SlideShare una empresa de Scribd logo
1 de 248
 
EARNED VALUE PROJECT MANAGEMENT
PREAMBLE  ,[object Object],[object Object],[object Object]
Your comments on the situation?
Earned Value Project Management  ,[object Object]
Earned Value Project Management  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Earned Value Project Management  Cost Variance (CV) Cost Variance = EV – AC (BCWP – ACWP) = Rs 60,000 – Rs 85,000  =  (-) Rs 25,000 Negative value indicating cost overruns.
Earned Value Project Management  ,[object Object],[object Object],Remember
Earned Value Project Management  ,[object Object],[object Object],[object Object]
Earned Value Project Management  Schedule Variance (SV) This is the algebraic difference between Earned Value of the work performed and the budgeted value of the work planned. In our case Schedule Variance = BCWP – BCWS   (EV)  –  (PV)  = Rs 60,000 – Rs 80,000  =  (-) Rs 20,000
You find anything odd about the measuring of schedule variance?
Earned Value Project Management  Schedule variance is being measured in monetary units – not time units.
Earned Value Project Management  A positive value for this variance represents work ahead of schedule, and negative value indicates behind schedule or schedule slippage
Earned Value Project Management  These variances not only tell the project manager about the true, rather than the apparent state of the project, they also ………………
Earned Value Project Management  In this case, the larger CV (42% of the EV) as compared to SV (33% of EV) tells us that we need to look more at the cost overrun aspects.
EARNED VALUE INDICES  ,[object Object],[object Object],[object Object]
EARNED VALUE INDICES  ,[object Object],[object Object],[object Object]
SCHEDULE PERFORMANCE INDEX (SPI) ,[object Object],SPI = = = = 0.75 ,[object Object],[object Object],BCWP BCWS EV PV 60,000 80,000
SCHEDULE PERFORMANCE INDEX (SPI) ,[object Object],15 0.75 = 20 days
COST PERFORMANCE INDEX (CPI) ,[object Object],CPI = = = = 0.705 ,[object Object],BCWP ACWP EV AC 60,000 85,000
COST PERFORMANCE INDEX (CPI) ,[object Object],BAC CPI EAC = BAC = Budget At Completion. The sum of all authorized budgets allocated to a project. It is synonymous with earned value term “Performance Measurement Baseline”.
COST PERFORMANCE INDEX (CPI) 80,000 0.705 EAC = In our case it is ………….. = Rs 1,13,475.17
COST PERFORMANCE INDEX (CPI) How would you explain the significance of EAC, SPI and CPI we have calculated?
COST PERFORMANCE INDEX (CPI) EAC allows us to forecast the total project costs on the basis of efficiency with which work performance is achieved.
COST PERFORMANCE INDEX (CPI) EV PV ,[object Object],[object Object],[object Object],= SPI
COST PERFORMANCE INDEX (CPI) EV AC Compare  What have you done by now (EV) To  What you have spent by now (AC) You Get a reading on productivity called CPI = CPI Ratio
COST PERFORMANCE INDEX (CPI) ,[object Object],[object Object],[object Object],Summary
COST PERFORMANCE INDEX (CPI) Interpretation of Indices  ........Summary Table 1:  Efficiency Indices Index  Cost (CPI) Schedule (SPI) > 1.00 Under Cost Ahead of schedule  = 1.00 On Cost On schedule  < 1.00 Over Cost  Behind schedule
PLANNING FOR EARNED  VALUE PROJECT MANAGEMENT
PROJECT FEATURES  ,[object Object],[object Object],[object Object],[object Object],[object Object]
PROJECT FEATURES  ,[object Object],[object Object],[object Object]
FIRST QUARTERLY PROJECT STATUS REPORT  ,[object Object],[object Object],[object Object]
FIRST QUARTERLY PROJECT STATUS REPORT  “ We are right on our cost spending plan, a little behind schedule perhaps, but we are doing well” , would be the positive spin put on these results by most practitioners.
EVPM EMPLOYMENT  ,[object Object],[object Object],[object Object]
[object Object],EVPM EMPLOYMENT
[object Object],[object Object],EVPM EMPLOYMENT
[object Object],[object Object],[object Object],EVPM EMPLOYMENT
EV requires a baseline master project schedule; or stated  another way without a master project schedule, one cannot employ Earned Value.  EVPM EMPLOYMENT
[object Object],[object Object],EVPM EMPLOYMENT
[object Object],[object Object],[object Object],[object Object],EVPM EMPLOYMENT
[object Object],[object Object],EVPM EMPLOYMENT
[object Object],[object Object],[object Object],EVPM EMPLOYMENT
[object Object],EVPM EMPLOYMENT
[object Object],EVPM EMPLOYMENT
[object Object],EVPM EMPLOYMENT
[object Object],EVPM EMPLOYMENT
[object Object],[object Object],[object Object],[object Object],EVPM EMPLOYMENT
Cost Actual spend Value generated  Planned value  Time These three quantities are the basis of all earned value performance measurements Fig 1
[object Object],EVPM EMPLOYMENT
[object Object],EVPM EMPLOYMENT
[object Object],EVPM EMPLOYMENT
[object Object],[object Object],EVPM EMPLOYMENT
[object Object],EVPM EMPLOYMENT
EVPM EMPLOYMENT  Although only at 20% completion point, by monitoring these three dimensions of earned value data, the project is forecasting a significant final overrun of costs.
[object Object],EVPM EMPLOYMENT
EVPM EMPLOYMENT  Decisions  After  Project  Quarterly Progress  Review Project budget revised to Rs 1.5M Time schedule remained at 12 months Main performance objective Getting project back on schedule
EVPM EMPLOYMENT  Final Results  ,[object Object],[object Object],[object Object],[object Object]
EVPM EMPLOYMENT
EVPM EMPLOYMENT  The value of Earned Value  Postmortem:
EVPM EMPLOYMENT  Will the use of earned value on projects prevent cost overruns? Question:
EVPM EMPLOYMENT  ,[object Object],[object Object],[object Object],[object Object]
EVPM EMPLOYMENT  ,[object Object]
EVPM EMPLOYMENT  ,[object Object],“ The accurate measurement of the physical work performed against a baseline plan. It has provided a reliable prediction of the final costs and schedule requirements for a given project.
EVPM EMPLOYMENT  ,[object Object]
EVPM EMPLOYMENT  ,[object Object]
EVPM EMPLOYMENT  ,[object Object]
TRADITIONAL PROJECT  COST MANAGEMENT
Internal Development Project ---The plan--- Fig 2:  A typical project cost expenditure projection  Authorized Budget 1,000,000 Cost Spend Plan Thousands (000) 1,000 750 500 250 1 2 3 4 Quarters
Internal Development Project ---1 st  Quarter Results-- Fig 3: Traditional cost management: plan versus actual costs Authorized Budget 1,000,000 Planned Costs  = 300K Thousands (000) 1,000 750 500 250 1 2 3 4 Quarters  Actual Costs = 300K Status date
Internal Development Project ---1 st  Quarter Results--- Fig 4: Earned value project management: 3 dimensional Authorized Budget 1,000,000 Planned Value = 300 Thousands (000) 1,000 750 500 250 1 2 3 4 Quarters  Actual Costs = 300K Status date Earned Value = 200K
EVPM EMPLOYMENT  ,[object Object],“ Overrun of costs. The project can be said to be running a negative Rs 100,000, cost variance. The delicate relationships reflected with these actual cost and schedule performance relationships can now be used to predict the final costs and schedule results of the project”.
EVPM EMPLOYMENT  ,[object Object],[object Object]
TRADITIONAL  COST MANAGEMENT VS EV PROJECT  MANAGEMENT
[object Object]
Fig 5: The Fundamental Differences Traditional Project Cost Management Planned funds = 300 K Actual costs  = 300 K Variance from an expenditure plan = (0K) Earned Value Project Management  Planned value = 300 K Earned value  = 200 K Variance from the planned schedule = (- 100K) Actual costs  = 300 K The “true” cost variance = (- 100K)
Fig 6: Project S-Curves Cumulative cost (in thousands) 80 60 40 20 40 35 30 25 20 15 10 5 45 Elapsed Time (in weeks)
Table 2: Budgeted Costs for Project Siera  Activity   Duration (in weeks) 5 10 15 20 25 30 35 40 45 Total  Design  6 2 - - - - - - - Engineer  - 4 8 8 8 - - - - Install  - - - 4 20 6 - - - Test  - - - - - 2 6 4 2 Total  6 6 8 12 28 8 6 4 2 Cumulative  6 12 20 32 60 68 74 78 80 80
Fig 7: Project Siera’s S-Curve showing negative Variance  Cumulative cost (in thousands) 80 60 40 20 40 35 30 25 20 15 10 5 45 Elapsed Time (in weeks) 10,000 Negative Var.  Cumulative Budgeted Cost Cumulative Actual Cost
S-CURVES DRAWBACKS
S-curves ,[object Object],[object Object]
Is this good or bad news?
[object Object],[object Object],S-curves
[object Object],[object Object],S-curves
