Special Issue Blogpost: Mount Polley, B.C., Tailings Dam Breach, Aug. 4th
2014
foboni@riskope.com coboni@riskope.com
Special Issue:
Mount Polley, B.C., Tailings Dam Breach, Aug. 4th
2014
We have, like many, been reading publicly available information about the widely
reported tailings dam accident at Mount Polley, B.C., Canada.
Of course, official inquiries will discuss causes and reponsibilities. What we intend to do
with this note is to rationally discuss a few concepts linked to this event, as it seems
that, like usual, in the aftermath of a catastrophe, numerous voices raise out of
emotional and sometimes irrational perceptions and issues start to be confused.
©Oboni Riskope Associates
Inc. www.riskope.com
Page 1 of 3 Vancouver Aug. 9th
2014
Special Issue Blogpost: Mount Polley, B.C., Tailings Dam Breach, Aug. 4th
2014
foboni@riskope.com coboni@riskope.com
In a paper we wrote in 2012 (see our blog http://www.riskope.com/2014/01/09/aspects-
of-risk-tolerability-manageable-vs-unmanageable-risks-in-relation-to-critical-decisions-
perpetuity-projects-public-opposition/ and download the paper
http://www.riskope.com/wp-content/uploads/2013/06/Factual-and-Foreseeable-
Reliability-of-Tailings-Dams-and-Nuclear-Reactors-a-Societal-Acceptability-Perspective.pdf
) we evaluated the world-wide rate of failures (major accidents only) of tailings dams and
nuclear reactors.
We used published records and statistics from reputable sources. We noted that “major
tailings accidents” are/were only fuzzily defined (generally it seems that the bigger the
outflow of material from the breached dam, the bigger the mediatic impact), contrary to
other hazardous industries (nuclear, for example).
On a portfolio of approximately 3,500 tailings dams world-wide we evaluated that in the
decade around 1979 (1974-1984) the rate of failure was 10-3
(one dam in one thousand
per annum on average) and the decade around 1999 (1994-2004) the rate of failure was
2*10-4
(two dams in ten thousand per annum on average). Those numbers mean
respectively 3.5 major dams breach in average per year (1974-1984), 0.7 major dams
breach in average per year (1994-2004). With those averages one could easily evaluate
the probability of having more failures in one year, but we will leave this aside, for the
moment. Again, we do not know if 3,500 is still correct, but we assume it is for the sake
of the discussion, and there is no clear definition of what a major breach is, so we
assume these are the most widely reported failures, that reach even non expert public
through media exposure. The validity of the 3.5-0.7 range can easily be “verified” by
looking at the Chronology of major tailings dam failures as published, for example, by
Wise-Uranium in their website. As such, the decrease from 3.5 to 0.7 can be seen as an
indicator of the mining industry performing overall a better job today than it did in the
past, but we will also leave this discussion to another time.
Many hazardous industries (chemical, electrical, for example) around the world consider
the limit of credibility for an accident at a probability in the range of 10-5
to 10-6
(one in
hundred thousand to one in a million). By the way, hydro dams have historic record of
failure floating around the credibility threshold. Thus tailings dams are to be considered
more hazardous than hydro dams, and they unfortunately cannot be breached at the end
of service life: they have to stay there “forever”. Obviously, with the estimated values of
the prior paragraph, major tailings dams breaches are to be considered way above
credibility now, and more so, in the longer run, although long term consolidation may
help a bit.
©Oboni Riskope Associates
Inc. www.riskope.com
Page 2 of 3 Vancouver Aug. 9th
2014
Special Issue Blogpost: Mount Polley, B.C., Tailings Dam Breach, Aug. 4th
2014
foboni@riskope.com coboni@riskope.com
There are, of course, ways to build and manage dams at levels of care that would reduce
the probability of major failures to the credibility threshold and we have already
demonstrated how this is possible in the short term. For the long term, including
perpetual care, we are publishing a paper and presenting a short course at the next
Tailings and Mine Waste 2014 conference in Keystone, Colorado with our friend Jack
Caldwell.
Finally we would like to touch on the theme of risk tolerability (tolerance) both from the
social and from the corporate point of view. Understanding social and corporate
tolerability (tolerance) to risk is an essential skill for governance and effective leadership
(http://www.riskope.com/wp-content/uploads/2013/06/Riskope-Aspects-of-Risk-
Tolerability-Manageable-vs.-Unmanageable-Risks-in-Relation-to-Governance-and-
Effective-Leadership.pdf ), one that effectively reduces knee-jerk reactions and crisis
potential in the aftermath of an accident. Unfortunately, common practice approaches in
the risk assessment/management arena use misleading tools such as Probability Impact
Graphs (PIGs, FMEA) that mask the reality of tolerance thresholds behind binning
exercises with multicoloured (and arbitrary) matrices. Misleading risk assessments
(http://www.riskope.com/wp-content/uploads/Can-We-Stop-Misrepresenting-Reality-to-
the-Public.pdf ) lead to wrong decisions, improper allotment of mitigative funds and
anger the public.
Proper tools exist, rational concepts have been laid out by many.
It is possible to get out of the rut of obsolete and misleading methods, avoiding future
routs!
©Oboni Riskope Associates
Inc. www.riskope.com
Page 3 of 3 Vancouver Aug. 9th
2014

