Air Products and Chemicals Inc. (APCI) is a geographically diversified Fortune 500
company with $7.4 billion in annual sales. The company operates in more than 30
countries, and half of its sales are to customers outside of the United States. It sells
gases, chemicals, and equipment and serves customers in technology, energy, health
care, and industrial markets. It has 19,900 employees worldwide.

Deliver the Difference and a Unified Focus
     In 2000 APCI installed a new chairman and CEO, John Paul Jones, who had
been with the company for 28 years. He took the reins of an organization that was
doing well and started to develop a plan to position the company for greater growth
and profitability. Jones saw inefficiencies and an emphasis on “my business” and
“my function.” Employees would often identify their functions as different from the
rest of the company and believe that they required separate processes. To establish
a new order, Jones introduced a vision called “Deliver the Difference” to unify the
organization into a “one company” focus and commitment. It summarizes APCI’s
vision, guiding values, and working environment.

    Today, “Deliver the Difference” posters are displayed throughout the company,
in hallways and conference rooms. When employees make decisions, they go back to
the document and ensure they are in line with it. Said George Diehl, global director
of the Process Management Center of Excellence and supply chain and process
management education lead, “People know this [document]; it is a real logo and
symbol internally for what we are all about.”

     The “Deliver the Difference” vision documents how the company differentiates
itself from competitors. It outlines guiding values: accountability; innovation;
integrity; respect; and a constant focus on safety, health, and the environment. It
also contains a working environment statement. The goal of the document is to



Business Process Management • ©2005 APQC                                                             83
AIR PRODUCTS


               increase the efficiency and effectiveness of the company and drive it to be the best
               company to work for, buy from, and invest in.

                  Despite having disparate businesses, many functions, and operations in many
               countries, the company identified four organization-wide initiatives that were
               needed to create increased shareholder, customer, and employee value:
               1. change—visibly value people in a positive work environment,
               2. portfolio management—continuously improve the return on capital,
               3. growth —grow through innovation and superior products and services for
                  customers, and
                                                                                     18
               4. work processes—reduce costs through work process simplification.

                   Committing to this vision requires understanding and listening to customers
               as one company by:
               • taking the best of the best and bringing it to customers faster (so velocity and
                   speed are important);
               • providing value for global businesses through one infrastructure (that can mean
                   one set of global processes, one IT system, or a set of legacy systems that support
                   all the businesses in a common way);
               • simplifying and standardizing global work processes (another embellishment on
                   the emphasis on processes); and
               • globally uniting by sharing knowledge across regions, businesses, and groups.
                   (Knowledge management is key to “Deliver the Difference,” and it is integrated
                   in the organization through global work processes.)

                      “Deliver the Difference” is the single description of the new corporate order.

               BPM STRATEGY, STRUCTURE, AND FUNDING
                      “If you really want to become process-focused, you are changing the way
                      corporations have been evolving, which has been around functions, around
                      businesses. Now what we are saying is that there is a new dimension called
                      ‘process,’ a whole new way of thinking about the way we add value.”
                                 —George Diehl, global director of the process management COE




               18
                    It is significant to this study that one of the four key foundational initiatives in “Deliver the
                    Difference” involves work processes.


84                                                                         Business Process Management • ©2005 APQC
AIR PRODUCTS


    “Creating a process-focused organization must be in the context of something
    that is very important to the company. A process-focused organization for the
    sake of being process-focused has little value and, quite frankly, has a negative
    feel to it. If it is not placed within the context of the strategy and direction of the
    company, you are probably not going to get a whole lot of recognition or buy-in
    for the concept itself.”
                                      —Bill Cantwell, vice president of supply chain

    APCI is transforming itself to become more process-focused so that it can drive
productivity and customer value. Supply Chain Vice President Bill Cantwell said
APCI’s vision is to be an organization where all work is “thought of, performed, and
managed as a process, focused on the customer to create satisfaction and ultimately
customer loyalty.” The company is not, nor does it strive to be, process-based—it is
not organized by process, but by function. In 2005, however, APCI plans to form
shared service centers, which will be organized by process; Cantwell said this is a
potential step toward APCI being organized by process.

    Soon after it published and began communicating “Deliver the Difference,”
the company tackled several initiatives to integrate this more unified and process-
focused vision into daily operations: portfolio management, a growth strategy, a
single-instance SAP
implementation,                          APCI’s Delivering the Difference Road Map
customer loyalty,
and introduction of
“process” as a third              Past       Portfolio
                                                         Growth
                                                                    Global  Enablers
                                Operating Management                Work     Continuous improvement
“axis” of management.             Mode       Process     Strategy
                                                                             Knowledge management
                                                                  Processes
It depicted this                                                             Customer loyalty
                                                                               Segmentation/business rules
transformation in a                                                            E-business

“Deliver the Difference     • Governance plan
Road Map” (Figure          • Planning and commitment process
21).

    APCI began                                                                                   • Economy
                                                  Values                                         • EPS growth
first with portfolio                               Accountability
                                                                                                 • Implementation success
management to focus                                Innovation
                                                   Integrity
more intently on its                               Respect
                                                   Safety, health         Drivers
“core businesses,”                                 Environment             SAP                                   The Best Company
which have the greatest                                                    Technology
                                                                                              Productivity
                                                                                                                     Work for
                                                                           Change                                    Buy from
strategic impact                                                           management                                Invest in

for the company.
Several businesses in
its portfolio did not
measure up to EPS
                                                                           Figure 21



Business Process Management • ©2005 APQC                                                                                       85
AIR PRODUCTS

                                                19
               (earnings per share) growth and profitability standards. “Portfolio management
               is difficult,” said Diehl. “Many times businesses are part of the company for a long
               time, and they become part of the family. People really do not like to look at them
               with a very sharp eye or a sharp pencil. These businesses hang around longer than
               they should.” Consequently, leaders put businesses into three categories: growth,
               core businesses, and businesses that needed to be restructured.

                   The second initiative was to develop a growth strategy that would determine
               how the company would invest its resources in the businesses. It chose to focus
               future investments in four growth industries: health care, electronics, performance
               materials, and energy and process industries. APCI created a growth board that
               reviewed opportunities to invest in these industries.

                    A project to implement a single instance of SAP started in 2001 and was the
               driving force to APCI becoming process-focused. Leaders learned from Michael
                          20                             21
               Hammer and Deloitte Consulting that organizations that succeed in SAP
               implementation do so because they see the project as process implementation,
               whereas organizations that fail see it as an IT tool implementation. The organization
               rallied around the idea that SAP implementation was a series of processes enabled
               by a tool rather than the other way around.

                   The company also wanted to ensure that the SAP and process work was focused
               on the customer and not an internally focused effort. Before proceeding, APCI
               launched a customer loyalty process and a scorecard to measure customer feedback.
               The process continues today. APCI cycles through approximately 5,000 customers
               located in all regions of the world and uses the data to define base customer
               requirements for the processes SAP is enabling.

                    Company leaders introduced the concept of process management as the third
               axis of management, in addition to business units and functions (Figure 22). Business
               units dictate where employees work; this axis includes strategy, identification of
               customers, etc., and functions dictate what employees do, such as sales, engineering,
               customer service, accounting, etc. As the third axis, processes dictate how employees
               work together to serve customers. Accordingly, APCI examined the concept of
               the connectivity of jobs. Historically, the company had a tendency to isolate jobs
               and hand off responsibilities. The company is currently minimizing handoffs and
               recognizing that individuals need to be responsible for an end-to-end process.

               19
                  Although EPS is an important performance driver, operating return on net assets is the most
                  important. All employees know what the target is and know where the company stands in
                  relation to the target. They are beginning to understand person by person what they can do to
                  contribute to it.
               20
                  www.hammerandco.com/about.asp (retrieved February 2005).
               21
                  www.deloitte.com (retrieved February 2005).


86                                                                   Business Process Management • ©2005 APQC
AIR PRODUCTS


                               Global Process Management
                                       A Third Dimension in Management


                   BUSINESSES                                                    • Businesses
     (Business unit, region, focused on P&L’s and markerts)                        determine where
                  “Best Company to Invest In”                                      we work.


                                                                                 • Functions
                                                FUNCTIONS                          describe what we
                 k




                                                                                   do.
              or




                                          (Departments, Centers of Excellence)
             W




                                              “Best Company to Work For”

                                                                                 • Processes focus
         PROCESSES
                                                                                   on how we do our
        (Source, make, fulfill, etc.)
                                                                                   work.
      “Best Company to Buy From”


                                                       Figure 22




    As the organization implemented SAP, became a process-focused organization,
and developed and communicated the concept of “one company” throughout, its
                                         22
leaders attempted to converge processes. Because the chemicals businesses and gas
businesses had different processes in various areas of the world, convergence became
one of the most fundamental principles in process management for APCI. Leaders
wanted those who were doing similar jobs to do them in a similar way as a means to
drive efficiency and effectiveness.

    Bill Cantwell, the vice president of the supply chain, said that the challenge was
great because the executives were “constantly running into the not-invented-here
syndrome.” As they were implementing a major release of SAP, they stopped the
implementation for a two-month period to focus on process convergence. Stopping
cost the company $12 million, but the executives knew they could not succeed until
processes were converged. By configuring six transaction models in SAP, APCI has
been successful in convergence.




22
     “Convergence” does not mean that everyone in the company does everything the same way, but
     instead means that employees may have one of six different ways of working (depending on the
     kind of business). For example, if employees produce and sell a bulk material, they have a unique
     model to converge around.


Business Process Management • ©2005 APQC                                                                           87
AIR PRODUCTS


               The Executive Process Owners
                  To underscore the importance of process as the third axis of management,
               Jones appointed executive process owners to lead the effort. Executive process
               owners are vice presidents of the company and are also the functional heads of
               major departments. Their functional role is concerned with functional excellence
               and their cost center. According to Cantwell, in their new role, executive process
               owners needed to:
               • articulate a process vision with key metrics,
               • document the end-to-end process,
               • sponsor process convergence decisions, and
               • lead as a process zealot.

                    In addition, according to Cantwell, the company has taken all IT spending from
               the businesses and given it to the process owners. The process owners are responsible
               for all process convergence activities. For example, one process owner ensures that all
               orders are processed one way. The job of the owner of the “fulfill” process (or “order
               to cash”) is to drive convergence across the company. Likewise, the process owners
               of “make,” “sell,” and “source” (or “requisition to pay”) all have the obligation to
               converge.

                   The process owner role is concerned with the effectiveness and efficiency of the
               end-to-end process across many functions. “Effectiveness” means that the process
               owner ensures that the output of their processes is delivering the right value to
               APCI customers and business owners. “Efficiency” means driving costs down by
               focusing on cycle time, re-work, etc. By being accountable for end-to-end work,
               process owners can re-align how work is done, especially at the functional interfaces,
               in order to improve productivity and make it easier for employees to perform their
               work, not just work smarter and faster in the old, inefficient process.

               Process Principles
                   Early in the “Deliver the Difference” journey, John Jones and Bill Cantwell
               established a set of fundamental process principles, some of which follow.
               • Business processes will be simple, standardized, and global; enabled by a single
                   instance of SAP and governed through a global process board.
               • Customer responsiveness, operational efficiency, and cycle times are all
                   important.
               • Value creation will be focused on the enterprise versus any individual
                   business.
               • Collaboration becomes the norm.

               Global Process Board
                  APCI has identified 13 global processes, each of which is led by a global
               process management team. The executive process owners from each global process


88                                                            Business Process Management • ©2005 APQC
AIR PRODUCTS


management team meet regularly as a global process board. The global process
board is responsible for documenting process design, identifying key performance
indicators, training, managing best practices (e.g., the best practices in implementing
process management), and resolving issues across the global process management
teams.

    Under each executive process owner, APCI has created full-time positions
called process managers. The process managers are essential to the global process
management effort.

    In addition to the global process board, APCI has a global supply chain board
to drive the efficiency of the supply chain. The company delineates the role of each
board so that none of the responsibilities are overlapping.

Process Management Road Map
    The company uses a four-pronged process management model that includes
process leadership, design, performance, and improvement, with SAP in the center.
APCI is involved in a one-instance SAP implementation, and much of the process
management activity is centered around it. This model is embedded in a road map
to help communicate process management to the organization (Figure 23).

Education and Training         Introduction to Process Management Course Road Map
    To help instill
this understanding of                                                                                    “Future State”
and focus on process
management, training                                                          “Top 10 List”
concerning processes,                                                                                      A Process-
ERP, and supply chains                                                                                      Focused
is a key element of                                                                                       Organization
                                                                 Process             Process
APCI’s approach.                                                Leadership           Design


    For example, APCI
                                                                  Process            Process
offers employees a                                                                 Performance
                                                                Improvement
training class called
“Introduction to                                               4 Keys to Managing Processes
Process Management.”                                          The Business Case for Process
Facilitators begin the
                                            Why Process?            The 7 “Powers of                Power #8—
classes by discussing                      Why Process Now?             Process”              APCI’s “Secret Weapon”
the meaning of
processes and the
                                 Process
attributes of a process-         Basics
focused organization.
They rally around
                                                                      Figure 23



Business Process Management • ©2005 APQC                                                                               89
AIR PRODUCTS


                       one simple, common definition of what a work process is: an organized group of
                       related activities that work together to create value for the customer. A process has
                       to be organized (i.e., designed and then documented). It has to work with other
                       processes, which requires cross-functional roles, and it needs to deliver something
                       of value to the company by contributing to being the best place to work for, the best
                       company to buy from, or the best company to invest in. It is end-to-end work, not
                       piecemeal. Facilitators make a business case for process management and explain
                       why it is important to the company. The course includes instruction about Michael
                       Hammer’s “Seven Powers of Process.”

