ORGINAL / COPY

    KERALA STATE ELECTRICITY BOARD




AUTOMATION OF SEISMOLOGICAL OBSERVATORIES OF KSEB TO
DIGITAL MODE WITH CENTRAL RECORDING STATIONS AND
ACCELEROGRAPHS




         TENDER NO: CE(C-DS) / 03 / 2012-13

                    VOLUME III

TECHNICAL SPECIFICATIONS FOR INSTRUMENTS
AND SCHEDULE OF PRICES




                           CHIEF ENGINEER (CIVIL- DAM SAFETY)


                                                            1
KERALA STATE ELECTRICITY BOARD




                                        CERTIFICATE
               Certified that this document of Technical Specifications for instruments and
        Schedule of prices Volume III for the Automation of Seismological observatories of KSE
        Board to digital mode with Central Recording Stations and Accelerograph consists of two
        parts



    Part I        - Technical Specifications for instruments           (PAGES 01-16)


    Part II       - Schedule of prices                             (PAGES 17 - 20)




                                           CHIEF ENGINEER (CIVIL- DAM SAFETY)


Office of the Chief Engineer (Civil-Dam Safety)
Kerala State Electricity Board
Vydyuthi Bhavanam, Pattom
Thiruvananthapuram, Kerala-695004, India
Phone / Fax 91471-2448972
Email: ceipds@ksebnet.com




                                                                                             2
PART - 1




TECHNICAL SPECIFICATION FOR INSTRUMENTS



          Section 1 – Specific Requirements - General
     Section 2 - Technical Specification of Instruments




                                                      3
Contents

Section 1

Specific Requirements

1.1     Introduction
1.2     General
1.3     Scope of Supply

1.4     Manuals and Drawing

1.5     Performance Guarantee

1.6     Training

1.7     Licence

Section – 2

TECHNICAL SPECIFICATION OF INSTRUMENTS

2.1     Electronic Equipments in Seismological Observatories

2.2.1   Broad Band Seismic Sensors
2.2.2   Data Acquisition System (DAS) and Other accessories
2.2.3   Accelerographs
2.2.4   VSAT Telemetry

2.2.5   Software at each field station

2.2.6 Central Recording Station (CRS) with auto–location facility

PART – II

SCHEDULE OF PRICES

Instructions for Completing the Schedule of Prices

Schedule of items




                                                                    4
Section 1
Specific Requirements

1.1    Introduction
      This section covers Board’s specific technical conditions and requirements for the
      Automation of seismological observatories of KSEB to digital mode with central recording
      stations (CRS) and Accelerographs - Supply, installation, testing and Commissioning of
      Seismic instruments, after sales service like all maintenance during warranty period, UPS
      for all equipments and central recording stations of suitable capacity using solar panels
      and system compatible to work in electric supply from the Grid. The scope of this
      specification include responsibility for complete supply, installation of supplied equipments
      / items at site, all works to install the equipments / components supplied, site testing,
      commissioning, provision of necessary assistance for site testing, commissioning of
      equipments / components supplied, reliability and warranty confirmation of
      instrumentation and Automation system etc for the unit supplied including necessary
      training for officers of KSE Board for running & maintenance of the installations.

      It is not intended here to describe the arrangement or installation, or to specify each and
      every component required for the completeness of the unit or to select each material for
      safe and reliable operation of the proposed unit / equipment. In general the unit shall be
      complete in all respect with its equipment and accessories as required to make a
      complete, highly reliable and maintainable installation, confirming to highest standards of
      engineering design, safety and workmanship.

      Every component required for the completeness of the unit / equipment and suitable
      material required for safe and reliable operation of the proposed unit / equipment is
      deemed to be included.

      The layouts and arrangements are given, location may be as shown or any where in
      Kerala State as directed by the Departmental Officers and the Contractor has to install
      and commission the items accordingly.

      The Contractor shall strictly observe the Specific requirements detailed out in the
      following sections in conjunction with the general requirements given in Schedule A1 &
      A2 of this document.

1.2 General
      The capacities, ratings, sizes, quantities and materials specified in Schedule A1 & A2 and in
      this specification are to be considered as the minimum requirements to be provided. It is
      the responsibility of the Contractor / Manufacturer to determine the required capacities,
      rating, sizes and quantities and select the appropriate material based on the guidelines
      given in the following specifications. The telemetric system offered shall be
      compatible to be interlinked with seismological network / data centre with in
      India.
      If the evaluated requirements are higher than the minimum requirements specified in
      Part-I and the following specifications, then the required capacity / rating / size / quantities
                                                                                                    5
for the equipment shall be provided. If the evaluated requirements are less than the
      minimum requirements, then the minimum requirements shall be complied with.
      If any discrepancy is observed in capacities, ratings, sizes, quantities and materials specified
      in Technical specifications – Part I and in the following specifications, then the
      requirements given in this specification shall prevail. In case of any specific doubts or
      issues, clarifications shall be obtained from the Board before proceeding.
      The work of any Section is integral with the whole of the contract documents and is not
      intended to be interpreted outside the context or as part.

1.3    Scope of Supply
      The detailed scope of supply including the quantity required is given in Schedules A1 –
      Price Schedule for Supply & Services attached with the Contract documents.
      All fittings and accessories of the equipments which may not have been specifically
      mentioned in the specification but considered necessary for the completion of the items
      shall deemed to be covered by the specification and shall be indicated / furnished by the
      contractor without any extra charges.
1.4    Manuals and Drawing
      Operation and maintenance manual in detail shall be supplied in six copies immediately
      after commissioning of equipment. The drawing shall be maintenance oriented and
      supplied in convenient bunches and on best quality paper. Besides, all drawings shall be
      finally supplied on long life CD/ROM
1.5    Performance Guarantee
      The equipment supplied under this contract will be under performance guarantee valid
      for the period of 3 years from the date commissioning
1.6    Training
      The contractor shall arrange training for the system supervisors / Engineers of KSE Board
      to familiarise them with the equipments so as to ensure better running & maintenance of
      the system including data collection, interpretation and other requirements
1.7    Licence
      The licences of the software required for the operation should be in the name of Kerala
      State Electricity Board and the license fee if any, for the software shall be included in the
      quoted price.