More Related Content

Viewers also liked

Real World Applications of OWL
Real World Applications of OWLReal World Applications of OWL
Real World Applications of OWLMichel Dumontier
 
Web 2.0, Nederlandse Spoorwegen En Proefstation Leiden
Web 2.0, Nederlandse Spoorwegen En Proefstation LeidenWeb 2.0, Nederlandse Spoorwegen En Proefstation Leiden
Web 2.0, Nederlandse Spoorwegen En Proefstation LeidenCoenDirkx
 
Are You A User Centred Designer?
Are You A User Centred Designer?Are You A User Centred Designer?
Are You A User Centred Designer?Johnson Goh
 
PresentacióN1
PresentacióN1PresentacióN1
PresentacióN1Alex_27
 
IVI Program, 'Scaling Up Entrepreneurship,' progam description
IVI Program, 'Scaling Up Entrepreneurship,' progam descriptionIVI Program, 'Scaling Up Entrepreneurship,' progam description
IVI Program, 'Scaling Up Entrepreneurship,' progam descriptionThomas Nastas
 
Certificación inversión o gasto
Certificación inversión o gastoCertificación inversión o gasto
Certificación inversión o gastoIvo Castillo
 
How to write tech posts & talks
How to write tech posts & talksHow to write tech posts & talks
How to write tech posts & talksRyan Chartrand
 
Amazon web services in the cloud computing landscape
Amazon web services in the cloud computing landscapeAmazon web services in the cloud computing landscape
Amazon web services in the cloud computing landscapelodeblomme
 
Internet e social network: ne abbiamo piene le tasche
Internet e social network: ne abbiamo piene le tascheInternet e social network: ne abbiamo piene le tasche
Internet e social network: ne abbiamo piene le tascheDenis Ferraretti
 

Viewers also liked (16)

Walt Disney Quotes
Walt Disney QuotesWalt Disney Quotes
Walt Disney Quotes
 
Monaco201209
Monaco201209Monaco201209
Monaco201209
 
Real World Applications of OWL
Real World Applications of OWLReal World Applications of OWL
Real World Applications of OWL
 
Web 2.0, Nederlandse Spoorwegen En Proefstation Leiden
Web 2.0, Nederlandse Spoorwegen En Proefstation LeidenWeb 2.0, Nederlandse Spoorwegen En Proefstation Leiden
Web 2.0, Nederlandse Spoorwegen En Proefstation Leiden
 
Banana2008
Banana2008Banana2008
Banana2008
 
Los gansos
Los gansosLos gansos
Los gansos
 
Are You A User Centred Designer?
Are You A User Centred Designer?Are You A User Centred Designer?
Are You A User Centred Designer?
 
Ishii presentation
Ishii presentationIshii presentation
Ishii presentation
 
PresentacióN1
PresentacióN1PresentacióN1
PresentacióN1
 
IVI Program, 'Scaling Up Entrepreneurship,' progam description
IVI Program, 'Scaling Up Entrepreneurship,' progam descriptionIVI Program, 'Scaling Up Entrepreneurship,' progam description
IVI Program, 'Scaling Up Entrepreneurship,' progam description
 
Riskopecredience 10 05 Final_Version
Riskopecredience 10 05 Final_VersionRiskopecredience 10 05 Final_Version
Riskopecredience 10 05 Final_Version
 
Certificación inversión o gasto
Certificación inversión o gastoCertificación inversión o gasto
Certificación inversión o gasto
 