[object Object],S-curves
COMPARISON OF TRACKING /  MONITORING TOOLS
Cost Project S-curves Schedule  Performance Fig 8: Monitoring Project Performance  S-curves
[object Object],S-curves
Cost Tracking control charts, Gantt charts Schedule  Performance Fig 9: Monitoring Project Performance  S-curves
[object Object],S-curves
[object Object],S-curves
Cost Tracking control charts, Gantt charts Schedule  Performance Fig 10: Monitoring Project Performance  Earned  Value  S-curves
[object Object],[object Object],[object Object],[object Object],S-curves
[object Object],[object Object],[object Object],[object Object],S-curves
Forecasting the Final Cost  and Schedule Results
[object Object],Forecasting the Final Cost and Schedule Results
[object Object],Forecasting the Final Cost and Schedule Results
The Project Manager’s “Official Estimate” (Actual costs + a new “bottom-up” ETC EVPM independent statistical EAC comparisons: ,[object Object],[object Object],[object Object],Fig 11:  Forecasting a Range of Estimates at Completion  ♣ ♣ ♣ ♣
How do projects typically estimate their final costs?  Question: Forecasting the Final Cost and Schedule Results
[object Object],[object Object],[object Object],Answer: Forecasting the Final Cost and Schedule Results
What’s wrong with this approach?  Question: Forecasting the Final Cost and Schedule Results
Preparing a new ETC is a royal pain in the neck! Preparing a new ETC is  non-project work . The very people who are performing on the project, who are often frustrated because they are running behind their schedule, must stop doing real project work and prepare a new baseline plan called the ETC.  Answer: Forecasting the Final Cost and Schedule Results
[object Object],Forecasting the Final Cost and Schedule Results
Fig 12: Monitoring earned value performance  Perfect “Schedule” performance = 1.0 (for every 1.00 work planned you get 1.00 in earned value) Perfect “Cost” performance = 1.0 (for every 1.00 in cost actuals you get 1.00 in earned value) Good = +1.0 Plan = 1.0 Poor  = -1.0 1.00 + –
[object Object],[object Object],Forecasting the Final Cost and Schedule Results
[object Object],[object Object],Forecasting the Final Cost and Schedule Results
EVPM Independent Statistical EAC Comparisons
1. “The Mathematical” or “Overrun-to-Date” Estimate at Completion
Fig 13: The “Mathematical” or “Overrun-to-Date”  EAC Short EAC Formula: AC + BAC – EV 1.00 + – Status date  Cost Overrun to date Long EAC Formula: Actual Costs + Remaining Work (BAC – EV) 1.0 pf
[object Object],EVPM Independent Statistical EAC Comparison
First reason to use this formula: The Mathematical or Overrun-to-date is often the first indication announcing to the project manager and executive management the first indication that they may have cost problem on their project. If a project spends Rs. 300,000/- to accomplish only Rs. 200,000/- of budgeted work, the project experienced a “cost overrun” for the initial work that it has performed. Management deserves to know this fact. EVPM Independent Statistical EAC Comparison
Second reason to use this formula: The Mathematical EAC is important because an early overrun does not go away with the passage of time. It is rare for an early front-end overrun disappearing through exemplary performance of the remaining work.  EVPM Independent Statistical EAC Comparison
In a project baseline, where are the best scope definition, best planning, best budget, and best scheduled dates placed; in the first half or the last half of the baseline?  Question: EVPM Independent Statistical EAC Comparison
Likely the best of every thing will be incorporated in to the first half baseline. Thus, if a  project incurs an overrun in the first half, what are the chances of making a later recovery of the overrun? Little to none. This EAC formula provides a sort of minimum overrun that does not go away.  Answer: EVPM Independent Statistical EAC Comparison
[object Object],[object Object],EVPM Independent Statistical EAC Comparison
2. The “Cumulative CPI” Estimate at Completion
[object Object],EVPM Independent Statistical EAC Comparison
Fig 14: The Low-end “Cumulative CPI”  EAC Short EAC Formula: BAC   =  EAC Cum. CPI 1.00 + – Status date  Cumulative CPI Plan EAC Long EAC Formula: Actual Costs + Remaining Work (BAC – EV)   (Cumulative CPI pf)
[object Object],EVPM Independent Statistical EAC Comparison
[object Object],[object Object],EVPM Independent Statistical EAC Comparison
[object Object],EVPM Independent Statistical EAC Comparison
[object Object],[object Object],[object Object],[object Object],EVPM Independent Statistical EAC Comparison
3. The “Cumulative CPI times SPI” estimate at completion
[object Object],EVPM Independent Statistical EAC Comparison
Fig 15: The High-end “Cumulative CPI times SPI”  EAC There is no short EAC Formula  Long EAC Formula: Actual Costs + Remaining Work (BAC – EV)   (Cumulative CPI x SPI pf) 1.00 + – Status date  Cumulative SPI Plan EAC Cumulative CPI
[object Object],EVPM Independent Statistical EAC Comparison
What is the utility of providing a statistical range (low /most likely / high) of final cost results for a given project?  Question: EVPM Independent Statistical EAC Comparison
Simply put, it is to test the reasonableness of the project manager’s “official” cost position against a statistical range of possible EV forecasts. EV forecasts can quickly provide management with an understanding of the cost risk facing any project. Answer: EVPM Independent Statistical EAC Comparison
[object Object],EVPM Independent Statistical EAC Comparison
Time Management: Predicting the Projects  Final Completion Date
[object Object],[object Object],Time Management
[object Object],Time Management
[object Object],Time Management
[object Object],Time Management
[object Object],[object Object],SV = EV – PV  Time Management
[object Object],Time Management
“ Do not rely on EV schedule variance alone to help predict the final completion date for a project.  Time Management
Fig 16: Monitoring the earned value schedule performance  Status date  Planned value  Earned value  2 months behind  2 months late? Budget  Budget  100% 75% 50% 25% Year 2 Year 1
[object Object],Everyone on overtime  or Bring in more people for this job  Time Management
[object Object],Negative schedule variance indicates that the project is running behind in accomplishing its planned work, that is, it is running a schedule position of less than 1.0 as shown.  Time Management
Fig 17: Earned value schedule variances must be analyzed  Compare late earned value tasks against the critical path and high risk tasks 1.00 + – Status date  Cumulative SPI Baseline Plan These tasks are late to the baseline schedule  Time
[object Object],[object Object],Recommendation  Time Management
[object Object],Time Management
[object Object],Time Management
[object Object],Time Management
[object Object],Time Management
[object Object],[object Object],[object Object],Time Management
[object Object],[object Object],[object Object],Time Management
Activation Limits of EVM Indices
Fig 18 Activation Limits of EVM Indices   Index Thresholds Action SPI /CPI Greater than 1.25 Work ahead of schedule, should use time on other problem / issues.  Very good productivity should use improvement on other problem / issues. Between 0.9 and 1.25 Schedule as expected. No action.  Productivity as expected. No action. Between 0.75 and 0.9 Warning! Work getting behind schedule, should act to get on track / Warning! Productivity low should act to get on track Less than 0.75 Out of control
[object Object],[object Object],[object Object],Activation Limits of EVM Indices
[object Object],[object Object],Activation Limits of EVM Indices
Three Factors Determine  the Final Project Results
[object Object],Three Factors
Factor-1: The quality of project baseline plan ,[object Object],“ FIRE FIRST AND AIM LATER”  Three Factors
[object Object],[object Object],[object Object],Three Factors
[object Object],Three Factors
Factor-2: Actual performance against the approved baseline plan  ,[object Object],Three Factors
Factor-3: Management’s determination to influence the final results  ,[object Object],Three Factors
[object Object],[object Object],Three Factors
