Case study on Hextable
                                                              Dance project


Summary:

   Hextable School, near Swanley, Kent has an enviable reputation as a centre of excellence for the
    performing arts.

   This case study describes how the Hextable Dance project moved from being unaffordable to reality,
    through the effective application of VE techniques.

   This project was started 10 years ago but stalled because the design, although innovative, was expected
    to exceed the available construction budget of £2.1m by 20% (about £420,000).


Issues faced by project team prior to Study:

   Two earlier schemes had failed and the current proposal exceeded the budget by 20%

   Due to the nature of the funding arrangements, finances were fixed and could not be increased

   The project team was unclear as to the precise nature of the client’s requirements.
Study & Approach
Study:

  As capital cost was a major concern, team recommended re-evaluating the project to focus on
   function.
 As saving one-fifth of the construction cost within the constraints of an existing design was likely
   to be an unrealistic target.
Approach:

   Identification of important functions – key value drivers – which ranged from delivery of the
    project to functions required of the completed building

Functions Including:

   Keeping within funding requirements

   Optimising the use of space

   Delivering functionality to match the school’s curriculum requirements.
Cont…

   With a clear understanding of the client’s needs, the team viewed the project from a functional
    perspective and identifyed opportunities for stretching the constraints of the existing design.

   Enabled the team to put forward innovative design solutions, without compromising the client’s
    requirements.

New Ideas Implemented:

   To lay the building over only one storey.

   The innovative roof structure and double-height studio ceiling
     retained by moving upper level areas to the ground floor, removing
     stairs and corridor space, so improving the building’s efficiency.

   To give areas multiple functionality, thus increasing flexibility and
     allowing two dance studios to be combined into one.
Lessons learned

   Involving all key stakeholders in the VM study was very important when defining value. It allowed
    stakeholders to buy into the process and ensured their needs were met.

   The architects’ full support made the VM process much more effective. They were willing to take
    suggestions from the project team and quickly put forward relevant options.

   Willingness by the team to return to the client’s core requirements and to reassess the required
    functionality opened the project to increased creativity by removing unnecessary constraints.



VE Implementation:

    A Value Engineering approach facilitated an innovative design solution that permitted the
    construction of a previously unaffordable project by reducing costs by £420,000.

   New design met the budget with no loss of aesthetic quality or functionality

Más contenido relacionado

La actualidad más candente

ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - BriefKai Yun Pang
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slidesahmong4
 
Elemental cost analysis Presentation Slides
Elemental cost analysis Presentation SlidesElemental cost analysis Presentation Slides
Elemental cost analysis Presentation SlidesArissa Loh
 
Value Management Assignment (Slides)
Value Management Assignment (Slides)Value Management Assignment (Slides)
Value Management Assignment (Slides)Pang Khai Shuen
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA FormKai Yun Pang
 
Vm assignment (5)
Vm assignment (5)Vm assignment (5)
Vm assignment (5)Yong Sy
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 
8. implementation (2) cost management
8. implementation (2)   cost management8. implementation (2)   cost management
8. implementation (2) cost managementDania Abdel-aziz
 
Value Management Assignment (Report)
Value Management Assignment (Report)Value Management Assignment (Report)
Value Management Assignment (Report)Pang Khai Shuen
 
Eca presentation
Eca presentationEca presentation
Eca presentationwendyteosy
 
Project Management Report
Project Management ReportProject Management Report
Project Management ReportSANKET SENAPATI
 
Malaysian Property Development
Malaysian Property DevelopmentMalaysian Property Development
Malaysian Property DevelopmentDebbie Loh
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalKai Yun Pang
 
VM Final Report
VM Final ReportVM Final Report
VM Final ReportMelvin Lim
 
Value management presentation slides
Value management presentation slidesValue management presentation slides
Value management presentation slidesDoreen Yeo
 

La actualidad más candente (20)

ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Vm report
Vm reportVm report
Vm report
 
ECA form
ECA formECA form
ECA form
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
 
Elemental cost analysis Presentation Slides
Elemental cost analysis Presentation SlidesElemental cost analysis Presentation Slides
Elemental cost analysis Presentation Slides
 
