                                  TPM Awareness Information                                   1
Courtesy, in part, of Motorola SPS.
                                                                                          Thank You!




     About T.P.M.

   After World War ll. Japanese industries determined that to complete successfully in the world market
they had to improve the quality of their products. to do so, they imported management and manufacturing
techniques from United States and adapted them to their circumstances. Subsequently, their products became
known throughout the world for their superior quality, focusing world attention on Japanese- style
management techniques.
                                               TPM DEVELOPMENT PROGRAM
                                              Implementing Total Productive Maintenance
                                                          Seiichi Nakajima.




  Cayman Systems USA 513 777-3394
      ©1998 Revision A 980810
                                      TPM Awareness Information                                               2
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




         WHAT IS T.P.M. ??


   Definition of T.P.M :
   T.P.M. IS: A PRODUCTIVE MANUFACTURING SYSTEM with the TOTAL
   Participation of: Managers, Supervisors, Engineers,
   Technicians and Operators.


   T.P.M. Includes the Following Benefits:
   • Maximize Overall Equipment Effectiveness
   • Establishment a Complete System of Maintenance for the Machine Entire
     Life
   • Create a Better Work Environment, Promoting the Participation for All
     Employees


Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   3
Courtesy, in part, of Motorola SPS.
                                                                                                  Thank You!




  T.P.M. = Medical Science of Equipment



                       PRODUCTION   Foton      AUTOMATION    B-820

                      VIDEO-AUTO DIE-BONDER MODEL 8030A




                              POWER

                                                                HEATER




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                                          TPM Awareness Information                                   4
Courtesy, in part, of Motorola SPS.
                                                                              Thank You!




The Main objective of TPM is :
                                   Zero Interruptions
                                     Zero Defects
                                    Zero Accidents

Throughout total employees participation from Top Management to Operators,
based in the following activities:

Autonomous Maintenance
• Planned Maintenance
• Individual Improvement
• Quality Maintenance
• Early Equipment Management
• Education/Training (People Development)
• Safety




 Cayman Systems USA 513 777-3394
     ©1998 Revision A 980810
                                      TPM Awareness Information                                   5
Courtesy, in part, of Motorola SPS.
                                                                                          Thank You!




                                  PILLARS OF TPM

                                                           I          P
                    A      M          M         M                         S        E
                                                      I    M          E                  M
                    U      A          A         A                 T       A        A
                                                      N    P          O                  A
                    T      I          I   P     I                 R       F        R
                                  Q                   D    R          P                  N
                    O      N          N   L     N                 A       E        L
                                  U                   I    O          L                  A
                    N      T          T   A     T                 I       T        Y
                                  A                   V    V          E                  G
                    O      E          E         E                 N       Y
                                  L       N           I               D                  E
                                                           E                       E
                    M      N      I   N   N     N     D           I   E                  M
                                                           M                       Q
                    O      A      T   A   E     A     U           N   V                  E
                                                           E              E        U
                    U      N      Y   N   D     N     A           G   E                  N
                                                           N              H        I
                    S      C          C         C     L               L                  T
                                                           T              S        P
                           E          E         E                     O
                                                                      P



                                                    5S´s


Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                          TPM Awareness Information                                           6
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




                                  T.P.M.
    Total Productive Manufacturing

                People , Equipment and Product
                Improvement by Working Together.


                                                                     EXCELLENCE




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   7
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




                                       PLANT
                                      OVERVIEW

  PLANT
 OVERVIEW




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   8
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




                                        TPM
                                  Self Assessment
  PLANT
 OVERVIEW



      TPM
Self Assessment




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   9
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




               TPM Self Assessment
Background:

∆1991 First attempt to implement TPM.
∆ TPM consultant provides training to selected Managers,
  Supervisors and Engineers.
∆ One coordinator with experience in Process and Maintenance
  is assigned to lead TPM.
∆ Literature and materials, prepared and distributed.

ð Lack of support and involvement results on failing the
       implementation.
Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   10
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




               TPM Self Assessment
1996

  ∆ One Staff Mgr. is assigned to lead the TPM Implementation
         plant wide.
  ∆     A core team is formed on 2Q/96 with key people from different
        departments to coordinate the implementation.
  ∆     Model equipment is selected based on bottle neck operation.
  ∆     Equipment conditions analysis performed.
  ∆     Most of the teams cover the initial cleaning.
  ∆     Activities are focused on six big losses detected and 5 S´s
         implementation.
Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   11
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




                                       Asia
                                   Benchmarking
  PLANT
 OVERVIEW



      TPM
Self Assessment



    Asia
Benchmarking




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   12
Courtesy, in part, of Motorola SPS.
                                                                              Thank You!



                              TPM Benchmarking
                                Asia Facilities
                                                                1996
Facility 1                        April
Facility 2                        May
Facility 3                        June


  Committee:                      4 Chosen Folks

 Objective:                         Learn from Asia success experiences in TPM
                                    implementation and come up with directions for
                                    Plant implementation.




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                    TPM Awareness Information                                     13
Courtesy, in part, of Motorola SPS.
                                                                            Thank You!




 Benchmarking Conclusions

                     Ø Total management involvement.
                     Ø T.P.M. Manager (dedicated).
                     Ø A well defined implementation process.
                     Ø Provide people with time to work on it. ( 4- 6 Hr./wk ).
                     Ø Each staff has their own T.P.M. Promoter full time.
                     Ø Focused in Consultant X model.
                     Ø Focused in just one product line per area.
                     Ø Budget assigned for consulting and external training.


Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                   TPM Awareness Information                                    14
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




                                       TPM
   PLANT
  OVERVIEW                        Implementation
        TPM
  Self Assessment



     Asia
 Benchmarking


     TPM
Implementation




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   15
Courtesy, in part, of Motorola SPS.
                                                                           Thank You!




