Human Factors Engineering:
Valve Access and Design
Martin Robb CPE
Aims
• This note has been written to identify some issues associated with design and placement of 
manual valves.  
• The aim is to ensure that valves can be used safely by operations and maintenance personnel.
Common Valve Problems
Valves are a source of frequent human interaction with the plant and access may be required in 
an emergency.  It is important to ensure the design and arrangement of valves supports the 
tasks.  Some common issues include:
•Valves that require more torque to open than operators can produce (too difficult to “crack”);
•Valves that take too long to open or close due to large number of turns;
•Valves that must be operated from an awkward posture, leading to injury.
Some example access issues (from an onshore project) are shown in the figures below.  
BlockedToo High Hard to access
General Valve Access Guidelines: 
•Locate valves in spaces normally entered without tools;
•Ensure valve is not surrounded by obstructions, moving equipment, hot 
surfaces etc. that could delay operation and maintenance;
•Ensure a safe standing surface is provided (avoid having operator stand on 
pipes, trays etc. to access); 
•Locate valves within arm’s reach.
General Valve Design & Layout Guidelines: 
•Provide at least 75mm (3”) clearance between outside of valve handwheel / 
lever and any obstacle;
•Ensure maximum force required to initially crack a valve does not exceed 
450N (100 lb);
•Provide a position indicator; this should be visible from the valve operating 
position;
•Use a mechanical extender rather than chain operator where necessary;
•Ensure handwheel or lever does not extend into normal walking areas.
Valve Criticality Analysis 
•Categorize valves to determine access requirements;
•May be performed in a workshop setting (time‐consuming) or by setting 
generic categories then managing by exception;
•Systematizes process and provides clear design criteria.  Can avoid 
unnecessary pipework / access platforms.
Category Use Description Access
1 Critical for safety or operations.  Also used 
frequently (at least once per 6‐month period) for 
routine operation and maintenance
a) Deck level or via permanent elevated 
surface.
b) Stair if above not practical.
2 Not critical but required for routine operation & 
maintenance.
As above, but vertical ladder with purpose‐built 
standing surface, mobile platform or scaffolding 
may be used with written permission from 
procuring agency.
3 Not critical; used infrequently e.g. during startup 
or rarely‐performed maintenance tasks.
Permanent accessibility is desirable for these 
valves but is not mandatory.
Indicate access requirements on drawings, 
including clearance for personnel, tools, parts and 
access equipment.
Design Checklist
The checklist below may be used with the Figures and Tables on the proceeding pages.
Source: ASTM‐F‐1166 (2007) Standard Practice for Human Engineering Design for 
Marine Systems, Equipment and Facilities. 
Valve Placement Guidelines

Más contenido relacionado

La actualidad más candente

BP_Waterline Hydrostatic
BP_Waterline HydrostaticBP_Waterline Hydrostatic
BP_Waterline Hydrostatic
Scott Nunn
 
Saudi arabian-engineering-standards-saes-j-502
Saudi arabian-engineering-standards-saes-j-502Saudi arabian-engineering-standards-saes-j-502
Saudi arabian-engineering-standards-saes-j-502
nadim khan
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
ram111eg
 

La actualidad más candente (20)

Design check list viii 1 rev0
Design check list viii 1 rev0Design check list viii 1 rev0
Design check list viii 1 rev0
 
Gas turbine
Gas turbine Gas turbine
Gas turbine
 
Boiler Commissioning .pdf
Boiler Commissioning .pdfBoiler Commissioning .pdf
Boiler Commissioning .pdf
 
Api 653 study guide
Api 653 study guideApi 653 study guide
Api 653 study guide
 
BP_Waterline Hydrostatic
BP_Waterline HydrostaticBP_Waterline Hydrostatic
BP_Waterline Hydrostatic
 
Vibration monitoring and its features for corelation
Vibration monitoring and its features for corelationVibration monitoring and its features for corelation
Vibration monitoring and its features for corelation
 
Fuel presentation1
Fuel presentation1Fuel presentation1
Fuel presentation1
 
Saudi arabian-engineering-standards-saes-j-502
Saudi arabian-engineering-standards-saes-j-502Saudi arabian-engineering-standards-saes-j-502
Saudi arabian-engineering-standards-saes-j-502
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
 
