SlideShare una empresa de Scribd logo
1 de 3
CHAPTER TWO QUESTIONS WITH ANSWERS
Q1. A substation supplies power by four feeders to its consumers. Feeder no 1 supplies six
consumers whose individual demands are 70 kW, 90 kW, 20 kW, 50 kW, 10 kW and 20 kW, while
maximum demand on the feeder is 200kW. Feeder no 2 supplies four consumers whose daily
maximum demands are 60 kW, 40 kW, 70 kW and 30 kW while the maximum demand on feeder no
2 is 160 kW. Feeders no 3 and 4 have daily maximum demands of 150 kW and 200 kW respectively,
while the maximum demand on the station is 600 kW.

Determine the diversity factors for the consumers of feeder no 1 and feeder no 2 and for the four
feeders.

Ans: 1.3; 1.25 and 1.183

Q2. A generating station has the following daily loads:

0 to 6 hr       4000 kW

6 to 8 hr       3000kW

8 to 12 hr      8000kW

12 to 14 hr     2000kW

14 to 18 hr     7500kW

18 to 20 hr     3000kW

20 to 24 hr     4500kW

Sketch load duration curve and determine the load factor and plant capacity factor assuming
capacity of the plant is 11000 kW.

Ans: 0.625, 0.4545

Q3. An industrial consumer having a maximum demand of 100 kW, maintains a load factor 60%. The
tariff rates are Rs. 1500 per KVA of maximum demand per annum plus paise 30 per kWh of energy
consumed. If the average pf is 0.8 lagging, calculate the total energy consumed per annum and
annual bill.



Q4. Compute the cost of electrical energy and average unit cost for consuming 450 kWh under block
rate quoted as below:

First 50 kWh at Rs. 3.80 per kWh

Next 50 kWh at Rs. 3.20 per kWh

Next 50 kWh at Rs. 2.80 per kWh
Next 50 kWh at Rs. 2.40 per kWh

Excess over 200 kWh at Rs. 2.10 per kWh.

Q5. A synchronous motor having a power consumption of 50 kW is connected in parallel with a load
of 200 kW having pf 0.8 lagging. The excitation of motor is adjusted until the combined pf becomes
0.9 lagging. Calculate the kVA input to the motor.

Ans: 57.76 kVA

Q6. It is desired to correct the power factor 0.95 by means of static condensers connected across
each phase of a 3-phase, 400 V, 50 Hz motor installation having a maximum load of 50 kVA at pf of
0.75 lagging. What must be the capacity of each delta – connected capacitor?

Ans: 244 uF

Q7.A factory having a load of 5 MW at 0.8 lagging for 2000 hours per annum buys energy on tariff of
Rs 500 per kVA plus Rs 2.5 per kWh consumed. If the power factor is improved to 0.95 lagging by
means of capacitors costing Rs 1350 per kVA and having a power loss of 200 watts per kVA, calculate
the annual charge for electrical energy (a) before and (b) after the installation of capacitors and (c)
the saving effected by their use. Allow 8% per annum for interest and depreciation on the
capacitors.

Q8. A consumer has an annual consumption of 70080 kWh. The charge is Rs 100 per kW of
maximum demand plus 5 paise per kWh.

(a) Find the annual bill and the overall costs per kWh is the load factor is 40%.

(b) What is the overall cost per kWh if (i) consumption was reduced by 25% with the same load
factor (ii) consumption remains the same as in (a) but the load factor is reduced to 30%?

Ans. (a) Rs 5504; 7.85p (b) (i) 7.85 p (ii) 8.80 p

Q9. A consumer takes a steady load of 1000 kW at a power factor of 0.707 lagging and pays Rs 80
per annum per kVA of maximum demand. Phase advancing plant costs Rs 128 per kVAr. Determine
the capacity of the phase advancing plant required for minimum overall annual expenditure. Interest
and depreciation total 10%. What will be the value of the new power factor of the supply? Deduce
and formula used.

Ans. 838 kVAr; 0.987 (lagging)

Q10     Two 50hp (metric) induction motors are each supplied on a tow part tariff at Rs 80 per kVA
of maximum demand plus 5 paise per kWh. The service needed is 3000 hours per annum at full load.
Motor A has efficiency 0.878 and p.f. 0.83 plus a capacitor costing Rs 75 per kVA to raise the p.f. to
0.91. Motor B with an efficiency 0.888 and p.f. 0.91 costs 1000 more than motor A. Assuming
interest and depreciation to be 12.5 % per annum for each motor and 8% for the capacitor, compare
the annual charges for two arrangements.