                           The course uses the road map diagram as a training tool to help participants
                       understand where the company is today and where it is going as an organization
                       (Figure 23, page 89). The road ends at an image of Mt. Everest, which signifies
                       the future state of a process-focused organization. The Mt. Everest image indicates
                       that process thinking is a higher view of the business. Through process thinking,
                       employees can have a better understanding of how the entire business is operating
                       and see the company from the eyes of the customer.

                           The road map helps the trainees realize that process management cannot be
                       implemented all at once. The company has traveled the “road” for more than four
                       years. The trainees understand how to build a foundation for process management,
                       according to Bill Ney, program manager and global process owner for performance
                       measurement, and take each step one at a time.

                       BPM DESIGN
                     To leverage business value, APCI focuses on process leadership, process
                                              design, process performance (measurement), and
APCI’s Process Management Model:              then process improvement (which are continuous
          A Continuous Loop                   improvement and knowledge management
                                              activities). As visualized in Figure 24, these
                                              capabilities form a continuous loop, and each is
   Process                  Process           closely related to SAP implementation.
     Leadership                     Design
                                                           The step of business process management design
                                                       involves:
                                                       • identifying enterprise processes,
                                                       • defining process owner accountabilities and
                                                            assigning enterprise process owners,
       Process                     Process             • building capabilities to achieve and sustain
     Improvement                 Performance               business value, and
                                                       • establishing clear interface roles.

                                                           APCI examines each one individually.
                   Figure 24



90                                                                   Business Process Management • ©2005 APQC
AIR PRODUCTS


The Basic Steps
     In 1999 Diehl attended a conference hosted by Michael Hammer. Hammer
had a simple message: If you are going to become a business process enterprise, even
at a regional level, first identify the processes that make up your company’s work.
Second, assign ownership of the processes end to end. Third, begin to measure them.
Fourth, start to improve them based on the measures.

    “Finally,” Diehl said, “it is one thing to measure and assign process owner
accountabilities. But what about the interfaces with other people like the business
owners or the functional owners who had some of that authority and responsibility
before? We have to recognize that there is a power-shift going on. How do you deal
with that interface and have peaceful co-existence going forward as you introduce
this new way of managing your business?” One answer is that process owners own
their global process designs, and the business and functional owners operate using
these converged, one company designs. Service level agreements begin to emerge
among them.

Enterprise Process Blueprint
    APCI currently has 13 global processes. A subset of the processes forms the
supply chain, a chain that contains much of the company’s value. Diehl said, “It is
the epicenter, if you will, of our global process model.” (See Figure 25.)

    In January 2004                         APCI’s Enterprise Process Blueprint
each process in Figure
25 had a longer, more
                                     Align                    Enterprise Process Blueprint
complicated name; for
example, “make” was
“produce products and                                                Supply Chain
services.” In seeking
                                                                            Plan
external guidance,                 Innovate
which APCI routinely
does to benchmark and                                  Source             Make            Fulfill      Customers
speed improvements,                    Sell
APCI adopted a concept
from the Supply Chain                                                     Build
Operations Reference
Council. APCI
managers liked the             People          Finance     Information        Environment    Governance
shortened names in the
council’s supply chain                                            Figure 25
process model, which
uses one-word terms such as “plan,” “source,” and “make.” Knowing that simplicity
would help convey the message of “what we do,” they adopted that idea.


Business Process Management • ©2005 APQC                                                                  91
AIR PRODUCTS


                   APCI also has a capital equipment business (an engineering business) that builds
               capital plants costing from $100,000 to more than $100 million. It has a separate
               supply chain called “build,” which focuses on this work. Each supply chain includes
               requisitioning of raw materials, sourcing, and purchasing. It also includes receiving
               at the plants and paying the suppliers. APCI’s manufacturing facilities start the
               conversion process, and maintenance processes are also in the supply chain. The
               end of the “make” process is the finished goods inventory. New orders come into
               “fulfill,” are picked from the finished goods inventories, and then are scheduled and
               delivered. Invoices are sent out after delivery and are paid. The process ends when
               cash is deposited in the bank and customers are satisfied

                  Figure 25 (page 91) shows the seven customer-facing processes, which are the
               processes of the supply chain plus two additional processes:
               1. “Innovate,” the new-product development process formerly known as “create
                  and improve offerings,” begins with new ideas and ends with a new marketplace
                  offering.
               2. “Sell,” formerly “find, win, and retain customers,” goes from a lead through a
                  proposal and a contract and ends when the customer is on-stream. Once on-
                  stream, the customer is served by the supply chain.

                   The supply chain is supported by fundamental corporate support areas such
               as “people” (HR), “finance,” “information,” “environment,” and “governance”
               (corporate governance including law and corporate secretaries).

                   Rounding out the list of the global processes is “align,” a leadership process
               that sits atop the others. The process was formerly called “develop and commit to
               enterprise plans.” The align process develops the five- and ten-year plans and has a
               three-year planning process called “plan and commit.” It also controls mergers and
               acquisitions.

                    In summary, the enterprise process blueprint shows the seven customer-facing
               and the five enabling processes as well as a single leadership process, for a total of
               13 global processes. The company has commissioned global process teams for 10 of
               the 13 in order to concentrate on where most of the money and customer impact
               are. The other 3 processes (“align,” “environment,” and “governance”) are slated to
               be addressed later. The current version of the blueprint appears frequently on APCI
               intranet Web sites.

                   The blueprint represents the work of 19,900 people. Employees can identify
               where they work in the model, and the blueprint is used in new-hire orientation
               and other employee communication sessions. The model has been evolving for four
               years and, with some minor changes, is withstanding the test of time, Diehl said.



92                                                           Business Process Management • ©2005 APQC
AIR PRODUCTS


“We have very intelligent and questioning people, and we are pretty much locked
in on this.”

Process Governance Structure
    Process leaders do not simply own the design of the process; that is only the
beginning of their accountabilities. They are also responsible for the measurement,
performance, and improvement of the process.

    Executive process owners could not manage entire processes on their own.
Initially, they were asked by the CEO to form the global process management
teams that would work with the SAP team to develop the infrastructure necessary
to deliver the full benefits of SAP implementation. In addition, they would oversee
the orderly transition of the SAP development activities from the SAP project
teams to the ongoing global process management teams as the implementation
rolled out. (See Figure 26 for the organization of the global process management
teams.) All convergence decisions are transferred to the executive process owners
and their teams, and they manage and own the process designs enabled by SAP
going forward.
                                              Global Process Management Team Structure at APCI
    APCI process
leaders benchmarked
other companies that                                                                                                       Global Process Board/
had formed global                                                                                                        Global Supply Chain Board
process management                             Executive Process Owner
                                                    Executive Process Owner
                                   IT Account Manager Executive Process Owner
                                                                    Process Manager


teams. As a result, it                   IT Account Manager

                              Global Process
                                               IT Account Manager
                                                     Global Process
                                                                         Process Manager
                                                                               Process Manager
                                                                            Global Process
                                  Owner Process
                                    Global                Owner Process
                                                           Global               Owner Process
                                                                                  Global                                                                 Global Process
developed a common                      Owner Process
                                          Global
                                              Owner
                                                               Owner Process
                                                                 Global
                                                                     Owner
                                                                                      Owner Process
                                                                                        Global
                                                                                            Owner

                                                                                                                                                          Management
structure led by an                                                                                                       Executive Process Owner
                                                                                                                                                             Team
executive process
owner. Currently,                  Integrated                                                              IT Account Manager                    Process Manager
the company has 10                Supply Chain
official global process
                                                                                                      Global Process            Global Process           Global Process
management teams.
                                          SAP team                                                        Owner                     Owner                    Owner
The process manager
acts as a lieutenant, a
day-to-day overseer                                                                                         Enterprise                    Regional or Sub-process
                                       E-business                                                            Design                              Owners
of the process. He or
                                                                                                             Owners                               (As required)
she is involved in the
details of measurement,
                                                                                                                         Figure 26
design, education, and
training.




Business Process Management • ©2005 APQC                                                                                                                              93
AIR PRODUCTS


                   The IT account manager, representing the IT organization, is focused on making
               sure both the SAP and the legacy systems for all the IT spend (and the applications
               that support the process) are addressed.

                   Each process is too big to be managed globally by one person, so the process
               is divided into three or four sub-processes owned by global process owners. For
               example, for the “plan” process, one global process owner is responsible for sales
               and operations planning and another is responsible for inventory management.
               The process also has regional and sub-process owners as required. An enterprise
               design owner has a detailed understanding of the SAP configuration in the global
               process.

                   Finally, some people outside of the team are regularly involved in the global
               process. This may include representation from the integrated supply chain team,
               the SAP team that feeds the particular process, or e-business. E-business is another
               form of technology enabling the processes, since external Web sites often act as
               windows on these processes that allow customers to access services, products, and
               information directly.

                  Process leaders from the different teams meet on a monthly basis and drive
               commonality around global process management issues.

               Process Design in a Process-focused Organization
                   Process designs require documentation that provides clear understanding and
               agreement regarding what work is to be done within and across the global processes.
               Just as important as product specifications, process designs help the company
               resolve customer complaints, take orders, deliver products, and collect money. The
               company requires processes be documented consistently so the employees in France,
               the United States, and Taiwan can have a global process that they can understand
               and perform consistently.

                   Using as unifying enablers a robust architecture, a single repository, common
               end-to-end process responsibility, organizational roles, and consistent terminology,
               the company can consistently control, store, and make documentation available so
               that processes are replicable, efficient, and value-driven.

                   Robust architecture—The company uses a multiple-level architecture and is able
               to drill down into the process. It uses a standard set of symbols and a standard set of
               six elements that make up a complete process design. It has adopted many elements
               of the Supply Chain Operations Reference Council’s architecture and uses common
               terminology. In 2001 it had approximately six ways to document processes; today




94                                                            Business Process Management • ©2005 APQC
AIR PRODUCTS


it has one. (The company trains employees to use this architecture and uses ARIS
                     23
as its modeling tool. )

       Repository and document control —Allprocess documents should reside in
one location. The company does not want an ISO documentation repository, a
process design for effectiveness and efficiency repository, and a Sarbanes-Oxley
documentation repository. Launched but not yet fully deployed, its single repository
is a Web-based tool, using a Microsoft SharePoint server.

    End-to-end connections —Processes are fitted into the architecture so that
employees can see the connectedness, for example, going across the entire supply
chain. The company also defines clear process levels to prevent employees from
jumping between levels when they document processes. Employees need to
understand supply chain variations and the appropriate end-to-end process.

       Organization—APCI needs employees who can read process maps, create a map,
design a process, and model a process. Practically every employee needs to be able to
read process maps. Training is provided to readers as needed. Employees can take
a two-hour course on how to read a standard map, and a three-day course teaches
employees how to map a process. Currently, approximately 600 employees have
taken the three-day course.

       Consistent terminology —Thecompany consistently uses ARIS symbols. Most
people in the company use the low-cost Visio tool, a common Microsoft software
product. They can use Visio to work with processes and generate new ideas. Then,
once the process is locked in and the executive process owner approves it, an ARIS
expert can put it into the more sophisticated ARIS process model.

    The company knows the value of standards, said Diehl. It has common naming
and numbering systems and uses the outside Supply Chain Operations Reference
Council reference model for numbering; the numbering system is also being made
compatible with Sarbanes-Oxley documentation requirements. Along with the
council, it leverages other models that follow standards, such as the APQC Process
                               SM
Classification Framework , so that it can compare best practices internally as well
as with other organizations.

Process Measurement in a Process-focused Organization
    The global process management teams assess processes using specific performance
measures and targets. The key performance indicators of a process are leading
indicators and predict performance. If a team measures increases in new customer
signings, then it can predict revenue generation six months from now. If signings

23
     Produced by IDS Sheer (www.ids-scheer.com).


Business Process Management • ©2005 APQC                                                          95
AIR PRODUCTS


               are going down today, that predictive process measure alerts the team to take action
               now to prevent future revenue decrease.

                   For APCI, key performance indicators predict financial and customer value.
               Process key performance indicators are regularly reviewed and acted on at business
               and process reviews. A business review is generally held monthly to examine those
               key performance indicators in the context of the business. Business measures and
               process measures are integrated at this meeting.

                   APCI plans to have real-time, global key performance indicators in place as
               a critical element of its process and supply chain focus. With SAP, the company
               has the potential to implement real-time global key performance indicators. In
               2003 teams were looking at scorecards to review their measures every quarter. Now,
               with its new dashboard (described in a later section), teams are reviewing monthly.
               According to Diehl, the company is striving for real-time measures because the
               sooner the teams know about potential trouble, the sooner they can act to get back
               on track.

                   The company is implementing a Web-based tool so that process key performance
               indicator results can be communicated to each employee. The goal is to allow every
               employee’s performance goals to be aligned with a few key performance indicators
               that they see on their portal when they open their PC. They can interact to find
               out where their team is performing on a key performance indicator and provide
               feedback to the process team about ideas they have to improve that indicator and
               how the team might work better together. (An example of this capability follows in
               the discussion of supply chain measurement.)

                   The company links its key performance indicators together. It has a corporate
               scorecard with 10 key performance indicators that the chairman and executive
               committee use. It also has a line-of-sight to the process and functional scorecards
               and to the strategic business unit scorecards.

               Process Improvement in a Process-focused Organization
                   When a team has its design capability in place, has its processes documented, is
               performing to the process, and is measuring actual versus target performance, the
               company looks first at what is going well. Diehl said: “We try not to jump to the
               negative. If one region is losing fewer accounts to the competition than another
               region, we want to understand and share that best practice.”

