Human Factors Engineering:
Valve Access and Design
Martin Robb CPE
Aims
• This note has been written to identify some issues associated with design and placement of 
manual valves.  
• The aim is to ensure that valves can be used safely by operations and maintenance personnel.
Common Valve Problems
Valves are a source of frequent human interaction with the plant and access may be required in 
an emergency.  It is important to ensure the design and arrangement of valves supports the 
tasks.  Some common issues include:
•Valves that require more torque to open than operators can produce (too difficult to “crack”);
•Valves that take too long to open or close due to large number of turns;
•Valves that must be operated from an awkward posture, leading to injury.
Some example access issues (from an onshore project) are shown in the figures below.  
BlockedToo High Hard to access
General Valve Access Guidelines: 
•Locate valves in spaces normally entered without tools;
•Ensure valve is not surrounded by obstructions, moving equipment, hot 
surfaces etc. that could delay operation and maintenance;
•Ensure a safe standing surface is provided (avoid having operator stand on 
pipes, trays etc. to access); 
•Locate valves within arm’s reach.
General Valve Design & Layout Guidelines: 
•Provide at least 75mm (3”) clearance between outside of valve handwheel / 
lever and any obstacle;
•Ensure maximum force required to initially crack a valve does not exceed 
450N (100 lb);
•Provide a position indicator; this should be visible from the valve operating 
position;
•Use a mechanical extender rather than chain operator where necessary;
•Ensure handwheel or lever does not extend into normal walking areas.
Valve Criticality Analysis 
•Categorize valves to determine access requirements;
•May be performed in a workshop setting (time‐consuming) or by setting 
generic categories then managing by exception;
•Systematizes process and provides clear design criteria.  Can avoid 
unnecessary pipework / access platforms.
Category Use Description Access
1 Critical for safety or operations.  Also used 
frequently (at least once per 6‐month period) for 
routine operation and maintenance
a) Deck level or via permanent elevated 
surface.
b) Stair if above not practical.
2 Not critical but required for routine operation & 
maintenance.
As above, but vertical ladder with purpose‐built 
standing surface, mobile platform or scaffolding 
may be used with written permission from 
procuring agency.
3 Not critical; used infrequently e.g. during startup 
or rarely‐performed maintenance tasks.
Permanent accessibility is desirable for these 
valves but is not mandatory.
Indicate access requirements on drawings, 
including clearance for personnel, tools, parts and 
access equipment.
Design Checklist
The checklist below may be used with the Figures and Tables on the proceeding pages.
Source: ASTM‐F‐1166 (2007) Standard Practice for Human Engineering Design for 
Marine Systems, Equipment and Facilities. 
Valve Placement Guidelines

Más contenido relacionado

La actualidad más candente

Best practices day one new morning
Best practices day one new morningBest practices day one new morning
Best practices day one new morningAhmed Radwan
 
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docx
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docxLADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docx
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docxDwarika Bhushan Sharma
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1Elsayed Amer
 
Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )amrhaggag
 
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docxHOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docxDwarika Bhushan Sharma
 
Production Packer setting and types
Production Packer setting and typesProduction Packer setting and types
Production Packer setting and typesElsayed Amer
 
FIRE PREVENTION CHECKLIST Form # HSEQ - FPC Rev 2 -.docx
FIRE PREVENTION CHECKLIST Form # HSEQ - FPC Rev 2 -.docxFIRE PREVENTION CHECKLIST Form # HSEQ - FPC Rev 2 -.docx
FIRE PREVENTION CHECKLIST Form # HSEQ - FPC Rev 2 -.docxDwarika Bhushan Sharma
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheetPhạm Thành
 
BOTTOM HOLE SURVEILLANCE UNIT
BOTTOM HOLE SURVEILLANCE UNITBOTTOM HOLE SURVEILLANCE UNIT
BOTTOM HOLE SURVEILLANCE UNITB. Budi Wicaksono
 
OCS Training Virtual - IADC Rig Equipment Inspection Certification
OCS Training Virtual - IADC Rig Equipment Inspection CertificationOCS Training Virtual - IADC Rig Equipment Inspection Certification
OCS Training Virtual - IADC Rig Equipment Inspection CertificationMuanisa Waras
 
CASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair Manual
CASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair ManualCASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair Manual
CASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair Manualhksemd yjekmd
 
HUMAN FACTORS ENGINEERING (HFE)
HUMAN FACTORS ENGINEERING (HFE)HUMAN FACTORS ENGINEERING (HFE)
HUMAN FACTORS ENGINEERING (HFE)iFluids
 
Mold Remediation and Mold Remediation Protocol - Indoor Air Quality Solution...
Mold Remediation and Mold Remediation Protocol -  Indoor Air Quality Solution...Mold Remediation and Mold Remediation Protocol -  Indoor Air Quality Solution...
Mold Remediation and Mold Remediation Protocol - Indoor Air Quality Solution...John P. Lapotaire, CIEC.
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1Elsayed Amer
 