[object Object],[object Object],Three Factors
Forecasting Final Project Status - TCPI Metric
Forecasting Final Project Status -  TCPI Metric ,[object Object],TCPI = on the status check date Work remaining Funds remaining
Fig 19: The To-Complete (the work) Performance Index (TCPI) Work remaining Funds remaining = TCPI Formula: 1.00 + – Status date  Cumulative CPI Baseline Plan TCPI
[object Object],“ What performance factor (CPI) must the project achieve in order to stay within the tangible future financial goal?” ,[object Object],Forecasting Final Project Status -  TCPI Metric
[object Object],Forecasting Final Project Status -  TCPI Metric
TCPI using management’s  “ Budget at Completion”   (BAC): Fig 20: Two “To-Complete Performance Index” (TCPI) Formulas  TCPI using the Project Manager’s  “ Estimate at Completion”   (EAC): Work Remaining (BAC – EV) Funds Remaining (BAC – AC) = TCPI (BAC) Work Remaining (BAC – EV) Funds Remaining (EAC – AC) = TCPI (EAC)
The TCPI Using Management's Budget at Completion
The TCPI Using Management Budgets at Completion ,[object Object]
[object Object],“ Will the current overrun cause the project to need more funds than management has authorized in its budget (BAC)?” The TCPI Using Management Budgets at Completion
Fig 21: The relationship of Cumulative CPI versus TCPI Status date at 50% Complete  Sunk Costs  Opportunity Costs  1.00 + – Cumulative CPI Baseline Plan TCPI .75 1.25
[object Object],The TCPI Using Management Budgets at Completion
[object Object],The TCPI Using Management Budgets at Completion
[object Object],[object Object],The TCPI Using Management Budgets at Completion
[object Object],The TCPI Using Management Budgets at Completion
[object Object],[object Object],The TCPI Using Management Budgets at Completion
The TCPI Using  The PM’s Estimate  at Completion (EAC)
The TCPI Using The PM’s Estimate at Completion (EAC)   ,[object Object],“ What is the real number needed to complete the project, the estimate at completion (EAC)?
The TCPI Using The PM’s Estimate at Completion (EAC)   ,[object Object],[object Object],[object Object]
The TCPI Using The PM’s Estimate at Completion (EAC)   ,[object Object]
The TCPI Using The PM’s Estimate at Completion (EAC)   ,[object Object],[object Object]
The TCPI Using The PM’s Estimate at Completion (EAC)   ,[object Object]
Fig 22: Using the TCPI to validate the Project Manager’s EAC  1.00 + – Cumulative CPI Baseline Plan PM EAC (1) (2) (3) Math EAC Cum. CPI EAC CPI x SPI EAC
The TCPI Using The PM’s Estimate at Completion (EAC)   ,[object Object]
The TCPI Using The PM’s Estimate at Completion (EAC)   ,[object Object],[object Object]
The TCPI Using The PM’s Estimate at Completion (EAC)   ,[object Object],[object Object],[object Object]
The TCPI Using The PM’s Estimate at Completion (EAC)   ,[object Object],[object Object]
The TCPI Using The PM’s Estimate at Completion (EAC)   ,[object Object],[object Object],[object Object]
The TCPI Using The PM’s Estimate at Completion (EAC)   ,[object Object]
Methods Used to  Plan and Measure EV
Method’s used to Plan and Measure EV ,[object Object],[object Object]
Method’s used to Plan and Measure EV ,[object Object],[object Object]
Method’s used to Plan and Measure EV ,[object Object],[object Object]
Fig 23: EV Measurement Methods Typically used for non-recurring tasks Used for either non-recurring or recurring tasks 1. Milestones weighted values. 2. Fixed formula (40/60, 25/75, 50/50 etc). 3. Percent complete estimates. 4. Percent complete with milestone gates. 5. Equivalent units. 6. Earned standards.
1. Milestones with Weighted Values  ,[object Object],[object Object],Method’s used to Plan and Measure EV
[object Object],[object Object],Method’s used to Plan and Measure EV
Fig 24:  Measure Earned Value with the Project Schedule  1. Milestones with Weighted Values 2. Fixed formula which adds to 100% 25% 75% 50% 50% 40% 60% 3. Percent complete estimates  100% 4. Percent complete with Milestone Gates  33% 67% 100%
2. Fixed (Start/Finish) Formula by Task: (40/60, 25/75, 50/50 etc.  ,[object Object],Method’s used to Plan and Measure EV
[object Object],Method’s used to Plan and Measure EV
3. Percent Complete Estimates ,[object Object],[object Object],Method’s used to Plan and Measure EV
[object Object],Method’s used to Plan and Measure EV
[object Object],[object Object],Method’s used to Plan and Measure EV
[object Object],Method’s used to Plan and Measure EV
[object Object],Method’s used to Plan and Measure EV
4. A Combination of Percent with Milestone Gates ,[object Object],[object Object],Method’s used to Plan and Measure EV
[object Object],[object Object],Method’s used to Plan and Measure EV
5. Equivalent Completed Units ,[object Object],[object Object],Method’s used to Plan and Measure EV
6. Earned Standards ,[object Object],Method’s used to Plan and Measure EV
[object Object],[object Object],Method’s used to Plan and Measure EV
The Genesis and Evolution  of Earned Value
[object Object],The Genesis and Evolution of Earned Value
Phase 0 – The Factory Floor: In the late 1800s ,[object Object],[object Object],Method’s used to Plan and Measure EV
[object Object],[object Object],Method’s used to Plan and Measure EV Phase 0
Phase 1 – PERT / Cost: 1962-1965  ,[object Object],[object Object],[object Object],Method’s used to Plan and Measure EV
[object Object],[object Object],[object Object],Method’s used to Plan and Measure EV Phase 1
[object Object],[object Object],Method’s used to Plan and Measure EV Phase 1
[object Object],Method’s used to Plan and Measure EV Phase 1
[object Object],[object Object],Method’s used to Plan and Measure EV Phase 1
[object Object],[object Object],Method’s used to Plan and Measure EV Phase 1
[object Object],[object Object],Method’s used to Plan and Measure EV Phase 1
[object Object],Method’s used to Plan and Measure EV Phase 1
Phase 2 – C / SCSC: 1967 to 1996 ,[object Object],[object Object],Method’s used to Plan and Measure EV
[object Object],[object Object],Method’s used to Plan and Measure EV Phase 2
[object Object],[object Object],[object Object],[object Object],Method’s used to Plan and Measure EV Phase 2
[object Object],Method’s used to Plan and Measure EV Phase 2
Phase 3 – Earned Value Management (ANSI/ EIA 748): 1996 to the Present ,[object Object],[object Object],[object Object],Method’s used to Plan and Measure EV
[object Object],[object Object],Method’s used to Plan and Measure EV Phase 3
Fig 25: Getting back to Earned Value Basics  Factory Floor ------------------------ 1890 PERT / COST -------------------------- 1962 C / SCSC ------------------------ 1967-1996 EVM ANSI-EIA-748 Standard -- 1998 Simple EVPM ------ into 21 st  Century
EPILOGUE  Focussing on Value of Work Accomplished (i.e. the earned value)
What Do Project Managers Want to Know?
[object Object],[object Object],[object Object],What do Project Managers want to know? Earned value asks and answers more important questions: ,[object Object],[object Object]
[object Object],[object Object],[object Object],What do Project Managers want to know?
This is not  cost  performance, but rather  funding  performance. What do Project Managers want to know?
What is missing? What do Project Managers want to know?
[object Object],What do Project Managers want to know?
[object Object],What do Project Managers want to know?
[object Object],What do Project Managers want to know? A Rs 10 million overrun of costs
[object Object],What do Project Managers want to know?
[object Object],[object Object],What do Project Managers want to know?
[object Object],What do Project Managers want to know?
Fig 26 Is this any good? Time Cost Planned Cost Cost to date
[object Object],What do Project Managers want to know?
[object Object],[object Object],[object Object],What do Project Managers want to know?
[object Object],What do Project Managers want to know?
[object Object],[object Object],What do Project Managers want to know?
[object Object],What do Project Managers want to know?
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Fig 27: The  DOD  EV  BOK
WARNING KEEP AWAY! Motto of unsuccessful project manager
“ Living with latent unease is better than facing the unpalatable truth”