                                                                                                    6
Section – 2

 TECHNICAL SPECIFICATION OF INSTRUMENTS
This section covers specific technical conditions and requirements for the various equipments
in connection with the Automation of seismological observatories of KSEB to digital mode with
central recording stations (CRS) and Accelerographs.


2.2     ELECTRONIC EQUIPMENTS IN SEISMOLOGICAL
        OBSERVATORIES

1.3.1 Broad band Seismic sensors

Topology
Symmetric / Orthogonal tri-axial seismometer with three components consisting of one vertical
and two horizontal having cross axis accuracy within 1°

Type
Broadband velocity transducer with electronic feedback so as to have a force balance transducer

Frequency response
Flat response (within ± 3dB) to ground velocity in the range 120 Sec to 50Hz.

Dynamic range
>135 dB

Output voltage
±20V or more

Damping
0.7 of critical

Velocity sensitivity
Differential output in the range of 1200 (2*600) V/m/sec to 2000 (2 * 1000)V/m/sec

Linearity
Less than ±1% of full scale

Mass cantering
Automatic or on external command locally or from remote

Calibration facility

                                                                                             7
Calibration facility through Data Acquisition System

Frequency response curve and system information

Frequency response curve of the unit along with information regarding transfer function
including poles and zeros should be provided.
Noise Response
Must be below the USGS Low Noise Model in the frequency range of at least 30 sec to 5 Hz.
Tested and certified reports of the self noise over the pass band should be provided.
Indicators
Should have an indicator for levelling the transducer and have an indicator
Mass position indicator
Facility to display and monitor the sensor internal mass position should be provided.
Humidity and operating
Up to 100% RH and 0° to 50 C°
Power requirement
< 2.0 Watts at 12 VDC
Housing
The tri-axial sensors should be mounted in a single water-proof and air-tight enclosure.
Mass locking and safety mechanism
A robust locking and safety mechanism during transportation should be provided
Connectors
All connectors should be water-proof and rust- proof
Cable
Low loss shielded cable of at least 20 meters with appropriate end connectors
Thermal insulation cover
Thermal insulation cover should be provided.
1.3.2 Data Acquisition System (DAS) and Other accessories

Number of channels
Three channels

ADC
Three independent 24-bit digitizers, one for each channel
Dynamic range
≥ 130 dB at 100 samples per second

                                                                                           8
Input range
Should match to the sensor output

Common mode rejection ratio
Better than 70 dB

Channel to Channel skew:
  a) Zero-Simultaneous sampling of all the channels
  b) Immune to electromagnetic interference
System noise
The overall system noise should not be more than 2-3 counts of 24-bits system on an RMS
basic in the frequency range corresponding to the pass band 120 sec to 50 Hz.
Sampling rate
User selectable in the range from 1 up to at least 500 SPS per channel in different data streams
(at least two or more). Simultaneous recording at different sampling rates in different streams
(two or more) both in continuous and trigger modes. Trigger parameters should be user
selectable.
Filter
Linear phase digital FIR filter
Internal RAM
16 MB or higher RAM
Storage capacity
Internal Hard disk / compact flash disc card of minimum capacity 8GB configured in “Ring-
Buffer” type recording of both continuous and triggered data.
 Recording format
Standard earthquake format compatible to Windows and UNIX with provision for using proven
compression techniques, User friendly data management utilities to be provided
Timing System

         a) GPS receiver based timing system with all its associated electronic circuits to be
            inside the DAS unit and antenna exposed to outside.
         b) Recording of GPS status information.
         c) Free running TCXO accuracy of 1 ppm over full operating temperature range.

GPS Antenna and cable
     a) Antenna cable length should be minimum 15 meters.
     b) Antenna should be enclosed in a water-tight enclosure and should work effectively
        in extreme climatic conditions.
     c) Lightening protection to provided.
     d) Rust-proof antenna mounting rod and its accessories.
                                                                                              9
Sensor Control features
     a) Sensor calibration facility
     b) Sensor mass position monitoring, locally or remotely.
     c) Sensor mass centering on command, locally or remotely.
Calibration
Facility for integrated system calibration to be provided and described
Recording mode
The DAS should have provision to support real-time data telemetry to a CRS through VSAT
telemetry network in addition to the local recording in hard disc / compact flash disc
Communication ports
    a) USB/Ethernet and/ or serial port connectivity to a local terminal for parameter
       setting and event data downloading.
    b) A separate port for dial-up modem connectivity to download the event data to CRS
Status Display
Status display for power, data acquisition, State of health (SOH), GPS status etc should be
available
Power requirements
 a) Supply voltage 10 -15 Volts DC
 b) Power consumption of DAS not exceeding 2W at 12V DC in normal active
    operational mode of data acquisition.
 c) Provision for charging the batteries both from solar cell and from a 230 V/50Hz AC mains
    source.
 d) Voltage from battery to sensor and DAS units should be through isolating DC/DC
    converters.
  e) DAS should resume data acquisition automatically when the power is restored after
    disruption.
 f) Power should be isolated from the signal ground
 g) The recorder should be configured so that the auxiliary external 12V DC power source
       may be easily connected in such a way as to add the capacity of the batteries.

Operating temperature and humidity range

Up to 100% RH and 0° to 50 C°

Environment

All the indoor units should work in typical tropical environment conditions and should work
without air conditioning.

Housing

GPS and DAS modules should be enclosed in weather and shock-proof sealed enclosures with
lighting protection.

                                                                                         10
VSAT telemetry connectivity

Ethernet port (10/100 Base-T) supporting TCP/IP or any other proven and tested protocol,
DAS firmware should support the following features:
       a) Full Duplex communication between field and Central Recording Station (CRS).
       b) Triggered or continuous data transmission
       c) Extensive error correction.
       d) Network state of health (SOH), communication performance statistics.

1.3.3 Accelerographs

      Type
      Internally mounted orthogonally oriented tri axial accelerometer with 24 bit 3channel
      recorder.
      Full scale
      ±2g
      Output voltage
      Matched to that of the Recorder
      Frequency band
      DC to 50 Hz
      Damping
      0.7 Critical
      Dynamic range
      Exceeding 112 dB
      Sample rate
      200 SPS or more per channel
      Memory
      1GB
      GPS Receiver for time synchronisation.
      Data acquisition mode in continuous, triggered with pre and post event recording
      facilities
      Software
      Data downloading software and Data Analysis Software, Shall include utility for
      converting the acceleration data in to velocity, displacement and power spectral density
      etc.