               IMPLEMENTATION/CONSULTANT



       * Q3 1996, Consultant X is selected to be Consultant.
       * Training of Managers, Team leaders and Team members
       * Master Plan Defined
       * TPM. implementation initiated according to Consultant X recommendations




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                    16
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!

                                   T.P.M. POLICY
 # ESTABLISH AN INTEGRATED STRUCTURE TO PROMOTE T.P.M.
   AS A COMPANY CULTURE.

 # MAXIMIZE OVERALL EQUIPMENT EFFECTIVENESS

 # TOTAL EMPLOYEE INVOLVEMENT.

 # CULTIVATE EQUIPMENT & PROCESS RELATED EXPERTISE THROUGHOUT
   SHOP FLOOR. ( Autonomous Maintenance, Planned Maintenance etc..)

 # ESTABLISH A RELIABILITY AND MAINTAINABILITY SYSTEM TO MAXIMIZE
   EQUIPMENT LIFE TIME. (Planned Maintenance Autonomous Maintenance,
   Individual Improvement, Early Equipment Management.)

 # ALL EMPLOYEES MUST PARTICIPATE IN T.P.M TRAINING PROGRAM.

 # ALL AREAS MUST FOLLOW T.P.M. ESTABLISHED GUIDE LINES.

 # DEPARTMENT HEAD IS RESPONSIBLE TO ACCOMPLISH AND SUPPORT
   T.P.M. GOALS.

Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   17
Courtesy, in part, of Motorola SPS.
                                                                                          Thank You!




                  T.P.M. PLANT WIDE STRUCTURE

                                                          TPM
                      T.P.M. Office                   Responsible
                                                     Plant Manager




                                        Autonomous                Planned             Individual
                          5 ´s          Maintenance             Maintenance         Improvement


      Quality                        Early                               Training
   Maintenance                     Equipment           Safety            People
                                  Management                           Development



Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                        TPM Awareness Information                                             18
Courtesy, in part, of Motorola SPS.
                                                                                 Thank You!



                                  PROMOTION STRUCTURE
                              (OVERLAPPING SMALL GROUPS)


                                        PLANT
                                       MANAGER
                                                                  STAFF MANAGERS
                                                                  OPERATIONS
      TPM PILLARS
      & PROMOTION                                                  DEPARTMENT
         OFFICE                                                    MANAGERS

        TPM                                                        DEPARTMENT
     PROMOTERS                                                     SUPERVISORS

                                                                    TPM TEAM


Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                      TPM Awareness Information                                      19
Courtesy, in part, of Motorola SPS.
                                                                           Thank You!




                                  VISION STATEMENT:
                   TPM
           PLANT WIDE
     IMPLEMENTATION

             Q1 2000




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                   TPM Awareness Information                                   20
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




T.P.M. IMPLEMENTATION ACTIVITIES
                            MANAGER TEAMS




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   21
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




                      PREPARATION / PLANNING STAGE


                # DEFINE PILOT LINES


                # AMOUNT OF MACHINES INCLUDED PER LINE


                # DEFINE CORE TEAM MEMBERS OF EACH LINE


                # SELECT TEAM MEMBERS PER MACHINE


                # START ACTIVITIES IN PILOT MACHINES (bottle neck.)



Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   22
Courtesy, in part, of Motorola SPS.
                                                                                          Thank You!

                               Line and Machine Selection


                   B-820
                   B-820


                               Machine 1                     Machine 2
                                                                                   N-661



           POWER

                      HEATER




                               Machine 3                               Machine 4
                                                                                                        B-609
                                                                                                        B-609




   V-701
   V-701




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                           TPM Awareness Information                                            23
TPM Implementation Plan
                                    1996       1997        1998         1999     2000
                  ACTIVITIES        Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2     Q3 Q4 Q1 Q2


              DEFINE STRATEGIES
PREPARATION      MASTER PLAN
                ORGANIZATION
   STAGE                                   T
            INTRODUCTION TRAINING      1   P    2
                  PUBLICITY                           3
                                           M
I       S      MODEL MACHINES
        T         Machine 1                     AUTONOMOUS MAINTENANCE
M                                          K
        A         Machine 2                               &
P                                          I
        R         Machine 3                       REDUCE 6 BIG LOSSES
L                                          C          EXTEND SIMILAR MACHINES
E       T         Machine 4
                                           K
M                  EXTEND                                           30%
E              IMPLEMENTATION              O                         to
N                  SIMILAR                 F                        50%
T       T     PRODUCTION LINES
A                                          F
        A
T       R         COMPLETE
I       G      IMPLEMENTATION                                             100%
O       E       DEFINED AREAS
N       T
TPM 90 Days Explosion Plan
                                                                    October                    November                              December
                                                               ww40 ww41 ww42 ww43 ww44 ww45 ww46 ww47 ww48 ww49 ww50 ww51 ww52
                    Machine 1
                PILOT TEAM                     Step 3                                          Start
                                    Planned maintenance                                                Start
                                                6 big losses                                   Start
                                Individual Improvement                                                         Start
           10 Extension teams                step 1-2                                                                                   4 mc    3 mc   3 mc
           19 Extension teams               Start step 1                                                                                7 mc    6 mc   6 mc
                    Machine 2
                 PILOT TEAM                  Step 2-3                                          Start
                                    Planned maintenance                                                Start
                                                6 big losses                  Step 1                           Step 2
                                Individual Improvement                                                                  Step 1
           11 Extension teams                step 1-2                                                  B-613    3 mc    2 mc 2 mc       B-601          L-604
                  Machine 3
                 PILOT TEAM                  Step 2-3                                                                   Start
                                    Planned maintenance                                                Start
                                                6 big losses                  Start
                                Individual Improvement                                                         Start
              6 Extension teams              step 1-2                                                                                   2 mc    4 mc
              2 Extension teams             Start step 1                      Start
                      Machine 4
                 PILOT TEAM                  Step 1-2                         Start
                                    Planned maintenance                                Start
                                                6 big losses                  Start
                                Individual Improvement                                                   Start
              4 extension teams             Start step 1                               a-820 a-821 J-701 J-601
PILLARS              IMPLEMENTATION MODEL
                                GANTT
                TPM Activity Board Extension Teams
                           Server        Data collection                                       M1              M2               M3              M4
          GM Audit
          Team presentations
          TPM Office Audit
          Consultant visit
          TPM Meeting
          Local BOOT CAMP
          TPM MCOE MEETING, JAPAN
          Pillars meeting
Courtesy, in part, of Motorola SPS.
                                                                                                Thank You!