Ans. Net annual saving with motor B is Rs 36.80.
Q11      A factory takes a load of 200 kW at 0.85 p.f. lagging for 2500 hours per annum and buys
energy on a tariff of Rs 100 per kVA plus 5 paise per kWh consumed. If the power factor is improved
to 0.90 lagging by means of capacitors costing Rs 350 per kVA and having a power loss of 100 watts
per kVA calculate the annual charge for electrical energy (a) before and (b) after the installation of
capacitors and (c) the saving effected by their use. Allow 8% per annum for interest and depreciation
on the capacitors.

Ans. (a) Rs 48530 (b) Rs 48270 (c) Rs 260

Q12.    A generating station supplies the following loads:

15 MW, 12 MW, 8.5 MW, 6 MW and 0.45 MW. The annual load factor of the power station is 48%.
Calculate (i) the number of units supplied annually (ii) diversity factor and (iii) demand factor, if the
station has a maximum demand of 22 MW.

Ans. (i) 92.5 X 10e6 kWh (ii) 1.907 (iii) 52.5%

Q13. A power station has a maximum demand of 200 MW, a plant load factor of 0.6, a plant
capacity factor of 0.5 and a plant use factor of 0.8. Find (i) the daily energy consumed (ii) the reserve
capacity of the plant and (iii) maximum energy that can be produced daily.

Ans. (i) 2880 MWh (ii) 40 MW (iii) 5706 MWh

Q14. The maximum demand of a power supply system is 30 MW. The annual factors as follows:
Load factor = 60%; Capacity factor = 50%; Use factor = 75%.

Determine (i) the annual energy production (ii) reserve capacity and (iii) the hours during which the
plant is not in service per year.

Ans. (i) 157.68 X 10e6 kWh (ii) 6 MW (iii) 2920 hours.

Q15. The maximum demand of a consumer is 1 MW and the units consumed per annum are
500000 kWh. Calculate the reduction in cost if the power factor is raised from 0.5 to 0.8. The tariff is
Rs 900 per annum per kW demand plus Rs 1.50 per kWh plus Re 0.30 per kVAh reactive. Calculate
the flat rate tariff for a unity power factor load.

Ans. Rs 147310.00; Rs 3.30 per kWh

Q16. A consumer, whose connected load is 400 kVA, consumes 1 X 10e6 kWh per annum and the
maximum demand registered is 250 kVA. He is offered the following two alternative tariffs:

Tariff A: Rs 1000 per annum per kVA of connected load + first 150 kWh per KVA of connected load at
Rs 3.0/kWh, next 50000 kWh at Rs 2.00 per kWh and the rest at Re 1.0/kWh.

Tariff B: Rs 1200 per annum per kVA of maximum demand + first 150 kWh per kVA of maximum
demand at Rs 3.0 per kWh; next 50000 kWh at Rs 2.0/kWh and the rest at Re 1.0/kWh.

Which tariff is economical and what is the annual gain?

Ans. Tariff B is cheaper; Annual gain = Rs 14500000

Más contenido relacionado

La actualidad más candente

Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
Md Irshad Ahmad
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
Priten Vasa
 
Bus duct fabrication
Bus duct fabricationBus duct fabrication
Bus duct fabrication
STUPIDPANDEY
 
Introduction to power system protection
Introduction to power system protectionIntroduction to power system protection
Introduction to power system protection
SaifUrrehman183
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
Partha Parida
 

La actualidad más candente (20)

Protective relay
Protective relay Protective relay
Protective relay
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
 
Mathematical modelling of steam turbine
Mathematical modelling of steam turbineMathematical modelling of steam turbine
Mathematical modelling of steam turbine
 
Motor Protection
Motor ProtectionMotor Protection
Motor Protection
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
Protection of Transmission lines
Protection of Transmission linesProtection of Transmission lines
Protection of Transmission lines
 
Bus duct fabrication
Bus duct fabricationBus duct fabrication
Bus duct fabrication
 
Electrical Machines - II
Electrical Machines - IIElectrical Machines - II
Electrical Machines - II
 
Motor starter
Motor starterMotor starter
Motor starter
 
Alternator protection
Alternator protectionAlternator protection
Alternator protection
 