      VSAT Connectivity
      The four accelerographs to be installed at Idukki DAM and one accelerograph to be
      installed at Vallakkadavu should be compatible to be interlinked to the CRS through
      VSAT.

      DAM Details:

      The total height of the DAM is approximately 165meters. The first Accelerograph will
      be installed in the top of the Idukki DAM and from the first Accelerograph to the
      second accelerograph is 85 meters. From second Accelerograph to third accelerograph
      is 85 meters. From third accelerograph to fourth accelerograph is 80 meters.

1.3.4 VSAT Telemetry
                                                                                           11
The bidder should quote for VSAT telemetry system with the following details:

      1. The system should transmit continuous tri-axial broad band seismograph data on
         real time basis @ 100sps from 7 seismograph stations and five accelerograph data
         on triggered basis @100sps to a Central Recording Station (CRS) situated at
         Thiruvananthapuram / Vazhathope or any other place in Kerala. The necessary
         VSAT hardware should be quoted. The VSAT system should run of Battery power.
         ie IDU should be operated from Battery Power.

      2. The VSAT telemetric system should be configured for a minimum band width of
         100kbps in the extended C band. Additional band width requirement shall be quoted
         as an optional item.

      3. The bidder should quote the bandwidth charges for a period of 3 years.

      4. The system should be capable of simultaneously recording at 2 central recording
         stations on continuous basis

      5. The system should be able to accept data from 10 more remote stations in future
         expansion.

      6. The hardware / band width or any other charges for the second CRS should be
         quoted as an optional item.

2.2.5 Software at each field station

2.2.5.1 Data Processing and other Utility Software

      a) Appropriate communication software to download the event data and log, through
        communication port in local terminal.


      b) Appropriate utility software for faster downloading of large amounts of data from the
        ring-buffer disk of the DAS, through fast-communication port (of DAS) into the local
        terminal.


      c) Parameter setting and on – site control panel

      d) Provision to convert the data into Standard formats such as SEISAN, ASCII, SEED etc.

      e) Provision to display the trigger information on different streams, State of Health of
         the Sensor, GPS and DAS, mass centering etc.

      f) Software for basic and advanced analysis of the seismic data
                                                                                           12
g) Continuous waveform display of the recorded data.

          h) Facility to plot and display and desired segment of recorded data.

2.2.6 Central Recording Station (CRS) with auto–location facility

At CRS there should be two sets of Data Acquisition Computer, one as a Primary and the
other as a Secondary for redundancy. Each Data Acquisition computer should consist of

   (i)       Work station for acquiring Real time Data from all field stations with hardware
             2.4GHz processor, 2 GB RAM, DVD+/– RW, 250 GB Hard Disk and 20" wide
             screen

   (ii)      Licensed Software for auto-location of earthquake parameters detected by the
             network and displays the parameters and the location on the appropriate map.

   (iii)     The automatic located earthquake parameters should also be automatically
             transmitted to the designated persons via SMS, email etc.

   (iv)      It should also have a provision to manually re-locating the earthquake parameter and
             revise the SMS to the designated persons.

   (v)        Power back up facility

   (vi)      LCD 42" screen for online display of continuous VSAT telemetric data

   (vii)     There should be provision to export event waveform data of auto located of events
             in a separate data base such as SEISAN to be used for offline analysis and generation
             of bulletin.

   (viii) The Data Acquisition Computer/system of the CRS should be capable to transfer
          incoming data from all or selected field stations of KSEB network to another server
          (of any other seismological network / data centre) on real time basis located at
          different place through internet or leased line. The incoming real time data at
          different place should be easily integrated with auto location software such as
          SEISCOMP, Response Hydra and Antelope. The required software module at both
          places for such data transfer should be provided as an optional item by the
          vendor.




                                                                                               13
14
15
16
PART - II




SCHEDULE – A1 & A2




SCHEDULE OF PRICES




                     17
Instructions for Completing the Schedule of Prices

This Schedule comprises typical forms for completion and submission by the Bidder.
Schedule-A1 & A2 shall be used for quoting the price for the design, planning,
engineering, manufacture and supply of equipment including installation, testing and
commissioning. The bidders shall indicate the rates in INR /USD as applicable for each
items of work including all taxes, freight & cartage, duties, levies, conveyance charges,
clearance charges etc. complete. All statutory recoveries will be deducted from the
contractor's work bill at the prevailing rates.

1.1            Bidders shall quote for the entire package on a single source responsibility basis.
1.2           Rates shall be quoted in INR for components /items manufactured in India and
              in INR / USD as applicable for items to be imported.

1.3.          The bidders shall quote their prices in the same format given in the schedules A1
              and no other formats devised by the contractor will be accepted.

.Terms of Payment


       (i)       The payment will be effected only after the satisfactory completion of the
                 work including supply, installation, testing and commissioning and on
                 proper certification by the Engineer in charge.

       (ii)      5% of the contract price will be retained as the performance security for a
                 period of 3 years which will be informed in the letter of acceptance.

       (iii)     If the contractor desires for a part payment, the break up schedule of items
                 claimed in the part bill shall be produced showing the cost, taxes, freight and
                 cartage, duties and levies etc. complete. 50% of the cost of equipments /
                 materials shall be considered for such payment after effecting statutory
                 recoveries.