                             T.P.M. TRANSITION CURVE
                    POLICIES DEVELOPMENT                T.P.M. PROMOTION DELEGATION
                    T.P.M. PROMOTION OFFICE START       INCLUDE T.P.M. IN PERFORMANCE                   C
                         MANAGEMENT MACHINES            MANAGEMENT PLAN.                                O
                         FOCUS IN FEW EQUIPMENT         INCLUDE T.P.M. IN JOB                           M
                         FOCUS TRAINING                 DESCRIPTION.                                    M
        D                                                                                               I
                         SUCCESS STORIES                ACCELERATED
        E                                                                                               T
        N                5 S´s                          DEPLOYMENT.                                     M
        I                                                                                               E
        A                                                                                               N
        L                         CONSULTANT                                        CONSULTANT          T
                                      IN                                               OUT
               KICK OFF



                                                   R     E
                                                   E     X
                                                   S     P                        GOALS SETTING FOR
                                                   I     L                        ALL ORGANIZATION.
                                                   S     O
                                                   T     R                     LOOK FOR ADDITIONAL WAYS
      DEVELOP DATA COLLECTION SYSTEM                     A
                                                   A
                                                         T
                                                                              TO DEPLOY T.P.M.
                                                   N
      ATTENTION TO FOCUS TEAMS                     C     I            FINISH CONFLICT WITH THE CULTURE
      TRAINING DEPLOYMENT                          E     O            ORGANIZATION ALIGNMENT
      IMPLEMENTATION PLAN                                N
                                                                      REWARD SYSTEM
      RESOURCE IMPLEMENTATION                                         CONTROL CHAOS


Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                          TPM Awareness Information                                                 26
Courtesy, in part, of Motorola SPS.
                                                                                    Thank You!


                                  KEY GOALS

       1.- TOTAL EQUIPMENT EFFECTIVENESS               %                    85
                 A) Equipment Breakdown             HOURS/MONTH             1/10
                 B) M.T.B.A.                        MINUTES                 1x10x
                 C) M.T.B.F.                        HOURS                    1x2x

      2.- REJECT CAUSED BY LINE EQUIPMENT           PPM                     1/5

      3.- LINE REJECT RATE                              %                   1/5

      4.- CYCLE TIME                                DAYS                   0.8X

      5.- FATAL ERROR AT CUSTOMER                   # OF                   0

      6.- ON TIME DELIVERED                             %                        98

      7.- MANUFACTURING COST                        USD                    20% LESS

      8.- LABOR PRODUCTIVITY                        K.UNITS /# OF D/L       2X




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                             27
Courtesy, in part, of Motorola SPS.
                                                                                Thank You!




                         AUTONOMOUS MAINTENANCE.




                                  MANUFACTURING SPECIALIST




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                        TPM Awareness Information                                   28
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




                       AUTONOMOUS MAINTENANCE IS:
          Maintenance performed by equipment operators.

                              THE FIRST 3 STEPS OF
                           AUTONOMOUS MAINTENANCE.

                   STEP # 1 INITIAL CLEANING.


                   STEP # 2 COUNTERMEASURES FOR THE CAUSES
                   OF FORCED DETERIORATION AND IMPROVING
                   HARD-TO-ACCESS AREAS.


                 STEP # 3 MAKING A TENTATIVE CLEANING/
                 LUBRICATION STANDARD.

Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   29
Courtesy, in part, of Motorola SPS.
                                                                                                            Thank You!
                                                    AUTONOMOUS
                                                    MAINTENANCE

                                                                     5

                                                         Formats:
                                                       Daily Cleaning &                6
                                        4              Initial Inspection
                                                       Hot Spots, CAP-DO
                                                       5W´s               Develop One
                                          Major Problems                  Point lesson
                                          Selection


                                                                 Step # 1           Standardization     7
                                                                                    Cleaning /
                                  3   Put F Tags             Initial Cleaning       Lubrication




                                                                               Training in
                                              Initial Cleaning               One Point Lesson
                                                (Inspection)
                                                                                                8
                                          2                      Photos Before
                                                                  Photos After


                                                                         1


Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                                TPM Awareness Information                                                       30
Courtesy, in part, of Motorola SPS.
                                                                                                                 Thank You!
                                             AUTONOMOUS
                                             MAINTENANCE

                                                                  5

                                                       Failures Analysis
                                  4                    Why´s Analysis
                                                                                               6
                                        Put “F” Tags                       Actions in
                                                                           Sources of
                                                                           Contamination &
                                                                           Hard access areas


                                                         Step # 2
                             Find & List                 Sources of             Modify Covers For
                      3      Areas of Hard                                      Easy Visualization   7
                             Access                    Contamination &             & Quick
                                                       Hard Access Areas         Disassemble




                                      Find & List
                                      Sources of
                                      Contamination                        Remove “F” Tags

                                  2                   Initial Inspection
                                                      Final Inspection                         8
                                                            (Audit)


                                                              1



Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                              TPM Awareness Information                                                              31
Courtesy, in part, of Motorola SPS.
                                                                                                                 Thank You!
                                            AUTONOMOUS
                                            MAINTENANCE

                                                               5


                                       4               Improve time of
                                                          execution                          6
                                           Verify                           Detail
                                           actual time                     activities
                                           Vs estimated



                              3
                                  Put “F” Tags        Step # 3
                                  (Establish time                                Remove
                                  & frequency)
                                      3                Tentative                 “F” Tags
                                                                                                 7
                                                       Standards


                                    Cleaning / Lubrication         Apply activities to
                                       implementation               similar machines
                                   2
                                                    Develop tentative
                                             2         standards                         8


                                                          1



Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                             TPM Awareness Information                                                               32
Courtesy, in part, of Motorola SPS.
                                                                                 Thank You!