La actualidad más candente (20)

Best practices day one new morning
Best practices day one new morningBest practices day one new morning
Best practices day one new morning
 
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docx
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docxLADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docx
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docx
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )
 
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docxHOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
 
Production Packer setting and types
Production Packer setting and typesProduction Packer setting and types
Production Packer setting and types
 
FIRE PREVENTION CHECKLIST Form # HSEQ - FPC Rev 2 -.docx
FIRE PREVENTION CHECKLIST Form # HSEQ - FPC Rev 2 -.docxFIRE PREVENTION CHECKLIST Form # HSEQ - FPC Rev 2 -.docx
FIRE PREVENTION CHECKLIST Form # HSEQ - FPC Rev 2 -.docx
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet
 
BOTTOM HOLE SURVEILLANCE UNIT
BOTTOM HOLE SURVEILLANCE UNITBOTTOM HOLE SURVEILLANCE UNIT
BOTTOM HOLE SURVEILLANCE UNIT
 
Norsok d-010u4 2013.en.02
Norsok d-010u4 2013.en.02Norsok d-010u4 2013.en.02
Norsok d-010u4 2013.en.02
 
Grinder safety
Grinder safetyGrinder safety
Grinder safety
 
OCS Training Virtual - IADC Rig Equipment Inspection Certification
OCS Training Virtual - IADC Rig Equipment Inspection CertificationOCS Training Virtual - IADC Rig Equipment Inspection Certification
OCS Training Virtual - IADC Rig Equipment Inspection Certification
 
Wire rope slings
Wire rope slingsWire rope slings
Wire rope slings
 
Casing Accessories , completion tools, liner hanger system
Casing Accessories , completion tools, liner hanger systemCasing Accessories , completion tools, liner hanger system
Casing Accessories , completion tools, liner hanger system
 
CASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair Manual
CASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair ManualCASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair Manual
CASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair Manual
 
HUMAN FACTORS ENGINEERING (HFE)
HUMAN FACTORS ENGINEERING (HFE)HUMAN FACTORS ENGINEERING (HFE)
HUMAN FACTORS ENGINEERING (HFE)
 
Mold Remediation and Mold Remediation Protocol - Indoor Air Quality Solution...
Mold Remediation and Mold Remediation Protocol -  Indoor Air Quality Solution...Mold Remediation and Mold Remediation Protocol -  Indoor Air Quality Solution...
Mold Remediation and Mold Remediation Protocol - Indoor Air Quality Solution...
 
Production packer
Production packerProduction packer
Production packer
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Nitrogen purging
Nitrogen  purgingNitrogen  purging
Nitrogen purging
 

Destacado

Design Day Poster [new]
Design Day Poster [new]Design Day Poster [new]
Design Day Poster [new]Zachary Swartz
 
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...McKenney's Inc
 
SATHURAGIRI HVAC PROJECT ENGINEER
SATHURAGIRI  HVAC PROJECT ENGINEERSATHURAGIRI  HVAC PROJECT ENGINEER
SATHURAGIRI HVAC PROJECT ENGINEERSathura Giri
 
HVAC First-Person Gaming Simulation presentation
HVAC First-Person Gaming Simulation presentationHVAC First-Person Gaming Simulation presentation
HVAC First-Person Gaming Simulation presentationcccscoetc
 
process design of water chilling plant
process design of water chilling plantprocess design of water chilling plant
process design of water chilling plantDinesh Sannepally
 
Telecommunication HVAC Maintenance Program.1
Telecommunication HVAC Maintenance Program.1Telecommunication HVAC Maintenance Program.1
Telecommunication HVAC Maintenance Program.1wacrowe
 
157882189 commissioning checklist3.11.10
157882189 commissioning checklist3.11.10157882189 commissioning checklist3.11.10
157882189 commissioning checklist3.11.10bijumt
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 
HVAC operation and Maintenance
HVAC operation and Maintenance HVAC operation and Maintenance
HVAC operation and Maintenance AC Repair Local
 
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsStep 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsSynergy Airflow and Ventilation
 
21 hvac design manual
21 hvac design manual21 hvac design manual
21 hvac design manualbhattbhai
 
Topic 3 District Cooling System
Topic 3 District Cooling SystemTopic 3 District Cooling System
Topic 3 District Cooling Systempnnazz
 
Cooling load calculations
Cooling load calculationsCooling load calculations
Cooling load calculationsWaleed Alyafie
 
Refrigeration and air conditioning ppt
Refrigeration and air conditioning pptRefrigeration and air conditioning ppt
Refrigeration and air conditioning pptShubham Hadadare
 
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRYHVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRYNamdeo Shinde
 
