). SKYPARK, MARINA BAY SANDS – SINGAPORE. Retrieved from
http://www.apavisa.com/en/proyecto-skypark-marina-bay-sands-singapore/
References:
Structure & Materials used on Singapore Gold Sand Marina Bay Hotel
1. Safdie, M. (2011, March). "Marina Bay Sand, Singapore." Council on Tall Building and
Urban Habitat.Retrieved June 22, 2013, from
http://www.ctbuh.org/TallBuildings/FeaturedTallBuildings/ArchiveJournal/MarinaBaySands
/tabid/1766/language/en-US/Default.aspx
2. McCafferty, P. S. & Brodkin, D. & Farnsworth, D. & Scott, D. (2011). Engineering an Icon –
The Marina Bay Sands ® Integrated Resort [Online exclusive].Structure. Retrieved June
22, 2013, from http://www.structuremag.org/article.aspx?articleid=1273
3. Mike, W. (2012, March 13). In Marina Bay Sands: Singapore’s Top Eco-Friendly
Hotel.Argophilia Travel News. Retrieved June 25, 2013, from
http://www.argophilia.com/news/marina-bay-sands-ecological-moves/25349/
References:
Industrialized Building Systems (IBS) implemented inSingapore Gold Sand Marina Bay Hotel
1. Industrialised Building System (IBS). (n.d.). Retrieved June 22, 2013, from Wikipedia:
http://en.wikipedia.org/wiki/Industrialised_Building_System_(IBS)
2. Copyright © Kimlun Corporation Berhad (867077-X). (n.d.). Industrialised Building
Systems (IBS). Retrieved June 22, 2013, from
http://www.kimlun.com/industrial_building_systems.html
3. Soletanche-Bachy Group. (2007). Marina bay sands.Retrieved June 22, 2013,
fromhttp://www.bachy-soletanche.com/SBF/sitev4_uk.nsf/technique/marina-bay-sands
4. McCafferty, P.S.&Brodkin, D.&Farnsworth, D. & Scott, D. (2011). Engineering an Icon–
The Marina Bay Sands ® Integrated Resort [Online exclusive].Structure. Retrieved June
22, 2013, from http://www.structuremag.org/article.aspx?articleid=1273
References:
Advantages of Industrialized Building Systems (IBS)
1. Incik. Mohd Nazli. (2011, March 28). Engineer Thinking..; Advantages of industrialised
building system (IBS). Retrieved from http://inginiur.blogspot.com/2011/03/advantages-of-
industrialised-building.html
2. Yong, E. (2011, May 7). Eric Yong’s Blog;The Advantages & Disadvantages of the
Industrialized Building Systems (IBS). Retrieved from
http://eforericyong.blogspot.com/2011/07/advantages-disadvantages-of.html
3. Juan Maier, B. M. (2012). The Marina Bay Sands Special Issue; the Arup Journal.
Retrieved from www.arup.com/Publications/~/media/Files/.../Arup_Journal_1_2012.ashx

More Related Content

What's hot

Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
Ar. Md Shahroz Alam
 
Dubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyDubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copy
Chyi Ong
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
Est
 

What's hot (20)

Menara Tabung Haji Case Study
Menara Tabung Haji Case StudyMenara Tabung Haji Case Study
Menara Tabung Haji Case Study
 
Green building index
Green building index Green building index
Green building index
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
PPT ON BURJ AL ARAB
PPT ON BURJ AL ARABPPT ON BURJ AL ARAB
PPT ON BURJ AL ARAB
 
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
bs:copbs101
bs:copbs101bs:copbs101
bs:copbs101
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
 
klcc
klccklcc
klcc
 
highland tower case study
highland tower case studyhighland tower case study
highland tower case study
 
kkr 2
kkr 2kkr 2
kkr 2
 
Dubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyDubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copy
 
Petronas twin tower
Petronas twin towerPetronas twin tower
Petronas twin tower
 
Telekom Tower
Telekom TowerTelekom Tower
Telekom Tower
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towers
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau Langkawi
 
Marina Bay Sands Singapore - Presentation
Marina Bay Sands Singapore - PresentationMarina Bay Sands Singapore - Presentation
Marina Bay Sands Singapore - Presentation
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 

Similar to Construction technology i singapore gold sand marina bay hotel

CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
Yap Xin
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
Chin Tze Wei
 
2010 structural designconcrete_sherif
2010 structural designconcrete_sherif2010 structural designconcrete_sherif
2010 structural designconcrete_sherif
hlksd
 

Similar to Construction technology i singapore gold sand marina bay hotel (20)

CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
Skyscrapers
SkyscrapersSkyscrapers
Skyscrapers
 
Internship report
Internship reportInternship report
Internship report
 
Btech
BtechBtech
Btech
 
Chhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal BuildingChhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal Building
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...
 
