CONTENTS
NO. COTENTS

PAGE NO.

1

OBJECTIVE

1

2

INTRODUCTION

2

3

EQUIPMENT

3

4

RESULT

5

DISCUSSION

6

6

CONCLUSION

8
Objective:
The objectives of this field work are:
-

To have a better understanding of the procedure for traversing.
To have experiences to the actual working environment on the site including
uncertainty weather condition.
To have witness the usage of equipment and apparatus on site.
To have the ability to setting up the tripod and adjusting the staff bubble.
To understand how to find out the azimuth from a point to another.
To have skills in using the auto meter level for correct reading
To increase the team working skills among group members.
To have the ability in recording data for the field work
To understand the angle of adjustment of traversing.
To have skills in applying formulae in calculation.
Introduction:
Our second fieldwork for Site Surveying is on traversing. We are required to do
another fieldwork and report with traversing to measure a chosen area. We have been
assigned to do our fieldwork on traversing at an open space area on Block E in Taylor’s
University Lakeside Campus. We were required to take four points on the open space area
to do close traversing.
The equipment required to do traverse survey are slightly different from leveling
survey. The equipment required to do a complete traverse survey are the Tripod,
Automatic Level, Measuring Tape and Plumb Bob. Hence, one of the equipment is
missing will cause a traverse survey unable to complete. Therefore, each of the equipment
of traverse survey is extremely important.
Traverse survey is a survey where we set up the Automatic Level at a point and
measuring few different pinpoints. The angles of the pinpointed stations and the distance
between two points are measured and note down. Traverse survey are measure with high
accuracy to positions a small numbers of pinpointed stations. Moreover, less precise
measurements can be made to features to be located without accumulating accidental
errors. There are two types of traverse survey which are the closed traverse and the
opened traverse.
The difference between a closed traverse and an opened traverse is that one has
the same starting and ending point. Where else, the other one will have different starting
and ending points. A closed traverse have same starting and ending point which means at
the end of the measuring we will go back to the same point. An opened traverse will have
different ending point from the starting one. In the nutshell, a closed traverse has benefits
over an opened traverse. A closed traverse can be refer back to the angles where it is
measured as they have the same starting and ending point and check its’ errors, where an
opened traverse have different starting point and ending point which its’ errors or
mistakes cannot be discovered.
Apparatus:
Basically, we were doing traversing work in our 2nd site surveying fieldwork. We
need a tripod, a dumpy level, some ranging rods (measuring rod) and a measuring tape in
order to finish this fieldwork.
Tripod: A tripod is a portable three-legged frame, used as a platform for supporting the
weight and maintaining the stability of some other object. A tripod provides stability
against downward forces and horizontal forces and movements about horizontal axes.
Automatic level: An automatic level, auto level meter, leveling instrument, or dumpy
level is an optical instrument used to establish or check points in the same horizontal
plane. It is used in surveying and building to transfer, measure, or set horizontal levels.
The automatic level is set up on a tripod and set to a leveled condition using foot screws
(leveling screws).
Ranging rod: A ranging rod is also name as measuring rod or range pole rod. It is a pole
for marking positions in surveying. It is a straight rod painted in bands of alternate red
and white each one foot wide and used for sightings by surveyors.
Measuring tape: A measuring tape is a flexible ruler that allows for a measure of great
length to be easily carried in pocket or toolkit and permits one to measure around curves
or corners. It consists of a ribbon of cloth, plastic, fiber glass, or metal strip with linearmeasurement markings. It is a common measuring tool.

Picture above shows a tripod.
Picture above shows a automatic level.