                                  TPM Teams Status
                                                                October 1997


             •Number of Hot Spots detected:                                    284
             •Number of Hot Spots solved:                                      126
             •One Point Lesson developed:                                     44
             •One Point Lesson Taught:                                        34
             •Number of teams on TPM:                                         27
             •Teams on step 3:                                                  1
             •Teams on step 2:                                                  2
             •Teams on step 1:                                                24
Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                    TPM Awareness Information                                        33
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




   PLANT
  OVERVIEW



        TPM
                                  Expansion Plan
  Self Assessment



     Asia
 Benchmarking


     TPM
Implementation




Expansion Plan




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   34
Courtesy, in part, of Motorola SPS.
                                                                                     Thank You!

                                        T.P.M. DEPLOYMENT



L
I
N
E

F
L
O
W



                                                                    1
                                  CURRENT EQUIPMENT IN T.P.M.
                                                                    9
                                                                    9
                                  SAME KIND OF EQUIPMENT                1997
                                                                    8
                                  1999/2000 EXPANSION
Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                        TPM Awareness Information                                        35
Courtesy, in part, of Motorola SPS.
                                                                                    Thank You!




                  PROJECTED PROGRESS IN TEAMS                         Q-1’ 98


           Line                   A.M. STEP # 1 A.M. STEP # 2 A.M. STEP # 3

    Wafer Process
     Line 1                               11                     16                    03


        Line 2                          03                      11                   01


         Line 3                          03                     08                    01


         Line 4                          04                     01                    01


Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                    TPM Awareness Information                                           36
Courtesy, in part, of Motorola SPS.
                                                                                                Thank You!



                                     T.P.M. FOLLOW-UP


                         TEAMS        TEAMS      TEAMS              Consultant X MANAGERS
                      PRESENTATION    AUDITS     MEETING            VISITS      PRESENTATION




                         6 TEAMS     6 TEAMS                                     MONTHLY
                                                  WEEKLY            TWO DAY
                           PER         PER                           EVERY        MEETING
                          MONTH       MONTH                           TWO
                                                                    MONTHS




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                        TPM Awareness Information                                                   37
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




   PLANT




                                         Pilot Team
  OVERVIEW



        TPM
  Self Assessment



     Asia
 Benchmarking
                                         Case Study
     TPM
Implementation




Expansion Plan



Pilot Team
Case Study




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   38
Courtesy, in part, of Motorola SPS.
                                                                                      Thank You!



                                  PILOT MACHINE




                                                                N-62361




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                    TPM Awareness Information                                             39
Courtesy, in part, of Motorola SPS.
                                                                                                                                 Thank You!




                                                          Defectives
  30
                       25
  25         23                                           23
                            22
                                           21
                  20                  20
  20                             18
                                                17
                                                     19


  15
  10                                                                     8
                                                                                     9
                                                                                                                         8
                                                                     7                                                                   7
                                                                             6           6                           6       6               6
                                                                 5               5                                               5
     5                                                                                       3
                                                                                                 4
                                                                                                     3   3
                                                                                                             2
                                                                                                                 4                   4


     0
                             N-662361                                    N-61162                         N-634766
                       JAN 96                    FEB                     MAR                 APR             MAY
                       JUN                       JUL                     AUG                 SEP             OCT 96


Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                                               TPM Awareness Information                                                             40
Courtesy, in part, of Motorola SPS.




                         % T. C.
                                                                                                                                                                                 Thank You!
                                                                                            DOWN TIME




                                                                                MAR
                                        ENE./96




                                                                                                                  MAY




                                                                                                                                            JUL




                                                                                                                                                                                OCT./96
                                                                                                 ABR
                                                               FEB




                                                                                                                               JUN




                                                                                                                                                                    SEP
                                                                                                                                                        AGO
                               25%
                                                                                                                                     23%                                  23%
                               20%                                                    20%                                                         20%
                                                                     18%                                                                                      18%                         18%
                                                  17%
                               15%                                                                                      15%



N-662361
                                                                                                       12%
                               10%

                                   5%

                                   0%




                         % T. C.




                                                                                                 ABR
                                                               FEB




                                                                                                                               JUN




                                                                                                                                                                    SEP
                                        ENE./96




                                                                                MAR




                                                                                                                                                        AGO
                                                                                                                  MAY




                                                                                                                                            JUL




                                                                                                                                                                                OCT./96
                               25%

                               20%

                               15%

N-663242                       10%
                                                  12%
                                                                     11%
                                                                                      10%
                                                                                                       11%
                                                                                                                        8%
                                                                                                                                     9%
                                                                                                                                                  7%
                                                                                                                                                                          8%
                                                                                                                                                                                          10%

                                                                                                                                                              6%
                                   5%

                                   0%
                         % T. C.




                                                                     FEB




                                                                                                                                 JUN
                                                                                      MAR




                                                                                                                                                        AGO




                                                                                                                                                                                OCT./96
                                                                                                                    MAY
                                                  ENE./96




                                                                                                                                             JUL
                                                                                                       ABR




                                                                                                                                                                    SEP
                               25,00%

                               20,00%

                               15,00%


 N-649666
                               10,00%                                                                                     9%
                                                            7,50%          8%                                                                                                             8%
                                                                                                             7%
                                                                                                                                                                          6%
                                   5,00%                                                    4%
                                                                                                                                       5%                     5%
                                                                                                                                                   3%
                                   0,00%




 Cayman Systems USA 513 777-3394
     ©1998 Revision A 980810
                                                                                TPM Awareness Information                                                                                            41
Courtesy, in part, of Motorola SPS.
                                                                                     Thank You!