Table formwork
Table formwork Table formwork
Table formwork
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...
 
Seismic Study of Building with Roof Top Telecommunication Towers
Seismic Study of Building with Roof Top Telecommunication TowersSeismic Study of Building with Roof Top Telecommunication Towers
Seismic Study of Building with Roof Top Telecommunication Towers
 
Aldar Headqaurter
Aldar Headqaurter  Aldar Headqaurter
Aldar Headqaurter
 
IRJET- A Review of Seismic Analysis of Shear Wall Optimization for Multi-...
IRJET-  	  A Review of Seismic Analysis of Shear Wall Optimization for Multi-...IRJET-  	  A Review of Seismic Analysis of Shear Wall Optimization for Multi-...
IRJET- A Review of Seismic Analysis of Shear Wall Optimization for Multi-...
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
Site report
Site reportSite report
Site report
 
2010 structural designconcrete_sherif
2010 structural designconcrete_sherif2010 structural designconcrete_sherif
2010 structural designconcrete_sherif
 
2010 structural designconcrete_sherif
2010 structural designconcrete_sherif2010 structural designconcrete_sherif
2010 structural designconcrete_sherif
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Building Technology II Project 1
Building Technology II Project 1Building Technology II Project 1
Building Technology II Project 1
 

More from 마 이환

Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
마 이환
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines
마 이환
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)
마 이환
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)
마 이환
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd
마 이환
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices
마 이환
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
마 이환
 

More from 마 이환 (20)

Measurement V
Measurement VMeasurement V
Measurement V
 
Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)
 
Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)
 
Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)
 
Internal memo
Internal memoInternal memo
Internal memo
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 

Recently uploaded

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Recently uploaded (20)

Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 

Construction technology i singapore gold sand marina bay hotel

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB1514 – Construction Technology 1 Singapore Gold Sand Marina Bay Hotel April Semester 2013 Group Assignment: Group 4 Submission Date: 26th June 2013 Name Student ID Marks Yam Yih Hwan 0305861 Tan Jia Jia 0307766 Yo Kai Sen 0310563 Teoh Tze Yoong 0314756
  • 2. Background Information of Singapore Gold Sand Marina Bay Hotel Singapore Gold Sand Marina Bay Hotel (MBS) is an Integrated Resort fronting Marina Bay in Singapore, which operated under Las Vegas Sands Corp. (Chua, 2011)MBS is designed by Canadian Architect named Moshe Safdie with Local Executive Architects Aedas, Pte, Ltd. In additional, Arup Group Limited is selected as the Structural Engineering for this project whereas the landscape of this building is designed by Peter Walker & Partners. The entire project area used is 845,000m2 and the site area used is 154,938m2 . The estimated budget on this project is USD $5.7 billion. (Safdie Architects, 2010) MBS began operations on 27 April 2010, and officially opened on 23 June. MBS comprises of three towers with 55-storey high topped by a 12,400m2 SkyPark. As for the Art Science Museum, it is shaped like a lotus flower. (Chua, 2011) On top of its three towers, the Marina Bay Sands was designed as a curious boat-shape and it is placed at the gateway to Singapore's harbor with strong and highly iconic structure. (Apavisa, n.d.) (Layout of Singapore Gold Sand Marina Bay Hotel)
  • 3. Furthermore, MBS offers luxury hotel, casino, retail mall, convention facilities and entertainment venues including theatres, nightclubs and a museum. It has 2,560 luxury rooms across three 55-storey hotel towers, totaling 265,683 m2 . (Safdie Architects, 2010) As we know, Marina Bay Sands is one of the biggest hotelslocated in Singapore; it’s covering 12,400 m2 , and is over 200 meters altitude. It has a 150 meters infinity-edged swimming pool at 250 meters high which overlook the view of Singapore skyline. There is a botanical garden which linked on top of the three 200m high hotels of marina bays where you can find 250 types of tree and 650 species of plants. (Apavisa, n.d.) MBS is one of the most complex designs ever built; it is a slopping tower which its angle as steep as 26 degrees and connecting legs at Level 23 to form a single building. The “Hanging Gardens” provides a magnificent backdrop which the visitors can overlook the upcoming Gardens by the Bay. (YourSingapore, 2012) Structure & Materials used on Singapore Gold Sand Marina Bay Hotel Shear walls are used as primary vertical and transverse structural system for all three towers. (McCafferty, 2011) Additional of concrete core walls located within both legs of each towers restrain the hotel in the longitudinal direction and help prevent out-of-plane buckling of the narrow shear walls within both legs of the towers. (McCafferty, 2011) Post-tensioned 8-inch Flat slabs span directly between the shear walls. (McCafferty, 2011) The flat slab scheme also provides flexibility in the hotel room layout, to hold a relatively tight 9-foot 10-inch typical floor-to- floor height, and accommodates flexibility of building services distribution and coordination throughout each floor. (McCafferty, 2011) (Diagram of Hotel Components)
  • 4. At level 23, where the story-height steel trusses are located, mechanical floors connected the legs of the towerto withstand the large shear forces that occur where these meet above the central atrium. (McCafferty, 2011) The base slab at ground floor level is post-tensioned to resist the horizontal thrusts produced by the inclined legs. (McCafferty, 2011) Each tower slab form is also slightly changed in relation to its pair, to increase the slenderness of the buildings, resulting in the appearance of six towers, instead of three. (Safdie, 2011) There is an energy efficient double-glazed unit suspended at the edge of the slab and is resting on a frame. (Safdie, 2011) Perpendicular to the façade, glass fins were installed to provide shading. (Safdie, 2011) In order to allow it to radiate out in elevation, the glass fins are suspended out of the horizontal stack joint. (Safdie, 2011) The glass fins are supported by a 3-sided aluminium frame, with the exposed forward edge, the sun light is been catch, as well as reflections of the façade, to create a specials effect. (Safdie, 2011) A 30%-reflective glass is used as the fins and to provide shading for the façade up to 20% of all solar gain. (Safdie, 2011) The belly of the SkyPark is made of more than 9,000 silver-painted metal-composite panels, the panels encloses the mega trusses which bridge the buildings at level 55, as well as a multitude of back of house spaces. (Safdie, 2011) Material that mainly used to build Marina Bay Hotel are aluminium and steels as the structural frame and reinforcement and as well as for the design. (Safdie, 2011) The material to build the façade of the hotel was carefully chosen to ensure that the building has a higher Envelope Thermal Transfer Value than the standard. (Mike, 2012) Whenever possible during the hotel’s construction, the engineers try to use green materials utilizing recycled products under Singapore’s Green Labeling Scheme – such as drainage cells, timber decking, drywall partitions and fire-rated doors. (Mike, 2012) Industrialized Building Systems (IBS) implemented in Singapore Gold Sand Marina Bay Hotel Industrialized Building Systems, generally known as IBS throughout Malaysia. In worldwide, IBS is also known as Pre-fabricated/Pre-fab Construction, Modern Method of Construction (MMC) and Off-site Construction.Industrialized Building Systems is a method of construction which uses techniques such as mass production of industrial components in a controlled environment, and latertransported to construction site for further assembly onto specific buildings. Each and every one of the pre-cast concrete and pre-fabricated timber/steel structures are customized and standardized making it more efficient and able to maintain it’s persistent in quality and quantity. Such pre-cast concrete and pre-fabricated timber/steel structures are particularly useful for high rise buildings or mass housing estates whereas similar structure can be replicated. In the construction of MBS, the foundations system used for the three towers was barrette piles with a number of bored piles for lighter loaded elements of the structures.Piles are driven into the soil for transferring loads and prevent deformation. Concrete piles are also used as pre-