Picture above shows some ranging rods.
Picture above shows a measuring tape.
Discussion:
Our group consists of five members. In this fieldwork, we are required to conduct
traversing around the campus. Here, the main activity we have to conduct is to set up the
measuring rod at different points and use the auto level machine to calculate the angle
between the measuring rods. The site which we conduct traversing is at the balcony at L.2.
In this fieldwork, we are going to set up a closed traverse. We were told that a closed
traverse will basically consist of four points which will make up a polygon. Closed
traverse involves the usage of interior angle to locate the points of the measuring rod.
We set up our tripod with the auto level meter on it. Having the air bubble inside the
boundary of the circle is to ensure the auto level meter is on a flat surface. Then one of
our group members holding the measuring rod is required to stand at the point we fixed.
The important thing here is that the person holding the measuring rod has to maintain the
rod at the fixed point and remember where the point is located as this affects the accuracy
of measurement. Our problem is that we only have two measuring rod for each group.
The first point is measured as 0˚ and till the second measuring rod is set up, the angle
between these two points is measured. In order to solve this problem, we use stones to
pinpoint the location of the measuring rod. Next, the length from the center of the tripod
to the point of the measuring rod is measured. We also measured the length between the
measuring rods. We are also encouraged to take a larger distance between the measuring
rods. In order to get the center below the auto level meter, the plumb bod is hung onto the
hook at the center of the tripod.
In this fieldwork, our group is effective and fast. We were fast enough to finish our
traversing before the sun gets too hot. We had set up four points as required and after
measuring all the lengths and angle between the measuring rods from the auto level meter,
our group get some confusion when we looked back to our data. Our group members
started to discuss about the data collected. Here, our lecturer, Sir Wong JeeKhai help us a
lot as he gave us a few questions to be thought through so that we knew how we could get
two of the internal angles at the end and found out where is the root of our problems. Our
problem is mainly about data recording. The angle measured is in between the measuring
rod taking the tripod as the center but the recording of data records the internal angle to
be the angles between the measuring rods. Throughout this process, we are required to
think and discuss among ourselves to solve this confusion and we learn how to discuss
and cooperate among each other so that we can find the answers to our question. At the
end, we were able to understand the steps to calculate the internal angles using both the
length and angles we had measured. The solution here is to have a clear idea on the
angles we have and use the trigonometry to find the length and angles of other parts.
After all these data collection and discussion, we started calculating all the internal
angles of our closed traverse. When we found out there is an error present, we had to
carry out the angle adjustment for closed traverse. This process requires the balancing of
internal angles, computation of latitudes and departure and also the balancing of latitudes
and departures. Latitude can be considered as the ∆Y and departure as the ∆X. The
calculation will include calculation using trigonometry sin and cos. As we were not given
the coordinate of one of the point, we could not compute the coordinates of the remaining
points.
Below are the formulae we used in calculation:
1. Sum of internal angle of polygon = (n – 2) x 180˚
2. Misclosure =
3. Latitude (∆Y) = Distance (H) cos α
4. Departures (∆X) = Distance (H) sin α
5. Error = ∑∆Y / ∑∆X
6. Correction = Error x
7. Adjusted ∆Y = ∆Y – Correction
8. Adjusted ∆X = ∆X – Correction

–
Conclusion:
Traversing is one of main task to identify the pin point on the map or in construction
drawing, so that we will stick to the boundary accurately. In this field work we did come
through some of the obstacle and have greater understanding on traversing. By carry out
this field work, we find that it is much harder compared with calculations we do in the
class. It is because there are so many mistakes we could pick up by not concentrating on
what we are doing or rushing it. Moreover, it allows us to hands-on on the equipment.
This is a great experience to explore and have a better knowing on the equipment.
Furthermore, our team have shown a good team work spirit. All of us get to their own
station and carry out their duty in no time. Besides that, we have adopted a systematic
way to carry out the task. We try to picture out the area that we are going to measure and
distribute job accordingly. In conclusion, this field work benefit us by stepping out of the
classroom which allow us to open our up our eyes and look into the practical part of it.

Más contenido relacionado

La actualidad más candente

SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSVISHNU VIJAYAN
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Est
 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling Darren Lee
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsBahzad5
 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eportMELVIN tan
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1Est
 
Tranverse report
Tranverse report Tranverse report
Tranverse report Wen Crystal
 
Closed Traverse Surveying - Report
Closed Traverse Surveying - ReportClosed Traverse Surveying - Report
Closed Traverse Surveying - ReportSarchia Khursheed
 
traversing of survey
traversing of surveytraversing of survey
traversing of surveySelf-employed
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversingseenyee
 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Enoch Wong
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Haziq1511
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric surveyStudent
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-reportFelix Vong
 
Leveling final-report
Leveling final-reportLeveling final-report
Leveling final-reportFelix Vong
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1tfkc1212
 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Haziq1511
 

La actualidad más candente (20)

SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2
 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eport
 
Two pegtest
Two pegtestTwo pegtest
Two pegtest
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
 