Line to Line & Double Line to Ground Fault On Power System
Line to Line & Double Line to Ground Fault On Power SystemLine to Line & Double Line to Ground Fault On Power System
Line to Line & Double Line to Ground Fault On Power System
 
Protection of alternator
Protection of alternatorProtection of alternator
Protection of alternator
 
Insulation coordination.
Insulation coordination.Insulation coordination.
Insulation coordination.
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 
A.C Drives
A.C DrivesA.C Drives
A.C Drives
 
10 electrical installation-guide-2016
10 electrical installation-guide-201610 electrical installation-guide-2016
10 electrical installation-guide-2016
 
Introduction to power system protection
Introduction to power system protectionIntroduction to power system protection
Introduction to power system protection
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
 

Destacado

Step1 Single Line Diagram
Step1 Single Line DiagramStep1 Single Line Diagram
Step1 Single Line Diagram
nanonon
 
Newton Raphson method for load flow analysis
Newton Raphson method for load flow analysisNewton Raphson method for load flow analysis
Newton Raphson method for load flow analysis
divyanshuprakashrock
 

Destacado (20)

Unit1 And 2 Sample Solutions
Unit1 And 2 Sample SolutionsUnit1 And 2 Sample Solutions
Unit1 And 2 Sample Solutions
 
Questions unit4
Questions unit4Questions unit4
Questions unit4
 
Questions practice unit iv
Questions practice unit ivQuestions practice unit iv
Questions practice unit iv
 
Unit v
Unit vUnit v
Unit v
 
Unit4questions
Unit4questionsUnit4questions
Unit4questions
 
Unit 2 samplesolutions
Unit 2 samplesolutionsUnit 2 samplesolutions
Unit 2 samplesolutions
 
Unit 2 Questions_Nagrath kothari
Unit 2 Questions_Nagrath kothariUnit 2 Questions_Nagrath kothari
Unit 2 Questions_Nagrath kothari
 
Practice questions for unit ii
Practice questions for unit iiPractice questions for unit ii
Practice questions for unit ii
 
Solutions -unit4
Solutions  -unit4Solutions  -unit4
Solutions -unit4
 
Practice questions
Practice questionsPractice questions
Practice questions
 
Unit1 8
Unit1 8Unit1 8
Unit1 8
 
Step1 Single Line Diagram
Step1 Single Line DiagramStep1 Single Line Diagram
Step1 Single Line Diagram
 
TPs-TDs : Travaux Pratiques & Dérigés (version 2014-2017) Génie Electrique/Ex...
TPs-TDs : Travaux Pratiques & Dérigés (version 2014-2017) Génie Electrique/Ex...TPs-TDs : Travaux Pratiques & Dérigés (version 2014-2017) Génie Electrique/Ex...
TPs-TDs : Travaux Pratiques & Dérigés (version 2014-2017) Génie Electrique/Ex...
 
Problemas resueltos cortocircuito trifasico
Problemas resueltos cortocircuito trifasicoProblemas resueltos cortocircuito trifasico
Problemas resueltos cortocircuito trifasico
 
Project report on 33kv Substation and Automatic Power Factor Controller in ONGC
Project report on 33kv Substation and Automatic Power Factor Controller in ONGCProject report on 33kv Substation and Automatic Power Factor Controller in ONGC
Project report on 33kv Substation and Automatic Power Factor Controller in ONGC
 
Unit 1, Power system Analysis
Unit 1, Power system AnalysisUnit 1, Power system Analysis
Unit 1, Power system Analysis
 
Newton Raphson method for load flow analysis
Newton Raphson method for load flow analysisNewton Raphson method for load flow analysis
Newton Raphson method for load flow analysis
 
Ee 1351 power system analysis
Ee 1351 power system analysisEe 1351 power system analysis
Ee 1351 power system analysis
 
load flow 1
 load flow 1 load flow 1
load flow 1
 
File 1 power system fault analysis
File 1 power system fault analysisFile 1 power system fault analysis
File 1 power system fault analysis
 

Similar a Unit1questions

Ee w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...
Ee  w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...Ee  w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...
Ee w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...
Silvester Van Koten
 
(General aspects of energy)
(General aspects of energy)(General aspects of energy)
(General aspects of energy)
malathi051
 
Advanced energy engineering ktu module 1
Advanced energy engineering ktu module 1Advanced energy engineering ktu module 1
Advanced energy engineering ktu module 1
NBoss
 

Similar a Unit1questions (20)

Power generation and economics
Power generation and economicsPower generation and economics
Power generation and economics
 
Ch01-ESR-L02.pdf
Ch01-ESR-L02.pdfCh01-ESR-L02.pdf
Ch01-ESR-L02.pdf
 
Ee w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...
Ee  w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...Ee  w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...
Ee w07.1 w_ 2. electricity generation _ part 4 (missing money & capacity pay...
 