How to write tech posts & talks
How to write tech posts & talksHow to write tech posts & talks
How to write tech posts & talks
 
AGENTS OF GOD
AGENTS OF GOD AGENTS OF GOD
AGENTS OF GOD
 
Amazon web services in the cloud computing landscape
Amazon web services in the cloud computing landscapeAmazon web services in the cloud computing landscape
Amazon web services in the cloud computing landscape
 
Internet e social network: ne abbiamo piene le tasche
Internet e social network: ne abbiamo piene le tascheInternet e social network: ne abbiamo piene le tasche
Internet e social network: ne abbiamo piene le tasche
 

More from Oboni Riskope Associates Inc.

Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Oboni Riskope Associates Inc.
 
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Oboni Riskope Associates Inc.
 
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Associates Inc.
 
Rims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeRims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeOboni Riskope Associates Inc.
 

More from Oboni Riskope Associates Inc. (20)

Riskope new web site announcement
Riskope new web site announcementRiskope new web site announcement
Riskope new web site announcement
 
Rational Risk and Crisis Management Course
Rational Risk and Crisis Management CourseRational Risk and Crisis Management Course
Rational Risk and Crisis Management Course
 
Cim2013 oboni oboni_zabolotoniuk
Cim2013 oboni oboni_zabolotoniukCim2013 oboni oboni_zabolotoniuk
Cim2013 oboni oboni_zabolotoniuk
 
Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...
 
Riskope for christmas 2012
Riskope for christmas 2012Riskope for christmas 2012
Riskope for christmas 2012
 
Ore cockpit castellano
Ore cockpit castellanoOre cockpit castellano
Ore cockpit castellano
 
Mining 012 riskope is it true that pi_gs
Mining 012 riskope  is it true that pi_gsMining 012 riskope  is it true that pi_gs
Mining 012 riskope is it true that pi_gs
 
Bogota 02 10-011 Risk Management Mining Summit
Bogota 02 10-011 Risk Management Mining SummitBogota 02 10-011 Risk Management Mining Summit
Bogota 02 10-011 Risk Management Mining Summit
 
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
 
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
 
Review ICS Guidelines
Review ICS GuidelinesReview ICS Guidelines
Review ICS Guidelines
 
Cassass presentation WLF2 Rome
Cassass presentation WLF2 RomeCassass presentation WLF2 Rome
Cassass presentation WLF2 Rome
 
Road Safety- Sicurezza Stradale
Road Safety- Sicurezza StradaleRoad Safety- Sicurezza Stradale
Road Safety- Sicurezza Stradale
 
Tolerability and Decision Making Discussion
Tolerability and Decision Making DiscussionTolerability and Decision Making Discussion
Tolerability and Decision Making Discussion
 
Rims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeRims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, Riskope
 
Rims Metals and Mining Session
Rims Metals and Mining Session Rims Metals and Mining Session
Rims Metals and Mining Session
 
Force Majeure: a Time Bomb
Force Majeure: a Time BombForce Majeure: a Time Bomb
Force Majeure: a Time Bomb
 
Oboni02 castellano
Oboni02 castellanoOboni02 castellano
Oboni02 castellano
 
Oboni01 castellano
Oboni01 castellanoOboni01 castellano
Oboni01 castellano
 
Cda esm waste oil disposal application part 2
Cda esm waste oil disposal application part 2Cda esm waste oil disposal application part 2
Cda esm waste oil disposal application part 2
 

Recently uploaded

Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 

Recently uploaded (20)

Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

Mount polley tailings dam failure, BC, Canada, Aug. 4th 2014

  • 1. Special Issue Blogpost: Mount Polley, B.C., Tailings Dam Breach, Aug. 4th 2014 foboni@riskope.com coboni@riskope.com Special Issue: Mount Polley, B.C., Tailings Dam Breach, Aug. 4th 2014 We have, like many, been reading publicly available information about the widely reported tailings dam accident at Mount Polley, B.C., Canada. Of course, official inquiries will discuss causes and reponsibilities. What we intend to do with this note is to rationally discuss a few concepts linked to this event, as it seems that, like usual, in the aftermath of a catastrophe, numerous voices raise out of emotional and sometimes irrational perceptions and issues start to be confused. ©Oboni Riskope Associates Inc. www.riskope.com Page 1 of 3 Vancouver Aug. 9th 2014
  • 2. Special Issue Blogpost: Mount Polley, B.C., Tailings Dam Breach, Aug. 4th 2014 foboni@riskope.com coboni@riskope.com In a paper we wrote in 2012 (see our blog http://www.riskope.com/2014/01/09/aspects- of-risk-tolerability-manageable-vs-unmanageable-risks-in-relation-to-critical-decisions- perpetuity-projects-public-opposition/ and download the paper http://www.riskope.com/wp-content/uploads/2013/06/Factual-and-Foreseeable- Reliability-of-Tailings-Dams-and-Nuclear-Reactors-a-Societal-Acceptability-Perspective.pdf ) we evaluated the world-wide rate of failures (major accidents only) of tailings dams and nuclear reactors. We used published records and statistics from reputable sources. We noted that “major tailings accidents” are/were only fuzzily defined (generally it seems that the bigger the outflow of material from the breached dam, the bigger the mediatic impact), contrary to other hazardous industries (nuclear, for example). On a portfolio of approximately 3,500 tailings dams world-wide we evaluated that in the decade around 1979 (1974-1984) the rate of failure was 10-3 (one dam in one thousand per annum on average) and the decade around 1999 (1994-2004) the rate of failure was 2*10-4 (two dams in ten thousand per annum on average). Those numbers mean respectively 3.5 major dams breach in average per year (1974-1984), 0.7 major dams breach in average per year (1994-2004). With those averages one could easily evaluate the probability of having more failures in one year, but we will leave this aside, for the moment. Again, we do not know if 3,500 is still correct, but we assume it is for the sake of the discussion, and there is no clear definition of what a major breach is, so we assume these are the most widely reported failures, that reach even non expert public through media exposure. The validity of the 3.5-0.7 range can easily be “verified” by looking at the Chronology of major tailings dam failures as published, for example, by Wise-Uranium in their website. As such, the decrease from 3.5 to 0.7 can be seen as an indicator of the mining industry performing overall a better job today than it did in the past, but we will also leave this discussion to another time. Many hazardous industries (chemical, electrical, for example) around the world consider the limit of credibility for an accident at a probability in the range of 10-5 to 10-6 (one in hundred thousand to one in a million). By the way, hydro dams have historic record of failure floating around the credibility threshold. Thus tailings dams are to be considered more hazardous than hydro dams, and they unfortunately cannot be breached at the end of service life: they have to stay there “forever”. Obviously, with the estimated values of the prior paragraph, major tailings dams breaches are to be considered way above credibility now, and more so, in the longer run, although long term consolidation may help a bit. ©Oboni Riskope Associates Inc. www.riskope.com Page 2 of 3 Vancouver Aug. 9th 2014
  • 3. Special Issue Blogpost: Mount Polley, B.C., Tailings Dam Breach, Aug. 4th 2014 foboni@riskope.com coboni@riskope.com There are, of course, ways to build and manage dams at levels of care that would reduce the probability of major failures to the credibility threshold and we have already demonstrated how this is possible in the short term. For the long term, including perpetual care, we are publishing a paper and presenting a short course at the next Tailings and Mine Waste 2014 conference in Keystone, Colorado with our friend Jack Caldwell. Finally we would like to touch on the theme of risk tolerability (tolerance) both from the social and from the corporate point of view. Understanding social and corporate tolerability (tolerance) to risk is an essential skill for governance and effective leadership (http://www.riskope.com/wp-content/uploads/2013/06/Riskope-Aspects-of-Risk- Tolerability-Manageable-vs.-Unmanageable-Risks-in-Relation-to-Governance-and- Effective-Leadership.pdf ), one that effectively reduces knee-jerk reactions and crisis potential in the aftermath of an accident. Unfortunately, common practice approaches in the risk assessment/management arena use misleading tools such as Probability Impact Graphs (PIGs, FMEA) that mask the reality of tolerance thresholds behind binning exercises with multicoloured (and arbitrary) matrices. Misleading risk assessments (http://www.riskope.com/wp-content/uploads/Can-We-Stop-Misrepresenting-Reality-to- the-Public.pdf ) lead to wrong decisions, improper allotment of mitigative funds and anger the public. Proper tools exist, rational concepts have been laid out by many. It is possible to get out of the rut of obsolete and misleading methods, avoiding future routs! ©Oboni Riskope Associates Inc. www.riskope.com Page 3 of 3 Vancouver Aug. 9th 2014