       (iv)      The base currency as regard to this tender is INR. But if the bidder desires to
                 quote for items which are imported and supplied for this work, the quote
                 shall be in INR/USD and the payment shall be made accordingly




                                                                                                18

Más contenido relacionado

La actualidad más candente

IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET -  	  Automated Monitoring Test Rig for Circuit Breaker OperationIRJET -  	  Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET - Automated Monitoring Test Rig for Circuit Breaker OperationIRJET Journal
 
Special Seismic Certification OSHPD
Special Seismic Certification OSHPDSpecial Seismic Certification OSHPD
Special Seismic Certification OSHPDmichaeljmack
 
Alan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationAlan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationNAES Corporation
 
IJSRED-V2I2P59
IJSRED-V2I2P59IJSRED-V2I2P59
IJSRED-V2I2P59IJSRED
 
Real-Time Monitoring and Assessment of Circuit Breaker Operations for Diagnos...
Real-Time Monitoring and Assessment of Circuit Breaker Operations for Diagnos...Real-Time Monitoring and Assessment of Circuit Breaker Operations for Diagnos...
Real-Time Monitoring and Assessment of Circuit Breaker Operations for Diagnos...Associate Professor in VSB Coimbatore
 
Safety System Modularity
Safety System ModularitySafety System Modularity
Safety System ModularityFasiul Alam
 
Fire alarm basics 1-5
Fire alarm basics 1-5Fire alarm basics 1-5
Fire alarm basics 1-5grantlerc
 
Rnp radio network planning drive test guide-20041217-b-1.0
Rnp radio network planning drive test guide-20041217-b-1.0Rnp radio network planning drive test guide-20041217-b-1.0
Rnp radio network planning drive test guide-20041217-b-1.0Razzaqe
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonNishkianDean
 
Implementation of Integrated Condition Based Maintenance
Implementation of Integrated Condition Based MaintenanceImplementation of Integrated Condition Based Maintenance
Implementation of Integrated Condition Based MaintenanceSarafian Salleh
 
Instrument Technician (1)
Instrument  Technician  (1)Instrument  Technician  (1)
Instrument Technician (1)Amit More
 
Ankur Sood-Instrument engineer
Ankur Sood-Instrument engineerAnkur Sood-Instrument engineer
Ankur Sood-Instrument engineerankur sood
 

La actualidad más candente (20)

IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET -  	  Automated Monitoring Test Rig for Circuit Breaker OperationIRJET -  	  Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
 
POWER SOLUTIONS
POWER SOLUTIONSPOWER SOLUTIONS
POWER SOLUTIONS
 
Special Seismic Certification OSHPD
Special Seismic Certification OSHPDSpecial Seismic Certification OSHPD
Special Seismic Certification OSHPD
 
Alan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationAlan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC Presentation
 
Cummins Power Generation OSHPD Flyer
Cummins Power Generation OSHPD FlyerCummins Power Generation OSHPD Flyer
Cummins Power Generation OSHPD Flyer
 
IJSRED-V2I2P59
IJSRED-V2I2P59IJSRED-V2I2P59
IJSRED-V2I2P59
 
EngineerResume
EngineerResumeEngineerResume
EngineerResume
 
Real-Time Monitoring and Assessment of Circuit Breaker Operations for Diagnos...
Real-Time Monitoring and Assessment of Circuit Breaker Operations for Diagnos...Real-Time Monitoring and Assessment of Circuit Breaker Operations for Diagnos...
Real-Time Monitoring and Assessment of Circuit Breaker Operations for Diagnos...
 
Safety System Modularity
Safety System ModularitySafety System Modularity
Safety System Modularity
 
Fire alarm basics 1-5
Fire alarm basics 1-5Fire alarm basics 1-5
Fire alarm basics 1-5
 
Pre commissioning
Pre commissioningPre commissioning
Pre commissioning
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
Rnp radio network planning drive test guide-20041217-b-1.0
Rnp radio network planning drive test guide-20041217-b-1.0Rnp radio network planning drive test guide-20041217-b-1.0
Rnp radio network planning drive test guide-20041217-b-1.0
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, Oregon
 
Implementation of Integrated Condition Based Maintenance
Implementation of Integrated Condition Based MaintenanceImplementation of Integrated Condition Based Maintenance
Implementation of Integrated Condition Based Maintenance
 
Matt Instr CV
Matt Instr CVMatt Instr CV
Matt Instr CV
 
Instrument Technician (1)
Instrument  Technician  (1)Instrument  Technician  (1)
Instrument Technician (1)
 
CS002
CS002CS002
CS002
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
Ankur Sood-Instrument engineer
Ankur Sood-Instrument engineerAnkur Sood-Instrument engineer
Ankur Sood-Instrument engineer
 

Destacado

Jaisal_cv_with_photo
Jaisal_cv_with_photoJaisal_cv_with_photo
Jaisal_cv_with_photoMuhsina Pp
 
RIKKU VARGHESE CV UPDATED
RIKKU VARGHESE CV UPDATEDRIKKU VARGHESE CV UPDATED
RIKKU VARGHESE CV UPDATEDRIkku Varghese
 
Devadas Pranassery _ KSEB, CE (CC) South _ Testimonial
Devadas Pranassery _ KSEB, CE (CC) South _ TestimonialDevadas Pranassery _ KSEB, CE (CC) South _ Testimonial
Devadas Pranassery _ KSEB, CE (CC) South _ TestimonialDevadas Pranassery
 
120702 crossbrouswer
120702 crossbrouswer120702 crossbrouswer
120702 crossbrousweritoyu_
 
Auditoria de sistemas
Auditoria de sistemasAuditoria de sistemas
Auditoria de sistemasNancy Barrera
 
Metabolic Disorders White Paper
Metabolic   Disorders White PaperMetabolic   Disorders White Paper
Metabolic Disorders White Paperybarshay
 
Auditoria de sistemas
Auditoria de sistemasAuditoria de sistemas
Auditoria de sistemasNancy Barrera
 
1. introduction to infinity
1. introduction to infinity1. introduction to infinity
1. introduction to infinityBiagio Tassone
 
Whitepaper cardiology-1
Whitepaper cardiology-1Whitepaper cardiology-1
Whitepaper cardiology-1ybarshay
 
KSEB Tariff calculation - Domestic
KSEB Tariff calculation - DomesticKSEB Tariff calculation - Domestic
KSEB Tariff calculation - DomesticVipin Wilfred
 
CM4106 Review of Lesson 4
CM4106 Review of Lesson 4CM4106 Review of Lesson 4
CM4106 Review of Lesson 4Yong Yao Tan
 
CM4106 Review of Lesson 3 (Part 1)
CM4106 Review of Lesson 3 (Part 1)CM4106 Review of Lesson 3 (Part 1)
CM4106 Review of Lesson 3 (Part 1)Yong Yao Tan
 
Report enhancing service-quality_and_organizational_eeffectiveness
Report enhancing service-quality_and_organizational_eeffectivenessReport enhancing service-quality_and_organizational_eeffectiveness
Report enhancing service-quality_and_organizational_eeffectivenessSalim Palayi
 