Más contenido relacionado

La actualidad más candente

Earned value analysis - presentation
Earned value analysis  -  presentationEarned value analysis  -  presentation
Earned value analysis - presentationProPM Academy
 
Project Management Earned Value
Project Management Earned ValueProject Management Earned Value
Project Management Earned Valueconstructioninside
 
Earned value analysis for a construction project
Earned value analysis for a construction projectEarned value analysis for a construction project
Earned value analysis for a construction projectIAEME Publication
 
Earned value management for Beginners
Earned value management for Beginners Earned value management for Beginners
Earned value management for Beginners Shenin Hassan
 
Earned value management (EVM)
Earned value management (EVM)Earned value management (EVM)
Earned value management (EVM)Joshua Render
 
Earned value analysis (1)
Earned value analysis (1)Earned value analysis (1)
Earned value analysis (1)Harshit Mahajan
 
A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)Glen Alleman
 
Earned Value Analysis - Basic Concepts
Earned Value Analysis  - Basic ConceptsEarned Value Analysis  - Basic Concepts
Earned Value Analysis - Basic ConceptsRicardo Viana Vargas
 
Earned value analysis training
Earned value analysis trainingEarned value analysis training
Earned value analysis trainingPaul King
 
Earned value
Earned valueEarned value
Earned valueOliver
 
Earned value management in action - A Webinar by Vivek Prakash, pmwares
Earned value management in action - A Webinar by Vivek Prakash, pmwares Earned value management in action - A Webinar by Vivek Prakash, pmwares
Earned value management in action - A Webinar by Vivek Prakash, pmwares Vivek Prakash
 
project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 waleed hamdy
 
Earned Value Management (EVM) Limitations
Earned Value Management (EVM) LimitationsEarned Value Management (EVM) Limitations
Earned Value Management (EVM) LimitationsIftikhar Anjum
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value ManagementMatt Stehling
 
Earned value in five easy pieces
Earned value in five easy piecesEarned value in five easy pieces
Earned value in five easy piecesGlen Alleman
 