Steam turbine condition monitoring
Steam turbine condition monitoringSteam turbine condition monitoring
Steam turbine condition monitoring
 
Overview of STI SP001 vs. API 653 Tank Inspections
Overview of STI SP001 vs. API 653 Tank InspectionsOverview of STI SP001 vs. API 653 Tank Inspections
Overview of STI SP001 vs. API 653 Tank Inspections
 
API 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdfAPI 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdf
 
Steam Blow out
Steam Blow outSteam Blow out
Steam Blow out
 
Peaking & Banding
Peaking & BandingPeaking & Banding
Peaking & Banding
 
TANK presentation-2.pptx
TANK presentation-2.pptxTANK presentation-2.pptx
TANK presentation-2.pptx
 
Boiler recommissioning procedure after capital overhaul
Boiler recommissioning procedure after capital overhaul Boiler recommissioning procedure after capital overhaul
Boiler recommissioning procedure after capital overhaul
 
Pwht1
Pwht1Pwht1
Pwht1
 
5.alignment
5.alignment5.alignment
5.alignment
 
Advanced Anti surge Control System for Turbine Driven Centrifugal Compressors
Advanced Anti surge Control System for Turbine Driven Centrifugal CompressorsAdvanced Anti surge Control System for Turbine Driven Centrifugal Compressors
Advanced Anti surge Control System for Turbine Driven Centrifugal Compressors
 
Boiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTBoiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFT
 

Destacado

Design Day Poster [new]
Design Day Poster [new]Design Day Poster [new]
Design Day Poster [new]
Zachary Swartz
 
SATHURAGIRI HVAC PROJECT ENGINEER
SATHURAGIRI  HVAC PROJECT ENGINEERSATHURAGIRI  HVAC PROJECT ENGINEER
SATHURAGIRI HVAC PROJECT ENGINEER
Sathura Giri
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
Murugan Pillai
 
21 hvac design manual
21 hvac design manual21 hvac design manual
21 hvac design manual
bhattbhai
 
Refrigeration and-air-conditioning-notes
Refrigeration and-air-conditioning-notesRefrigeration and-air-conditioning-notes
Refrigeration and-air-conditioning-notes
Olumide Daniel
 

Destacado (20)

Design Day Poster [new]
Design Day Poster [new]Design Day Poster [new]
Design Day Poster [new]
 
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
 
SATHURAGIRI HVAC PROJECT ENGINEER
SATHURAGIRI  HVAC PROJECT ENGINEERSATHURAGIRI  HVAC PROJECT ENGINEER
SATHURAGIRI HVAC PROJECT ENGINEER
 
HVAC First-Person Gaming Simulation presentation
HVAC First-Person Gaming Simulation presentationHVAC First-Person Gaming Simulation presentation
HVAC First-Person Gaming Simulation presentation
 
process design of water chilling plant
process design of water chilling plantprocess design of water chilling plant
process design of water chilling plant
 
Telecommunication HVAC Maintenance Program.1
Telecommunication HVAC Maintenance Program.1Telecommunication HVAC Maintenance Program.1
Telecommunication HVAC Maintenance Program.1
 
157882189 commissioning checklist3.11.10
157882189 commissioning checklist3.11.10157882189 commissioning checklist3.11.10
157882189 commissioning checklist3.11.10
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
HVAC operation and Maintenance
HVAC operation and Maintenance HVAC operation and Maintenance
HVAC operation and Maintenance
 
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsStep 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
 
21 hvac design manual
21 hvac design manual21 hvac design manual
21 hvac design manual
 
Topic 3 District Cooling System
Topic 3 District Cooling SystemTopic 3 District Cooling System
Topic 3 District Cooling System
 
Cooling load calculations
Cooling load calculationsCooling load calculations
Cooling load calculations
 
Refrigeration and air conditioning ppt
Refrigeration and air conditioning pptRefrigeration and air conditioning ppt
Refrigeration and air conditioning ppt
 
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRYHVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
 
Types of air conditioning systems
Types of air conditioning systemsTypes of air conditioning systems
Types of air conditioning systems
 