CLEANING IS INSPECTION....




                                                                                              5’S

                                                               AUTONOMOUS
                                                               MAINTENANCE




 Cayman Systems USA 513 777-3394
     ©1998 Revision A 980810
                                   TPM Awareness Information                                             42
Courtesy, in part, of Motorola SPS.
                                                                              Thank You!




                      INSPECTION IS DETECTION.




                                            CRASH




                                  Broken Part




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                      TPM Awareness Information                                   43
Courtesy, in part, of Motorola SPS.
                                                                                               Thank You!

                                                            PRESSURE
                                  CORRECT




                                                                   INCORRECT


                                                                         TO MUCH
                                                                         TO MUCH
                                                                        PRESSURE
                                                                        PRESSURE




                                                                    CORRECT
                                                                                    ALIGNMENT

                                                                                                      INCORRECT




                                                                    GAUGE                                  NO



Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                            TPM Awareness Information                                              44
Courtesy, in part, of Motorola SPS.
                                                                                      Thank You!


                                    CORRECT
                                                      CENTERING
                                                              INCORRECT




                    Dummy Part




                                               CORRECT



   SYMMETRY                                                                  INCORRECT




                                                                                 BENT
                                                                                 BENT




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                               45
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!



                                  CONTACT


                                                                          INCORRECT
                                  CORRECT




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   46
Courtesy, in part, of Motorola SPS.
                                                                             Thank You!


                                  TO STANDARDIZE AND
                                  PREVENT RECURRENCE


                                                  One Point Lesson




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                     TPM Awareness Information                                   47
Courtesy, in part, of Motorola SPS.
                                                                           Thank You!




                                    MACHINE
                                  PERFORMANCE




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                   TPM Awareness Information                                   48
Courtesy, in part, of Motorola SPS.
                                                                                                                                                                                 Thank You!

                                                                                                          Defectives
         25                   23


         20                                      18


         15                                                                                                                                               “ZERO”
                                                                                                                                                           Defectives
                                                                   10




                                                                                                                       Abr

                                                                                                                                  May




                                                                                                                                                                     Ago
                                                                                                                                                         Jul
                                                 Oct-96




                                                                                                    Feb

                                                                                                             Mar




                                                                                                                                              Jun
                                                                                     Jan-97
                              Sep-96



                                                                   Dec-96




                                                                                                                                                                              Sep
         10
                                                                                     6

                5                                                                                   3
                                                                                                                       2
                                                                                                             1
                                                                                                                                  0           0          0           0        0
                0



                                                                                                                                              P.C. BOARD
                                                                   DOWN TIME
       % D.T.




                                                                                                                                              DAMAGED
       25%
                                       Nov-96




                                                                                                                      Apr




                                                                                                                                                                                  Sep
                                                                                                                                  May




                                                                                                                                                                       Aug
                                                                                                                                                          Jul
                                                                            Jan-97
                                                          Dec-96




                                                                                              Feb


                                                                                                           Mar




                                                                                                                                              Jun
                    Oct-96




       20%                                                                                                                  20%
                             18%
       15%                                      15%
                                                                                                                                        12%
       10%
                                                                   9%
                                                                                     8%
                                                                                                    7%
                                                                                                                                                    6%
           5%                                                                                                    5%
                                                                                                                                                                4%
                                                                                                                                                                             3%         3%
           0%




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                                                                              TPM Awareness Information                                                                              49
Courtesy, in part, of Motorola SPS.
                                                                                              Thank You!




WHAT IS NEXT?

                                                                     6 Big
                                                                     Losses
                                  LINK

                                                                              4
                                                                                  4



                                              Autonomous                               Planned
                                              Maintenance                     3       Maintenance




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                         TPM Awareness Information                                                50
Courtesy, in part, of Motorola SPS.
                                                                          Thank You!




Cayman Systems USA 513 777-3394
    ©1998 Revision A 980810
                                  TPM Awareness Information                                   51

Más contenido relacionado

Destacado

PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...DevGAMM Conference
 

Destacado (20)

Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 

Tpm

  • 1. Courtesy, in part, of Motorola SPS. Thank You! Welcome To Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 1
  • 2. Courtesy, in part, of Motorola SPS. Thank You! About T.P.M. After World War ll. Japanese industries determined that to complete successfully in the world market they had to improve the quality of their products. to do so, they imported management and manufacturing techniques from United States and adapted them to their circumstances. Subsequently, their products became known throughout the world for their superior quality, focusing world attention on Japanese- style management techniques. TPM DEVELOPMENT PROGRAM Implementing Total Productive Maintenance Seiichi Nakajima. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 2
  • 3. Courtesy, in part, of Motorola SPS. Thank You! WHAT IS T.P.M. ?? Definition of T.P.M : T.P.M. IS: A PRODUCTIVE MANUFACTURING SYSTEM with the TOTAL Participation of: Managers, Supervisors, Engineers, Technicians and Operators. T.P.M. Includes the Following Benefits: • Maximize Overall Equipment Effectiveness • Establishment a Complete System of Maintenance for the Machine Entire Life • Create a Better Work Environment, Promoting the Participation for All Employees Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 3
  • 4. Courtesy, in part, of Motorola SPS. Thank You! T.P.M. = Medical Science of Equipment PRODUCTION Foton AUTOMATION B-820 VIDEO-AUTO DIE-BONDER MODEL 8030A POWER HEATER Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 4
  • 5. Courtesy, in part, of Motorola SPS. Thank You! The Main objective of TPM is : Zero Interruptions Zero Defects Zero Accidents Throughout total employees participation from Top Management to Operators, based in the following activities: Autonomous Maintenance • Planned Maintenance • Individual Improvement • Quality Maintenance • Early Equipment Management • Education/Training (People Development) • Safety Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 5
  • 6. Courtesy, in part, of Motorola SPS. Thank You! PILLARS OF TPM I P A M M M S E I M E M U A A A T A A N P O A T I I P I R F R Q D R P N O N N L N A E L U I O L A N T T A T I T Y A V V E G O E E E N Y L N I D E E E M N I N N N D I E M M Q O A T A E A U N V E E E U U N Y N D N A G E N N H I S C C C L L T T S P E E E O P 5S´s Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 6
  • 7. Courtesy, in part, of Motorola SPS. Thank You! T.P.M. Total Productive Manufacturing People , Equipment and Product Improvement by Working Together. EXCELLENCE Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 7
  • 8. Courtesy, in part, of Motorola SPS. Thank You! PLANT OVERVIEW PLANT OVERVIEW Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 8
  • 9. Courtesy, in part, of Motorola SPS. Thank You! TPM Self Assessment PLANT OVERVIEW TPM Self Assessment Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 9
  • 10. Courtesy, in part, of Motorola SPS. Thank You! TPM Self Assessment Background: ∆1991 First attempt to implement TPM. ∆ TPM consultant provides training to selected Managers, Supervisors and Engineers. ∆ One coordinator with experience in Process and Maintenance is assigned to lead TPM. ∆ Literature and materials, prepared and distributed. ð Lack of support and involvement results on failing the implementation. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 10
  • 11. Courtesy, in part, of Motorola SPS. Thank You! TPM Self Assessment 1996 ∆ One Staff Mgr. is assigned to lead the TPM Implementation plant wide. ∆ A core team is formed on 2Q/96 with key people from different departments to coordinate the implementation. ∆ Model equipment is selected based on bottle neck operation. ∆ Equipment conditions analysis performed. ∆ Most of the teams cover the initial cleaning. ∆ Activities are focused on six big losses detected and 5 S´s implementation. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 11
  • 12. Courtesy, in part, of Motorola SPS. Thank You! Asia Benchmarking PLANT OVERVIEW TPM Self Assessment Asia Benchmarking Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 12
  • 13. Courtesy, in part, of Motorola SPS. Thank You! TPM Benchmarking Asia Facilities 1996 Facility 1 April Facility 2 May Facility 3 June Committee: 4 Chosen Folks Objective: Learn from Asia success experiences in TPM implementation and come up with directions for Plant implementation. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 13
  • 14. Courtesy, in part, of Motorola SPS. Thank You! Benchmarking Conclusions Ø Total management involvement. Ø T.P.M. Manager (dedicated). Ø A well defined implementation process. Ø Provide people with time to work on it. ( 4- 6 Hr./wk ). Ø Each staff has their own T.P.M. Promoter full time. Ø Focused in Consultant X model. Ø Focused in just one product line per area. Ø Budget assigned for consulting and external training. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 14
  • 15. Courtesy, in part, of Motorola SPS. Thank You! TPM PLANT OVERVIEW Implementation TPM Self Assessment Asia Benchmarking TPM Implementation Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 15
  • 16. Courtesy, in part, of Motorola SPS. Thank You! IMPLEMENTATION/CONSULTANT * Q3 1996, Consultant X is selected to be Consultant. * Training of Managers, Team leaders and Team members * Master Plan Defined * TPM. implementation initiated according to Consultant X recommendations Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 16