La actualidad más candente (20)

Earned value analysis - presentation
Earned value analysis  -  presentationEarned value analysis  -  presentation
Earned value analysis - presentation
 
Project Management Earned Value
Project Management Earned ValueProject Management Earned Value
Project Management Earned Value
 
Earned value analysis for a construction project
Earned value analysis for a construction projectEarned value analysis for a construction project
Earned value analysis for a construction project
 
Earned value management for Beginners
Earned value management for Beginners Earned value management for Beginners
Earned value management for Beginners
 
Earned value management (EVM)
Earned value management (EVM)Earned value management (EVM)
Earned value management (EVM)
 
Earned value analysis (1)
Earned value analysis (1)Earned value analysis (1)
Earned value analysis (1)
 
Earned value management
Earned value managementEarned value management
Earned value management
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)
 
Earned Value Analysis - Basic Concepts
Earned Value Analysis  - Basic ConceptsEarned Value Analysis  - Basic Concepts
Earned Value Analysis - Basic Concepts
 
Earned value analysis training
Earned value analysis trainingEarned value analysis training
Earned value analysis training
 
Earned value
Earned valueEarned value
Earned value
 
Project Control Process
Project Control ProcessProject Control Process
Project Control Process
 
Earned value management in action - A Webinar by Vivek Prakash, pmwares
Earned value management in action - A Webinar by Vivek Prakash, pmwares Earned value management in action - A Webinar by Vivek Prakash, pmwares
Earned value management in action - A Webinar by Vivek Prakash, pmwares
 
project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
Earned Value Management (EVM) Limitations
Earned Value Management (EVM) LimitationsEarned Value Management (EVM) Limitations
Earned Value Management (EVM) Limitations
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
Earned value in five easy pieces
Earned value in five easy piecesEarned value in five easy pieces
Earned value in five easy pieces
 

Destacado

What Do You Know about Beam Ray Rife Machine
What Do You Know about Beam Ray Rife MachineWhat Do You Know about Beam Ray Rife Machine
What Do You Know about Beam Ray Rife MachineSpooky2 Rife
 
Earned value management with Examples | Control Cost | PMBOK | PMP
Earned value management with Examples | Control Cost | PMBOK | PMPEarned value management with Examples | Control Cost | PMBOK | PMP
Earned value management with Examples | Control Cost | PMBOK | PMPJustAcademy
 
Doenças emergentes e reemergentes
Doenças emergentes e reemergentesDoenças emergentes e reemergentes
Doenças emergentes e reemergentesalforreca567
 
BI : SharePoint 2016 BI or PowerBI v2 ? (O365 Saturday Copenhagen, 2016)
BI : SharePoint 2016 BI or PowerBI v2 ? (O365 Saturday Copenhagen, 2016)BI : SharePoint 2016 BI or PowerBI v2 ? (O365 Saturday Copenhagen, 2016)
BI : SharePoint 2016 BI or PowerBI v2 ? (O365 Saturday Copenhagen, 2016)serge luca
 
Radiología Tecnica de Waters
Radiología Tecnica de WatersRadiología Tecnica de Waters
Radiología Tecnica de WatersBUAP
 
HAVAS MEDIA-POCHE_WORLDWIDE N2
HAVAS MEDIA-POCHE_WORLDWIDE N2HAVAS MEDIA-POCHE_WORLDWIDE N2
HAVAS MEDIA-POCHE_WORLDWIDE N2Abed Mwangiza
 
Crowdsourcing Webmontag Hannover 23.11.2009
Crowdsourcing Webmontag Hannover 23.11.2009Crowdsourcing Webmontag Hannover 23.11.2009
Crowdsourcing Webmontag Hannover 23.11.2009glembotzky
 
Workshop Junge Ohren
Workshop Junge OhrenWorkshop Junge Ohren
Workshop Junge OhrenKarin Janner
 
Budget justification 1
Budget justification 1Budget justification 1
Budget justification 1dicosmo178
 
Meed projects presentation for ksa mega projects september 2013.v1
Meed projects presentation for ksa mega projects september 2013.v1Meed projects presentation for ksa mega projects september 2013.v1
Meed projects presentation for ksa mega projects september 2013.v1Ibrahim Al-Hudhaif
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 

Destacado (16)

Araex Magazine #4
Araex Magazine #4Araex Magazine #4
Araex Magazine #4
 
What Do You Know about Beam Ray Rife Machine
What Do You Know about Beam Ray Rife MachineWhat Do You Know about Beam Ray Rife Machine
What Do You Know about Beam Ray Rife Machine
 
Earned value management with Examples | Control Cost | PMBOK | PMP
Earned value management with Examples | Control Cost | PMBOK | PMPEarned value management with Examples | Control Cost | PMBOK | PMP
Earned value management with Examples | Control Cost | PMBOK | PMP
 
E deu dons aos homens
E deu dons aos homensE deu dons aos homens
E deu dons aos homens
 
CHÁ MALUCO!!!
CHÁ MALUCO!!!CHÁ MALUCO!!!
CHÁ MALUCO!!!
 
Doenças emergentes e reemergentes
Doenças emergentes e reemergentesDoenças emergentes e reemergentes
Doenças emergentes e reemergentes
 
BI : SharePoint 2016 BI or PowerBI v2 ? (O365 Saturday Copenhagen, 2016)
BI : SharePoint 2016 BI or PowerBI v2 ? (O365 Saturday Copenhagen, 2016)BI : SharePoint 2016 BI or PowerBI v2 ? (O365 Saturday Copenhagen, 2016)
BI : SharePoint 2016 BI or PowerBI v2 ? (O365 Saturday Copenhagen, 2016)
 
Radiología Tecnica de Waters
Radiología Tecnica de WatersRadiología Tecnica de Waters
Radiología Tecnica de Waters
 
HAVAS MEDIA-POCHE_WORLDWIDE N2
HAVAS MEDIA-POCHE_WORLDWIDE N2HAVAS MEDIA-POCHE_WORLDWIDE N2
HAVAS MEDIA-POCHE_WORLDWIDE N2
 
Crowdsourcing Webmontag Hannover 23.11.2009
Crowdsourcing Webmontag Hannover 23.11.2009Crowdsourcing Webmontag Hannover 23.11.2009
Crowdsourcing Webmontag Hannover 23.11.2009
 
Workshop Junge Ohren
Workshop Junge OhrenWorkshop Junge Ohren
Workshop Junge Ohren
 
Earned value analisys
Earned value analisysEarned value analisys
Earned value analisys
 
Budget justification 1
Budget justification 1Budget justification 1
Budget justification 1
 
Graham Winch
Graham WinchGraham Winch
Graham Winch
 
Meed projects presentation for ksa mega projects september 2013.v1
Meed projects presentation for ksa mega projects september 2013.v1Meed projects presentation for ksa mega projects september 2013.v1
Meed projects presentation for ksa mega projects september 2013.v1
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 