                    If the team recognizes a gap between the value of the key performance indicator
               and the target, then it performs a root-cause analysis. Figure 27 shows that the team
               has two options on the left hand side: either the process is correct and the execution
               is the problem or the process itself needs to be redesigned.


96                                                            Business Process Management • ©2005 APQC
AIR PRODUCTS


                        Process Management Model

   Cause                     CREATE AND IMPLEMENT SOLUTIONS
  Analysis            • Improve execution     • Continuous improvement
                      • Process redesign      • Knowledge management
                                                                           Process
                                                                         Improvement

  Gap         Success
                                      SHARE BEST PRACTICES
                                    • Knowledge management


                                                                           Process
                  MEASURE ACTUAL VERSUS TARGET PERFORMANCE
                                                                         Performance


                                                                           Process
                        DESIGN AND IMPLEMENT PROCESSES
                                                                           Design


                                                                          Process
                      APCI STRATEGIES, BUSINESS MODELS,
                                                                         Leadership
                     BUSINESS PLANS, CHANGE MANAGEMENT

                                            Figure 27




Continuous Improvement and Knowledge Management
     APCI’s “one company” continuous improvement model is a merger of Six Sigma
and Lean management principles. In some companies, Lean groups and Six Sigma
groups work side by side, and each group reports its benefits independently. In 2002
APCI determined to combine the two, even though some employees felt strongly
about one and some about the other. According to Diehl, the model merges the best
of Six Sigma with the best elements of Lean: Six Sigma is strong in planning and
looking across processes to determine where the best opportunities for improvement
are, and Lean provides excellent continuous improvement tools.

    The continuous improvement model has five steps: prepare, analyze and
prioritize, plan, implement, and learn. It enables teams to use a variety of tools
to solve problems in untraditional ways. Continuous improvement has top-
down leadership; businesses or processes do not begin until the top leader agrees.
Continuous improvement is tied to the annual planning cycle.

   Continuous improvement tools are plentiful and varied. They include both hard
and soft tools adopted from Six Sigma, Lean, and other sources. Teams use Kaizen
methods, value-stream mapping, and many more. The company has a five-step
change model with several tools including a stakeholder analysis tool.


Business Process Management • ©2005 APQC                                                         97
AIR PRODUCTS


                                      “Deliver the Difference” mandates an environment of knowledge sharing and
                                  reuse in globally connected communities. Knowledge is shared through a variety
                                  of communities such as communities of interest, communities of practice, centers
                                  of excellence, aligned organizations, and integrated work processes. Knowledge
                                  management activities are organized around four key capabilities: collaboration, idea
                                  management, best practices transfer, and learning. Figure 28 shows how knowledge
                                  management and continuous improvement are integrated with process management
                                  using the following steps:
                                                                                             1. W h e n w o r k i n g
    Applying CI and KM to Global Process Management                                               on       process
                                                                                                  improvements,
                                                4. Improvements are                               APCI uses key
   Process              Process                     sustained by process                          performance
  Leadership             Design                     documentation and      Collaboration          indicators to
                                           4        KPI monitoring.
                                                                                                  measure how the
   Process              Process                                                                   work process is
                                                                                Idea
 Improvement          Performance
                                                                           Management             performing relative
PM                                                                                                to speed, waste, and
                           1                                                                      effectiveness. From
                                                                           Best Practice
                                                                        3     Transfer
                                                                                                  these measures, it
                                                                                                  determines what
                                                                                                  process elements
                                                                             Learning             need to improve.
                                                   2                                         2. C o n t i n u o u s
                                                                                                  improvement is
                                                                          KM
                                                                                                  applied to the work
  Prepare    Prioritize         Plan        Implement       Learn
                                                                                                  process to improve
               Cycle Tied to Operating Plan                                                       it.
CI                                                                                           3. T h e c o m p a n y
                                                                                                  applies knowledge
                                               Figure 28                                          management to
                                                                                                  share the best
                                                                                                  processes and
                                                                                                  practices.
                                  4. Improvements are sustained by documenting processes and monitoring key
                                      performance indicators.

                            A Vision for Collaboration
                                Collaboration is essential for maintaining a unified outlook, and corporate
                            leaders share a vision for collaboration, said Diehl. They believe that process owners
                            should have high-performing processes using the best designs and the best practices.
                            In turn, the process owners should be supporting the businesses in achieving their
                            goals because the businesses are executing these common processes.


98                                                                            Business Process Management • ©2005 APQC
AIR PRODUCTS


    Process owners must have well-established, actively aligned, and collaborative
relationships with the business units and their leaders. Process owners develop
and share critical key performance indicators and targets with the business units,
and they are continually identifying opportunities to improve processes across the
businesses. APCI does not want to only deploy continuous improvement projects
inside businesses because they cannot be leveraged. Projects have more value if they
are done at a global process level. Business and process leaders select major process
improvement projects together.

    Another important area of collaboration among business leaders and process
owner is consistent employee communication. For four years, APCI has cascaded
communications throughout the organization. Three times a year, leaders meet with
the top 50 executives worldwide. They in turn communicate to the top 600 leaders
in the company. The top 600 communicate down to the rest of the organization.
Leaders think of it as a waterfall effect.

Measuring Maturity
    APCI believes that the higher a process is in the maturity model, the better the
link to business value. (The company has used a maturity model developed by Kevin
              24
McCormack. ) Processes are designated with the following levels of maturity:
• Ad hoc (Score 1.0 to 2.0) —Processes are unstructured and ill-defined. Process
    measures are not in place, and the jobs and organizational structures are based
    on the traditional functions, not horizontal processes. Individual heroics and
    “working around the system” are what makes things happen.
• Defined (Score 2.0 to 3.0) —Basic processes are defined and documented.
    Changes to these processes must now go through a formal procedure. Jobs
    and organizational structures include a process aspect but remain basically
    traditional. Representatives from functions meet regularly to coordinate with
    each other concerning process activities but only as representatives of their
    traditional functions.
• Linked (Score 3.0 to 4.0) —This is the breakthrough level. Managers employ
    process management with strategic intent. Broad process jobs and structures
    are put in place outside of traditional functions. Cooperation between intra-
    company functions, vendors, and customers takes the form of teams that share
    common process measures and goals.
• Integrated (Score 4.0 to 5.0) —The company, its vendors, and suppliers take
    cooperation to the process level. Organizational structures and jobs are based on
    processes, and traditional functions—as they relate to the supply chain—begin
    to disappear altogether. Process measures and management systems are deeply
    embedded in the organization. Advanced process management practices take
    shape.
24
     Business Process Orientation: Gaining the E-Business Competitive Advantage, K.P. McCormack and
     W.C. Johnson, St. Lucie Press, 2001.


Business Process Management • ©2005 APQC                                                                        99
AIR PRODUCTS


                    In 2003 APCI surveyed 100 of its top managers—the top 50 in the corporate
                hierarchy plus another 50 thought leaders. The survey asked: Where do you think we
                are on this model? The average score was 3.2. McCormack’s benchmark data showed
                that APCI was below the average of leading process-focused companies, whose
                average score was 3.5. McCormack and APCI’s process leaders concluded that, to
                drive its process efforts up the maturity scale, the company should concentrate on
                process measurement, process design, and role clarity. In this way, the company
                used a maturity model to focus its priorities to build company capabilities.

                IMPLEMENTING AND SUSTAINING BPM
                     The company can no longer maximize its productivity and customer satisfaction
                by focusing on individual global processes; it is changing its focus to the points where
                the processes intersect and where they link end-to-end. This is where it has found the
                biggest areas for improvement. The first group of processes that it decided to focus
                on was the supply chain processes: plan, source, make, and fulfill. Approximately 80
                percent of the cost-of-goods-sold go through this chain. “That is where the money
                is,” said Diehl, “and we are trying to follow the money for business value. After all,
                our customers depend on the output of our supply chain processes.”

                    The supply chain organization includes all process management, continuous
                improvement, and SAP activities. The chairman has seven direct reports including
                the vice president of the supply chain. Reporting to the vice president of the supply
                chain is a group of both traditional functions and global processes.

                    Annually, APCI purchases approximately $3.5 billion of goods, equipment,
                and raw materials. It has an SAP project, a global customer service organization, a
                customer engagement team, a customer loyalty team, and the “sell” global process
                management team. The names of the boxes in the lower level of the chart indicate
                a major change in how APCI operates as a company. It is changing the names of
                organizations to verbs as an indication of what is important. The organizational
                chart names are a mixture between processes and functions; the company is creating
                a balance between the two.

                Integrating Global Processes Through a Supply Chain Focus
                    The company developed a supply chain planning capability that it organized
                to take advantage of the visibility of data that SAP was providing. Because the
                new group wanted to drive supply chain processes to the highest level of maturity
                possible, it called itself “integrated supply chain.”

                    According to Tom Ward, the vice president of the integrated supply chain,
                businesses were on the verge of mutiny when the company first introduced a supply
                chain focus in late 2003. To overcome resistance, the CEO had to visibly support
                the effort.


100                                                             Business Process Management • ©2005 APQC
AIR PRODUCTS


     Ward was assigned to head the integrated supply chain group to focus on
building capabilities, solutions, and global strategies on a “one company” basis.
According to Ward, this involved more than just planning; the group cuts across
all the supply chains and determines the most effective ways to run a global supply
chain. It is not, nor will it ever be, a big team. Its people are deployed globally and
have skills in continuous improvement, process management, data management,
and SAP.

    Within each of the businesses, a supply chain director has been assigned to drive
the supply chain activities for that business. To create the “one company” approach,
they align everything that they do with what the integrated supply chain team does
at the enterprise level. Because the integrated supply chain team is responsible for
continuous improvement, each business has the same responsibility. Because the
integrated supply chain team instills foundational capabilities at the enterprise level,
the businesses deploy these capabilities at their level. The integrated supply chain
team has a supply chain key performance indicator dashboard at the enterprise level;
the businesses use the same measurement dashboard.

     Ward’s task became to create the focus while not adding overhead. The reason
for the supply chain focus is that the processes that compose the chain spend $4.6
billion annually. “It is the core set of processes where the money is,” said Ward.

    A challenge was not to focus on the supply chain by creating a whole separate
structure; the company wanted to work with the existing organizations. It wanted to
leverage the existing continuous improvement, process management, and knowledge
management infrastructure. It reorganized without spending any new money; in
fact, it reduced costs due to overlapping activities.

    Ward uses the pipeline in Figure 29 to help employees envision the supply
chain. It portrays a pipeline with no bends or constrictions in which goods and
services go to customers seamlessly, and it is running on the back of a single instance
of SAP. Images such
as these are valuable                                Pipeline to Our Customers
for training and
communications.

    The company’s
goal is to have 13                                                                                  Customer’s
                                           Supplier   Plan   Source     Make      Fulfill   Customer Customer
percent operating
return on net assets
by 2007. It is driving                          Leverage the Single Instance SAP Platform
a program to triple
productivity based on
                                                                      Figure 29



Business Process Management • ©2005 APQC                                                                         101
AIR PRODUCTS


                APCI’s historic rate. The supply chain teams play a critical role by continuously
                improving the supply chain and reducing functional costs. People first tried to meet
                the goals by simply reducing service levels and not worrying about effectiveness. To
                prevent a slippage in effectiveness, the company is now entering into service level
                agreements with its functions and businesses.

                    The integrated supply chain group will meet its goals by simplifying,
                standardizing, shortening, and sharing processes—a mandate from the “Deliver the
                Difference” vision. Its leaders are concentrating both on educating the employees
                (especially the middle managers) and on funding approximately 1,700 projects. It
                manages each one using color-coded status indicators. With processes defined and
                deployed, it can focus on measuring and monitoring results.

                    The integrated supply chain group is involved in some foundational projects.
                One is the sales and operations planning process, a rudimentary process that was
                built in the early days of SAP. Either businesses were not using it or they were
                modifying it to meet their needs. In 2004 the integrated supply chain created a
                second version that has been well-received. It is now implementing a “one company”
                enterprise tool to enable this process so that every business that runs the process can
                use the same tool.

                    To enable a process with an IT tool, the team uses the same disciplined approach
                that the company uses for its SAP project: Bring all businesses in, write a blueprint,
                develop a consistent design, and require everyone to use it the same way.

                EVALUATION AND RESULTS
                     The company no longer tracks separate lists of benefits (SAP benefits, continuous
                improvement benefits, etc.). All benefits are managed through one instrument called
                the “one company” improvement tool, or Idea Tracker. It sits on a platform built in
                2003 for knowledge management and now supports all businesses and functions. It
                is helping the company move away from a paper-based environment (spreadsheets,
                PowerPoints, Word documents, special reports, etc.)

                    The intranet-based Idea Tracker tool was developed simply to track new ideas
                until they became projects. APCI added the capability to monitor and log the
                benefits of ongoing projects. The company developed a rigorous definition regarding
                what a benefit is (e.g., a onetime benefit, an ongoing benefit, an avoided cost, or a
                reduced cost). Idea Tracker captures whether the project impacts the profit and loss
                statement or the balance sheet.

                   Employees enter information about ideas or projects into the tool. The
                organization requires that all projects that are complete be documented in Idea
                Tracker so that the cumulative benefits can be tracked across the company and


102                                                            Business Process Management • ©2005 APQC
AIR PRODUCTS


the owner of the idea can get credit for the results. In the future, all businesses and
functions will be required to enter their approved but not-yet-started projects to be
able to provide an organization-wide benefits forecast.

     The company measures its success based on two result areas: increases in
productivity as shown on the profit and loss statement and increases in customer
loyalty scores. Incentive compensation is designed to reward people based on
the performance of the company as a whole and not on the performance of the
business—a system that Cantwell said encourages convergence. APCI has not drawn
a direct line between customer loyalty scores and incentive compensation. Customer
loyalty is a leading indicator, a means to an end.