  • 5. cast beams to be placed in the structure of the building for the purpose on supporting the building loadings. (Foundation of Singapore Gold Sand Marina Bay Hotel) Furthermore,pre-cast reinforced concrete shear walls, vary from thickness of 28 inches at the base of the tower to 20 inches of higher floor levels, and are located within 33-foor centres for each of the three towers. Shear walls are used as primary vertical and transverse structural system for all three towers. (Shear walls of three towers)
  • 6. On top of the MBS is where the SkyPark located. Steel structure for the SkyParkwas pre- fabricated off-site in 14 primary segments. Then, truck the pre-fabricated steel structure to site and lift them into place for assembly onto the top of the tower. The bridging sections extending between adjacent towers each consist of three 400-ton bridge trusses that were pre-assembled at grade. Totalof 7,000 tons steelwork was erected into the SkyPark to maintain and support its weight. (Primary Pre-Fabricated steelsegments) Advantages of Industrialized Building Systems (IBS) During the construction, Industrialized Building Systems (IBS) able to increase the construction speed of MBS by providing pre-cast and pre-fabricatedcomponents. As compared to normal build, it is much fasteras it doesn’t required labours to construct it step by step. There are factories that provide pre-cast/pre-fabricated components, saving up time andspeed up the process of construction. Industrialized Building Systems componentsonly work at the site, therefore pre-cast/pre-fabricated components must be brought over to site for further assembly. It also provides flexibility in the design of pre-cast element so that different systems may produce their own unique pre-fabrication construction methods. (Fabrication The podium roofs)(Fabrication Sand SkyPark)
  • 7. Besides that, Industrialized Building Systems also helped to save up costs on the construction of MBS. WithinIndustrialized Building Systems, there is aluminum, steel, timber and other materials of formwork that can be reused while pouring the concrete. By using these systems, itcan reduce the numbers of labours. For examples, the needs for skilled workers, bar- benders and carpenters can be reduced. Furthermore, Industrialized Building Systems allowed the construction of MBSto build in a moreeco-friendly environment. The usagesof timber formwork will be lesser down andwastage of construction materials can be reducedwhile usingIndustrialized Building Systems in the construction. The system helps to increase the safety and neatness conditionof site. The systems also help to avoid the delay on construction works affected by weather. Due to the components of Industrialized Building Systems, the effects of weather on construction operation became lesser. In conclusion, Industrialized Building Systems able to save up time, cost, and provide a more eco-friendly environment during the construction of MBS.
  • 8. References: Background Information of Singapore Gold Sand Marina Bay Hotel 1. Chua, A. (2011). Marina Bay Sands. SingaporeInfopedia. Retrieved from http://infopedia.nl.sg/articles/SIP_1607_2011-11-01.html 2. “Marina Bay Sands / Safdie Architects” (2010, 26 July). ArchDaily. Accessed 23 June2013. Retrieved fromhttp://www.archdaily.com/70186 3. YourSingapore. (2012). Marina Bay Sands® Hotel and Sands SkyPark®. Retrieved from http://www.yoursingapore.com/content/traveller/en/browse/see-and-do/arts-and- entertainment/architecture/sky-park.html 4. Apavisa. (n.d.). SKYPARK, MARINA BAY SANDS – SINGAPORE. Retrieved from http://www.apavisa.com/en/proyecto-skypark-marina-bay-sands-singapore/ References: Structure & Materials used on Singapore Gold Sand Marina Bay Hotel 1. Safdie, M. (2011, March). "Marina Bay Sand, Singapore." Council on Tall Building and Urban Habitat.Retrieved June 22, 2013, from http://www.ctbuh.org/TallBuildings/FeaturedTallBuildings/ArchiveJournal/MarinaBaySands /tabid/1766/language/en-US/Default.aspx 2. McCafferty, P. S. & Brodkin, D. & Farnsworth, D. & Scott, D. (2011). Engineering an Icon – The Marina Bay Sands ® Integrated Resort [Online exclusive].Structure. Retrieved June 22, 2013, from http://www.structuremag.org/article.aspx?articleid=1273 3. Mike, W. (2012, March 13). In Marina Bay Sands: Singapore’s Top Eco-Friendly Hotel.Argophilia Travel News. Retrieved June 25, 2013, from http://www.argophilia.com/news/marina-bay-sands-ecological-moves/25349/ References: Industrialized Building Systems (IBS) implemented inSingapore Gold Sand Marina Bay Hotel 1. Industrialised Building System (IBS). (n.d.). Retrieved June 22, 2013, from Wikipedia: http://en.wikipedia.org/wiki/Industrialised_Building_System_(IBS) 2. Copyright © Kimlun Corporation Berhad (867077-X). (n.d.). Industrialised Building Systems (IBS). Retrieved June 22, 2013, from http://www.kimlun.com/industrial_building_systems.html 3. Soletanche-Bachy Group. (2007). Marina bay sands.Retrieved June 22, 2013, fromhttp://www.bachy-soletanche.com/SBF/sitev4_uk.nsf/technique/marina-bay-sands 4. McCafferty, P.S.&Brodkin, D.&Farnsworth, D. & Scott, D. (2011). Engineering an Icon– The Marina Bay Sands ® Integrated Resort [Online exclusive].Structure. Retrieved June 22, 2013, from http://www.structuremag.org/article.aspx?articleid=1273
  • 9. References: Advantages of Industrialized Building Systems (IBS) 1. Incik. Mohd Nazli. (2011, March 28). Engineer Thinking..; Advantages of industrialised building system (IBS). Retrieved from http://inginiur.blogspot.com/2011/03/advantages-of- industrialised-building.html 2. Yong, E. (2011, May 7). Eric Yong’s Blog;The Advantages & Disadvantages of the Industrialized Building Systems (IBS). Retrieved from http://eforericyong.blogspot.com/2011/07/advantages-disadvantages-of.html 3. Juan Maier, B. M. (2012). The Marina Bay Sands Special Issue; the Arup Journal. Retrieved from www.arup.com/Publications/~/media/Files/.../Arup_Journal_1_2012.ashx