Similar a Earned value Project Management (evpm)

Project monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisProject monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisBECM, RUET, Bangladesh
 
Projects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part OneProjects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part OneWaleed Hamdy Albana
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.pptProfDrAnbalaganChinn
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementSerdar Temiz
 
Earned value management
Earned value managementEarned value management
Earned value managementwhizkris
 
PM - EVM - Dr Najam Abbas - OHT 1.pdf
PM - EVM - Dr Najam Abbas - OHT 1.pdfPM - EVM - Dr Najam Abbas - OHT 1.pdf
PM - EVM - Dr Najam Abbas - OHT 1.pdfNajm Naqvi
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-controleidalin95
 
Earned value management
Earned value managementEarned value management
Earned value managementGautam Kumar
 
Earned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docxEarned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docxsagarlesley
 

Similar a Earned value Project Management (evpm) (20)

Earned value analysis
Earned value analysisEarned value analysis
Earned value analysis
 
Project Management EVM & SCBA
Project Management EVM & SCBAProject Management EVM & SCBA
Project Management EVM & SCBA
 
Project monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisProject monitoring & Earned Value Analysis
Project monitoring & Earned Value Analysis
 
Projects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part OneProjects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part One
 
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSISPROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
 
EVA - Metrics.ppt
EVA - Metrics.pptEVA - Metrics.ppt
EVA - Metrics.ppt
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
 
Project monitoring lecture 1
Project monitoring lecture 1Project monitoring lecture 1
Project monitoring lecture 1
 
Back to basics - Earned Value Management for beginners webinar
Back to basics - Earned Value Management for beginners webinarBack to basics - Earned Value Management for beginners webinar
Back to basics - Earned Value Management for beginners webinar
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Earned value management
Earned value managementEarned value management
Earned value management
 
PM - EVM - Dr Najam Abbas - OHT 1.pdf
PM - EVM - Dr Najam Abbas - OHT 1.pdfPM - EVM - Dr Najam Abbas - OHT 1.pdf
PM - EVM - Dr Najam Abbas - OHT 1.pdf
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-control
 
An introduction to project accounting
An introduction to project accountingAn introduction to project accounting
An introduction to project accounting
 
Earned value management
Earned value managementEarned value management
Earned value management
 
Basics of EVM.pdf
Basics of  EVM.pdfBasics of  EVM.pdf
Basics of EVM.pdf
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Pmp cost chapter 7
Pmp cost chapter 7Pmp cost chapter 7
Pmp cost chapter 7
 
Earned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docxEarned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docx
 
PMP COST FORMULAE
PMP COST FORMULAEPMP COST FORMULAE
PMP COST FORMULAE
 

Más de Ejaz Bhatti

Security League Swztland
Security League SwztlandSecurity League Swztland
Security League SwztlandEjaz Bhatti
 
China Controlled Economy
China  Controlled EconomyChina  Controlled Economy
China Controlled EconomyEjaz Bhatti
 
Basics for oil riggers
Basics for oil riggersBasics for oil riggers
Basics for oil riggersEjaz Bhatti
 
ERP a research & study paper by ejaz ahmed bhatti
ERP a research & study paper by ejaz ahmed bhattiERP a research & study paper by ejaz ahmed bhatti
ERP a research & study paper by ejaz ahmed bhattiEjaz Bhatti
 
ERP presentation ejaz ahmed bhatti
ERP  presentation  ejaz ahmed bhattiERP  presentation  ejaz ahmed bhatti
ERP presentation ejaz ahmed bhattiEjaz Bhatti
 
Feasibilty Study And Report
Feasibilty Study And Report Feasibilty Study And Report
Feasibilty Study And Report Ejaz Bhatti
 

Más de Ejaz Bhatti (8)

Security League Swztland
Security League SwztlandSecurity League Swztland
Security League Swztland
 
China Controlled Economy
China  Controlled EconomyChina  Controlled Economy
China Controlled Economy
 
Basics for oil riggers
Basics for oil riggersBasics for oil riggers
Basics for oil riggers
 
INCOTERMS
INCOTERMSINCOTERMS
INCOTERMS
 
ERP a research & study paper by ejaz ahmed bhatti
ERP a research & study paper by ejaz ahmed bhattiERP a research & study paper by ejaz ahmed bhatti
ERP a research & study paper by ejaz ahmed bhatti
 
ERP presentation ejaz ahmed bhatti
ERP  presentation  ejaz ahmed bhattiERP  presentation  ejaz ahmed bhatti
ERP presentation ejaz ahmed bhatti
 
Feasibilty Study And Report
Feasibilty Study And Report Feasibilty Study And Report
Feasibilty Study And Report
 
1 800-got-junk
1 800-got-junk1 800-got-junk
1 800-got-junk
 

Último

Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 

Último (20)

Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 

Earned value Project Management (evpm)

