ISTQB / ISEB Foundation Exam Practice - 2
1. Testing in the Lifecycle 1 Principles 2 Lifecycle 4 Dynamic test techniques 3 Static testing 5 Management 6 Tools Software Testing ISTQB / ISEB Foundation Exam Practice Chapter 2
2. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
3. V-Model: test levels Integration Testing in the Small Integration Testing in the Large System Testing Component Testing Acceptance Testing Code Design Specification System Specification Project Specification Business Requirements
4. V-Model: late test design Tests Business Requirements Tests Project Specification Tests System Specification Tests Design Specification Tests Code Integration Testing in the Small Integration Testing in the Large System Testing Component Testing Acceptance Testing “ We don’t have time to design tests early” Design Tests?
5. V-Model: early test design Tests Business Requirements Tests Project Specification Tests System Specification Tests Design Specification Tests Code Integration Testing in the Small Integration Testing in the Large System Testing Component Testing Acceptance Testing Tests Tests Tests Tests Tests Run Tests Design Tests
6.
7. Experience report: Phase 1 Phase 1: Plan 2 mo 2 mo dev test test 150 faults 1st mo. 50 faults users not happy Quality fraught, lots of dev overtime Actual "has to go in" but didn't work
8. Experience report: Phase 2 Source: Simon Barlow & Alan Veitch, Scottish Widows, Feb 96 Phase 2: Plan 2 mo 6 wks dev test test 50 faults 1st mo. 0 faults happy users! Quality smooth, not much for dev to do Actual acc test: full week (vs half day) on time Phase 1: Plan 2 mo 2 mo dev test test 150 faults 1st mo. 50 faults users not happy Quality fraught, lots of dev overtime Actual "has to go in" but didn't work Phase 2: Plan 2 mo 6 wks dev test test 50 faults 1st mo. 0 faults happy users! Quality smooth, not much for dev to do Actual acc test: full week (vs half day) on time
12. The V Model - Exercise Exceptions: Conversion Test FOS: DN/Gldn DS FD Build Components Build Units TD Build System Code Build Assemblage VD System Test Integration Test Review FD Review TD TUT FUT Review DS Review VD Assembly Test
21. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
22.
23.
24.
25.
26.
27.
28.
29.
30. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
31.
32.
33.
34. Component Test Document Hierarchy Source: BS 7925-2, Software Component Testing Standard, Annex A Component Test Strategy Project Component Test Plan Component Test Specification Component Test Plan Component Test Report
35. Component test process Checking for Component Test Completion Component Test Planning Component Test Specification Component Test Execution Component Test Recording BEGIN END
36. Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Component test planning - how the test strategy and project test plan apply to the component under test - any exceptions to the strategy - all software the component will interact with (e.g. stubs and drivers
37. Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Component test specification - test cases are designed using the test case design techniques specified in the test plan (Section 3) - Test case: objective initial state of component input expected outcome - test cases should be repeatable
38. Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Component test execution - each test case is executed - standard does not specify whether executed manually or using a test execution tool
39. Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Component test recording - identities & versions of component, test specification - actual outcome recorded & compared to expected outcome - discrepancies logged - repeat test activities to establish removal of the discrepancy (fault in test or verify fix) - record coverage levels achieved for test completion criteria specified in test plan Sufficient to show test activities carried out
40. Component test process Component Test Planning Component Test Specification Component Test Execution Component Test Recording Checking for Component Test Completion BEGIN END Checking for component test completion - check test records against specified test completion criteria - if not met, repeat test activities - may need to repeat test specification to design test cases to meet completion criteria (e.g. white box)
41.
42. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
72.
73.
74.
75. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
76.
77.
78. User Acceptance testing 20% of function by 80% of code System testing distributed over this line Acceptance testing distributed over this line 80% of function by 20% of code
79.
80.
81.
82. Acceptance testing motto If you don't have patience to test the system the system will surely test your patience
83. Contents Models for testing, economics of testing High level test planning Component Testing Integration testing in the small System testing (non-functional and functional) Integration testing in the large Acceptance testing Maintenance testing Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
84.
85.
86.
87.
88. Summary: Key Points V-model shows test levels, early test design High level test planning Component testing using the standard Integration testing in the small: strategies System testing (non-functional and functional) Integration testing in the large Acceptance testing: user responsibility Maintenance testing to preserve quality Lifecycle 1 2 3 4 5 6 ISTQB / ISEB Foundation Exam Practice
Editor's Notes
Work takes twice as long to do for one week for five users: £50/hr x 7 = £350/day * 5 = £1750/wk / 2 = £875 / wk * 5 users = £4375 Double check because they don't trust it any more, 12% more time for 5 weeks: £350/day * 5 users = £1750, so 12% = £200/day * 25 days = £5000 747 away from stand late £1000/min