CM4106 Review of Lesson 1
CM4106 Review of Lesson 1CM4106 Review of Lesson 1
CM4106 Review of Lesson 1Yong Yao Tan
 
Jung and individuation
Jung and individuationJung and individuation
Jung and individuationBiagio Tassone
 

Destacado (18)

Jaisal_cv_with_photo
Jaisal_cv_with_photoJaisal_cv_with_photo
Jaisal_cv_with_photo
 
finallink
finallinkfinallink
finallink
 
RIKKU VARGHESE CV UPDATED
RIKKU VARGHESE CV UPDATEDRIKKU VARGHESE CV UPDATED
RIKKU VARGHESE CV UPDATED
 
Devadas Pranassery _ KSEB, CE (CC) South _ Testimonial
Devadas Pranassery _ KSEB, CE (CC) South _ TestimonialDevadas Pranassery _ KSEB, CE (CC) South _ Testimonial
Devadas Pranassery _ KSEB, CE (CC) South _ Testimonial
 
120702 crossbrouswer
120702 crossbrouswer120702 crossbrouswer
120702 crossbrouswer
 
Auditoria de sistemas
Auditoria de sistemasAuditoria de sistemas
Auditoria de sistemas
 
Metabolic Disorders White Paper
Metabolic   Disorders White PaperMetabolic   Disorders White Paper
Metabolic Disorders White Paper
 
Auditoria de sistemas
Auditoria de sistemasAuditoria de sistemas
Auditoria de sistemas
 
1. introduction to infinity
1. introduction to infinity1. introduction to infinity
1. introduction to infinity
 
Divas años 60
Divas años 60Divas años 60
Divas años 60
 
Whitepaper cardiology-1
Whitepaper cardiology-1Whitepaper cardiology-1
Whitepaper cardiology-1
 
KSEB Tariff calculation - Domestic
KSEB Tariff calculation - DomesticKSEB Tariff calculation - Domestic
KSEB Tariff calculation - Domestic
 
Ifb bds-scc
Ifb bds-sccIfb bds-scc
Ifb bds-scc
 
CM4106 Review of Lesson 4
CM4106 Review of Lesson 4CM4106 Review of Lesson 4
CM4106 Review of Lesson 4
 
CM4106 Review of Lesson 3 (Part 1)
CM4106 Review of Lesson 3 (Part 1)CM4106 Review of Lesson 3 (Part 1)
CM4106 Review of Lesson 3 (Part 1)
 
Report enhancing service-quality_and_organizational_eeffectiveness
Report enhancing service-quality_and_organizational_eeffectivenessReport enhancing service-quality_and_organizational_eeffectiveness
Report enhancing service-quality_and_organizational_eeffectiveness
 
CM4106 Review of Lesson 1
CM4106 Review of Lesson 1CM4106 Review of Lesson 1
CM4106 Review of Lesson 1
 
Jung and individuation
Jung and individuationJung and individuation
Jung and individuation
 

Similar a Volume iii revised

Tes p-122.01-r0 (2)
Tes p-122.01-r0 (2)Tes p-122.01-r0 (2)
Tes p-122.01-r0 (2)Ibrahim Ali
 
Download-manuals-ground water-manual-gw-volume4referencemanualgeo-hydrology
 Download-manuals-ground water-manual-gw-volume4referencemanualgeo-hydrology Download-manuals-ground water-manual-gw-volume4referencemanualgeo-hydrology
Download-manuals-ground water-manual-gw-volume4referencemanualgeo-hydrologyhydrologyproject001
 
Transformer monitoring and controlling with GSM based system
Transformer monitoring and controlling with GSM based systemTransformer monitoring and controlling with GSM based system
Transformer monitoring and controlling with GSM based systemIRJET Journal
 
URS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdfURS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdfDiegoMonge23
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601SARAVANAN A
 
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGSCRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGSArchili Kokhtashvili
 
{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en
{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en
{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_enLuis Antonio González Mederos
 
Mathematical Tools for the Analysis of Periodic and Aperiodic Grid Signals
Mathematical Tools for the Analysis of Periodic and Aperiodic Grid SignalsMathematical Tools for the Analysis of Periodic and Aperiodic Grid Signals
Mathematical Tools for the Analysis of Periodic and Aperiodic Grid SignalsIRJET Journal
 
A novel collective health monitoring of a wind park
A novel collective health monitoring of a wind parkA novel collective health monitoring of a wind park
A novel collective health monitoring of a wind parknooriasukmaningtyas
 
CE Power NERC Compliance
CE Power NERC ComplianceCE Power NERC Compliance
CE Power NERC ComplianceBrian V. Wilson
 
gsmackay-en3602-project
gsmackay-en3602-projectgsmackay-en3602-project
gsmackay-en3602-projectGerard Mackay
 
Scope of work and terms and conditions fin al
Scope of work and terms and conditions fin alScope of work and terms and conditions fin al
Scope of work and terms and conditions fin alAshish Khandelwal
 
A low cost short range wireless embedded system for multiple parameter control
A low cost short range wireless embedded system for multiple parameter controlA low cost short range wireless embedded system for multiple parameter control
A low cost short range wireless embedded system for multiple parameter controleSAT Journals
 
A low cost short range wireless embedded system for multiple parameter control
A low cost short range wireless embedded system for multiple parameter controlA low cost short range wireless embedded system for multiple parameter control
A low cost short range wireless embedded system for multiple parameter controleSAT Publishing House
 

Similar a Volume iii revised (20)

Tes p-122.01-r0 (2)
Tes p-122.01-r0 (2)Tes p-122.01-r0 (2)
Tes p-122.01-r0 (2)
 
Download-manuals-ground water-manual-gw-volume4referencemanualgeo-hydrology
 Download-manuals-ground water-manual-gw-volume4referencemanualgeo-hydrology Download-manuals-ground water-manual-gw-volume4referencemanualgeo-hydrology
Download-manuals-ground water-manual-gw-volume4referencemanualgeo-hydrology
 
Transformer monitoring and controlling with GSM based system
Transformer monitoring and controlling with GSM based systemTransformer monitoring and controlling with GSM based system
Transformer monitoring and controlling with GSM based system
 