  • 1.  
  • 2. EARNED VALUE PROJECT MANAGEMENT
  • 3.
  • 4. Your comments on the situation?
  • 5.
  • 6.
  • 7. Earned Value Project Management Cost Variance (CV) Cost Variance = EV – AC (BCWP – ACWP) = Rs 60,000 – Rs 85,000 = (-) Rs 25,000 Negative value indicating cost overruns.
  • 8.
  • 9.
  • 10. Earned Value Project Management Schedule Variance (SV) This is the algebraic difference between Earned Value of the work performed and the budgeted value of the work planned. In our case Schedule Variance = BCWP – BCWS (EV) – (PV) = Rs 60,000 – Rs 80,000 = (-) Rs 20,000
  • 11. You find anything odd about the measuring of schedule variance?
  • 12. Earned Value Project Management Schedule variance is being measured in monetary units – not time units.
  • 13. Earned Value Project Management A positive value for this variance represents work ahead of schedule, and negative value indicates behind schedule or schedule slippage
  • 14. Earned Value Project Management These variances not only tell the project manager about the true, rather than the apparent state of the project, they also ………………
  • 15. Earned Value Project Management In this case, the larger CV (42% of the EV) as compared to SV (33% of EV) tells us that we need to look more at the cost overrun aspects.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22. COST PERFORMANCE INDEX (CPI) 80,000 0.705 EAC = In our case it is ………….. = Rs 1,13,475.17
  • 23. COST PERFORMANCE INDEX (CPI) How would you explain the significance of EAC, SPI and CPI we have calculated?
  • 24. COST PERFORMANCE INDEX (CPI) EAC allows us to forecast the total project costs on the basis of efficiency with which work performance is achieved.
  • 25.
  • 26. COST PERFORMANCE INDEX (CPI) EV AC Compare What have you done by now (EV) To What you have spent by now (AC) You Get a reading on productivity called CPI = CPI Ratio
  • 27.
  • 28. COST PERFORMANCE INDEX (CPI) Interpretation of Indices ........Summary Table 1: Efficiency Indices Index Cost (CPI) Schedule (SPI) > 1.00 Under Cost Ahead of schedule = 1.00 On Cost On schedule < 1.00 Over Cost Behind schedule
  • 29. PLANNING FOR EARNED VALUE PROJECT MANAGEMENT
  • 30.
  • 31.
  • 32.
  • 33. FIRST QUARTERLY PROJECT STATUS REPORT “ We are right on our cost spending plan, a little behind schedule perhaps, but we are doing well” , would be the positive spin put on these results by most practitioners.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38. EV requires a baseline master project schedule; or stated another way without a master project schedule, one cannot employ Earned Value. EVPM EMPLOYMENT
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48. Cost Actual spend Value generated Planned value Time These three quantities are the basis of all earned value performance measurements Fig 1
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54. EVPM EMPLOYMENT Although only at 20% completion point, by monitoring these three dimensions of earned value data, the project is forecasting a significant final overrun of costs.
  • 55.
  • 56. EVPM EMPLOYMENT Decisions After Project Quarterly Progress Review Project budget revised to Rs 1.5M Time schedule remained at 12 months Main performance objective Getting project back on schedule
  • 57.
  • 59. EVPM EMPLOYMENT The value of Earned Value Postmortem:
  • 60. EVPM EMPLOYMENT Will the use of earned value on projects prevent cost overruns? Question:
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66.
  • 67. TRADITIONAL PROJECT COST MANAGEMENT
  • 68. Internal Development Project ---The plan--- Fig 2: A typical project cost expenditure projection Authorized Budget 1,000,000 Cost Spend Plan Thousands (000) 1,000 750 500 250 1 2 3 4 Quarters
  • 69. Internal Development Project ---1 st Quarter Results-- Fig 3: Traditional cost management: plan versus actual costs Authorized Budget 1,000,000 Planned Costs = 300K Thousands (000) 1,000 750 500 250 1 2 3 4 Quarters Actual Costs = 300K Status date
  • 70. Internal Development Project ---1 st Quarter Results--- Fig 4: Earned value project management: 3 dimensional Authorized Budget 1,000,000 Planned Value = 300 Thousands (000) 1,000 750 500 250 1 2 3 4 Quarters Actual Costs = 300K Status date Earned Value = 200K
  • 71.
  • 72.
  • 73. TRADITIONAL COST MANAGEMENT VS EV PROJECT MANAGEMENT
  • 74.
  • 75. Fig 5: The Fundamental Differences Traditional Project Cost Management Planned funds = 300 K Actual costs = 300 K Variance from an expenditure plan = (0K) Earned Value Project Management Planned value = 300 K Earned value = 200 K Variance from the planned schedule = (- 100K) Actual costs = 300 K The “true” cost variance = (- 100K)
  • 76. Fig 6: Project S-Curves Cumulative cost (in thousands) 80 60 40 20 40 35 30 25 20 15 10 5 45 Elapsed Time (in weeks)
  • 77. Table 2: Budgeted Costs for Project Siera Activity Duration (in weeks) 5 10 15 20 25 30 35 40 45 Total Design 6 2 - - - - - - - Engineer - 4 8 8 8 - - - - Install - - - 4 20 6 - - - Test - - - - - 2 6 4 2 Total 6 6 8 12 28 8 6 4 2 Cumulative 6 12 20 32 60 68 74 78 80 80
  • 78. Fig 7: Project Siera’s S-Curve showing negative Variance Cumulative cost (in thousands) 80 60 40 20 40 35 30 25 20 15 10 5 45 Elapsed Time (in weeks) 10,000 Negative Var. Cumulative Budgeted Cost Cumulative Actual Cost
  • 80.
  • 81. Is this good or bad news?
  • 82.
  • 83.
  • 84.
  • 85. COMPARISON OF TRACKING / MONITORING TOOLS
  • 86. Cost Project S-curves Schedule Performance Fig 8: Monitoring Project Performance S-curves
  • 87.
  • 88. Cost Tracking control charts, Gantt charts Schedule Performance Fig 9: Monitoring Project Performance S-curves
  • 89.
  • 90.
  • 91. Cost Tracking control charts, Gantt charts Schedule Performance Fig 10: Monitoring Project Performance Earned Value S-curves
  • 92.
  • 93.
  • 94. Forecasting the Final Cost and Schedule Results
  • 95.
  • 96.
  • 97.
  • 98. How do projects typically estimate their final costs? Question: Forecasting the Final Cost and Schedule Results
  • 99.
  • 100. What’s wrong with this approach? Question: Forecasting the Final Cost and Schedule Results
  • 101. Preparing a new ETC is a royal pain in the neck! Preparing a new ETC is non-project work . The very people who are performing on the project, who are often frustrated because they are running behind their schedule, must stop doing real project work and prepare a new baseline plan called the ETC. Answer: Forecasting the Final Cost and Schedule Results
  • 102.
  • 103. Fig 12: Monitoring earned value performance Perfect “Schedule” performance = 1.0 (for every 1.00 work planned you get 1.00 in earned value) Perfect “Cost” performance = 1.0 (for every 1.00 in cost actuals you get 1.00 in earned value) Good = +1.0 Plan = 1.0 Poor = -1.0 1.00 + –
  • 104.
  • 105.
  • 106. EVPM Independent Statistical EAC Comparisons
  • 107. 1. “The Mathematical” or “Overrun-to-Date” Estimate at Completion
  • 108. Fig 13: The “Mathematical” or “Overrun-to-Date” EAC Short EAC Formula: AC + BAC – EV 1.00 + – Status date Cost Overrun to date Long EAC Formula: Actual Costs + Remaining Work (BAC – EV) 1.0 pf