Types of air conditioning systems
Types of air conditioning systemsTypes of air conditioning systems
Types of air conditioning systemsbecoolseo
 
Refrigeration and-air-conditioning-notes
Refrigeration and-air-conditioning-notesRefrigeration and-air-conditioning-notes
Refrigeration and-air-conditioning-notesOlumide Daniel
 
Air conditioning-system ppt
Air conditioning-system pptAir conditioning-system ppt
Air conditioning-system pptIshtiaq Ahmad
 
Air Conditioning System
Air Conditioning SystemAir Conditioning System
Air Conditioning SystemSumit Ranjan
 

Destacado (20)

Design Day Poster [new]
Design Day Poster [new]Design Day Poster [new]
Design Day Poster [new]
 
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at...
 
SATHURAGIRI HVAC PROJECT ENGINEER
SATHURAGIRI  HVAC PROJECT ENGINEERSATHURAGIRI  HVAC PROJECT ENGINEER
SATHURAGIRI HVAC PROJECT ENGINEER
 
HVAC First-Person Gaming Simulation presentation
HVAC First-Person Gaming Simulation presentationHVAC First-Person Gaming Simulation presentation
HVAC First-Person Gaming Simulation presentation
 
process design of water chilling plant
process design of water chilling plantprocess design of water chilling plant
process design of water chilling plant
 
Telecommunication HVAC Maintenance Program.1
Telecommunication HVAC Maintenance Program.1Telecommunication HVAC Maintenance Program.1
Telecommunication HVAC Maintenance Program.1
 
157882189 commissioning checklist3.11.10
157882189 commissioning checklist3.11.10157882189 commissioning checklist3.11.10
157882189 commissioning checklist3.11.10
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
HVAC operation and Maintenance
HVAC operation and Maintenance HVAC operation and Maintenance
HVAC operation and Maintenance
 
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsStep 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
 
21 hvac design manual
21 hvac design manual21 hvac design manual
21 hvac design manual
 
Topic 3 District Cooling System
Topic 3 District Cooling SystemTopic 3 District Cooling System
Topic 3 District Cooling System
 
Cooling load calculations
Cooling load calculationsCooling load calculations
Cooling load calculations
 
Refrigeration and air conditioning ppt
Refrigeration and air conditioning pptRefrigeration and air conditioning ppt
Refrigeration and air conditioning ppt
 
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRYHVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
 
Types of air conditioning systems
Types of air conditioning systemsTypes of air conditioning systems
Types of air conditioning systems
 
Refrigeration and-air-conditioning-notes
Refrigeration and-air-conditioning-notesRefrigeration and-air-conditioning-notes
Refrigeration and-air-conditioning-notes
 
Air conditioning-system ppt
Air conditioning-system pptAir conditioning-system ppt
Air conditioning-system ppt
 
Air Conditioning System
Air Conditioning SystemAir Conditioning System
Air Conditioning System
 
HVAC Sysems & AHU
HVAC Sysems & AHUHVAC Sysems & AHU
HVAC Sysems & AHU
 

Similar a Valve Placement Guidelines

Sealweld commissioning enhancement
Sealweld commissioning enhancementSealweld commissioning enhancement
Sealweld commissioning enhancementkokan007
 
Valve designing trends in 2022
Valve designing trends in 2022Valve designing trends in 2022
Valve designing trends in 2022Sowmiya Siva
 
Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 dieselpub
 
how to select the right valves.pptx
how to select the right valves.pptxhow to select the right valves.pptx
how to select the right valves.pptxSowmiya Siva
 
HOW VALVE DESIGN OPTIMIZES FLUID FLOW AND PRESSURE CONTROL.pptx
HOW VALVE DESIGN OPTIMIZES FLUID FLOW AND PRESSURE CONTROL.pptxHOW VALVE DESIGN OPTIMIZES FLUID FLOW AND PRESSURE CONTROL.pptx
HOW VALVE DESIGN OPTIMIZES FLUID FLOW AND PRESSURE CONTROL.pptxbusiness info
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completionAkshaya Mishra
 
TYPES OF VALVES FOR OIL AND GAS INDUSTRIES
TYPES OF VALVES FOR OIL AND GAS INDUSTRIESTYPES OF VALVES FOR OIL AND GAS INDUSTRIES
TYPES OF VALVES FOR OIL AND GAS INDUSTRIESSowmiya Siva
 
Cov company presentation 2018
Cov company presentation 2018Cov company presentation 2018
Cov company presentation 2018nayeem7265840
 
Industrial Valves – Extending their Service Life
Industrial Valves – Extending their Service LifeIndustrial Valves – Extending their Service Life
Industrial Valves – Extending their Service Liferameshbabu91988
 
Well control equipment
Well control equipmentWell control equipment
Well control equipmentSARWAR SALAM
 