Value Management Assignment (Slides)
Value Management Assignment (Slides)Value Management Assignment (Slides)
Value Management Assignment (Slides)
 
Bs2 assignment
Bs2 assignmentBs2 assignment
Bs2 assignment
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
 
Vm assignment (5)
Vm assignment (5)Vm assignment (5)
Vm assignment (5)
 
GBI: Role of BS
GBI: Role of BSGBI: Role of BS
GBI: Role of BS
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 
8. implementation (2) cost management
8. implementation (2)   cost management8. implementation (2)   cost management
8. implementation (2) cost management
 
Value Management Assignment (Report)
Value Management Assignment (Report)Value Management Assignment (Report)
Value Management Assignment (Report)
 
Eca presentation
Eca presentationEca presentation
Eca presentation
 
PP2 COMPILCATION
PP2 COMPILCATIONPP2 COMPILCATION
PP2 COMPILCATION
 
Project Management Report
Project Management ReportProject Management Report
Project Management Report
 
Malaysian Property Development
Malaysian Property DevelopmentMalaysian Property Development
Malaysian Property Development
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 
VM Final Report
VM Final ReportVM Final Report
VM Final Report
 
Value management presentation slides
Value management presentation slidesValue management presentation slides
Value management presentation slides
 

Similar a Case study on hextable dance project

Waitakere Central Presentation 23 April 2010 V8 Final
Waitakere Central Presentation 23 April 2010 V8 FinalWaitakere Central Presentation 23 April 2010 V8 Final
Waitakere Central Presentation 23 April 2010 V8 Finalchallengeprojects
 
Demonstration case studies
Demonstration case studiesDemonstration case studies
Demonstration case studiesparkerjce
 
COTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative FutureCOTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative Futurejuliekannai
 
The Open University Construction Framework 2008 2011 Proving
The Open University Construction Framework 2008   2011 ProvingThe Open University Construction Framework 2008   2011 Proving
The Open University Construction Framework 2008 2011 ProvingMikeRhodesMCIOB
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Minn Lwin
 
Green building rating system on des innovations
Green building rating system on des innovationsGreen building rating system on des innovations
Green building rating system on des innovationssaif hasan
 
Energy Show 2022 - EXEED Outline and Sample Projects
Energy Show 2022 - EXEED Outline and Sample ProjectsEnergy Show 2022 - EXEED Outline and Sample Projects
Energy Show 2022 - EXEED Outline and Sample ProjectsSustainableEnergyAut
 
Innovations in Sustainable Design and Construction for London's Future.pdf
Innovations in Sustainable Design and Construction for London's Future.pdfInnovations in Sustainable Design and Construction for London's Future.pdf
Innovations in Sustainable Design and Construction for London's Future.pdfBuilders London
 
21st Century Education Sis Bfe Mena 2011
21st Century Education Sis Bfe Mena 201121st Century Education Sis Bfe Mena 2011
21st Century Education Sis Bfe Mena 2011espie77
 
Formations project
Formations project Formations project
Formations project IETI SD
 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group AssignmentArissa Loh
 
Disrupting Thinking to Enable Innovation
Disrupting Thinking to Enable InnovationDisrupting Thinking to Enable Innovation
Disrupting Thinking to Enable InnovationGary Wood
 

Similar a Case study on hextable dance project (20)

Workplace 2.0
Workplace 2.0Workplace 2.0
Workplace 2.0
 
Waitakere Central Presentation 23 April 2010 V8 Final
Waitakere Central Presentation 23 April 2010 V8 FinalWaitakere Central Presentation 23 April 2010 V8 Final
Waitakere Central Presentation 23 April 2010 V8 Final
 
Demonstration case studies
Demonstration case studiesDemonstration case studies
Demonstration case studies
 
COTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative FutureCOTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative Future
 
The Open University Construction Framework 2008 2011 Proving
The Open University Construction Framework 2008   2011 ProvingThe Open University Construction Framework 2008   2011 Proving
The Open University Construction Framework 2008 2011 Proving
 
Michelle Jepp 15
Michelle Jepp 15Michelle Jepp 15
Michelle Jepp 15
 
122 value engineering
122 value engineering122 value engineering
122 value engineering
 