Tranverse report
Tranverse report Tranverse report
Tranverse report
 
Closed Traverse Surveying - Report
Closed Traverse Surveying - ReportClosed Traverse Surveying - Report
Closed Traverse Surveying - Report
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Levelling report
Levelling reportLevelling report
Levelling report
 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)
 
Traversing
TraversingTraversing
Traversing
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-report
 
Leveling final-report
Leveling final-reportLeveling final-report
Leveling final-report
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)
 

Destacado

Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2 JamesMoy7
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1Yap Xin
 
Site Surveying report2 traversing
Site Surveying report2 traversingSite Surveying report2 traversing
Site Surveying report2 traversingKhangWei Chin
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSheng Zhe
 
Assignment 1
Assignment 1Assignment 1
Assignment 1Momo Poyi
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling seenyee
 
Levelling final
Levelling finalLevelling final
Levelling finalseenyee
 
S2 3.1 tape and offset surveying
S2 3.1 tape and offset surveyingS2 3.1 tape and offset surveying
S2 3.1 tape and offset surveyingEst
 
Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Sheng Zhe
 
Introduction to Sunway Berhad
Introduction to Sunway BerhadIntroduction to Sunway Berhad
Introduction to Sunway BerhadJohann Lo
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - TraversingXinYee Khoo
 
Skyscrapers- Petronas Towers
Skyscrapers- Petronas TowersSkyscrapers- Petronas Towers
Skyscrapers- Petronas TowersRanju Ravindran
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i마 이환
 

Destacado (20)

Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Site Surveying report2 traversing
Site Surveying report2 traversingSite Surveying report2 traversing
Site Surveying report2 traversing
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversing
 
Assignment 1
Assignment 1Assignment 1
Assignment 1
 
Fieldwork 1
Fieldwork 1Fieldwork 1
Fieldwork 1
 
Surveying l
Surveying lSurveying l
Surveying l
 
Bandar Sunway Lagoon
Bandar Sunway LagoonBandar Sunway Lagoon
Bandar Sunway Lagoon
 
Surveying
SurveyingSurveying
Surveying
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling
 
Levelling final
Levelling finalLevelling final
Levelling final
 
S2 3.1 tape and offset surveying
S2 3.1 tape and offset surveyingS2 3.1 tape and offset surveying
S2 3.1 tape and offset surveying
 
Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
 
Introduction to Sunway Berhad
Introduction to Sunway BerhadIntroduction to Sunway Berhad
Introduction to Sunway Berhad
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Sunway Group
Sunway Group Sunway Group
Sunway Group
 
Skyscrapers- Petronas Towers
Skyscrapers- Petronas TowersSkyscrapers- Petronas Towers
Skyscrapers- Petronas Towers
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
 

Similar a Site Surveying Fieldwork 2

Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Enoch Wong
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)Jing Chuang
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Doreen Yeo
 
Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) PartBishnuBhandari12
 
GNSS Localizations for Construction
GNSS Localizations for ConstructionGNSS Localizations for Construction
GNSS Localizations for ConstructionDavid Rowlett
 
Learners Module Quarter 3 and 4 Grade 7
Learners Module Quarter 3 and 4 Grade 7Learners Module Quarter 3 and 4 Grade 7
Learners Module Quarter 3 and 4 Grade 7Rhea Domingo
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignmentSze Ting Kuek
 
Tacheometry @surveyingreport
Tacheometry @surveyingreportTacheometry @surveyingreport
Tacheometry @surveyingreportKiplimoCalvin
 
ABSTRACT The objective of this experiment is to calculate the ar.docx
ABSTRACT The objective of this experiment is to calculate the ar.docxABSTRACT The objective of this experiment is to calculate the ar.docx
ABSTRACT The objective of this experiment is to calculate the ar.docxransayo
 
Traverse @surveyingreport
Traverse @surveyingreportTraverse @surveyingreport
Traverse @surveyingreportKiplimoCalvin
 
1.4 Modeling And Analysis, The Mongolian Steppe Steps
1.4 Modeling And Analysis, The Mongolian Steppe Steps1.4 Modeling And Analysis, The Mongolian Steppe Steps
1.4 Modeling And Analysis, The Mongolian Steppe StepsTyler Cash
 
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINEROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINEKiplimoCalvin
 
G6 m5-a-lesson 3-t
G6 m5-a-lesson 3-tG6 m5-a-lesson 3-t
G6 m5-a-lesson 3-tmlabuski
 