Refrigeration and-air-conditioning-notes
Refrigeration and-air-conditioning-notesRefrigeration and-air-conditioning-notes
Refrigeration and-air-conditioning-notes
 
Air conditioning-system ppt
Air conditioning-system pptAir conditioning-system ppt
Air conditioning-system ppt
 
Air Conditioning System
Air Conditioning SystemAir Conditioning System
Air Conditioning System
 
HVAC Sysems & AHU
HVAC Sysems & AHUHVAC Sysems & AHU
HVAC Sysems & AHU
 

Similar a Valve Placement Guidelines

Sealweld commissioning enhancement
Sealweld commissioning enhancementSealweld commissioning enhancement
Sealweld commissioning enhancement
kokan007
 
Psm vpppa reg v
Psm vpppa reg vPsm vpppa reg v
Psm vpppa reg v
vtsiri
 

Similar a Valve Placement Guidelines (20)

Sealweld commissioning enhancement
Sealweld commissioning enhancementSealweld commissioning enhancement
Sealweld commissioning enhancement
 
HUMAN FACTORS ENGINEERING (HFE)
HUMAN FACTORS ENGINEERING (HFE)HUMAN FACTORS ENGINEERING (HFE)
HUMAN FACTORS ENGINEERING (HFE)
 
Valve designing trends in 2022
Valve designing trends in 2022Valve designing trends in 2022
Valve designing trends in 2022
 
Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2
 
how to select the right valves.pptx
how to select the right valves.pptxhow to select the right valves.pptx
how to select the right valves.pptx
 
HOW VALVE DESIGN OPTIMIZES FLUID FLOW AND PRESSURE CONTROL.pptx
HOW VALVE DESIGN OPTIMIZES FLUID FLOW AND PRESSURE CONTROL.pptxHOW VALVE DESIGN OPTIMIZES FLUID FLOW AND PRESSURE CONTROL.pptx
HOW VALVE DESIGN OPTIMIZES FLUID FLOW AND PRESSURE CONTROL.pptx
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
TYPES OF VALVES FOR OIL AND GAS INDUSTRIES
TYPES OF VALVES FOR OIL AND GAS INDUSTRIESTYPES OF VALVES FOR OIL AND GAS INDUSTRIES
TYPES OF VALVES FOR OIL AND GAS INDUSTRIES
 
Cov company presentation 2018
Cov company presentation 2018Cov company presentation 2018
Cov company presentation 2018
 
Industrial Valves – Extending their Service Life
Industrial Valves – Extending their Service LifeIndustrial Valves – Extending their Service Life
Industrial Valves – Extending their Service Life
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
Mechanical Valve
Mechanical ValveMechanical Valve
Mechanical Valve
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)
 
Explained Valve opening methods & few capacities
Explained Valve opening methods & few capacitiesExplained Valve opening methods & few capacities
Explained Valve opening methods & few capacities
 
complete guide to process valves
complete guide to process valves complete guide to process valves
complete guide to process valves
 
Valves operation and functions complete guide
Valves operation and functions complete guideValves operation and functions complete guide
Valves operation and functions complete guide
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
 
Psm vpppa reg v
Psm vpppa reg vPsm vpppa reg v
Psm vpppa reg v
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 

Más de Martin Robb CPE (7)

ORS Consulting: Summary of National Academies Safety Culture Report
ORS Consulting: Summary of National Academies Safety Culture ReportORS Consulting: Summary of National Academies Safety Culture Report
ORS Consulting: Summary of National Academies Safety Culture Report
 
ORS Consulting Overview of Services
ORS Consulting Overview of ServicesORS Consulting Overview of Services
ORS Consulting Overview of Services
 
ORS Consulting Overview of Services
ORS Consulting Overview of ServicesORS Consulting Overview of Services
ORS Consulting Overview of Services
 
Opening Presentation
Opening PresentationOpening Presentation
Opening Presentation
 
Activities Summary 2010
Activities Summary 2010Activities Summary 2010
Activities Summary 2010
 
Activity Highlights
Activity HighlightsActivity Highlights
Activity Highlights
 
Valhall Working Environment Case Study
Valhall Working Environment Case StudyValhall Working Environment Case Study
Valhall Working Environment Case Study
 

Valve Placement Guidelines