Results and Progress Under “Deliver a Difference”
    The company’s values come directly from “Deliver the Difference.” In adherence
to those principles, the company has:
• begun a single instance implementation of SAP and established 10 global
    processes,
• consolidated global organizations under single managers,
• established an annual customer loyalty survey for each business in each region,
• doubled the rate of hard productivity savings in 2004 and is on target to triple
    the rate in 2005, and
• created regional shared service centers.

The Supply Chain Dashboard
     The supply chain dashboard is available to all employees through an intranet
portal. Drilling down through the portal by clicking on a performance measurement
link leads the employee to an option to review the supply chain key performance
indicators. The 17 key performance indicators are aligned with “Deliver the
Difference” values and are categorized under the goals of best company to: buy
from (customer value), work for (operational leadership), and invest in (shareholder
value). Down arrows indicate a trend in the wrong direction, and up arrows indicate
a trend in the right direction. Some icons allow the reader to drill down further for
more information.

    Businesses have business-level targets. The target of the vice president of the
supply chain at the enterprise level is a sum of the targets of all the businesses that
he supports.

The Effect of BPM Implementation—Customer Loyalty Example
    APCI measures 54 individual customer characteristics; an example is illustrated
in Figure 30 (page 104).




Business Process Management • ©2005 APQC                                                            103
AIR PRODUCTS


                                                  Customer Loyalty

                   Key Drivers—Differentiators                         SAP Recovery Evident in Germany
                                                                           (from the customer’s perspective)
                   • Ease of doing business
                   • Respond and resolve problems
                   • Lower cost of business




                                                                        Customer Loyalty
                   • Manage activities in an integrated
                     fashion




                                                                            Germany
                   • Increase productivity and efficiency


                   Business Basics—”table stakes”
                   • Consistent reliable product
                                                                                              SAP              Currently
                   • Delivery as committed                                                   Go Live

                   • Complete and accurate invoicing                          Note:
                                                                              Vulnerable = Indifferent + At Risk Customers



                                                           Figure 30




                    The characteristics are broken up into a number of different categories. Some are
                “table stakes;” that is, the company receives no value for differentiating itself in these
                areas and considers it the cost of doing business. However, if the company achieves
                in the area of key drivers, then it receives benefits and increased customer loyalty.

                    For example, during its first SAP release in Germany, APCI surveyed its
                customers both before and after the implementation. Using this data, it kept a
                focus on its customers as the new process and ERP system bugs were worked out.
                As illustrated in Figure 30, the company did suffer a performance dip in customer
                satisfaction as the new ERP system was implemented but actually increased its
                performance to higher levels after a period of time.

                   Each of the 17 businesses is required to survey their customers annually.
                Businesses work on the one or two high-priority areas that customers indicate need
                improvement.

                    Based on survey results, APCI categorizes its customers as: secure, favorable (the
                largest category), indifferent, and at-risk. The indifferent and the at-risk customers
                are recognized as a group called “vulnerable.” The secure customers typically not
                only give 100 percent of their business to APCI but also are willing to recommend


104                                                              Business Process Management • ©2005 APQC
AIR PRODUCTS


the company to another customer. Customers of the businesses going through SAP
implementation (and the accompanying process convergence) began to receive
different invoices and their prices and units of measure changed. The company
matched their survey responses to the changes that were occurring. The company
considers the results of this study carefully because possibly the unprofitable
customers are becoming more vulnerable—a fact that is not necessarily bad. APCI
tries to ensure that its important and profitable customers are driven into the secure
category and tries to move unprofitable customers to profitability by changing their
service offerings based on the price that they are willing to pay.

LESSONS LEARNED
    “Our single instance ERP system has been a great catalyst for the company
    because trying to implement business process management and become a process-
    focused organization without a big catalyst or a lever for change would be more
    daunting than it has been.”
             —George Diehl, global director of the Process Management COE

    APCI’s concept of “one company” jump-started global process management.
Cantwell said that before “Deliver the Difference,” the organization was influenced
by what seemed to be the initiative-of-the-month. Consequently, employees found
prioritizing difficult. APCI was a decentralized enterprise; it had its gases business,
chemicals business, and equipment business. It operated in Europe and the United
States and was developing a business in Asia, and employees often operated as
though they were in an independent organization. APCI had 34 legacy systems
to process customer transactions, five ways to manage quality, and three ways to
conduct continuous improvement activities.

   APCI has many success factors in place, among them the use of enablers such as
continuous improvement, knowledge management, customer loyalty, segmentation,
business rules, and e-business. Frequent benchmarking was also a factor. The
company benchmarks for credibility and speed. It benchmarked the procedures
necessary to form process teams and document processes.

Key Findings
    Process owners should be clear about what they are not going to do. APCI
process owners are tempted to try to do too much. The global process board focuses
the process owners on the priorities and initiatives and then drives the initiatives
throughout the company.

     Resistance from middle management to a process focus has been, and continues
to be, very strong, according to Cantwell. Middle managers feel the brunt of change
and, he said, 40 percent of them may not make it because they do not have the
skills to operate in the new world. The company has learned to manage change


Business Process Management • ©2005 APQC                                                          105
AIR PRODUCTS


                proactively. It recognizes before it begins where to expect the resistance. Because
                change takes so long, convincing people to change is difficult. Many will not be in
                the same job long enough to see the fruits of their labor; organization leaders thus
                pave the way for the success of successors and must rely on employees doing the
                right thing just for the sake of doing the right thing.

                    The company converged processes concurrently with SAP implementation.
                SAP gave the work teams hard deadlines that they had to meet, and the SAP project
                artificially imposed the deadlines. A motivator in meeting deadlines came from the
                estimation that delaying SAP implementation would cost the company $6 million
                per month.

                    APCI has made a conscious decision not to distract employees from SAP
                implementation by implementing other initiatives such as customer relationship
                management. Its philosophy is to be SAP-centric and not include vendors or
                capabilities that are not integrated into SAP—because to do so would require
                upgrading SAP, which would require that all interfaces with other applications be
                redone. Cantwell said: “We are not at all interested in looking at a lot of boutique
                solutions to bolt onto SAP. If SAP has it, we’ll use it.”

                    Mapping and maintaining processes can be expensive. The company carefully
                balances business value versus elegant solutions. Employees have a tendency to
                map everything and document all processes. Leaders continue to tell employees
                to prioritize and avoid documenting, for instance, how to forklift something in a
                plant. Global process teams have been asked to identify the five processes that they
                are working to improve.

                    APCI has also learned to:
                •   focus on a few measurable initiatives,
                •   avoid creating a bureaucracy and overhead,
                •   define what it will and will not resource each year to keep process owners from
                    being conflicted,
                •   integrate change plans into project plans and anticipate resistance from middle
                    management, and
                •   communicate frequently to leaders and then let them cascade and customize the
                    message.

                Suggestions for Success
                    Cantwell said that APCI is cautiously optimistic that it will be successful in the
                long term by focusing on process as an integral part of its strategy. Its leaders have a
                few suggestions that will help others transform their organizations.
                • Do not do everything at once. Lay a foundation, and constantly build on what
                    came before. The company recognizes and stifles the desire to jump to the answer
                    too quickly.
106                                                             Business Process Management • ©2005 APQC
AIR PRODUCTS


•   As you go step-by-step, sequence events with dedicated resources. Transformation
    cannot be a part-time job. Find a number of employees and isolate them to
    drive the initiative. Cantwell said: “Somebody’s life has to depend on this being
    successful. If you can say, ‘Well, I did not quite get to this,’ or ‘Let me show you
    all of the other good things I have done, so we did not really get to this,’ you will
    not be successful.” Cantwell suggested dividing the work, isolating a few steps,
    dedicating resources to them, creating credibility in the organization by meeting
    milestones, and moving to the next step.
•   Manage change aggressively. Anticipate resistance and deal with it early to gain
    acceptance that the change has value.
•   Concentrate on visibility and velocity. By implementing a single instance of
    SAP, the company increased visibility of information. By increasing its focus
    on processes, it has achieved faster cycle times.
•   Also concentrate on simplicity. Take complexity out of the business. Historically,
    APCI made its business complex by customizing products for the benefit of
    customers, but customers were not paying for the customization.
•   Focus on both effectiveness and efficiency.
•   Realize that the transformation process is never complete.
•   Keep a customer focus. APCI has learned during the first four years of its
    process-focused evolution that focusing on IT systems and processes can make a
    company internally focused. If it does not also have a metric to focus on customer
    responsiveness to the transformation, then it will lose those customers.

     One suggestion for success rises to the top, and all of the APCI site visit hosts
consider it essential: Obtain CEO support. Moving to a process-focused organization
requires too much change to accomplish without the strong endorsement of the
CEO. Employees’ jobs and environments change. For them to be able to buy in,
they must recognize that the CEO is behind it and intends to make it happen.
Cantwell provided an example of its necessity. “Process convergence, driving people
to change the way they do things, is exceptionally challenging for an organization,
especially when it is not a good solution for an individual business. What typically
happens in that business is that managers say, ‘No way am I doing it. You are
increasing my cost structure, and you are decreasing my effectiveness.’ The managers
inside the business bring it up to their general manager, the vice president of the
business, who will always support them. The issue continues to be escalated until it
arrives on the desk of the CEO. The CEO must say ‘I don’t care if it is worse for your
business; this is what I want for the company to succeed.’ If the buck does not stop
at the CEO level, there is always going to be someone to override convergence.”

Goals and Plans
    By the end of first quarter 2005, 80 percent of the company will be operating
with SAP. APCI’s Asia operations will have SAP in 2006.



Business Process Management • ©2005 APQC                                                              107
AIR PRODUCTS


                    Ward said that APCI believes that its BPM infrastructure and tools are mostly
                in place, positioning it for future success. In his cover letter in APCI’s 2004 annual
                report, John Jones concludes with this paragraph:

                    All of the groundwork we have laid since 2000—restructuring our portfolio,
                    resourcing our growth businesses and focusing on work process improvement—
                    paid off in fiscal 2004. Those four years presented great challenges for Air
                    Products, but our focus and desire to win came through. And this will continue
                    into fiscal 2005 and beyond. …There’s still much important work left to do.
                    Our strategies will help drive top-line growth and return on capital. And it will
                    be our passion that delivers that difference.




108                                                              Business Process Management • ©2005 APQC

Más contenido relacionado

La actualidad más candente

Personality traits relevant to ob.
Personality traits relevant to ob.Personality traits relevant to ob.
Personality traits relevant to ob.Syed Shah
 
Participation and empowerment in od
Participation and empowerment in odParticipation and empowerment in od
Participation and empowerment in odGurpreet Kaur
 
Plateau 2014 talent management
Plateau 2014 talent managementPlateau 2014 talent management
Plateau 2014 talent managementwangcheng556688
 
Top 10 freight interview questions with answers
Top 10 freight interview questions with answersTop 10 freight interview questions with answers
Top 10 freight interview questions with answersbrownmichael917
 
Organisational behaviour ppt
Organisational behaviour  pptOrganisational behaviour  ppt
Organisational behaviour pptsaransuriyan
 
Organizational culture and environment
Organizational culture and environmentOrganizational culture and environment
Organizational culture and environmentAashray For Everyone
 
Perception and individual decisionmaking
Perception and individual decisionmakingPerception and individual decisionmaking
Perception and individual decisionmakingAIMS Education
 
Organisational culture
Organisational culture Organisational culture
Organisational culture Payal Deep
 
O.b 2 attitude and job satisfaction
O.b 2 attitude and job satisfaction O.b 2 attitude and job satisfaction
O.b 2 attitude and job satisfaction yousuf adil
 
Power & politics
Power & politicsPower & politics
Power & politicsFaria Fary
 
Communication Strategy for HR
Communication Strategy for HRCommunication Strategy for HR
Communication Strategy for HRCharudutta Jena
 
Transformational Change- OCD
Transformational Change- OCDTransformational Change- OCD
Transformational Change- OCDPriya Singh
 
HOW WILL THE FOURTH INDUSTRIAL REVOLUTION IMPACT HR AND LEARNING & DEVELOPMEN...
HOW WILL THE FOURTH INDUSTRIAL REVOLUTION IMPACT HR AND LEARNING & DEVELOPMEN...HOW WILL THE FOURTH INDUSTRIAL REVOLUTION IMPACT HR AND LEARNING & DEVELOPMEN...
HOW WILL THE FOURTH INDUSTRIAL REVOLUTION IMPACT HR AND LEARNING & DEVELOPMEN...Human Capital Media
 
Employee Empowerment jonshen-2021
Employee Empowerment jonshen-2021Employee Empowerment jonshen-2021
Employee Empowerment jonshen-2021jonalyn shenton
 
Performance Management and Development
Performance Management and DevelopmentPerformance Management and Development
Performance Management and DevelopmentCharles Cotter, PhD
 

La actualidad más candente (20)

Personality traits relevant to ob.
Personality traits relevant to ob.Personality traits relevant to ob.
Personality traits relevant to ob.
 