Surveying instruments.pptx
Surveying instruments.pptxSurveying instruments.pptx
Surveying instruments.pptxNATHANNATE4
 
Constant velocity presentation
Constant velocity presentationConstant velocity presentation
Constant velocity presentationsmithnj
 
Interactive Ppt
Interactive PptInteractive Ppt
Interactive Pptcoxonj
 
Share My Lesson: The Slope of a Line
Share My Lesson: The Slope of a LineShare My Lesson: The Slope of a Line
Share My Lesson: The Slope of a LineShare My Lesson
 
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfLecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfAlwandBarzani
 

Similar a Site Surveying Fieldwork 2 (20)

Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)
 
2 nd report
2 nd report2 nd report
2 nd report
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) Part
 
GNSS Localizations for Construction
GNSS Localizations for ConstructionGNSS Localizations for Construction
GNSS Localizations for Construction
 
Learners Module Quarter 3 and 4 Grade 7
Learners Module Quarter 3 and 4 Grade 7Learners Module Quarter 3 and 4 Grade 7
Learners Module Quarter 3 and 4 Grade 7
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignment
 
Tacheometry @surveyingreport
Tacheometry @surveyingreportTacheometry @surveyingreport
Tacheometry @surveyingreport
 
ABSTRACT The objective of this experiment is to calculate the ar.docx
ABSTRACT The objective of this experiment is to calculate the ar.docxABSTRACT The objective of this experiment is to calculate the ar.docx
ABSTRACT The objective of this experiment is to calculate the ar.docx
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Traverse @surveyingreport
Traverse @surveyingreportTraverse @surveyingreport
Traverse @surveyingreport
 
1.4 Modeling And Analysis, The Mongolian Steppe Steps
1.4 Modeling And Analysis, The Mongolian Steppe Steps1.4 Modeling And Analysis, The Mongolian Steppe Steps
1.4 Modeling And Analysis, The Mongolian Steppe Steps
 
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINEROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
 
G6 m5-a-lesson 3-t
G6 m5-a-lesson 3-tG6 m5-a-lesson 3-t
G6 m5-a-lesson 3-t
 
Surveying instruments.pptx
Surveying instruments.pptxSurveying instruments.pptx
Surveying instruments.pptx
 
Constant velocity presentation
Constant velocity presentationConstant velocity presentation
Constant velocity presentation
 
Interactive Ppt
Interactive PptInteractive Ppt
Interactive Ppt
 
Share My Lesson: The Slope of a Line
Share My Lesson: The Slope of a LineShare My Lesson: The Slope of a Line
Share My Lesson: The Slope of a Line
 
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfLecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
 

Más de Yap Xin

Building services report subang parade
Building services report  subang paradeBuilding services report  subang parade
Building services report subang paradeYap Xin
 
Building services presentation subang parade
Building services presentation subang paradeBuilding services presentation subang parade
Building services presentation subang paradeYap Xin
 
Compile version communication in consruction
Compile version communication in consructionCompile version communication in consruction
Compile version communication in consructionYap Xin
 
SMART tunnel report
SMART tunnel reportSMART tunnel report
SMART tunnel reportYap Xin
 
BS Stormwater management assignment
BS Stormwater management assignmentBS Stormwater management assignment
BS Stormwater management assignmentYap Xin
 
CT site visit report
CT site visit report CT site visit report
CT site visit report Yap Xin
 
CT Part 2
CT Part 2CT Part 2
CT Part 2Yap Xin
 
Rubber presentation slide
Rubber presentation slideRubber presentation slide
Rubber presentation slideYap Xin
 
CT Presentation (KLCC)
CT Presentation (KLCC)CT Presentation (KLCC)
CT Presentation (KLCC)Yap Xin
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written ReportYap Xin
 
Site research report bm (steel) corrected
Site research report bm (steel) correctedSite research report bm (steel) corrected
Site research report bm (steel) correctedYap Xin
 

Más de Yap Xin (11)

Building services report subang parade
Building services report  subang paradeBuilding services report  subang parade
Building services report subang parade
 
Building services presentation subang parade
Building services presentation subang paradeBuilding services presentation subang parade
Building services presentation subang parade
 
Compile version communication in consruction
Compile version communication in consructionCompile version communication in consruction
Compile version communication in consruction
 
