SlideShare a Scribd company logo
1 of 2
CMGT 410 Week 5 Complete

                      PLEASE DOWNLOAD HERE
CMGT/410 Week 5 Individual Assignment

Project Postmortem

Now that the company offsite 2-day training session project is over, conduct a
postmortem review.

Submit a 1- to 2-page memo that does the following:

Details the benefits and drawbacks of a postmortem review

Lists who should partake in this meeting,

Indicates what you hope to discover at the conclusion

CMGT/410 Week 5 LearningTeamAssignment

Revise and submit all sections of your Learning Team project along with the
Week Five section below.

It is essential for establishing confidence that a project will be executed effectively
and with minimal waste. A plan for performance measurement requires identifying
which critical element should be measured, how they are measured, and when
they are measured to communicate if the project is on track.

At a minimum the section will contain the following:

Measurable objectives identified as milestones on the Gantt chart

Risk mitigation strategy for analyzing and reporting unplanned changes as well
what procedures you plan to implement for handling change control issues

Description of project reporting regarding the on-going evaluation and status of
project efforts to stakeholder and participants on the project team

Method for determining whether the project has met its objectives and how the
project is terminated

Write 3 to 4 pages on your findings.

Prepare a 10- to 12-slide Microsoft® PowerPoint® presentation of the entire
Learning Team Project, as completed in Weeks Two, Three, Four, and Five.
Week 5 DQ1

Based on the article by Kutsch, why is it important to conduct a project risk
management process? What are some of the downfalls to not conducting
one?

Week 5 DQ2

In your own words, how would you explain project risk management? What
are some real-life examples where project risk management would be
imperative? Givedetailsforeachexample.

More Related Content

Viewers also liked

Semmi különös, csak egész nap lövöldözés
Semmi különös, csak egész nap lövöldözésSemmi különös, csak egész nap lövöldözés
Semmi különös, csak egész nap lövöldözésArany Tibor
 
천안오피, 강서오피, 영통오피, 역삼역오피【다솜넷】
천안오피, 강서오피, 영통오피, 역삼역오피【다솜넷】천안오피, 강서오피, 영통오피, 역삼역오피【다솜넷】
천안오피, 강서오피, 영통오피, 역삼역오피【다솜넷】dasom011
 
강남오피&범계오피,안산오피@<다솜넷>수내역오피
강남오피&범계오피,안산오피@<다솜넷>수내역오피강남오피&범계오피,안산오피@<다솜넷>수내역오피
강남오피&범계오피,안산오피@<다솜넷>수내역오피dasom010
 
청주오피, 부천오피, 논현오피, 인천오피【다솜넷】
청주오피, 부천오피, 논현오피, 인천오피【다솜넷】청주오피, 부천오피, 논현오피, 인천오피【다솜넷】
청주오피, 부천오피, 논현오피, 인천오피【다솜넷】dasom011
 

Viewers also liked (8)

Pressao tubos
Pressao tubosPressao tubos
Pressao tubos
 
Semmi különös, csak egész nap lövöldözés
Semmi különös, csak egész nap lövöldözésSemmi különös, csak egész nap lövöldözés
Semmi különös, csak egész nap lövöldözés
 
About Me
About MeAbout Me
About Me
 
천안오피, 강서오피, 영통오피, 역삼역오피【다솜넷】
천안오피, 강서오피, 영통오피, 역삼역오피【다솜넷】천안오피, 강서오피, 영통오피, 역삼역오피【다솜넷】
천안오피, 강서오피, 영통오피, 역삼역오피【다솜넷】
 
강남오피&범계오피,안산오피@<다솜넷>수내역오피
강남오피&범계오피,안산오피@<다솜넷>수내역오피강남오피&범계오피,안산오피@<다솜넷>수내역오피
강남오피&범계오피,안산오피@<다솜넷>수내역오피
 
Section 2 Side 3 Draft
Section 2 Side 3 DraftSection 2 Side 3 Draft
Section 2 Side 3 Draft
 
Batocka.cert
Batocka.certBatocka.cert
Batocka.cert
 
청주오피, 부천오피, 논현오피, 인천오피【다솜넷】
청주오피, 부천오피, 논현오피, 인천오피【다솜넷】청주오피, 부천오피, 논현오피, 인천오피【다솜넷】
청주오피, 부천오피, 논현오피, 인천오피【다솜넷】
 

Cmgt 410 week 5 complete

  • 1. CMGT 410 Week 5 Complete PLEASE DOWNLOAD HERE CMGT/410 Week 5 Individual Assignment Project Postmortem Now that the company offsite 2-day training session project is over, conduct a postmortem review. Submit a 1- to 2-page memo that does the following: Details the benefits and drawbacks of a postmortem review Lists who should partake in this meeting, Indicates what you hope to discover at the conclusion CMGT/410 Week 5 LearningTeamAssignment Revise and submit all sections of your Learning Team project along with the Week Five section below. It is essential for establishing confidence that a project will be executed effectively and with minimal waste. A plan for performance measurement requires identifying which critical element should be measured, how they are measured, and when they are measured to communicate if the project is on track. At a minimum the section will contain the following: Measurable objectives identified as milestones on the Gantt chart Risk mitigation strategy for analyzing and reporting unplanned changes as well what procedures you plan to implement for handling change control issues Description of project reporting regarding the on-going evaluation and status of project efforts to stakeholder and participants on the project team Method for determining whether the project has met its objectives and how the project is terminated Write 3 to 4 pages on your findings. Prepare a 10- to 12-slide Microsoft® PowerPoint® presentation of the entire Learning Team Project, as completed in Weeks Two, Three, Four, and Five.
  • 2. Week 5 DQ1 Based on the article by Kutsch, why is it important to conduct a project risk management process? What are some of the downfalls to not conducting one? Week 5 DQ2 In your own words, how would you explain project risk management? What are some real-life examples where project risk management would be imperative? Givedetailsforeachexample.