Sas guj
Sas gujSas guj
Sas guj
 
URS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdfURS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdf
 
Bid document bhel
Bid document bhelBid document bhel
Bid document bhel
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601
 
Psoc
PsocPsoc
Psoc
 
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGSCRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
 
{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en
{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en
{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en
 
Bms specs
Bms specsBms specs
Bms specs
 
Mathematical Tools for the Analysis of Periodic and Aperiodic Grid Signals
Mathematical Tools for the Analysis of Periodic and Aperiodic Grid SignalsMathematical Tools for the Analysis of Periodic and Aperiodic Grid Signals
Mathematical Tools for the Analysis of Periodic and Aperiodic Grid Signals
 
A novel collective health monitoring of a wind park
A novel collective health monitoring of a wind parkA novel collective health monitoring of a wind park
A novel collective health monitoring of a wind park
 
CE Power NERC Compliance
CE Power NERC ComplianceCE Power NERC Compliance
CE Power NERC Compliance
 
Scada foft &amp; hardware
Scada foft &amp; hardwareScada foft &amp; hardware
Scada foft &amp; hardware
 
gsmackay-en3602-project
gsmackay-en3602-projectgsmackay-en3602-project
gsmackay-en3602-project
 
Scope of work and terms and conditions fin al
Scope of work and terms and conditions fin alScope of work and terms and conditions fin al
Scope of work and terms and conditions fin al
 
ATS @Station
ATS @StationATS @Station
ATS @Station
 
A low cost short range wireless embedded system for multiple parameter control
A low cost short range wireless embedded system for multiple parameter controlA low cost short range wireless embedded system for multiple parameter control
A low cost short range wireless embedded system for multiple parameter control
 
A low cost short range wireless embedded system for multiple parameter control
A low cost short range wireless embedded system for multiple parameter controlA low cost short range wireless embedded system for multiple parameter control
A low cost short range wireless embedded system for multiple parameter control
 

