Se ha denunciado esta presentación.
Utilizamos tu perfil de LinkedIn y tus datos de actividad para personalizar los anuncios y mostrarte publicidad más relevante. Puedes cambiar tus preferencias de publicidad en cualquier momento.
Incremental Improvement
by Tanya Zavialova
How old is Facebook?
2005 2015
How old is Coca-Cola bottle?
How old is UX Camp Europe?
great examples of quality improvement
illustrate development of ideas and technology
but preservation of legacy
Why do I want to talk about it?
On one hand
some designers believe
that by discarding work
of another guy or girl on
a project
they start revolution.
Most...
On the other hand some
product owners believe
that by simply adding
more features they make
their product better.
Most oft...
I want to share my recipe
Assumptions to start with
• Technology changes
• Context changes
• Expectations change
• Ideas evolve
• You work on yet
an...
picture by unsplash @ pixabay.com
Steps to take to initiate a quality improvement
1. Study existing version first: purpose...
6. Re-create information
architecture and/or
screen flow.
7. Group new features into
categories.
8. Find an appropriate
pl...
picture by unsplash @ pixabay.com
Steps to take to make a quality improvement
8. Go through features list and sketch ideas...
thank you
Incremetal improvement
Incremetal improvement
Próximo SlideShare
Cargando en…5
×

de

Incremetal improvement Slide 1 Incremetal improvement Slide 2 Incremetal improvement Slide 3 Incremetal improvement Slide 4 Incremetal improvement Slide 5 Incremetal improvement Slide 6 Incremetal improvement Slide 7 Incremetal improvement Slide 8 Incremetal improvement Slide 9 Incremetal improvement Slide 10 Incremetal improvement Slide 11 Incremetal improvement Slide 12 Incremetal improvement Slide 13 Incremetal improvement Slide 14 Incremetal improvement Slide 15 Incremetal improvement Slide 16 Incremetal improvement Slide 17
Próximo SlideShare
Design Yourself: Communication and Process in UXD
Siguiente
Descargar para leer sin conexión y ver en pantalla completa.

6 recomendaciones

Compartir

Descargar para leer sin conexión

Incremetal improvement

Descargar para leer sin conexión

It is always a challenge to improve someone else's idea or product without destroying it. I do it for living and here is my recipe.

Incremetal improvement

  1. 1. Incremental Improvement by Tanya Zavialova
  2. 2. How old is Facebook?
  3. 3. 2005 2015
  4. 4. How old is Coca-Cola bottle?
  5. 5. How old is UX Camp Europe?
  6. 6. great examples of quality improvement illustrate development of ideas and technology but preservation of legacy
  7. 7. Why do I want to talk about it?
  8. 8. On one hand some designers believe that by discarding work of another guy or girl on a project they start revolution. Most often not!
  9. 9. On the other hand some product owners believe that by simply adding more features they make their product better. Most often not!
  10. 10. I want to share my recipe
  11. 11. Assumptions to start with • Technology changes • Context changes • Expectations change • Ideas evolve • You work on yet another iteration Therefore • Think roadmap • Think development bandwidth • Think evaluation
  12. 12. picture by unsplash @ pixabay.com Steps to take to initiate a quality improvement 1. Study existing version first: purpose, history, mechanics… 2. Get know users and their feedback’ feedback. 3. Find out what ideas development team has. 4. Read business requirements for the first time. All! 5. Analyze existing pain points and missing parts to fix before new features can be developed.
  13. 13. 6. Re-create information architecture and/or screen flow. 7. Group new features into categories. 8. Find an appropriate place for new features between existing ones. F1 F2 F3 F2.1 F2.2 F2.3 F4 F2.4 F4.1 F4.2 F1.1 Sometimes you need to add not requested features to accommodate requested ones.
  14. 14. picture by unsplash @ pixabay.com Steps to take to make a quality improvement 8. Go through features list and sketch ideas considering existing pain points. 9. List screens and functions that might be affected. 10. Be ready to revise screens at least twice. 11. Discuss proposal with product owner. 12. Discuss proposal with developers (de-scoping follows). 13. Prepare semi-final specification, get approval and share.
  15. 15. thank you
  • nadiyaabrosimova1

    Jun. 30, 2017
  • WGP_web_group

    Jun. 30, 2017
  • nataliapikozh

    Oct. 16, 2015
  • ClaudiaLuckas

    Jun. 25, 2015
  • MarjoBidard

    Jun. 22, 2015
  • prina777

    Jun. 21, 2015

It is always a challenge to improve someone else's idea or product without destroying it. I do it for living and here is my recipe.

Vistas

Total de vistas

1.858

En Slideshare

0

De embebidos

0

Número de embebidos

206

Acciones

Descargas

8

Compartidos

0

Comentarios

0

Me gusta

6

×