Mechanical Valve
Mechanical ValveMechanical Valve
Mechanical ValveNathan
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)SAJJAD KHUDHUR ABBAS
 
Explained Valve opening methods & few capacities
Explained Valve opening methods & few capacitiesExplained Valve opening methods & few capacities
Explained Valve opening methods & few capacitiesVrushtiVarma
 
complete guide to process valves
complete guide to process valves complete guide to process valves
complete guide to process valves Elsayed Amer
 
Valves operation and functions complete guide
Valves operation and functions complete guideValves operation and functions complete guide
Valves operation and functions complete guideElsayed Amer
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyDesign World
 
Psm vpppa reg v
Psm vpppa reg vPsm vpppa reg v
Psm vpppa reg vvtsiri
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenancevijay oak
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenancevijay oak
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenancevijay oak
 

Similar a Valve Placement Guidelines (20)

Sealweld commissioning enhancement
Sealweld commissioning enhancementSealweld commissioning enhancement
Sealweld commissioning enhancement
 
Valve designing trends in 2022
Valve designing trends in 2022Valve designing trends in 2022
Valve designing trends in 2022
 
Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2
 
how to select the right valves.pptx
how to select the right valves.pptxhow to select the right valves.pptx
how to select the right valves.pptx
 
HOW VALVE DESIGN OPTIMIZES FLUID FLOW AND PRESSURE CONTROL.pptx
HOW VALVE DESIGN OPTIMIZES FLUID FLOW AND PRESSURE CONTROL.pptxHOW VALVE DESIGN OPTIMIZES FLUID FLOW AND PRESSURE CONTROL.pptx
HOW VALVE DESIGN OPTIMIZES FLUID FLOW AND PRESSURE CONTROL.pptx
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
TYPES OF VALVES FOR OIL AND GAS INDUSTRIES
TYPES OF VALVES FOR OIL AND GAS INDUSTRIESTYPES OF VALVES FOR OIL AND GAS INDUSTRIES
TYPES OF VALVES FOR OIL AND GAS INDUSTRIES
 
Cov company presentation 2018
Cov company presentation 2018Cov company presentation 2018
Cov company presentation 2018
 
Industrial Valves – Extending their Service Life
Industrial Valves – Extending their Service LifeIndustrial Valves – Extending their Service Life
Industrial Valves – Extending their Service Life
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
Mechanical Valve
Mechanical ValveMechanical Valve
Mechanical Valve
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)
 
Explained Valve opening methods & few capacities
Explained Valve opening methods & few capacitiesExplained Valve opening methods & few capacities
Explained Valve opening methods & few capacities
 
complete guide to process valves
complete guide to process valves complete guide to process valves
complete guide to process valves
 
Valves operation and functions complete guide
Valves operation and functions complete guideValves operation and functions complete guide
Valves operation and functions complete guide
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
 
Psm vpppa reg v
Psm vpppa reg vPsm vpppa reg v
Psm vpppa reg v
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 

Más de Martin Robb CPE

ORS Consulting: Summary of National Academies Safety Culture Report
ORS Consulting: Summary of National Academies Safety Culture ReportORS Consulting: Summary of National Academies Safety Culture Report
ORS Consulting: Summary of National Academies Safety Culture ReportMartin Robb CPE
 
ORS Consulting Overview of Services
ORS Consulting Overview of ServicesORS Consulting Overview of Services
ORS Consulting Overview of ServicesMartin Robb CPE
 
ORS Consulting Overview of Services
ORS Consulting Overview of ServicesORS Consulting Overview of Services
ORS Consulting Overview of ServicesMartin Robb CPE
 
Valhall Working Environment Case Study
Valhall Working Environment Case StudyValhall Working Environment Case Study
Valhall Working Environment Case StudyMartin Robb CPE
 

Más de Martin Robb CPE (7)

ORS Consulting: Summary of National Academies Safety Culture Report
ORS Consulting: Summary of National Academies Safety Culture ReportORS Consulting: Summary of National Academies Safety Culture Report
ORS Consulting: Summary of National Academies Safety Culture Report
 
ORS Consulting Overview of Services
ORS Consulting Overview of ServicesORS Consulting Overview of Services
ORS Consulting Overview of Services
 
ORS Consulting Overview of Services
ORS Consulting Overview of ServicesORS Consulting Overview of Services
ORS Consulting Overview of Services
 
Opening Presentation
Opening PresentationOpening Presentation
Opening Presentation
 
Activities Summary 2010
Activities Summary 2010Activities Summary 2010
Activities Summary 2010
 
Activity Highlights
Activity HighlightsActivity Highlights
Activity Highlights
 
Valhall Working Environment Case Study
Valhall Working Environment Case StudyValhall Working Environment Case Study
Valhall Working Environment Case Study
 

Valve Placement Guidelines