SMART tunnel report
SMART tunnel reportSMART tunnel report
SMART tunnel report
 
BS Stormwater management assignment
BS Stormwater management assignmentBS Stormwater management assignment
BS Stormwater management assignment
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
CT Part 2
CT Part 2CT Part 2
CT Part 2
 
Rubber presentation slide
Rubber presentation slideRubber presentation slide
Rubber presentation slide
 
CT Presentation (KLCC)
CT Presentation (KLCC)CT Presentation (KLCC)
CT Presentation (KLCC)
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
Site research report bm (steel) corrected
Site research report bm (steel) correctedSite research report bm (steel) corrected
Site research report bm (steel) corrected
 

Último

Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfAarwolf Industries LLC
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...panagenda
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observabilityitnewsafrica
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Kaya Weers
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integrationmarketing932765
 
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...itnewsafrica
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialJoão Esperancinha
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...Nikki Chapple
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...BookNet Canada
 
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Mark Simos
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...Wes McKinney
 
All These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDFAll These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDFMichael Gough
 
Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Karmanjay Verma
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 

Último (20)

Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdf
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
 
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorial
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
 
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
 
All These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDFAll These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDF
 
Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 

Site Surveying Fieldwork 2

  • 1. ________________________ SITE SURVEYING (QSB 1813) SEMESTER 2 FIELDWORK REPORT 2 NAME STUDENT ID LIEW CHEE HOW 0314758 FELIX LAU CIUN 0301789 WOO TEO JUN TANG 0314667 YAP HUE ENG 0314857 YAP ZHI XIN 0314542 SUBMISSION DATE: 4 DECEMBER 2013
  • 3. Objective: The objectives of this field work are: - To have a better understanding of the procedure for traversing. To have experiences to the actual working environment on the site including uncertainty weather condition. To have witness the usage of equipment and apparatus on site. To have the ability to setting up the tripod and adjusting the staff bubble. To understand how to find out the azimuth from a point to another. To have skills in using the auto meter level for correct reading To increase the team working skills among group members. To have the ability in recording data for the field work To understand the angle of adjustment of traversing. To have skills in applying formulae in calculation.
  • 4. Introduction: Our second fieldwork for Site Surveying is on traversing. We are required to do another fieldwork and report with traversing to measure a chosen area. We have been assigned to do our fieldwork on traversing at an open space area on Block E in Taylor’s University Lakeside Campus. We were required to take four points on the open space area to do close traversing. The equipment required to do traverse survey are slightly different from leveling survey. The equipment required to do a complete traverse survey are the Tripod, Automatic Level, Measuring Tape and Plumb Bob. Hence, one of the equipment is missing will cause a traverse survey unable to complete. Therefore, each of the equipment of traverse survey is extremely important. Traverse survey is a survey where we set up the Automatic Level at a point and measuring few different pinpoints. The angles of the pinpointed stations and the distance between two points are measured and note down. Traverse survey are measure with high accuracy to positions a small numbers of pinpointed stations. Moreover, less precise measurements can be made to features to be located without accumulating accidental errors. There are two types of traverse survey which are the closed traverse and the opened traverse. The difference between a closed traverse and an opened traverse is that one has the same starting and ending point. Where else, the other one will have different starting and ending points. A closed traverse have same starting and ending point which means at the end of the measuring we will go back to the same point. An opened traverse will have different ending point from the starting one. In the nutshell, a closed traverse has benefits over an opened traverse. A closed traverse can be refer back to the angles where it is measured as they have the same starting and ending point and check its’ errors, where an opened traverse have different starting point and ending point which its’ errors or mistakes cannot be discovered.