  • 17. Courtesy, in part, of Motorola SPS. Thank You! T.P.M. POLICY # ESTABLISH AN INTEGRATED STRUCTURE TO PROMOTE T.P.M. AS A COMPANY CULTURE. # MAXIMIZE OVERALL EQUIPMENT EFFECTIVENESS # TOTAL EMPLOYEE INVOLVEMENT. # CULTIVATE EQUIPMENT & PROCESS RELATED EXPERTISE THROUGHOUT SHOP FLOOR. ( Autonomous Maintenance, Planned Maintenance etc..) # ESTABLISH A RELIABILITY AND MAINTAINABILITY SYSTEM TO MAXIMIZE EQUIPMENT LIFE TIME. (Planned Maintenance Autonomous Maintenance, Individual Improvement, Early Equipment Management.) # ALL EMPLOYEES MUST PARTICIPATE IN T.P.M TRAINING PROGRAM. # ALL AREAS MUST FOLLOW T.P.M. ESTABLISHED GUIDE LINES. # DEPARTMENT HEAD IS RESPONSIBLE TO ACCOMPLISH AND SUPPORT T.P.M. GOALS. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 17
  • 18. Courtesy, in part, of Motorola SPS. Thank You! T.P.M. PLANT WIDE STRUCTURE TPM T.P.M. Office Responsible Plant Manager Autonomous Planned Individual 5 ´s Maintenance Maintenance Improvement Quality Early Training Maintenance Equipment Safety People Management Development Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 18
  • 19. Courtesy, in part, of Motorola SPS. Thank You! PROMOTION STRUCTURE (OVERLAPPING SMALL GROUPS) PLANT MANAGER STAFF MANAGERS OPERATIONS TPM PILLARS & PROMOTION DEPARTMENT OFFICE MANAGERS TPM DEPARTMENT PROMOTERS SUPERVISORS TPM TEAM Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 19
  • 20. Courtesy, in part, of Motorola SPS. Thank You! VISION STATEMENT: TPM PLANT WIDE IMPLEMENTATION Q1 2000 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 20
  • 21. Courtesy, in part, of Motorola SPS. Thank You! T.P.M. IMPLEMENTATION ACTIVITIES MANAGER TEAMS Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 21
  • 22. Courtesy, in part, of Motorola SPS. Thank You! PREPARATION / PLANNING STAGE # DEFINE PILOT LINES # AMOUNT OF MACHINES INCLUDED PER LINE # DEFINE CORE TEAM MEMBERS OF EACH LINE # SELECT TEAM MEMBERS PER MACHINE # START ACTIVITIES IN PILOT MACHINES (bottle neck.) Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 22
  • 23. Courtesy, in part, of Motorola SPS. Thank You! Line and Machine Selection B-820 B-820 Machine 1 Machine 2 N-661 POWER HEATER Machine 3 Machine 4 B-609 B-609 V-701 V-701 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 23
  • 24. TPM Implementation Plan 1996 1997 1998 1999 2000 ACTIVITIES Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 DEFINE STRATEGIES PREPARATION MASTER PLAN ORGANIZATION STAGE T INTRODUCTION TRAINING 1 P 2 PUBLICITY 3 M I S MODEL MACHINES T Machine 1 AUTONOMOUS MAINTENANCE M K A Machine 2 & P I R Machine 3 REDUCE 6 BIG LOSSES L C EXTEND SIMILAR MACHINES E T Machine 4 K M EXTEND 30% E IMPLEMENTATION O to N SIMILAR F 50% T T PRODUCTION LINES A F A T R COMPLETE I G IMPLEMENTATION 100% O E DEFINED AREAS N T
  • 25. TPM 90 Days Explosion Plan October November December ww40 ww41 ww42 ww43 ww44 ww45 ww46 ww47 ww48 ww49 ww50 ww51 ww52 Machine 1 PILOT TEAM Step 3 Start Planned maintenance Start 6 big losses Start Individual Improvement Start 10 Extension teams step 1-2 4 mc 3 mc 3 mc 19 Extension teams Start step 1 7 mc 6 mc 6 mc Machine 2 PILOT TEAM Step 2-3 Start Planned maintenance Start 6 big losses Step 1 Step 2 Individual Improvement Step 1 11 Extension teams step 1-2 B-613 3 mc 2 mc 2 mc B-601 L-604 Machine 3 PILOT TEAM Step 2-3 Start Planned maintenance Start 6 big losses Start Individual Improvement Start 6 Extension teams step 1-2 2 mc 4 mc 2 Extension teams Start step 1 Start Machine 4 PILOT TEAM Step 1-2 Start Planned maintenance Start 6 big losses Start Individual Improvement Start 4 extension teams Start step 1 a-820 a-821 J-701 J-601 PILLARS IMPLEMENTATION MODEL GANTT TPM Activity Board Extension Teams Server Data collection M1 M2 M3 M4 GM Audit Team presentations TPM Office Audit Consultant visit TPM Meeting Local BOOT CAMP TPM MCOE MEETING, JAPAN Pillars meeting
  • 26. Courtesy, in part, of Motorola SPS. Thank You! T.P.M. TRANSITION CURVE POLICIES DEVELOPMENT T.P.M. PROMOTION DELEGATION T.P.M. PROMOTION OFFICE START INCLUDE T.P.M. IN PERFORMANCE C MANAGEMENT MACHINES MANAGEMENT PLAN. O FOCUS IN FEW EQUIPMENT INCLUDE T.P.M. IN JOB M FOCUS TRAINING DESCRIPTION. M D I SUCCESS STORIES ACCELERATED E T N 5 S´s DEPLOYMENT. M I E A N L CONSULTANT CONSULTANT T IN OUT KICK OFF R E E X S P GOALS SETTING FOR I L ALL ORGANIZATION. S O T R LOOK FOR ADDITIONAL WAYS DEVELOP DATA COLLECTION SYSTEM A A T TO DEPLOY T.P.M. N ATTENTION TO FOCUS TEAMS C I FINISH CONFLICT WITH THE CULTURE TRAINING DEPLOYMENT E O ORGANIZATION ALIGNMENT IMPLEMENTATION PLAN N REWARD SYSTEM RESOURCE IMPLEMENTATION CONTROL CHAOS Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 26
  • 27. Courtesy, in part, of Motorola SPS. Thank You! KEY GOALS 1.- TOTAL EQUIPMENT EFFECTIVENESS % 85 A) Equipment Breakdown HOURS/MONTH 1/10 B) M.T.B.A. MINUTES 1x10x C) M.T.B.F. HOURS 1x2x 2.- REJECT CAUSED BY LINE EQUIPMENT PPM 1/5 3.- LINE REJECT RATE % 1/5 4.- CYCLE TIME DAYS 0.8X 5.- FATAL ERROR AT CUSTOMER # OF 0 6.- ON TIME DELIVERED % 98 7.- MANUFACTURING COST USD 20% LESS 8.- LABOR PRODUCTIVITY K.UNITS /# OF D/L 2X Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 27
  • 28. Courtesy, in part, of Motorola SPS. Thank You! AUTONOMOUS MAINTENANCE. MANUFACTURING SPECIALIST Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 28
  • 29. Courtesy, in part, of Motorola SPS. Thank You! AUTONOMOUS MAINTENANCE IS: Maintenance performed by equipment operators. THE FIRST 3 STEPS OF AUTONOMOUS MAINTENANCE. STEP # 1 INITIAL CLEANING. STEP # 2 COUNTERMEASURES FOR THE CAUSES OF FORCED DETERIORATION AND IMPROVING HARD-TO-ACCESS AREAS. STEP # 3 MAKING A TENTATIVE CLEANING/ LUBRICATION STANDARD. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 29