Participation and empowerment in od
Participation and empowerment in odParticipation and empowerment in od
Participation and empowerment in od
 
Plateau 2014 talent management
Plateau 2014 talent managementPlateau 2014 talent management
Plateau 2014 talent management
 
Top 10 freight interview questions with answers
Top 10 freight interview questions with answersTop 10 freight interview questions with answers
Top 10 freight interview questions with answers
 
Management Century
Management Century Management Century
Management Century
 
Organisational behaviour ppt
Organisational behaviour  pptOrganisational behaviour  ppt
Organisational behaviour ppt
 
Organizational culture and environment
Organizational culture and environmentOrganizational culture and environment
Organizational culture and environment
 
Perception and individual decisionmaking
Perception and individual decisionmakingPerception and individual decisionmaking
Perception and individual decisionmaking
 
OB - Diversity
OB - DiversityOB - Diversity
OB - Diversity
 
Organisational culture
Organisational culture Organisational culture
Organisational culture
 
O.b 2 attitude and job satisfaction
O.b 2 attitude and job satisfaction O.b 2 attitude and job satisfaction
O.b 2 attitude and job satisfaction
 
Building Self-Directed Team
Building Self-Directed TeamBuilding Self-Directed Team
Building Self-Directed Team
 
Organisation behaviour
Organisation behaviourOrganisation behaviour
Organisation behaviour
 
Power & politics
Power & politicsPower & politics
Power & politics
 
Job analysis
Job analysisJob analysis
Job analysis
 
Communication Strategy for HR
Communication Strategy for HRCommunication Strategy for HR
Communication Strategy for HR
 
Transformational Change- OCD
Transformational Change- OCDTransformational Change- OCD
Transformational Change- OCD
 
HOW WILL THE FOURTH INDUSTRIAL REVOLUTION IMPACT HR AND LEARNING & DEVELOPMEN...
HOW WILL THE FOURTH INDUSTRIAL REVOLUTION IMPACT HR AND LEARNING & DEVELOPMEN...HOW WILL THE FOURTH INDUSTRIAL REVOLUTION IMPACT HR AND LEARNING & DEVELOPMEN...
HOW WILL THE FOURTH INDUSTRIAL REVOLUTION IMPACT HR AND LEARNING & DEVELOPMEN...
 
Employee Empowerment jonshen-2021
Employee Empowerment jonshen-2021Employee Empowerment jonshen-2021
Employee Empowerment jonshen-2021
 
Performance Management and Development
Performance Management and DevelopmentPerformance Management and Development
Performance Management and Development
 

Similar a BPM - Air Products, Case Study

Improving Your Strategic Focus & Performance Dan Ryan
Improving Your Strategic Focus & Performance   Dan RyanImproving Your Strategic Focus & Performance   Dan Ryan
Improving Your Strategic Focus & Performance Dan RyanTaryn Soltysiak
 
Improving Your Strategic Focus & Performance Dan Ryan
Improving Your Strategic Focus & Performance   Dan RyanImproving Your Strategic Focus & Performance   Dan Ryan
Improving Your Strategic Focus & Performance Dan RyanSteven Bonacorsi
 
Improving Your Strategic Focus & Performance Dan Ryan
Improving Your Strategic Focus & Performance   Dan RyanImproving Your Strategic Focus & Performance   Dan Ryan
Improving Your Strategic Focus & Performance Dan RyanClaudia Rubino
 
Profitiviti Business Operations Intelligence Article
Profitiviti Business Operations Intelligence ArticleProfitiviti Business Operations Intelligence Article
Profitiviti Business Operations Intelligence ArticleSteve Raack
 
Enterprise Architecture Governance for an Enterprise Transformation Journey: ...
Enterprise Architecture Governance for an Enterprise Transformation Journey: ...Enterprise Architecture Governance for an Enterprise Transformation Journey: ...
Enterprise Architecture Governance for an Enterprise Transformation Journey: ...Marcelo Sávio
 
Newport consulting firm calling card 2011 v1 (print)
 Newport consulting firm calling card 2011 v1 (print) Newport consulting firm calling card 2011 v1 (print)
Newport consulting firm calling card 2011 v1 (print)William Newman
 
Innovation And It Alignment 121510 Abbreviated
Innovation And It Alignment 121510 AbbreviatedInnovation And It Alignment 121510 Abbreviated
Innovation And It Alignment 121510 AbbreviatedGlenn Bunker
 
01020 6 Ppde Webinar Slides
01020 6 Ppde Webinar Slides01020 6 Ppde Webinar Slides
01020 6 Ppde Webinar SlidesJohn Hall
 
OAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost Management
OAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost ManagementOAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost Management
OAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost ManagementRJ Linehan
 
Office 2007 Business Value Whitepaper, Microsoft and Capgemini
Office 2007 Business Value Whitepaper, Microsoft and CapgeminiOffice 2007 Business Value Whitepaper, Microsoft and Capgemini
Office 2007 Business Value Whitepaper, Microsoft and CapgeminiMary Marks
 
Principles of program governance
Principles of program governancePrinciples of program governance
Principles of program governanceGlen Alleman
 
Opus Global Group - Operations Due Diligence Project
Opus Global Group - Operations Due Diligence ProjectOpus Global Group - Operations Due Diligence Project
Opus Global Group - Operations Due Diligence Projecttsilvestri
 
Elisit Solutions Overview
Elisit Solutions OverviewElisit Solutions Overview
Elisit Solutions Overviewdavidladams71
 
Article: From Best Practice to Success Transfer
Article:  From Best Practice to Success TransferArticle:  From Best Practice to Success Transfer
Article: From Best Practice to Success Transferrepner
 
Principles of program governance
Principles of program governancePrinciples of program governance
Principles of program governanceGlen Alleman
 
Collaborating for innovation 2010 study
Collaborating for innovation 2010 studyCollaborating for innovation 2010 study
Collaborating for innovation 2010 studyKoen Klokgieters
 
Six Sigma & Innovation – Co-Exist vs. Compete
Six Sigma & Innovation – Co-Exist vs. CompeteSix Sigma & Innovation – Co-Exist vs. Compete
Six Sigma & Innovation – Co-Exist vs. CompeteECC International
 
Principia21 Overview And Example Case Studies
Principia21 Overview And Example Case StudiesPrincipia21 Overview And Example Case Studies
Principia21 Overview And Example Case StudiesCraig B. DeLano
 

Similar a BPM - Air Products, Case Study (20)

Improving Your Strategic Focus & Performance Dan Ryan
Improving Your Strategic Focus & Performance   Dan RyanImproving Your Strategic Focus & Performance   Dan Ryan
Improving Your Strategic Focus & Performance Dan Ryan
 
Improving Your Strategic Focus & Performance Dan Ryan
Improving Your Strategic Focus & Performance   Dan RyanImproving Your Strategic Focus & Performance   Dan Ryan
Improving Your Strategic Focus & Performance Dan Ryan
 
Improving Your Strategic Focus & Performance Dan Ryan
Improving Your Strategic Focus & Performance   Dan RyanImproving Your Strategic Focus & Performance   Dan Ryan
Improving Your Strategic Focus & Performance Dan Ryan
 
Profitiviti Business Operations Intelligence Article
Profitiviti Business Operations Intelligence ArticleProfitiviti Business Operations Intelligence Article
Profitiviti Business Operations Intelligence Article
 
Enterprise Architecture Governance for an Enterprise Transformation Journey: ...
Enterprise Architecture Governance for an Enterprise Transformation Journey: ...Enterprise Architecture Governance for an Enterprise Transformation Journey: ...
Enterprise Architecture Governance for an Enterprise Transformation Journey: ...
 
Newport consulting firm calling card 2011 v1 (print)
 Newport consulting firm calling card 2011 v1 (print) Newport consulting firm calling card 2011 v1 (print)
Newport consulting firm calling card 2011 v1 (print)
 
Innovation And It Alignment 121510 Abbreviated
Innovation And It Alignment 121510 AbbreviatedInnovation And It Alignment 121510 Abbreviated
Innovation And It Alignment 121510 Abbreviated
 
01020 6 Ppde Webinar Slides
01020 6 Ppde Webinar Slides01020 6 Ppde Webinar Slides
01020 6 Ppde Webinar Slides
 
OAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost Management
OAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost ManagementOAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost Management
OAUGNYC 2012, Product Spotlight: Oracle Hyperion Profitability & Cost Management
 
Office 2007 Business Value Whitepaper, Microsoft and Capgemini
Office 2007 Business Value Whitepaper, Microsoft and CapgeminiOffice 2007 Business Value Whitepaper, Microsoft and Capgemini
Office 2007 Business Value Whitepaper, Microsoft and Capgemini
 
Principles of program governance
Principles of program governancePrinciples of program governance
Principles of program governance
 
Opus Global Group - Operations Due Diligence Project
Opus Global Group - Operations Due Diligence ProjectOpus Global Group - Operations Due Diligence Project
Opus Global Group - Operations Due Diligence Project
 
Elisit Solutions Overview
Elisit Solutions OverviewElisit Solutions Overview
Elisit Solutions Overview
 
Article: From Best Practice to Success Transfer
Article:  From Best Practice to Success TransferArticle:  From Best Practice to Success Transfer
Article: From Best Practice to Success Transfer
 
Process Innovation for 2012
Process Innovation for 2012Process Innovation for 2012
Process Innovation for 2012
 
Principles of program governance
Principles of program governancePrinciples of program governance
Principles of program governance
 
NuStratis Brochure
NuStratis BrochureNuStratis Brochure
NuStratis Brochure
 
Collaborating for innovation 2010 study
Collaborating for innovation 2010 studyCollaborating for innovation 2010 study
Collaborating for innovation 2010 study
 
Six Sigma & Innovation – Co-Exist vs. Compete
Six Sigma & Innovation – Co-Exist vs. CompeteSix Sigma & Innovation – Co-Exist vs. Compete
Six Sigma & Innovation – Co-Exist vs. Compete
 
Principia21 Overview And Example Case Studies
Principia21 Overview And Example Case StudiesPrincipia21 Overview And Example Case Studies
Principia21 Overview And Example Case Studies
 