  • 109.
  • 110. First reason to use this formula: The Mathematical or Overrun-to-date is often the first indication announcing to the project manager and executive management the first indication that they may have cost problem on their project. If a project spends Rs. 300,000/- to accomplish only Rs. 200,000/- of budgeted work, the project experienced a “cost overrun” for the initial work that it has performed. Management deserves to know this fact. EVPM Independent Statistical EAC Comparison
  • 111. Second reason to use this formula: The Mathematical EAC is important because an early overrun does not go away with the passage of time. It is rare for an early front-end overrun disappearing through exemplary performance of the remaining work. EVPM Independent Statistical EAC Comparison
  • 112. In a project baseline, where are the best scope definition, best planning, best budget, and best scheduled dates placed; in the first half or the last half of the baseline? Question: EVPM Independent Statistical EAC Comparison
  • 113. Likely the best of every thing will be incorporated in to the first half baseline. Thus, if a project incurs an overrun in the first half, what are the chances of making a later recovery of the overrun? Little to none. This EAC formula provides a sort of minimum overrun that does not go away. Answer: EVPM Independent Statistical EAC Comparison
  • 114.
  • 115. 2. The “Cumulative CPI” Estimate at Completion
  • 116.
  • 117. Fig 14: The Low-end “Cumulative CPI” EAC Short EAC Formula: BAC = EAC Cum. CPI 1.00 + – Status date Cumulative CPI Plan EAC Long EAC Formula: Actual Costs + Remaining Work (BAC – EV) (Cumulative CPI pf)
  • 118.
  • 119.
  • 120.
  • 121.
  • 122. 3. The “Cumulative CPI times SPI” estimate at completion
  • 123.
  • 124. Fig 15: The High-end “Cumulative CPI times SPI” EAC There is no short EAC Formula Long EAC Formula: Actual Costs + Remaining Work (BAC – EV) (Cumulative CPI x SPI pf) 1.00 + – Status date Cumulative SPI Plan EAC Cumulative CPI
  • 125.
  • 126. What is the utility of providing a statistical range (low /most likely / high) of final cost results for a given project? Question: EVPM Independent Statistical EAC Comparison
  • 127. Simply put, it is to test the reasonableness of the project manager’s “official” cost position against a statistical range of possible EV forecasts. EV forecasts can quickly provide management with an understanding of the cost risk facing any project. Answer: EVPM Independent Statistical EAC Comparison
  • 128.
  • 129. Time Management: Predicting the Projects Final Completion Date
  • 130.
  • 131.
  • 132.
  • 133.
  • 134.
  • 135.
  • 136. “ Do not rely on EV schedule variance alone to help predict the final completion date for a project. Time Management
  • 137. Fig 16: Monitoring the earned value schedule performance Status date Planned value Earned value 2 months behind 2 months late? Budget Budget 100% 75% 50% 25% Year 2 Year 1
  • 138.
  • 139.
  • 140. Fig 17: Earned value schedule variances must be analyzed Compare late earned value tasks against the critical path and high risk tasks 1.00 + – Status date Cumulative SPI Baseline Plan These tasks are late to the baseline schedule Time
  • 141.
  • 142.
  • 143.
  • 144.
  • 145.
  • 146.
  • 147.
  • 148. Activation Limits of EVM Indices
  • 149. Fig 18 Activation Limits of EVM Indices Index Thresholds Action SPI /CPI Greater than 1.25 Work ahead of schedule, should use time on other problem / issues. Very good productivity should use improvement on other problem / issues. Between 0.9 and 1.25 Schedule as expected. No action. Productivity as expected. No action. Between 0.75 and 0.9 Warning! Work getting behind schedule, should act to get on track / Warning! Productivity low should act to get on track Less than 0.75 Out of control
  • 150.
  • 151.
  • 152. Three Factors Determine the Final Project Results
  • 153.
  • 154.
  • 155.
  • 156.
  • 157.
  • 158.
  • 159.
  • 160.
  • 161. Forecasting Final Project Status - TCPI Metric
  • 162.
  • 163. Fig 19: The To-Complete (the work) Performance Index (TCPI) Work remaining Funds remaining = TCPI Formula: 1.00 + – Status date Cumulative CPI Baseline Plan TCPI
  • 164.
  • 165.
  • 166. TCPI using management’s “ Budget at Completion” (BAC): Fig 20: Two “To-Complete Performance Index” (TCPI) Formulas TCPI using the Project Manager’s “ Estimate at Completion” (EAC): Work Remaining (BAC – EV) Funds Remaining (BAC – AC) = TCPI (BAC) Work Remaining (BAC – EV) Funds Remaining (EAC – AC) = TCPI (EAC)
  • 167. The TCPI Using Management's Budget at Completion
  • 168.
  • 169.
  • 170. Fig 21: The relationship of Cumulative CPI versus TCPI Status date at 50% Complete Sunk Costs Opportunity Costs 1.00 + – Cumulative CPI Baseline Plan TCPI .75 1.25
  • 171.
  • 172.
  • 173.
  • 174.
  • 175.
  • 176. The TCPI Using The PM’s Estimate at Completion (EAC)
  • 177.
  • 178.
  • 179.
  • 180.
  • 181.
  • 182. Fig 22: Using the TCPI to validate the Project Manager’s EAC 1.00 + – Cumulative CPI Baseline Plan PM EAC (1) (2) (3) Math EAC Cum. CPI EAC CPI x SPI EAC
  • 183.
  • 184.
  • 185.
  • 186.
  • 187.
  • 188.
  • 189. Methods Used to Plan and Measure EV
  • 190.
  • 191.
  • 192.
  • 193. Fig 23: EV Measurement Methods Typically used for non-recurring tasks Used for either non-recurring or recurring tasks 1. Milestones weighted values. 2. Fixed formula (40/60, 25/75, 50/50 etc). 3. Percent complete estimates. 4. Percent complete with milestone gates. 5. Equivalent units. 6. Earned standards.
  • 194.
  • 195.
  • 196. Fig 24: Measure Earned Value with the Project Schedule 1. Milestones with Weighted Values 2. Fixed formula which adds to 100% 25% 75% 50% 50% 40% 60% 3. Percent complete estimates 100% 4. Percent complete with Milestone Gates 33% 67% 100%
  • 197.
  • 198.
  • 199.
  • 200.
  • 201.
  • 202.
  • 203.
  • 204.
  • 205.
  • 206.
  • 207.
  • 208.
  • 209. The Genesis and Evolution of Earned Value
  • 210.
  • 211.
  • 212.
  • 213.
  • 214.
  • 215.
  • 216.
  • 217.
  • 218.
  • 219.
  • 220.
  • 221.
  • 222.
  • 223.
  • 224.
  • 225.
  • 226.
  • 227. Fig 25: Getting back to Earned Value Basics Factory Floor ------------------------ 1890 PERT / COST -------------------------- 1962 C / SCSC ------------------------ 1967-1996 EVM ANSI-EIA-748 Standard -- 1998 Simple EVPM ------ into 21 st Century
  • 228. EPILOGUE Focussing on Value of Work Accomplished (i.e. the earned value)
  • 229. What Do Project Managers Want to Know?
  • 230.
  • 231.
  • 232. This is not cost performance, but rather funding performance. What do Project Managers want to know?
  • 233. What is missing? What do Project Managers want to know?
  • 234.
  • 235.
  • 236.
  • 237.
  • 238.
  • 239.
  • 240. Fig 26 Is this any good? Time Cost Planned Cost Cost to date
  • 241.
  • 242.
  • 243.
  • 244.
  • 245.
  • 246.
  • 247. WARNING KEEP AWAY! Motto of unsuccessful project manager
  • 248. “ Living with latent unease is better than facing the unpalatable truth”