  • 30. Courtesy, in part, of Motorola SPS. Thank You! AUTONOMOUS MAINTENANCE 5 Formats: Daily Cleaning & 6 4 Initial Inspection Hot Spots, CAP-DO 5W´s Develop One Major Problems Point lesson Selection Step # 1 Standardization 7 Cleaning / 3 Put F Tags Initial Cleaning Lubrication Training in Initial Cleaning One Point Lesson (Inspection) 8 2 Photos Before Photos After 1 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 30
  • 31. Courtesy, in part, of Motorola SPS. Thank You! AUTONOMOUS MAINTENANCE 5 Failures Analysis 4 Why´s Analysis 6 Put “F” Tags Actions in Sources of Contamination & Hard access areas Step # 2 Find & List Sources of Modify Covers For 3 Areas of Hard Easy Visualization 7 Access Contamination & & Quick Hard Access Areas Disassemble Find & List Sources of Contamination Remove “F” Tags 2 Initial Inspection Final Inspection 8 (Audit) 1 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 31
  • 32. Courtesy, in part, of Motorola SPS. Thank You! AUTONOMOUS MAINTENANCE 5 4 Improve time of execution 6 Verify Detail actual time activities Vs estimated 3 Put “F” Tags Step # 3 (Establish time Remove & frequency) 3 Tentative “F” Tags 7 Standards Cleaning / Lubrication Apply activities to implementation similar machines 2 Develop tentative 2 standards 8 1 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 32
  • 33. Courtesy, in part, of Motorola SPS. Thank You! TPM Teams Status October 1997 •Number of Hot Spots detected: 284 •Number of Hot Spots solved: 126 •One Point Lesson developed: 44 •One Point Lesson Taught: 34 •Number of teams on TPM: 27 •Teams on step 3: 1 •Teams on step 2: 2 •Teams on step 1: 24 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 33
  • 34. Courtesy, in part, of Motorola SPS. Thank You! PLANT OVERVIEW TPM Expansion Plan Self Assessment Asia Benchmarking TPM Implementation Expansion Plan Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 34
  • 35. Courtesy, in part, of Motorola SPS. Thank You! T.P.M. DEPLOYMENT L I N E F L O W 1 CURRENT EQUIPMENT IN T.P.M. 9 9 SAME KIND OF EQUIPMENT 1997 8 1999/2000 EXPANSION Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 35
  • 36. Courtesy, in part, of Motorola SPS. Thank You! PROJECTED PROGRESS IN TEAMS Q-1’ 98 Line A.M. STEP # 1 A.M. STEP # 2 A.M. STEP # 3 Wafer Process Line 1 11 16 03 Line 2 03 11 01 Line 3 03 08 01 Line 4 04 01 01 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 36
  • 37. Courtesy, in part, of Motorola SPS. Thank You! T.P.M. FOLLOW-UP TEAMS TEAMS TEAMS Consultant X MANAGERS PRESENTATION AUDITS MEETING VISITS PRESENTATION 6 TEAMS 6 TEAMS MONTHLY WEEKLY TWO DAY PER PER EVERY MEETING MONTH MONTH TWO MONTHS Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 37
  • 38. Courtesy, in part, of Motorola SPS. Thank You! PLANT Pilot Team OVERVIEW TPM Self Assessment Asia Benchmarking Case Study TPM Implementation Expansion Plan Pilot Team Case Study Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 38
  • 39. Courtesy, in part, of Motorola SPS. Thank You! PILOT MACHINE N-62361 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 39
  • 40. Courtesy, in part, of Motorola SPS. Thank You! Defectives 30 25 25 23 23 22 21 20 20 20 18 17 19 15 10 8 9 8 7 7 6 6 6 6 6 5 5 5 5 3 4 3 3 2 4 4 0 N-662361 N-61162 N-634766 JAN 96 FEB MAR APR MAY JUN JUL AUG SEP OCT 96 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 40
  • 41. Courtesy, in part, of Motorola SPS. % T. C. Thank You! DOWN TIME MAR ENE./96 MAY JUL OCT./96 ABR FEB JUN SEP AGO 25% 23% 23% 20% 20% 20% 18% 18% 18% 17% 15% 15% N-662361 12% 10% 5% 0% % T. C. ABR FEB JUN SEP ENE./96 MAR AGO MAY JUL OCT./96 25% 20% 15% N-663242 10% 12% 11% 10% 11% 8% 9% 7% 8% 10% 6% 5% 0% % T. C. FEB JUN MAR AGO OCT./96 MAY ENE./96 JUL ABR SEP 25,00% 20,00% 15,00% N-649666 10,00% 9% 7,50% 8% 8% 7% 6% 5,00% 4% 5% 5% 3% 0,00% Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 41
  • 42. Courtesy, in part, of Motorola SPS. Thank You! CLEANING IS INSPECTION.... 5’S AUTONOMOUS MAINTENANCE Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 42
  • 43. Courtesy, in part, of Motorola SPS. Thank You! INSPECTION IS DETECTION. CRASH Broken Part Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 43
  • 44. Courtesy, in part, of Motorola SPS. Thank You! PRESSURE CORRECT INCORRECT TO MUCH TO MUCH PRESSURE PRESSURE CORRECT ALIGNMENT INCORRECT GAUGE NO Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 44
  • 45. Courtesy, in part, of Motorola SPS. Thank You! CORRECT CENTERING INCORRECT Dummy Part CORRECT SYMMETRY INCORRECT BENT BENT Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 45
  • 46. Courtesy, in part, of Motorola SPS. Thank You! CONTACT INCORRECT CORRECT Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 46
  • 47. Courtesy, in part, of Motorola SPS. Thank You! TO STANDARDIZE AND PREVENT RECURRENCE One Point Lesson Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 47
  • 48. Courtesy, in part, of Motorola SPS. Thank You! MACHINE PERFORMANCE Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 48
  • 49. Courtesy, in part, of Motorola SPS. Thank You! Defectives 25 23 20 18 15 “ZERO” Defectives 10 Abr May Ago Jul Oct-96 Feb Mar Jun Jan-97 Sep-96 Dec-96 Sep 10 6 5 3 2 1 0 0 0 0 0 0 P.C. BOARD DOWN TIME % D.T. DAMAGED 25% Nov-96 Apr Sep May Aug Jul Jan-97 Dec-96 Feb Mar Jun Oct-96 20% 20% 18% 15% 15% 12% 10% 9% 8% 7% 6% 5% 5% 4% 3% 3% 0% Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 49
  • 50. Courtesy, in part, of Motorola SPS. Thank You! WHAT IS NEXT? 6 Big Losses LINK 4 4 Autonomous Planned Maintenance 3 Maintenance Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 50
  • 51. Courtesy, in part, of Motorola SPS. Thank You! Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information 51