BPM - Air Products, Case Study

  • 1. BUSINESS PROCESS MANAGEMENT AIR PRODUCTS Air Products and Chemicals Inc. Air Products and Chemicals Inc. (APCI) is a geographically diversified Fortune 500 company with $7.4 billion in annual sales. The company operates in more than 30 countries, and half of its sales are to customers outside of the United States. It sells gases, chemicals, and equipment and serves customers in technology, energy, health care, and industrial markets. It has 19,900 employees worldwide. Deliver the Difference and a Unified Focus In 2000 APCI installed a new chairman and CEO, John Paul Jones, who had been with the company for 28 years. He took the reins of an organization that was doing well and started to develop a plan to position the company for greater growth and profitability. Jones saw inefficiencies and an emphasis on “my business” and “my function.” Employees would often identify their functions as different from the rest of the company and believe that they required separate processes. To establish a new order, Jones introduced a vision called “Deliver the Difference” to unify the organization into a “one company” focus and commitment. It summarizes APCI’s vision, guiding values, and working environment. Today, “Deliver the Difference” posters are displayed throughout the company, in hallways and conference rooms. When employees make decisions, they go back to the document and ensure they are in line with it. Said George Diehl, global director of the Process Management Center of Excellence and supply chain and process management education lead, “People know this [document]; it is a real logo and symbol internally for what we are all about.” The “Deliver the Difference” vision documents how the company differentiates itself from competitors. It outlines guiding values: accountability; innovation; integrity; respect; and a constant focus on safety, health, and the environment. It also contains a working environment statement. The goal of the document is to Business Process Management • ©2005 APQC 83
  • 2. AIR PRODUCTS increase the efficiency and effectiveness of the company and drive it to be the best company to work for, buy from, and invest in. Despite having disparate businesses, many functions, and operations in many countries, the company identified four organization-wide initiatives that were needed to create increased shareholder, customer, and employee value: 1. change—visibly value people in a positive work environment, 2. portfolio management—continuously improve the return on capital, 3. growth —grow through innovation and superior products and services for customers, and 18 4. work processes—reduce costs through work process simplification. Committing to this vision requires understanding and listening to customers as one company by: • taking the best of the best and bringing it to customers faster (so velocity and speed are important); • providing value for global businesses through one infrastructure (that can mean one set of global processes, one IT system, or a set of legacy systems that support all the businesses in a common way); • simplifying and standardizing global work processes (another embellishment on the emphasis on processes); and • globally uniting by sharing knowledge across regions, businesses, and groups. (Knowledge management is key to “Deliver the Difference,” and it is integrated in the organization through global work processes.) “Deliver the Difference” is the single description of the new corporate order. BPM STRATEGY, STRUCTURE, AND FUNDING “If you really want to become process-focused, you are changing the way corporations have been evolving, which has been around functions, around businesses. Now what we are saying is that there is a new dimension called ‘process,’ a whole new way of thinking about the way we add value.” —George Diehl, global director of the process management COE 18 It is significant to this study that one of the four key foundational initiatives in “Deliver the Difference” involves work processes. 84 Business Process Management • ©2005 APQC
  • 3. AIR PRODUCTS “Creating a process-focused organization must be in the context of something that is very important to the company. A process-focused organization for the sake of being process-focused has little value and, quite frankly, has a negative feel to it. If it is not placed within the context of the strategy and direction of the company, you are probably not going to get a whole lot of recognition or buy-in for the concept itself.” —Bill Cantwell, vice president of supply chain APCI is transforming itself to become more process-focused so that it can drive productivity and customer value. Supply Chain Vice President Bill Cantwell said APCI’s vision is to be an organization where all work is “thought of, performed, and managed as a process, focused on the customer to create satisfaction and ultimately customer loyalty.” The company is not, nor does it strive to be, process-based—it is not organized by process, but by function. In 2005, however, APCI plans to form shared service centers, which will be organized by process; Cantwell said this is a potential step toward APCI being organized by process. Soon after it published and began communicating “Deliver the Difference,” the company tackled several initiatives to integrate this more unified and process- focused vision into daily operations: portfolio management, a growth strategy, a single-instance SAP implementation, APCI’s Delivering the Difference Road Map customer loyalty, and introduction of “process” as a third Past Portfolio Growth Global Enablers Operating Management Work Continuous improvement “axis” of management. Mode Process Strategy Knowledge management Processes It depicted this Customer loyalty Segmentation/business rules transformation in a E-business “Deliver the Difference • Governance plan Road Map” (Figure • Planning and commitment process 21). APCI began • Economy Values • EPS growth first with portfolio Accountability • Implementation success management to focus Innovation Integrity more intently on its Respect Safety, health Drivers “core businesses,” Environment SAP The Best Company which have the greatest Technology Productivity Work for Change Buy from strategic impact management Invest in for the company. Several businesses in its portfolio did not measure up to EPS Figure 21 Business Process Management • ©2005 APQC 85
  • 4. AIR PRODUCTS 19 (earnings per share) growth and profitability standards. “Portfolio management is difficult,” said Diehl. “Many times businesses are part of the company for a long time, and they become part of the family. People really do not like to look at them with a very sharp eye or a sharp pencil. These businesses hang around longer than they should.” Consequently, leaders put businesses into three categories: growth, core businesses, and businesses that needed to be restructured. The second initiative was to develop a growth strategy that would determine how the company would invest its resources in the businesses. It chose to focus future investments in four growth industries: health care, electronics, performance materials, and energy and process industries. APCI created a growth board that reviewed opportunities to invest in these industries. A project to implement a single instance of SAP started in 2001 and was the driving force to APCI becoming process-focused. Leaders learned from Michael 20 21 Hammer and Deloitte Consulting that organizations that succeed in SAP implementation do so because they see the project as process implementation, whereas organizations that fail see it as an IT tool implementation. The organization rallied around the idea that SAP implementation was a series of processes enabled by a tool rather than the other way around. The company also wanted to ensure that the SAP and process work was focused on the customer and not an internally focused effort. Before proceeding, APCI launched a customer loyalty process and a scorecard to measure customer feedback. The process continues today. APCI cycles through approximately 5,000 customers located in all regions of the world and uses the data to define base customer requirements for the processes SAP is enabling. Company leaders introduced the concept of process management as the third axis of management, in addition to business units and functions (Figure 22). Business units dictate where employees work; this axis includes strategy, identification of customers, etc., and functions dictate what employees do, such as sales, engineering, customer service, accounting, etc. As the third axis, processes dictate how employees work together to serve customers. Accordingly, APCI examined the concept of the connectivity of jobs. Historically, the company had a tendency to isolate jobs and hand off responsibilities. The company is currently minimizing handoffs and recognizing that individuals need to be responsible for an end-to-end process. 19 Although EPS is an important performance driver, operating return on net assets is the most important. All employees know what the target is and know where the company stands in relation to the target. They are beginning to understand person by person what they can do to contribute to it. 20 www.hammerandco.com/about.asp (retrieved February 2005). 21 www.deloitte.com (retrieved February 2005). 86 Business Process Management • ©2005 APQC
  • 5. AIR PRODUCTS Global Process Management A Third Dimension in Management BUSINESSES • Businesses (Business unit, region, focused on P&L’s and markerts) determine where “Best Company to Invest In” we work. • Functions FUNCTIONS describe what we k do. or (Departments, Centers of Excellence) W “Best Company to Work For” • Processes focus PROCESSES on how we do our (Source, make, fulfill, etc.) work. “Best Company to Buy From” Figure 22 As the organization implemented SAP, became a process-focused organization, and developed and communicated the concept of “one company” throughout, its 22 leaders attempted to converge processes. Because the chemicals businesses and gas businesses had different processes in various areas of the world, convergence became one of the most fundamental principles in process management for APCI. Leaders wanted those who were doing similar jobs to do them in a similar way as a means to drive efficiency and effectiveness. Bill Cantwell, the vice president of the supply chain, said that the challenge was great because the executives were “constantly running into the not-invented-here syndrome.” As they were implementing a major release of SAP, they stopped the implementation for a two-month period to focus on process convergence. Stopping cost the company $12 million, but the executives knew they could not succeed until processes were converged. By configuring six transaction models in SAP, APCI has been successful in convergence. 22 “Convergence” does not mean that everyone in the company does everything the same way, but instead means that employees may have one of six different ways of working (depending on the kind of business). For example, if employees produce and sell a bulk material, they have a unique model to converge around. Business Process Management • ©2005 APQC 87
  • 6. AIR PRODUCTS The Executive Process Owners To underscore the importance of process as the third axis of management, Jones appointed executive process owners to lead the effort. Executive process owners are vice presidents of the company and are also the functional heads of major departments. Their functional role is concerned with functional excellence and their cost center. According to Cantwell, in their new role, executive process owners needed to: • articulate a process vision with key metrics, • document the end-to-end process, • sponsor process convergence decisions, and • lead as a process zealot. In addition, according to Cantwell, the company has taken all IT spending from the businesses and given it to the process owners. The process owners are responsible for all process convergence activities. For example, one process owner ensures that all orders are processed one way. The job of the owner of the “fulfill” process (or “order to cash”) is to drive convergence across the company. Likewise, the process owners of “make,” “sell,” and “source” (or “requisition to pay”) all have the obligation to converge. The process owner role is concerned with the effectiveness and efficiency of the end-to-end process across many functions. “Effectiveness” means that the process owner ensures that the output of their processes is delivering the right value to APCI customers and business owners. “Efficiency” means driving costs down by focusing on cycle time, re-work, etc. By being accountable for end-to-end work, process owners can re-align how work is done, especially at the functional interfaces, in order to improve productivity and make it easier for employees to perform their work, not just work smarter and faster in the old, inefficient process. Process Principles Early in the “Deliver the Difference” journey, John Jones and Bill Cantwell established a set of fundamental process principles, some of which follow. • Business processes will be simple, standardized, and global; enabled by a single instance of SAP and governed through a global process board. • Customer responsiveness, operational efficiency, and cycle times are all important. • Value creation will be focused on the enterprise versus any individual business. • Collaboration becomes the norm. Global Process Board APCI has identified 13 global processes, each of which is led by a global process management team. The executive process owners from each global process 88 Business Process Management • ©2005 APQC
  • 7. AIR PRODUCTS management team meet regularly as a global process board. The global process board is responsible for documenting process design, identifying key performance indicators, training, managing best practices (e.g., the best practices in implementing process management), and resolving issues across the global process management teams. Under each executive process owner, APCI has created full-time positions called process managers. The process managers are essential to the global process management effort. In addition to the global process board, APCI has a global supply chain board to drive the efficiency of the supply chain. The company delineates the role of each board so that none of the responsibilities are overlapping. Process Management Road Map The company uses a four-pronged process management model that includes process leadership, design, performance, and improvement, with SAP in the center. APCI is involved in a one-instance SAP implementation, and much of the process management activity is centered around it. This model is embedded in a road map to help communicate process management to the organization (Figure 23). Education and Training Introduction to Process Management Course Road Map To help instill this understanding of “Future State” and focus on process management, training “Top 10 List” concerning processes, A Process- ERP, and supply chains Focused is a key element of Organization Process Process APCI’s approach. Leadership Design For example, APCI Process Process offers employees a Performance Improvement training class called “Introduction to 4 Keys to Managing Processes Process Management.” The Business Case for Process Facilitators begin the Why Process? The 7 “Powers of Power #8— classes by discussing Why Process Now? Process” APCI’s “Secret Weapon” the meaning of processes and the Process attributes of a process- Basics focused organization. They rally around Figure 23 Business Process Management • ©2005 APQC 89
  • 8. AIR PRODUCTS one simple, common definition of what a work process is: an organized group of related activities that work together to create value for the customer. A process has to be organized (i.e., designed and then documented). It has to work with other processes, which requires cross-functional roles, and it needs to deliver something of value to the company by contributing to being the best place to work for, the best company to buy from, or the best company to invest in. It is end-to-end work, not piecemeal. Facilitators make a business case for process management and explain why it is important to the company. The course includes instruction about Michael Hammer’s “Seven Powers of Process.” The course uses the road map diagram as a training tool to help participants understand where the company is today and where it is going as an organization (Figure 23, page 89). The road ends at an image of Mt. Everest, which signifies the future state of a process-focused organization. The Mt. Everest image indicates that process thinking is a higher view of the business. Through process thinking, employees can have a better understanding of how the entire business is operating and see the company from the eyes of the customer. The road map helps the trainees realize that process management cannot be implemented all at once. The company has traveled the “road” for more than four years. The trainees understand how to build a foundation for process management, according to Bill Ney, program manager and global process owner for performance measurement, and take each step one at a time. BPM DESIGN To leverage business value, APCI focuses on process leadership, process design, process performance (measurement), and APCI’s Process Management Model: then process improvement (which are continuous A Continuous Loop improvement and knowledge management activities). As visualized in Figure 24, these capabilities form a continuous loop, and each is Process Process closely related to SAP implementation. Leadership Design The step of business process management design involves: • identifying enterprise processes, • defining process owner accountabilities and assigning enterprise process owners, Process Process • building capabilities to achieve and sustain Improvement Performance business value, and • establishing clear interface roles. APCI examines each one individually. Figure 24 90 Business Process Management • ©2005 APQC
  • 9. AIR PRODUCTS The Basic Steps In 1999 Diehl attended a conference hosted by Michael Hammer. Hammer had a simple message: If you are going to become a business process enterprise, even at a regional level, first identify the processes that make up your company’s work. Second, assign ownership of the processes end to end. Third, begin to measure them. Fourth, start to improve them based on the measures. “Finally,” Diehl said, “it is one thing to measure and assign process owner accountabilities. But what about the interfaces with other people like the business owners or the functional owners who had some of that authority and responsibility before? We have to recognize that there is a power-shift going on. How do you deal with that interface and have peaceful co-existence going forward as you introduce this new way of managing your business?” One answer is that process owners own their global process designs, and the business and functional owners operate using these converged, one company designs. Service level agreements begin to emerge among them. Enterprise Process Blueprint APCI currently has 13 global processes. A subset of the processes forms the supply chain, a chain that contains much of the company’s value. Diehl said, “It is the epicenter, if you will, of our global process model.” (See Figure 25.) In January 2004 APCI’s Enterprise Process Blueprint each process in Figure 25 had a longer, more Align Enterprise Process Blueprint complicated name; for example, “make” was “produce products and Supply Chain services.” In seeking Plan external guidance, Innovate which APCI routinely does to benchmark and Source Make Fulfill Customers speed improvements, Sell APCI adopted a concept from the Supply Chain Build Operations Reference Council. APCI managers liked the People Finance Information Environment Governance shortened names in the council’s supply chain Figure 25 process model, which uses one-word terms such as “plan,” “source,” and “make.” Knowing that simplicity would help convey the message of “what we do,” they adopted that idea. Business Process Management • ©2005 APQC 91