Cve presentation slide
Cve presentation slideCve presentation slide
Cve presentation slide
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725
 
Green building rating system on des innovations
Green building rating system on des innovationsGreen building rating system on des innovations
Green building rating system on des innovations
 
Energy Show 2022 - EXEED Outline and Sample Projects
Energy Show 2022 - EXEED Outline and Sample ProjectsEnergy Show 2022 - EXEED Outline and Sample Projects
Energy Show 2022 - EXEED Outline and Sample Projects
 
CWong Resume
CWong ResumeCWong Resume
CWong Resume
 
Innovations in Sustainable Design and Construction for London's Future.pdf
Innovations in Sustainable Design and Construction for London's Future.pdfInnovations in Sustainable Design and Construction for London's Future.pdf
Innovations in Sustainable Design and Construction for London's Future.pdf
 
Heather\'s Resume
Heather\'s  ResumeHeather\'s  Resume
Heather\'s Resume
 
21st Century Education Sis Bfe Mena 2011
21st Century Education Sis Bfe Mena 201121st Century Education Sis Bfe Mena 2011
21st Century Education Sis Bfe Mena 2011
 
ILP Scotland webinar: Edinburgh’s 64,000 energy efficient project
ILP Scotland webinar: Edinburgh’s 64,000 energy efficient projectILP Scotland webinar: Edinburgh’s 64,000 energy efficient project
ILP Scotland webinar: Edinburgh’s 64,000 energy efficient project
 
Formations project
Formations project Formations project
Formations project
 
Formation`s project
Formation`s projectFormation`s project
Formation`s project
 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group Assignment
 
Disrupting Thinking to Enable Innovation
Disrupting Thinking to Enable InnovationDisrupting Thinking to Enable Innovation
Disrupting Thinking to Enable Innovation
 

Último

Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 

Último (20)

Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 

Case study on hextable dance project

  • 1. Case study on Hextable Dance project Summary:  Hextable School, near Swanley, Kent has an enviable reputation as a centre of excellence for the performing arts.  This case study describes how the Hextable Dance project moved from being unaffordable to reality, through the effective application of VE techniques.  This project was started 10 years ago but stalled because the design, although innovative, was expected to exceed the available construction budget of £2.1m by 20% (about £420,000). Issues faced by project team prior to Study:  Two earlier schemes had failed and the current proposal exceeded the budget by 20%  Due to the nature of the funding arrangements, finances were fixed and could not be increased  The project team was unclear as to the precise nature of the client’s requirements.
  • 2. Study & Approach Study:  As capital cost was a major concern, team recommended re-evaluating the project to focus on function.  As saving one-fifth of the construction cost within the constraints of an existing design was likely to be an unrealistic target. Approach:  Identification of important functions – key value drivers – which ranged from delivery of the project to functions required of the completed building Functions Including:  Keeping within funding requirements  Optimising the use of space  Delivering functionality to match the school’s curriculum requirements.
  • 3. Cont…  With a clear understanding of the client’s needs, the team viewed the project from a functional perspective and identifyed opportunities for stretching the constraints of the existing design.  Enabled the team to put forward innovative design solutions, without compromising the client’s requirements. New Ideas Implemented:  To lay the building over only one storey.  The innovative roof structure and double-height studio ceiling retained by moving upper level areas to the ground floor, removing stairs and corridor space, so improving the building’s efficiency.  To give areas multiple functionality, thus increasing flexibility and allowing two dance studios to be combined into one.
  • 4. Lessons learned  Involving all key stakeholders in the VM study was very important when defining value. It allowed stakeholders to buy into the process and ensured their needs were met.  The architects’ full support made the VM process much more effective. They were willing to take suggestions from the project team and quickly put forward relevant options.  Willingness by the team to return to the client’s core requirements and to reassess the required functionality opened the project to increased creativity by removing unnecessary constraints. VE Implementation:  A Value Engineering approach facilitated an innovative design solution that permitted the construction of a previously unaffordable project by reducing costs by £420,000.  New design met the budget with no loss of aesthetic quality or functionality