Volume iii revised

  • 1. ORGINAL / COPY KERALA STATE ELECTRICITY BOARD AUTOMATION OF SEISMOLOGICAL OBSERVATORIES OF KSEB TO DIGITAL MODE WITH CENTRAL RECORDING STATIONS AND ACCELEROGRAPHS TENDER NO: CE(C-DS) / 03 / 2012-13 VOLUME III TECHNICAL SPECIFICATIONS FOR INSTRUMENTS AND SCHEDULE OF PRICES CHIEF ENGINEER (CIVIL- DAM SAFETY) 1
  • 2. KERALA STATE ELECTRICITY BOARD CERTIFICATE Certified that this document of Technical Specifications for instruments and Schedule of prices Volume III for the Automation of Seismological observatories of KSE Board to digital mode with Central Recording Stations and Accelerograph consists of two parts Part I - Technical Specifications for instruments (PAGES 01-16) Part II - Schedule of prices (PAGES 17 - 20) CHIEF ENGINEER (CIVIL- DAM SAFETY) Office of the Chief Engineer (Civil-Dam Safety) Kerala State Electricity Board Vydyuthi Bhavanam, Pattom Thiruvananthapuram, Kerala-695004, India Phone / Fax 91471-2448972 Email: ceipds@ksebnet.com 2
  • 3. PART - 1 TECHNICAL SPECIFICATION FOR INSTRUMENTS Section 1 – Specific Requirements - General Section 2 - Technical Specification of Instruments 3
  • 4. Contents Section 1 Specific Requirements 1.1 Introduction 1.2 General 1.3 Scope of Supply 1.4 Manuals and Drawing 1.5 Performance Guarantee 1.6 Training 1.7 Licence Section – 2 TECHNICAL SPECIFICATION OF INSTRUMENTS 2.1 Electronic Equipments in Seismological Observatories 2.2.1 Broad Band Seismic Sensors 2.2.2 Data Acquisition System (DAS) and Other accessories 2.2.3 Accelerographs 2.2.4 VSAT Telemetry 2.2.5 Software at each field station 2.2.6 Central Recording Station (CRS) with auto–location facility PART – II SCHEDULE OF PRICES Instructions for Completing the Schedule of Prices Schedule of items 4
  • 5. Section 1 Specific Requirements 1.1 Introduction This section covers Board’s specific technical conditions and requirements for the Automation of seismological observatories of KSEB to digital mode with central recording stations (CRS) and Accelerographs - Supply, installation, testing and Commissioning of Seismic instruments, after sales service like all maintenance during warranty period, UPS for all equipments and central recording stations of suitable capacity using solar panels and system compatible to work in electric supply from the Grid. The scope of this specification include responsibility for complete supply, installation of supplied equipments / items at site, all works to install the equipments / components supplied, site testing, commissioning, provision of necessary assistance for site testing, commissioning of equipments / components supplied, reliability and warranty confirmation of instrumentation and Automation system etc for the unit supplied including necessary training for officers of KSE Board for running & maintenance of the installations. It is not intended here to describe the arrangement or installation, or to specify each and every component required for the completeness of the unit or to select each material for safe and reliable operation of the proposed unit / equipment. In general the unit shall be complete in all respect with its equipment and accessories as required to make a complete, highly reliable and maintainable installation, confirming to highest standards of engineering design, safety and workmanship. Every component required for the completeness of the unit / equipment and suitable material required for safe and reliable operation of the proposed unit / equipment is deemed to be included. The layouts and arrangements are given, location may be as shown or any where in Kerala State as directed by the Departmental Officers and the Contractor has to install and commission the items accordingly. The Contractor shall strictly observe the Specific requirements detailed out in the following sections in conjunction with the general requirements given in Schedule A1 & A2 of this document. 1.2 General The capacities, ratings, sizes, quantities and materials specified in Schedule A1 & A2 and in this specification are to be considered as the minimum requirements to be provided. It is the responsibility of the Contractor / Manufacturer to determine the required capacities, rating, sizes and quantities and select the appropriate material based on the guidelines given in the following specifications. The telemetric system offered shall be compatible to be interlinked with seismological network / data centre with in India. If the evaluated requirements are higher than the minimum requirements specified in Part-I and the following specifications, then the required capacity / rating / size / quantities 5
  • 6. for the equipment shall be provided. If the evaluated requirements are less than the minimum requirements, then the minimum requirements shall be complied with. If any discrepancy is observed in capacities, ratings, sizes, quantities and materials specified in Technical specifications – Part I and in the following specifications, then the requirements given in this specification shall prevail. In case of any specific doubts or issues, clarifications shall be obtained from the Board before proceeding. The work of any Section is integral with the whole of the contract documents and is not intended to be interpreted outside the context or as part. 1.3 Scope of Supply The detailed scope of supply including the quantity required is given in Schedules A1 – Price Schedule for Supply & Services attached with the Contract documents. All fittings and accessories of the equipments which may not have been specifically mentioned in the specification but considered necessary for the completion of the items shall deemed to be covered by the specification and shall be indicated / furnished by the contractor without any extra charges. 1.4 Manuals and Drawing Operation and maintenance manual in detail shall be supplied in six copies immediately after commissioning of equipment. The drawing shall be maintenance oriented and supplied in convenient bunches and on best quality paper. Besides, all drawings shall be finally supplied on long life CD/ROM 1.5 Performance Guarantee The equipment supplied under this contract will be under performance guarantee valid for the period of 3 years from the date commissioning 1.6 Training The contractor shall arrange training for the system supervisors / Engineers of KSE Board to familiarise them with the equipments so as to ensure better running & maintenance of the system including data collection, interpretation and other requirements 1.7 Licence The licences of the software required for the operation should be in the name of Kerala State Electricity Board and the license fee if any, for the software shall be included in the quoted price. 6
  • 7. Section – 2 TECHNICAL SPECIFICATION OF INSTRUMENTS This section covers specific technical conditions and requirements for the various equipments in connection with the Automation of seismological observatories of KSEB to digital mode with central recording stations (CRS) and Accelerographs. 2.2 ELECTRONIC EQUIPMENTS IN SEISMOLOGICAL OBSERVATORIES 1.3.1 Broad band Seismic sensors Topology Symmetric / Orthogonal tri-axial seismometer with three components consisting of one vertical and two horizontal having cross axis accuracy within 1° Type Broadband velocity transducer with electronic feedback so as to have a force balance transducer Frequency response Flat response (within ± 3dB) to ground velocity in the range 120 Sec to 50Hz. Dynamic range >135 dB Output voltage ±20V or more Damping 0.7 of critical Velocity sensitivity Differential output in the range of 1200 (2*600) V/m/sec to 2000 (2 * 1000)V/m/sec Linearity Less than ±1% of full scale Mass cantering Automatic or on external command locally or from remote Calibration facility 7
  • 8. Calibration facility through Data Acquisition System Frequency response curve and system information Frequency response curve of the unit along with information regarding transfer function including poles and zeros should be provided. Noise Response Must be below the USGS Low Noise Model in the frequency range of at least 30 sec to 5 Hz. Tested and certified reports of the self noise over the pass band should be provided. Indicators Should have an indicator for levelling the transducer and have an indicator Mass position indicator Facility to display and monitor the sensor internal mass position should be provided. Humidity and operating Up to 100% RH and 0° to 50 C° Power requirement < 2.0 Watts at 12 VDC Housing The tri-axial sensors should be mounted in a single water-proof and air-tight enclosure. Mass locking and safety mechanism A robust locking and safety mechanism during transportation should be provided Connectors All connectors should be water-proof and rust- proof Cable Low loss shielded cable of at least 20 meters with appropriate end connectors Thermal insulation cover Thermal insulation cover should be provided. 1.3.2 Data Acquisition System (DAS) and Other accessories Number of channels Three channels ADC Three independent 24-bit digitizers, one for each channel Dynamic range ≥ 130 dB at 100 samples per second 8