  • 10. AIR PRODUCTS APCI also has a capital equipment business (an engineering business) that builds capital plants costing from $100,000 to more than $100 million. It has a separate supply chain called “build,” which focuses on this work. Each supply chain includes requisitioning of raw materials, sourcing, and purchasing. It also includes receiving at the plants and paying the suppliers. APCI’s manufacturing facilities start the conversion process, and maintenance processes are also in the supply chain. The end of the “make” process is the finished goods inventory. New orders come into “fulfill,” are picked from the finished goods inventories, and then are scheduled and delivered. Invoices are sent out after delivery and are paid. The process ends when cash is deposited in the bank and customers are satisfied Figure 25 (page 91) shows the seven customer-facing processes, which are the processes of the supply chain plus two additional processes: 1. “Innovate,” the new-product development process formerly known as “create and improve offerings,” begins with new ideas and ends with a new marketplace offering. 2. “Sell,” formerly “find, win, and retain customers,” goes from a lead through a proposal and a contract and ends when the customer is on-stream. Once on- stream, the customer is served by the supply chain. The supply chain is supported by fundamental corporate support areas such as “people” (HR), “finance,” “information,” “environment,” and “governance” (corporate governance including law and corporate secretaries). Rounding out the list of the global processes is “align,” a leadership process that sits atop the others. The process was formerly called “develop and commit to enterprise plans.” The align process develops the five- and ten-year plans and has a three-year planning process called “plan and commit.” It also controls mergers and acquisitions. In summary, the enterprise process blueprint shows the seven customer-facing and the five enabling processes as well as a single leadership process, for a total of 13 global processes. The company has commissioned global process teams for 10 of the 13 in order to concentrate on where most of the money and customer impact are. The other 3 processes (“align,” “environment,” and “governance”) are slated to be addressed later. The current version of the blueprint appears frequently on APCI intranet Web sites. The blueprint represents the work of 19,900 people. Employees can identify where they work in the model, and the blueprint is used in new-hire orientation and other employee communication sessions. The model has been evolving for four years and, with some minor changes, is withstanding the test of time, Diehl said. 92 Business Process Management • ©2005 APQC
  • 11. AIR PRODUCTS “We have very intelligent and questioning people, and we are pretty much locked in on this.” Process Governance Structure Process leaders do not simply own the design of the process; that is only the beginning of their accountabilities. They are also responsible for the measurement, performance, and improvement of the process. Executive process owners could not manage entire processes on their own. Initially, they were asked by the CEO to form the global process management teams that would work with the SAP team to develop the infrastructure necessary to deliver the full benefits of SAP implementation. In addition, they would oversee the orderly transition of the SAP development activities from the SAP project teams to the ongoing global process management teams as the implementation rolled out. (See Figure 26 for the organization of the global process management teams.) All convergence decisions are transferred to the executive process owners and their teams, and they manage and own the process designs enabled by SAP going forward. Global Process Management Team Structure at APCI APCI process leaders benchmarked other companies that Global Process Board/ had formed global Global Supply Chain Board process management Executive Process Owner Executive Process Owner IT Account Manager Executive Process Owner Process Manager teams. As a result, it IT Account Manager Global Process IT Account Manager Global Process Process Manager Process Manager Global Process Owner Process Global Owner Process Global Owner Process Global Global Process developed a common Owner Process Global Owner Owner Process Global Owner Owner Process Global Owner Management structure led by an Executive Process Owner Team executive process owner. Currently, Integrated IT Account Manager Process Manager the company has 10 Supply Chain official global process Global Process Global Process Global Process management teams. SAP team Owner Owner Owner The process manager acts as a lieutenant, a day-to-day overseer Enterprise Regional or Sub-process E-business Design Owners of the process. He or Owners (As required) she is involved in the details of measurement, Figure 26 design, education, and training. Business Process Management • ©2005 APQC 93
  • 12. AIR PRODUCTS The IT account manager, representing the IT organization, is focused on making sure both the SAP and the legacy systems for all the IT spend (and the applications that support the process) are addressed. Each process is too big to be managed globally by one person, so the process is divided into three or four sub-processes owned by global process owners. For example, for the “plan” process, one global process owner is responsible for sales and operations planning and another is responsible for inventory management. The process also has regional and sub-process owners as required. An enterprise design owner has a detailed understanding of the SAP configuration in the global process. Finally, some people outside of the team are regularly involved in the global process. This may include representation from the integrated supply chain team, the SAP team that feeds the particular process, or e-business. E-business is another form of technology enabling the processes, since external Web sites often act as windows on these processes that allow customers to access services, products, and information directly. Process leaders from the different teams meet on a monthly basis and drive commonality around global process management issues. Process Design in a Process-focused Organization Process designs require documentation that provides clear understanding and agreement regarding what work is to be done within and across the global processes. Just as important as product specifications, process designs help the company resolve customer complaints, take orders, deliver products, and collect money. The company requires processes be documented consistently so the employees in France, the United States, and Taiwan can have a global process that they can understand and perform consistently. Using as unifying enablers a robust architecture, a single repository, common end-to-end process responsibility, organizational roles, and consistent terminology, the company can consistently control, store, and make documentation available so that processes are replicable, efficient, and value-driven. Robust architecture—The company uses a multiple-level architecture and is able to drill down into the process. It uses a standard set of symbols and a standard set of six elements that make up a complete process design. It has adopted many elements of the Supply Chain Operations Reference Council’s architecture and uses common terminology. In 2001 it had approximately six ways to document processes; today 94 Business Process Management • ©2005 APQC
  • 13. AIR PRODUCTS it has one. (The company trains employees to use this architecture and uses ARIS 23 as its modeling tool. ) Repository and document control —Allprocess documents should reside in one location. The company does not want an ISO documentation repository, a process design for effectiveness and efficiency repository, and a Sarbanes-Oxley documentation repository. Launched but not yet fully deployed, its single repository is a Web-based tool, using a Microsoft SharePoint server. End-to-end connections —Processes are fitted into the architecture so that employees can see the connectedness, for example, going across the entire supply chain. The company also defines clear process levels to prevent employees from jumping between levels when they document processes. Employees need to understand supply chain variations and the appropriate end-to-end process. Organization—APCI needs employees who can read process maps, create a map, design a process, and model a process. Practically every employee needs to be able to read process maps. Training is provided to readers as needed. Employees can take a two-hour course on how to read a standard map, and a three-day course teaches employees how to map a process. Currently, approximately 600 employees have taken the three-day course. Consistent terminology —Thecompany consistently uses ARIS symbols. Most people in the company use the low-cost Visio tool, a common Microsoft software product. They can use Visio to work with processes and generate new ideas. Then, once the process is locked in and the executive process owner approves it, an ARIS expert can put it into the more sophisticated ARIS process model. The company knows the value of standards, said Diehl. It has common naming and numbering systems and uses the outside Supply Chain Operations Reference Council reference model for numbering; the numbering system is also being made compatible with Sarbanes-Oxley documentation requirements. Along with the council, it leverages other models that follow standards, such as the APQC Process SM Classification Framework , so that it can compare best practices internally as well as with other organizations. Process Measurement in a Process-focused Organization The global process management teams assess processes using specific performance measures and targets. The key performance indicators of a process are leading indicators and predict performance. If a team measures increases in new customer signings, then it can predict revenue generation six months from now. If signings 23 Produced by IDS Sheer (www.ids-scheer.com). Business Process Management • ©2005 APQC 95
  • 14. AIR PRODUCTS are going down today, that predictive process measure alerts the team to take action now to prevent future revenue decrease. For APCI, key performance indicators predict financial and customer value. Process key performance indicators are regularly reviewed and acted on at business and process reviews. A business review is generally held monthly to examine those key performance indicators in the context of the business. Business measures and process measures are integrated at this meeting. APCI plans to have real-time, global key performance indicators in place as a critical element of its process and supply chain focus. With SAP, the company has the potential to implement real-time global key performance indicators. In 2003 teams were looking at scorecards to review their measures every quarter. Now, with its new dashboard (described in a later section), teams are reviewing monthly. According to Diehl, the company is striving for real-time measures because the sooner the teams know about potential trouble, the sooner they can act to get back on track. The company is implementing a Web-based tool so that process key performance indicator results can be communicated to each employee. The goal is to allow every employee’s performance goals to be aligned with a few key performance indicators that they see on their portal when they open their PC. They can interact to find out where their team is performing on a key performance indicator and provide feedback to the process team about ideas they have to improve that indicator and how the team might work better together. (An example of this capability follows in the discussion of supply chain measurement.) The company links its key performance indicators together. It has a corporate scorecard with 10 key performance indicators that the chairman and executive committee use. It also has a line-of-sight to the process and functional scorecards and to the strategic business unit scorecards. Process Improvement in a Process-focused Organization When a team has its design capability in place, has its processes documented, is performing to the process, and is measuring actual versus target performance, the company looks first at what is going well. Diehl said: “We try not to jump to the negative. If one region is losing fewer accounts to the competition than another region, we want to understand and share that best practice.” If the team recognizes a gap between the value of the key performance indicator and the target, then it performs a root-cause analysis. Figure 27 shows that the team has two options on the left hand side: either the process is correct and the execution is the problem or the process itself needs to be redesigned. 96 Business Process Management • ©2005 APQC
  • 15. AIR PRODUCTS Process Management Model Cause CREATE AND IMPLEMENT SOLUTIONS Analysis • Improve execution • Continuous improvement • Process redesign • Knowledge management Process Improvement Gap Success SHARE BEST PRACTICES • Knowledge management Process MEASURE ACTUAL VERSUS TARGET PERFORMANCE Performance Process DESIGN AND IMPLEMENT PROCESSES Design Process APCI STRATEGIES, BUSINESS MODELS, Leadership BUSINESS PLANS, CHANGE MANAGEMENT Figure 27 Continuous Improvement and Knowledge Management APCI’s “one company” continuous improvement model is a merger of Six Sigma and Lean management principles. In some companies, Lean groups and Six Sigma groups work side by side, and each group reports its benefits independently. In 2002 APCI determined to combine the two, even though some employees felt strongly about one and some about the other. According to Diehl, the model merges the best of Six Sigma with the best elements of Lean: Six Sigma is strong in planning and looking across processes to determine where the best opportunities for improvement are, and Lean provides excellent continuous improvement tools. The continuous improvement model has five steps: prepare, analyze and prioritize, plan, implement, and learn. It enables teams to use a variety of tools to solve problems in untraditional ways. Continuous improvement has top- down leadership; businesses or processes do not begin until the top leader agrees. Continuous improvement is tied to the annual planning cycle. Continuous improvement tools are plentiful and varied. They include both hard and soft tools adopted from Six Sigma, Lean, and other sources. Teams use Kaizen methods, value-stream mapping, and many more. The company has a five-step change model with several tools including a stakeholder analysis tool. Business Process Management • ©2005 APQC 97
  • 16. AIR PRODUCTS “Deliver the Difference” mandates an environment of knowledge sharing and reuse in globally connected communities. Knowledge is shared through a variety of communities such as communities of interest, communities of practice, centers of excellence, aligned organizations, and integrated work processes. Knowledge management activities are organized around four key capabilities: collaboration, idea management, best practices transfer, and learning. Figure 28 shows how knowledge management and continuous improvement are integrated with process management using the following steps: 1. W h e n w o r k i n g Applying CI and KM to Global Process Management on process improvements, 4. Improvements are APCI uses key Process Process sustained by process performance Leadership Design documentation and Collaboration indicators to 4 KPI monitoring. measure how the Process Process work process is Idea Improvement Performance Management performing relative PM to speed, waste, and 1 effectiveness. From Best Practice 3 Transfer these measures, it determines what process elements Learning need to improve. 2 2. C o n t i n u o u s improvement is KM applied to the work Prepare Prioritize Plan Implement Learn process to improve Cycle Tied to Operating Plan it. CI 3. T h e c o m p a n y applies knowledge Figure 28 management to share the best processes and practices. 4. Improvements are sustained by documenting processes and monitoring key performance indicators. A Vision for Collaboration Collaboration is essential for maintaining a unified outlook, and corporate leaders share a vision for collaboration, said Diehl. They believe that process owners should have high-performing processes using the best designs and the best practices. In turn, the process owners should be supporting the businesses in achieving their goals because the businesses are executing these common processes. 98 Business Process Management • ©2005 APQC
  • 17. AIR PRODUCTS Process owners must have well-established, actively aligned, and collaborative relationships with the business units and their leaders. Process owners develop and share critical key performance indicators and targets with the business units, and they are continually identifying opportunities to improve processes across the businesses. APCI does not want to only deploy continuous improvement projects inside businesses because they cannot be leveraged. Projects have more value if they are done at a global process level. Business and process leaders select major process improvement projects together. Another important area of collaboration among business leaders and process owner is consistent employee communication. For four years, APCI has cascaded communications throughout the organization. Three times a year, leaders meet with the top 50 executives worldwide. They in turn communicate to the top 600 leaders in the company. The top 600 communicate down to the rest of the organization. Leaders think of it as a waterfall effect. Measuring Maturity APCI believes that the higher a process is in the maturity model, the better the link to business value. (The company has used a maturity model developed by Kevin 24 McCormack. ) Processes are designated with the following levels of maturity: • Ad hoc (Score 1.0 to 2.0) —Processes are unstructured and ill-defined. Process measures are not in place, and the jobs and organizational structures are based on the traditional functions, not horizontal processes. Individual heroics and “working around the system” are what makes things happen. • Defined (Score 2.0 to 3.0) —Basic processes are defined and documented. Changes to these processes must now go through a formal procedure. Jobs and organizational structures include a process aspect but remain basically traditional. Representatives from functions meet regularly to coordinate with each other concerning process activities but only as representatives of their traditional functions. • Linked (Score 3.0 to 4.0) —This is the breakthrough level. Managers employ process management with strategic intent. Broad process jobs and structures are put in place outside of traditional functions. Cooperation between intra- company functions, vendors, and customers takes the form of teams that share common process measures and goals. • Integrated (Score 4.0 to 5.0) —The company, its vendors, and suppliers take cooperation to the process level. Organizational structures and jobs are based on processes, and traditional functions—as they relate to the supply chain—begin to disappear altogether. Process measures and management systems are deeply embedded in the organization. Advanced process management practices take shape. 24 Business Process Orientation: Gaining the E-Business Competitive Advantage, K.P. McCormack and W.C. Johnson, St. Lucie Press, 2001. Business Process Management • ©2005 APQC 99