How Power Factor corection works.pdf
How Power Factor corection works.pdfHow Power Factor corection works.pdf
How Power Factor corection works.pdf
 
Pv tubewell economics potential pakistan
Pv tubewell economics potential pakistanPv tubewell economics potential pakistan
Pv tubewell economics potential pakistan
 
(General aspects of energy)
(General aspects of energy)(General aspects of energy)
(General aspects of energy)
 
Lecture-on-DISTRIBUTION-SYSTEM-edited.pptx
Lecture-on-DISTRIBUTION-SYSTEM-edited.pptxLecture-on-DISTRIBUTION-SYSTEM-edited.pptx
Lecture-on-DISTRIBUTION-SYSTEM-edited.pptx
 
Advanced energy engineering ktu module 1
Advanced energy engineering ktu module 1Advanced energy engineering ktu module 1
Advanced energy engineering ktu module 1
 
PROPOSAL
PROPOSALPROPOSAL
PROPOSAL
 
Introduction to ReGenX Generator Innovations & Commercialization Overview 201...
Introduction to ReGenX Generator Innovations & Commercialization Overview 201...Introduction to ReGenX Generator Innovations & Commercialization Overview 201...
Introduction to ReGenX Generator Innovations & Commercialization Overview 201...
 
PV AND OTHER RENEWABLE ENERGY
 PV AND OTHER RENEWABLE ENERGY PV AND OTHER RENEWABLE ENERGY
PV AND OTHER RENEWABLE ENERGY
 
Comparison study of lead-acid and lithium-ıon batteries for solar photovoltai...
Comparison study of lead-acid and lithium-ıon batteries for solar photovoltai...Comparison study of lead-acid and lithium-ıon batteries for solar photovoltai...
Comparison study of lead-acid and lithium-ıon batteries for solar photovoltai...
 
Psoc qp
Psoc qpPsoc qp
Psoc qp
 
Tarrif and load curves
Tarrif and load curvesTarrif and load curves
Tarrif and load curves
 
Wind turbine report
Wind turbine reportWind turbine report
Wind turbine report
 
Load Forecasting Using LSTM Model
Load Forecasting Using LSTM ModelLoad Forecasting Using LSTM Model
Load Forecasting Using LSTM Model
 
Power system Stability, Equal area criteria
Power system Stability, Equal area criteriaPower system Stability, Equal area criteria
Power system Stability, Equal area criteria
 
Power Factor.ppt
Power Factor.pptPower Factor.ppt
Power Factor.ppt
 
powerfactor.pdf
powerfactor.pdfpowerfactor.pdf
powerfactor.pdf
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 

Más de Abha Tripathi

Unit1 and 2 sample solutions
Unit1 and 2 sample solutionsUnit1 and 2 sample solutions
Unit1 and 2 sample solutions
Abha Tripathi
 
Non Conventional (Renewable) Energy Sources 01
Non Conventional (Renewable) Energy Sources 01Non Conventional (Renewable) Energy Sources 01
Non Conventional (Renewable) Energy Sources 01
Abha Tripathi
 
Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01
Abha Tripathi
 
Questions From 1st Unit Nagrath
Questions From 1st Unit NagrathQuestions From 1st Unit Nagrath
Questions From 1st Unit Nagrath
Abha Tripathi
 

Más de Abha Tripathi (18)

Questions unit3
Questions unit3Questions unit3
Questions unit3
 
Unit1 and 2 sample solutions
Unit1 and 2 sample solutionsUnit1 and 2 sample solutions
Unit1 and 2 sample solutions
 
Non Conventional (Renewable) Energy Sources 01
Non Conventional (Renewable) Energy Sources 01Non Conventional (Renewable) Energy Sources 01
Non Conventional (Renewable) Energy Sources 01
 
Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01
 
Symmetrical components
Symmetrical componentsSymmetrical components
Symmetrical components
 