  • 9. Input range Should match to the sensor output Common mode rejection ratio Better than 70 dB Channel to Channel skew: a) Zero-Simultaneous sampling of all the channels b) Immune to electromagnetic interference System noise The overall system noise should not be more than 2-3 counts of 24-bits system on an RMS basic in the frequency range corresponding to the pass band 120 sec to 50 Hz. Sampling rate User selectable in the range from 1 up to at least 500 SPS per channel in different data streams (at least two or more). Simultaneous recording at different sampling rates in different streams (two or more) both in continuous and trigger modes. Trigger parameters should be user selectable. Filter Linear phase digital FIR filter Internal RAM 16 MB or higher RAM Storage capacity Internal Hard disk / compact flash disc card of minimum capacity 8GB configured in “Ring- Buffer” type recording of both continuous and triggered data. Recording format Standard earthquake format compatible to Windows and UNIX with provision for using proven compression techniques, User friendly data management utilities to be provided Timing System a) GPS receiver based timing system with all its associated electronic circuits to be inside the DAS unit and antenna exposed to outside. b) Recording of GPS status information. c) Free running TCXO accuracy of 1 ppm over full operating temperature range. GPS Antenna and cable a) Antenna cable length should be minimum 15 meters. b) Antenna should be enclosed in a water-tight enclosure and should work effectively in extreme climatic conditions. c) Lightening protection to provided. d) Rust-proof antenna mounting rod and its accessories. 9
  • 10. Sensor Control features a) Sensor calibration facility b) Sensor mass position monitoring, locally or remotely. c) Sensor mass centering on command, locally or remotely. Calibration Facility for integrated system calibration to be provided and described Recording mode The DAS should have provision to support real-time data telemetry to a CRS through VSAT telemetry network in addition to the local recording in hard disc / compact flash disc Communication ports a) USB/Ethernet and/ or serial port connectivity to a local terminal for parameter setting and event data downloading. b) A separate port for dial-up modem connectivity to download the event data to CRS Status Display Status display for power, data acquisition, State of health (SOH), GPS status etc should be available Power requirements a) Supply voltage 10 -15 Volts DC b) Power consumption of DAS not exceeding 2W at 12V DC in normal active operational mode of data acquisition. c) Provision for charging the batteries both from solar cell and from a 230 V/50Hz AC mains source. d) Voltage from battery to sensor and DAS units should be through isolating DC/DC converters. e) DAS should resume data acquisition automatically when the power is restored after disruption. f) Power should be isolated from the signal ground g) The recorder should be configured so that the auxiliary external 12V DC power source may be easily connected in such a way as to add the capacity of the batteries. Operating temperature and humidity range Up to 100% RH and 0° to 50 C° Environment All the indoor units should work in typical tropical environment conditions and should work without air conditioning. Housing GPS and DAS modules should be enclosed in weather and shock-proof sealed enclosures with lighting protection. 10
  • 11. VSAT telemetry connectivity Ethernet port (10/100 Base-T) supporting TCP/IP or any other proven and tested protocol, DAS firmware should support the following features: a) Full Duplex communication between field and Central Recording Station (CRS). b) Triggered or continuous data transmission c) Extensive error correction. d) Network state of health (SOH), communication performance statistics. 1.3.3 Accelerographs Type Internally mounted orthogonally oriented tri axial accelerometer with 24 bit 3channel recorder. Full scale ±2g Output voltage Matched to that of the Recorder Frequency band DC to 50 Hz Damping 0.7 Critical Dynamic range Exceeding 112 dB Sample rate 200 SPS or more per channel Memory 1GB GPS Receiver for time synchronisation. Data acquisition mode in continuous, triggered with pre and post event recording facilities Software Data downloading software and Data Analysis Software, Shall include utility for converting the acceleration data in to velocity, displacement and power spectral density etc. VSAT Connectivity The four accelerographs to be installed at Idukki DAM and one accelerograph to be installed at Vallakkadavu should be compatible to be interlinked to the CRS through VSAT. DAM Details: The total height of the DAM is approximately 165meters. The first Accelerograph will be installed in the top of the Idukki DAM and from the first Accelerograph to the second accelerograph is 85 meters. From second Accelerograph to third accelerograph is 85 meters. From third accelerograph to fourth accelerograph is 80 meters. 1.3.4 VSAT Telemetry 11
  • 12. The bidder should quote for VSAT telemetry system with the following details: 1. The system should transmit continuous tri-axial broad band seismograph data on real time basis @ 100sps from 7 seismograph stations and five accelerograph data on triggered basis @100sps to a Central Recording Station (CRS) situated at Thiruvananthapuram / Vazhathope or any other place in Kerala. The necessary VSAT hardware should be quoted. The VSAT system should run of Battery power. ie IDU should be operated from Battery Power. 2. The VSAT telemetric system should be configured for a minimum band width of 100kbps in the extended C band. Additional band width requirement shall be quoted as an optional item. 3. The bidder should quote the bandwidth charges for a period of 3 years. 4. The system should be capable of simultaneously recording at 2 central recording stations on continuous basis 5. The system should be able to accept data from 10 more remote stations in future expansion. 6. The hardware / band width or any other charges for the second CRS should be quoted as an optional item. 2.2.5 Software at each field station 2.2.5.1 Data Processing and other Utility Software a) Appropriate communication software to download the event data and log, through communication port in local terminal. b) Appropriate utility software for faster downloading of large amounts of data from the ring-buffer disk of the DAS, through fast-communication port (of DAS) into the local terminal. c) Parameter setting and on – site control panel d) Provision to convert the data into Standard formats such as SEISAN, ASCII, SEED etc. e) Provision to display the trigger information on different streams, State of Health of the Sensor, GPS and DAS, mass centering etc. f) Software for basic and advanced analysis of the seismic data 12
  • 13. g) Continuous waveform display of the recorded data. h) Facility to plot and display and desired segment of recorded data. 2.2.6 Central Recording Station (CRS) with auto–location facility At CRS there should be two sets of Data Acquisition Computer, one as a Primary and the other as a Secondary for redundancy. Each Data Acquisition computer should consist of (i) Work station for acquiring Real time Data from all field stations with hardware 2.4GHz processor, 2 GB RAM, DVD+/– RW, 250 GB Hard Disk and 20" wide screen (ii) Licensed Software for auto-location of earthquake parameters detected by the network and displays the parameters and the location on the appropriate map. (iii) The automatic located earthquake parameters should also be automatically transmitted to the designated persons via SMS, email etc. (iv) It should also have a provision to manually re-locating the earthquake parameter and revise the SMS to the designated persons. (v) Power back up facility (vi) LCD 42" screen for online display of continuous VSAT telemetric data (vii) There should be provision to export event waveform data of auto located of events in a separate data base such as SEISAN to be used for offline analysis and generation of bulletin. (viii) The Data Acquisition Computer/system of the CRS should be capable to transfer incoming data from all or selected field stations of KSEB network to another server (of any other seismological network / data centre) on real time basis located at different place through internet or leased line. The incoming real time data at different place should be easily integrated with auto location software such as SEISCOMP, Response Hydra and Antelope. The required software module at both places for such data transfer should be provided as an optional item by the vendor. 13
  • 14. 14
  • 15. 15
  • 16. 16
  • 17. PART - II SCHEDULE – A1 & A2 SCHEDULE OF PRICES 17
  • 18. Instructions for Completing the Schedule of Prices This Schedule comprises typical forms for completion and submission by the Bidder. Schedule-A1 & A2 shall be used for quoting the price for the design, planning, engineering, manufacture and supply of equipment including installation, testing and commissioning. The bidders shall indicate the rates in INR /USD as applicable for each items of work including all taxes, freight & cartage, duties, levies, conveyance charges, clearance charges etc. complete. All statutory recoveries will be deducted from the contractor's work bill at the prevailing rates. 1.1 Bidders shall quote for the entire package on a single source responsibility basis. 1.2 Rates shall be quoted in INR for components /items manufactured in India and in INR / USD as applicable for items to be imported. 1.3. The bidders shall quote their prices in the same format given in the schedules A1 and no other formats devised by the contractor will be accepted. .Terms of Payment (i) The payment will be effected only after the satisfactory completion of the work including supply, installation, testing and commissioning and on proper certification by the Engineer in charge. (ii) 5% of the contract price will be retained as the performance security for a period of 3 years which will be informed in the letter of acceptance. (iii) If the contractor desires for a part payment, the break up schedule of items claimed in the part bill shall be produced showing the cost, taxes, freight and cartage, duties and levies etc. complete. 50% of the cost of equipments / materials shall be considered for such payment after effecting statutory recoveries. (iv) The base currency as regard to this tender is INR. But if the bidder desires to quote for items which are imported and supplied for this work, the quote shall be in INR/USD and the payment shall be made accordingly 18