  • 5. Apparatus: Basically, we were doing traversing work in our 2nd site surveying fieldwork. We need a tripod, a dumpy level, some ranging rods (measuring rod) and a measuring tape in order to finish this fieldwork. Tripod: A tripod is a portable three-legged frame, used as a platform for supporting the weight and maintaining the stability of some other object. A tripod provides stability against downward forces and horizontal forces and movements about horizontal axes. Automatic level: An automatic level, auto level meter, leveling instrument, or dumpy level is an optical instrument used to establish or check points in the same horizontal plane. It is used in surveying and building to transfer, measure, or set horizontal levels. The automatic level is set up on a tripod and set to a leveled condition using foot screws (leveling screws). Ranging rod: A ranging rod is also name as measuring rod or range pole rod. It is a pole for marking positions in surveying. It is a straight rod painted in bands of alternate red and white each one foot wide and used for sightings by surveyors. Measuring tape: A measuring tape is a flexible ruler that allows for a measure of great length to be easily carried in pocket or toolkit and permits one to measure around curves or corners. It consists of a ribbon of cloth, plastic, fiber glass, or metal strip with linearmeasurement markings. It is a common measuring tool. Picture above shows a tripod.
  • 6. Picture above shows a automatic level. Picture above shows some ranging rods.
  • 7. Picture above shows a measuring tape.
  • 8. Discussion: Our group consists of five members. In this fieldwork, we are required to conduct traversing around the campus. Here, the main activity we have to conduct is to set up the measuring rod at different points and use the auto level machine to calculate the angle between the measuring rods. The site which we conduct traversing is at the balcony at L.2. In this fieldwork, we are going to set up a closed traverse. We were told that a closed traverse will basically consist of four points which will make up a polygon. Closed traverse involves the usage of interior angle to locate the points of the measuring rod. We set up our tripod with the auto level meter on it. Having the air bubble inside the boundary of the circle is to ensure the auto level meter is on a flat surface. Then one of our group members holding the measuring rod is required to stand at the point we fixed. The important thing here is that the person holding the measuring rod has to maintain the rod at the fixed point and remember where the point is located as this affects the accuracy of measurement. Our problem is that we only have two measuring rod for each group. The first point is measured as 0˚ and till the second measuring rod is set up, the angle between these two points is measured. In order to solve this problem, we use stones to pinpoint the location of the measuring rod. Next, the length from the center of the tripod to the point of the measuring rod is measured. We also measured the length between the measuring rods. We are also encouraged to take a larger distance between the measuring rods. In order to get the center below the auto level meter, the plumb bod is hung onto the hook at the center of the tripod. In this fieldwork, our group is effective and fast. We were fast enough to finish our traversing before the sun gets too hot. We had set up four points as required and after measuring all the lengths and angle between the measuring rods from the auto level meter, our group get some confusion when we looked back to our data. Our group members started to discuss about the data collected. Here, our lecturer, Sir Wong JeeKhai help us a lot as he gave us a few questions to be thought through so that we knew how we could get two of the internal angles at the end and found out where is the root of our problems. Our problem is mainly about data recording. The angle measured is in between the measuring rod taking the tripod as the center but the recording of data records the internal angle to be the angles between the measuring rods. Throughout this process, we are required to think and discuss among ourselves to solve this confusion and we learn how to discuss and cooperate among each other so that we can find the answers to our question. At the end, we were able to understand the steps to calculate the internal angles using both the length and angles we had measured. The solution here is to have a clear idea on the angles we have and use the trigonometry to find the length and angles of other parts. After all these data collection and discussion, we started calculating all the internal angles of our closed traverse. When we found out there is an error present, we had to carry out the angle adjustment for closed traverse. This process requires the balancing of internal angles, computation of latitudes and departure and also the balancing of latitudes
  • 9. and departures. Latitude can be considered as the ∆Y and departure as the ∆X. The calculation will include calculation using trigonometry sin and cos. As we were not given the coordinate of one of the point, we could not compute the coordinates of the remaining points. Below are the formulae we used in calculation: 1. Sum of internal angle of polygon = (n – 2) x 180˚ 2. Misclosure = 3. Latitude (∆Y) = Distance (H) cos α 4. Departures (∆X) = Distance (H) sin α 5. Error = ∑∆Y / ∑∆X 6. Correction = Error x 7. Adjusted ∆Y = ∆Y – Correction 8. Adjusted ∆X = ∆X – Correction –
  • 10. Conclusion: Traversing is one of main task to identify the pin point on the map or in construction drawing, so that we will stick to the boundary accurately. In this field work we did come through some of the obstacle and have greater understanding on traversing. By carry out this field work, we find that it is much harder compared with calculations we do in the class. It is because there are so many mistakes we could pick up by not concentrating on what we are doing or rushing it. Moreover, it allows us to hands-on on the equipment. This is a great experience to explore and have a better knowing on the equipment. Furthermore, our team have shown a good team work spirit. All of us get to their own station and carry out their duty in no time. Besides that, we have adopted a systematic way to carry out the task. We try to picture out the area that we are going to measure and distribute job accordingly. In conclusion, this field work benefit us by stepping out of the classroom which allow us to open our up our eyes and look into the practical part of it.