  • 18. AIR PRODUCTS In 2003 APCI surveyed 100 of its top managers—the top 50 in the corporate hierarchy plus another 50 thought leaders. The survey asked: Where do you think we are on this model? The average score was 3.2. McCormack’s benchmark data showed that APCI was below the average of leading process-focused companies, whose average score was 3.5. McCormack and APCI’s process leaders concluded that, to drive its process efforts up the maturity scale, the company should concentrate on process measurement, process design, and role clarity. In this way, the company used a maturity model to focus its priorities to build company capabilities. IMPLEMENTING AND SUSTAINING BPM The company can no longer maximize its productivity and customer satisfaction by focusing on individual global processes; it is changing its focus to the points where the processes intersect and where they link end-to-end. This is where it has found the biggest areas for improvement. The first group of processes that it decided to focus on was the supply chain processes: plan, source, make, and fulfill. Approximately 80 percent of the cost-of-goods-sold go through this chain. “That is where the money is,” said Diehl, “and we are trying to follow the money for business value. After all, our customers depend on the output of our supply chain processes.” The supply chain organization includes all process management, continuous improvement, and SAP activities. The chairman has seven direct reports including the vice president of the supply chain. Reporting to the vice president of the supply chain is a group of both traditional functions and global processes. Annually, APCI purchases approximately $3.5 billion of goods, equipment, and raw materials. It has an SAP project, a global customer service organization, a customer engagement team, a customer loyalty team, and the “sell” global process management team. The names of the boxes in the lower level of the chart indicate a major change in how APCI operates as a company. It is changing the names of organizations to verbs as an indication of what is important. The organizational chart names are a mixture between processes and functions; the company is creating a balance between the two. Integrating Global Processes Through a Supply Chain Focus The company developed a supply chain planning capability that it organized to take advantage of the visibility of data that SAP was providing. Because the new group wanted to drive supply chain processes to the highest level of maturity possible, it called itself “integrated supply chain.” According to Tom Ward, the vice president of the integrated supply chain, businesses were on the verge of mutiny when the company first introduced a supply chain focus in late 2003. To overcome resistance, the CEO had to visibly support the effort. 100 Business Process Management • ©2005 APQC
  • 19. AIR PRODUCTS Ward was assigned to head the integrated supply chain group to focus on building capabilities, solutions, and global strategies on a “one company” basis. According to Ward, this involved more than just planning; the group cuts across all the supply chains and determines the most effective ways to run a global supply chain. It is not, nor will it ever be, a big team. Its people are deployed globally and have skills in continuous improvement, process management, data management, and SAP. Within each of the businesses, a supply chain director has been assigned to drive the supply chain activities for that business. To create the “one company” approach, they align everything that they do with what the integrated supply chain team does at the enterprise level. Because the integrated supply chain team is responsible for continuous improvement, each business has the same responsibility. Because the integrated supply chain team instills foundational capabilities at the enterprise level, the businesses deploy these capabilities at their level. The integrated supply chain team has a supply chain key performance indicator dashboard at the enterprise level; the businesses use the same measurement dashboard. Ward’s task became to create the focus while not adding overhead. The reason for the supply chain focus is that the processes that compose the chain spend $4.6 billion annually. “It is the core set of processes where the money is,” said Ward. A challenge was not to focus on the supply chain by creating a whole separate structure; the company wanted to work with the existing organizations. It wanted to leverage the existing continuous improvement, process management, and knowledge management infrastructure. It reorganized without spending any new money; in fact, it reduced costs due to overlapping activities. Ward uses the pipeline in Figure 29 to help employees envision the supply chain. It portrays a pipeline with no bends or constrictions in which goods and services go to customers seamlessly, and it is running on the back of a single instance of SAP. Images such as these are valuable Pipeline to Our Customers for training and communications. The company’s goal is to have 13 Customer’s Supplier Plan Source Make Fulfill Customer Customer percent operating return on net assets by 2007. It is driving Leverage the Single Instance SAP Platform a program to triple productivity based on Figure 29 Business Process Management • ©2005 APQC 101
  • 20. AIR PRODUCTS APCI’s historic rate. The supply chain teams play a critical role by continuously improving the supply chain and reducing functional costs. People first tried to meet the goals by simply reducing service levels and not worrying about effectiveness. To prevent a slippage in effectiveness, the company is now entering into service level agreements with its functions and businesses. The integrated supply chain group will meet its goals by simplifying, standardizing, shortening, and sharing processes—a mandate from the “Deliver the Difference” vision. Its leaders are concentrating both on educating the employees (especially the middle managers) and on funding approximately 1,700 projects. It manages each one using color-coded status indicators. With processes defined and deployed, it can focus on measuring and monitoring results. The integrated supply chain group is involved in some foundational projects. One is the sales and operations planning process, a rudimentary process that was built in the early days of SAP. Either businesses were not using it or they were modifying it to meet their needs. In 2004 the integrated supply chain created a second version that has been well-received. It is now implementing a “one company” enterprise tool to enable this process so that every business that runs the process can use the same tool. To enable a process with an IT tool, the team uses the same disciplined approach that the company uses for its SAP project: Bring all businesses in, write a blueprint, develop a consistent design, and require everyone to use it the same way. EVALUATION AND RESULTS The company no longer tracks separate lists of benefits (SAP benefits, continuous improvement benefits, etc.). All benefits are managed through one instrument called the “one company” improvement tool, or Idea Tracker. It sits on a platform built in 2003 for knowledge management and now supports all businesses and functions. It is helping the company move away from a paper-based environment (spreadsheets, PowerPoints, Word documents, special reports, etc.) The intranet-based Idea Tracker tool was developed simply to track new ideas until they became projects. APCI added the capability to monitor and log the benefits of ongoing projects. The company developed a rigorous definition regarding what a benefit is (e.g., a onetime benefit, an ongoing benefit, an avoided cost, or a reduced cost). Idea Tracker captures whether the project impacts the profit and loss statement or the balance sheet. Employees enter information about ideas or projects into the tool. The organization requires that all projects that are complete be documented in Idea Tracker so that the cumulative benefits can be tracked across the company and 102 Business Process Management • ©2005 APQC
  • 21. AIR PRODUCTS the owner of the idea can get credit for the results. In the future, all businesses and functions will be required to enter their approved but not-yet-started projects to be able to provide an organization-wide benefits forecast. The company measures its success based on two result areas: increases in productivity as shown on the profit and loss statement and increases in customer loyalty scores. Incentive compensation is designed to reward people based on the performance of the company as a whole and not on the performance of the business—a system that Cantwell said encourages convergence. APCI has not drawn a direct line between customer loyalty scores and incentive compensation. Customer loyalty is a leading indicator, a means to an end. Results and Progress Under “Deliver a Difference” The company’s values come directly from “Deliver the Difference.” In adherence to those principles, the company has: • begun a single instance implementation of SAP and established 10 global processes, • consolidated global organizations under single managers, • established an annual customer loyalty survey for each business in each region, • doubled the rate of hard productivity savings in 2004 and is on target to triple the rate in 2005, and • created regional shared service centers. The Supply Chain Dashboard The supply chain dashboard is available to all employees through an intranet portal. Drilling down through the portal by clicking on a performance measurement link leads the employee to an option to review the supply chain key performance indicators. The 17 key performance indicators are aligned with “Deliver the Difference” values and are categorized under the goals of best company to: buy from (customer value), work for (operational leadership), and invest in (shareholder value). Down arrows indicate a trend in the wrong direction, and up arrows indicate a trend in the right direction. Some icons allow the reader to drill down further for more information. Businesses have business-level targets. The target of the vice president of the supply chain at the enterprise level is a sum of the targets of all the businesses that he supports. The Effect of BPM Implementation—Customer Loyalty Example APCI measures 54 individual customer characteristics; an example is illustrated in Figure 30 (page 104). Business Process Management • ©2005 APQC 103
  • 22. AIR PRODUCTS Customer Loyalty Key Drivers—Differentiators SAP Recovery Evident in Germany (from the customer’s perspective) • Ease of doing business • Respond and resolve problems • Lower cost of business Customer Loyalty • Manage activities in an integrated fashion Germany • Increase productivity and efficiency Business Basics—”table stakes” • Consistent reliable product SAP Currently • Delivery as committed Go Live • Complete and accurate invoicing Note: Vulnerable = Indifferent + At Risk Customers Figure 30 The characteristics are broken up into a number of different categories. Some are “table stakes;” that is, the company receives no value for differentiating itself in these areas and considers it the cost of doing business. However, if the company achieves in the area of key drivers, then it receives benefits and increased customer loyalty. For example, during its first SAP release in Germany, APCI surveyed its customers both before and after the implementation. Using this data, it kept a focus on its customers as the new process and ERP system bugs were worked out. As illustrated in Figure 30, the company did suffer a performance dip in customer satisfaction as the new ERP system was implemented but actually increased its performance to higher levels after a period of time. Each of the 17 businesses is required to survey their customers annually. Businesses work on the one or two high-priority areas that customers indicate need improvement. Based on survey results, APCI categorizes its customers as: secure, favorable (the largest category), indifferent, and at-risk. The indifferent and the at-risk customers are recognized as a group called “vulnerable.” The secure customers typically not only give 100 percent of their business to APCI but also are willing to recommend 104 Business Process Management • ©2005 APQC
  • 23. AIR PRODUCTS the company to another customer. Customers of the businesses going through SAP implementation (and the accompanying process convergence) began to receive different invoices and their prices and units of measure changed. The company matched their survey responses to the changes that were occurring. The company considers the results of this study carefully because possibly the unprofitable customers are becoming more vulnerable—a fact that is not necessarily bad. APCI tries to ensure that its important and profitable customers are driven into the secure category and tries to move unprofitable customers to profitability by changing their service offerings based on the price that they are willing to pay. LESSONS LEARNED “Our single instance ERP system has been a great catalyst for the company because trying to implement business process management and become a process- focused organization without a big catalyst or a lever for change would be more daunting than it has been.” —George Diehl, global director of the Process Management COE APCI’s concept of “one company” jump-started global process management. Cantwell said that before “Deliver the Difference,” the organization was influenced by what seemed to be the initiative-of-the-month. Consequently, employees found prioritizing difficult. APCI was a decentralized enterprise; it had its gases business, chemicals business, and equipment business. It operated in Europe and the United States and was developing a business in Asia, and employees often operated as though they were in an independent organization. APCI had 34 legacy systems to process customer transactions, five ways to manage quality, and three ways to conduct continuous improvement activities. APCI has many success factors in place, among them the use of enablers such as continuous improvement, knowledge management, customer loyalty, segmentation, business rules, and e-business. Frequent benchmarking was also a factor. The company benchmarks for credibility and speed. It benchmarked the procedures necessary to form process teams and document processes. Key Findings Process owners should be clear about what they are not going to do. APCI process owners are tempted to try to do too much. The global process board focuses the process owners on the priorities and initiatives and then drives the initiatives throughout the company. Resistance from middle management to a process focus has been, and continues to be, very strong, according to Cantwell. Middle managers feel the brunt of change and, he said, 40 percent of them may not make it because they do not have the skills to operate in the new world. The company has learned to manage change Business Process Management • ©2005 APQC 105
  • 24. AIR PRODUCTS proactively. It recognizes before it begins where to expect the resistance. Because change takes so long, convincing people to change is difficult. Many will not be in the same job long enough to see the fruits of their labor; organization leaders thus pave the way for the success of successors and must rely on employees doing the right thing just for the sake of doing the right thing. The company converged processes concurrently with SAP implementation. SAP gave the work teams hard deadlines that they had to meet, and the SAP project artificially imposed the deadlines. A motivator in meeting deadlines came from the estimation that delaying SAP implementation would cost the company $6 million per month. APCI has made a conscious decision not to distract employees from SAP implementation by implementing other initiatives such as customer relationship management. Its philosophy is to be SAP-centric and not include vendors or capabilities that are not integrated into SAP—because to do so would require upgrading SAP, which would require that all interfaces with other applications be redone. Cantwell said: “We are not at all interested in looking at a lot of boutique solutions to bolt onto SAP. If SAP has it, we’ll use it.” Mapping and maintaining processes can be expensive. The company carefully balances business value versus elegant solutions. Employees have a tendency to map everything and document all processes. Leaders continue to tell employees to prioritize and avoid documenting, for instance, how to forklift something in a plant. Global process teams have been asked to identify the five processes that they are working to improve. APCI has also learned to: • focus on a few measurable initiatives, • avoid creating a bureaucracy and overhead, • define what it will and will not resource each year to keep process owners from being conflicted, • integrate change plans into project plans and anticipate resistance from middle management, and • communicate frequently to leaders and then let them cascade and customize the message. Suggestions for Success Cantwell said that APCI is cautiously optimistic that it will be successful in the long term by focusing on process as an integral part of its strategy. Its leaders have a few suggestions that will help others transform their organizations. • Do not do everything at once. Lay a foundation, and constantly build on what came before. The company recognizes and stifles the desire to jump to the answer too quickly. 106 Business Process Management • ©2005 APQC
  • 25. AIR PRODUCTS • As you go step-by-step, sequence events with dedicated resources. Transformation cannot be a part-time job. Find a number of employees and isolate them to drive the initiative. Cantwell said: “Somebody’s life has to depend on this being successful. If you can say, ‘Well, I did not quite get to this,’ or ‘Let me show you all of the other good things I have done, so we did not really get to this,’ you will not be successful.” Cantwell suggested dividing the work, isolating a few steps, dedicating resources to them, creating credibility in the organization by meeting milestones, and moving to the next step. • Manage change aggressively. Anticipate resistance and deal with it early to gain acceptance that the change has value. • Concentrate on visibility and velocity. By implementing a single instance of SAP, the company increased visibility of information. By increasing its focus on processes, it has achieved faster cycle times. • Also concentrate on simplicity. Take complexity out of the business. Historically, APCI made its business complex by customizing products for the benefit of customers, but customers were not paying for the customization. • Focus on both effectiveness and efficiency. • Realize that the transformation process is never complete. • Keep a customer focus. APCI has learned during the first four years of its process-focused evolution that focusing on IT systems and processes can make a company internally focused. If it does not also have a metric to focus on customer responsiveness to the transformation, then it will lose those customers. One suggestion for success rises to the top, and all of the APCI site visit hosts consider it essential: Obtain CEO support. Moving to a process-focused organization requires too much change to accomplish without the strong endorsement of the CEO. Employees’ jobs and environments change. For them to be able to buy in, they must recognize that the CEO is behind it and intends to make it happen. Cantwell provided an example of its necessity. “Process convergence, driving people to change the way they do things, is exceptionally challenging for an organization, especially when it is not a good solution for an individual business. What typically happens in that business is that managers say, ‘No way am I doing it. You are increasing my cost structure, and you are decreasing my effectiveness.’ The managers inside the business bring it up to their general manager, the vice president of the business, who will always support them. The issue continues to be escalated until it arrives on the desk of the CEO. The CEO must say ‘I don’t care if it is worse for your business; this is what I want for the company to succeed.’ If the buck does not stop at the CEO level, there is always going to be someone to override convergence.” Goals and Plans By the end of first quarter 2005, 80 percent of the company will be operating with SAP. APCI’s Asia operations will have SAP in 2006. Business Process Management • ©2005 APQC 107
  • 26. AIR PRODUCTS Ward said that APCI believes that its BPM infrastructure and tools are mostly in place, positioning it for future success. In his cover letter in APCI’s 2004 annual report, John Jones concludes with this paragraph: All of the groundwork we have laid since 2000—restructuring our portfolio, resourcing our growth businesses and focusing on work process improvement— paid off in fiscal 2004. Those four years presented great challenges for Air Products, but our focus and desire to win came through. And this will continue into fiscal 2005 and beyond. …There’s still much important work left to do. Our strategies will help drive top-line growth and return on capital. And it will be our passion that delivers that difference. 108 Business Process Management • ©2005 APQC