Representation of power system components
Representation of power system componentsRepresentation of power system components
Representation of power system components
 
Questions unit2 ch3
Questions unit2 ch3Questions unit2 ch3
Questions unit2 ch3
 
Renewable Sor
Renewable SorRenewable Sor
Renewable Sor
 
Gas and diesel Plant
Gas and diesel PlantGas and diesel Plant
Gas and diesel Plant
 
NPP, Nuclear Power Plant,
NPP, Nuclear Power Plant, NPP, Nuclear Power Plant,
NPP, Nuclear Power Plant,
 
Hydro E
Hydro EHydro E
Hydro E
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Soln unit5
Soln unit5Soln unit5
Soln unit5
 
Questions From 1st Unit Nagrath
Questions From 1st Unit NagrathQuestions From 1st Unit Nagrath
Questions From 1st Unit Nagrath
 
Unit 3 Part 1
Unit 3 Part 1Unit 3 Part 1
Unit 3 Part 1
 
Grading The Insulator Problem
Grading The Insulator ProblemGrading The Insulator Problem
Grading The Insulator Problem
 
Dc Distribution
Dc DistributionDc Distribution
Dc Distribution
 
Dc Distributed Load
Dc Distributed LoadDc Distributed Load
Dc Distributed Load
 

Último

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Último (20)

Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 

Unit1questions

  • 1. CHAPTER TWO QUESTIONS WITH ANSWERS Q1. A substation supplies power by four feeders to its consumers. Feeder no 1 supplies six consumers whose individual demands are 70 kW, 90 kW, 20 kW, 50 kW, 10 kW and 20 kW, while maximum demand on the feeder is 200kW. Feeder no 2 supplies four consumers whose daily maximum demands are 60 kW, 40 kW, 70 kW and 30 kW while the maximum demand on feeder no 2 is 160 kW. Feeders no 3 and 4 have daily maximum demands of 150 kW and 200 kW respectively, while the maximum demand on the station is 600 kW. Determine the diversity factors for the consumers of feeder no 1 and feeder no 2 and for the four feeders. Ans: 1.3; 1.25 and 1.183 Q2. A generating station has the following daily loads: 0 to 6 hr 4000 kW 6 to 8 hr 3000kW 8 to 12 hr 8000kW 12 to 14 hr 2000kW 14 to 18 hr 7500kW 18 to 20 hr 3000kW 20 to 24 hr 4500kW Sketch load duration curve and determine the load factor and plant capacity factor assuming capacity of the plant is 11000 kW. Ans: 0.625, 0.4545 Q3. An industrial consumer having a maximum demand of 100 kW, maintains a load factor 60%. The tariff rates are Rs. 1500 per KVA of maximum demand per annum plus paise 30 per kWh of energy consumed. If the average pf is 0.8 lagging, calculate the total energy consumed per annum and annual bill. Q4. Compute the cost of electrical energy and average unit cost for consuming 450 kWh under block rate quoted as below: First 50 kWh at Rs. 3.80 per kWh Next 50 kWh at Rs. 3.20 per kWh Next 50 kWh at Rs. 2.80 per kWh
  • 2. Next 50 kWh at Rs. 2.40 per kWh Excess over 200 kWh at Rs. 2.10 per kWh. Q5. A synchronous motor having a power consumption of 50 kW is connected in parallel with a load of 200 kW having pf 0.8 lagging. The excitation of motor is adjusted until the combined pf becomes 0.9 lagging. Calculate the kVA input to the motor. Ans: 57.76 kVA Q6. It is desired to correct the power factor 0.95 by means of static condensers connected across each phase of a 3-phase, 400 V, 50 Hz motor installation having a maximum load of 50 kVA at pf of 0.75 lagging. What must be the capacity of each delta – connected capacitor? Ans: 244 uF Q7.A factory having a load of 5 MW at 0.8 lagging for 2000 hours per annum buys energy on tariff of Rs 500 per kVA plus Rs 2.5 per kWh consumed. If the power factor is improved to 0.95 lagging by means of capacitors costing Rs 1350 per kVA and having a power loss of 200 watts per kVA, calculate the annual charge for electrical energy (a) before and (b) after the installation of capacitors and (c) the saving effected by their use. Allow 8% per annum for interest and depreciation on the capacitors. Q8. A consumer has an annual consumption of 70080 kWh. The charge is Rs 100 per kW of maximum demand plus 5 paise per kWh. (a) Find the annual bill and the overall costs per kWh is the load factor is 40%. (b) What is the overall cost per kWh if (i) consumption was reduced by 25% with the same load factor (ii) consumption remains the same as in (a) but the load factor is reduced to 30%? Ans. (a) Rs 5504; 7.85p (b) (i) 7.85 p (ii) 8.80 p Q9. A consumer takes a steady load of 1000 kW at a power factor of 0.707 lagging and pays Rs 80 per annum per kVA of maximum demand. Phase advancing plant costs Rs 128 per kVAr. Determine the capacity of the phase advancing plant required for minimum overall annual expenditure. Interest and depreciation total 10%. What will be the value of the new power factor of the supply? Deduce and formula used. Ans. 838 kVAr; 0.987 (lagging) Q10 Two 50hp (metric) induction motors are each supplied on a tow part tariff at Rs 80 per kVA of maximum demand plus 5 paise per kWh. The service needed is 3000 hours per annum at full load. Motor A has efficiency 0.878 and p.f. 0.83 plus a capacitor costing Rs 75 per kVA to raise the p.f. to 0.91. Motor B with an efficiency 0.888 and p.f. 0.91 costs 1000 more than motor A. Assuming interest and depreciation to be 12.5 % per annum for each motor and 8% for the capacitor, compare the annual charges for two arrangements. Ans. Net annual saving with motor B is Rs 36.80.
  • 3. Q11 A factory takes a load of 200 kW at 0.85 p.f. lagging for 2500 hours per annum and buys energy on a tariff of Rs 100 per kVA plus 5 paise per kWh consumed. If the power factor is improved to 0.90 lagging by means of capacitors costing Rs 350 per kVA and having a power loss of 100 watts per kVA calculate the annual charge for electrical energy (a) before and (b) after the installation of capacitors and (c) the saving effected by their use. Allow 8% per annum for interest and depreciation on the capacitors. Ans. (a) Rs 48530 (b) Rs 48270 (c) Rs 260 Q12. A generating station supplies the following loads: 15 MW, 12 MW, 8.5 MW, 6 MW and 0.45 MW. The annual load factor of the power station is 48%. Calculate (i) the number of units supplied annually (ii) diversity factor and (iii) demand factor, if the station has a maximum demand of 22 MW. Ans. (i) 92.5 X 10e6 kWh (ii) 1.907 (iii) 52.5% Q13. A power station has a maximum demand of 200 MW, a plant load factor of 0.6, a plant capacity factor of 0.5 and a plant use factor of 0.8. Find (i) the daily energy consumed (ii) the reserve capacity of the plant and (iii) maximum energy that can be produced daily. Ans. (i) 2880 MWh (ii) 40 MW (iii) 5706 MWh Q14. The maximum demand of a power supply system is 30 MW. The annual factors as follows: Load factor = 60%; Capacity factor = 50%; Use factor = 75%. Determine (i) the annual energy production (ii) reserve capacity and (iii) the hours during which the plant is not in service per year. Ans. (i) 157.68 X 10e6 kWh (ii) 6 MW (iii) 2920 hours. Q15. The maximum demand of a consumer is 1 MW and the units consumed per annum are 500000 kWh. Calculate the reduction in cost if the power factor is raised from 0.5 to 0.8. The tariff is Rs 900 per annum per kW demand plus Rs 1.50 per kWh plus Re 0.30 per kVAh reactive. Calculate the flat rate tariff for a unity power factor load. Ans. Rs 147310.00; Rs 3.30 per kWh Q16. A consumer, whose connected load is 400 kVA, consumes 1 X 10e6 kWh per annum and the maximum demand registered is 250 kVA. He is offered the following two alternative tariffs: Tariff A: Rs 1000 per annum per kVA of connected load + first 150 kWh per KVA of connected load at Rs 3.0/kWh, next 50000 kWh at Rs 2.00 per kWh and the rest at Re 1.0/kWh. Tariff B: Rs 1200 per annum per kVA of maximum demand + first 150 kWh per kVA of maximum demand at Rs 3.0 per kWh; next 50000 kWh at Rs 2.0/kWh and the rest at Re 1.0/kWh. Which tariff is economical and what is the annual gain? Ans. Tariff B is cheaper; Annual gain = Rs 14500000