2. Objective
Assure product quality.
Reduce Product return rate.
Analyze and Trace product Bugs.
Meet up and reduce Target lead time.
Milestone define.
Alarm on Project review.
Negotiate with client on customization.
Deal with customer while Bug review either project review
New feature follow up
To observe Standard
Keep product follow up ALL standard, such as ETSI / GSM / EDGE / BT …..
this part will also cover basic IOT test
3. Activities
Test Plan define
Test Case development
MMI Test (system test)
Stress test (auto test)
HW Test (BB / RF)
Reliability Test
Global Field Trial
IOT (Interoperability-Testing)
FTA
Develop Testing Tool
Problem Tracing / Analyze
Test report Provide
4. Road Map / Milestone
Phase 0 (S0) Phase 1 (S1) Phase 2 (S2) Phase 3 (S3) Phase 4 (S4) Phase 5 (S5)
Test Design
Phase
Bug Finding/
Function
Test
Problem
Analysis/
Combinatio
n Test
Validation Test Regression Test/
MP Stage
Review Stage
Duration/ Manpower
2 - 3 weeks/ 1 -3
persons
2 -3 weeks/ 4 -5
persons
3 - 4 weeks/ 4 -5
persons
1 - 2 weeks/ 4 persons 4 weeks/ 4 - 5
persons
1 week/ All Engineers
Mission
1. Testing Plan:
Schedule, Resource,
Test Skill
Training…
2. Review Spec.
3. Optimize Test Case
1. Finish the first
round of Test
Case.
2. Find out all issues
inside the
product.
1. Issues Analysis &
Reproduce
Process
Finding
2. Complex
combination
test executes.
1. Final verification
for the
software to
confirm the
quality.
1. Quick response to
all the issues
from Field side
& End-User
side.
1. Review overall
items
happened
during the test
period, and
then make
improvement
on it.
Input
1. MRS (Marketing
Request
Spec.)/ Product
Spec.
2. Software Design
Spec./ MMI
Functional
Spec.
3. Standard Test Case
4. User Manual
5. Senario Flow Chart
1. Test Case Excel &
Test Case
Database.
2. Software
Functional
Priority List.
3. Software version:
Alpha/ Beta.
1. Issue List.
2. Software version:
ESR
1. Updated Test Case
Database.
2. Issue List.
3. Software version:
ETR
1. Remainder issue
list.
2. Field or End-User
Feedback Issue
Report.
3. Software version:
Delta.
1. Field Feedback
Issue Report.
2. End-User
Feedback Issue
Report.
5. Phase 0 (S0) Phase 1 (S1) Phase 2 (S2) Phase 3 (S3) Phase 4 (S4) Phase 5 (S5)
Action
1. Review Spec. &
highlight the
problem from
test of view.
2. Plan the test
schedule, test
resource &
finish the
System Test
Plan
3. Base on STP to
create Test
Design Spec.
4. Base on TDS to
create Test
Case Spec.
5. Generate Test Case
Excel file.
6. Submit Project
PTS database.
7. Create Project
Information
sharing
database.
8. Test Case Training.
1. Run Test Case &
fill in the
result.
2. Bug review.
3. Generate Auto Test
Script.
1. Analysis the
“Random”/
“Once” issue;
try to find out
rules.
2. Identify the root
cause of issues.
3. Clarify discussion
issues.
4. Modify the test
case.
1.Go through all the
items in final
test case
database.
2. Field Trial
1. Field Test
2. Analysis End-User
Report issue.
3. Verify the Delta
version after
MP.
4. Execute the Auto
Test Script to
cover the lack
of resource.
1. Review the Not
Suitable Test
Case.
2. Review the Not
Available Test
Case.
3. Check the coverage
of Test Plan
which is based
on Customer/
Field/ End-
User Report.
4. Modify the
standard Test
Plan.
5. Plan the test
training.
Road Map / Milestone
6. MMI Test (system test)
Basic Function
SS / USSD / Call Forward …. Etc (all ETSI standard)
GUI (user interface spec) / Language check
All interrupt passibility
Following up test case.
Advance feature
WAP / GPRD
JAVA
Download
MMS / EMS
PoC / PTT
IMPS
USB / IrDA / BlueTooth / synchronization etc..
7. Test case / Test Plan / IOT / Field Trial
Please see example I given yesterday, there are total more then
8000 test items in test case.
8. HW Test (BB / RF)
Radio frequency
Power Level
Phase error
Frequency error
Burst Timing (Ramp Up / Down)
Timing Advance
Spectrum due to modulation
Spectrum due to switching transient
Bit Error Rate
Rx Level Accuracy
Usable receiver input level range
Inter-Modulation Rejection
Co-Channel Rejection Class Ib RBER
Co-Channel Rejection Class II RBER
Adjacent Channel Rejection Class Ib
RBER
Adjacent Channel Rejection Class II
RBER
RF Exposure Limits (SAR)
Handover Check
blocking and Spurious Response
AM suppression
Conduct Spurious Emissions (Active-
mode)
Conduct Spurious Emissions ( Idle-
mode)
Radiated Spurious Emissions (Active-
mode)
Radiated Spurious Emissions ( Idle-
mode)
Bese Band
Acoustic SLR
Sending Freq. Response
Acoustic RLR
Receiving Freq. Response
Acoustic STMR
Acoustic Stability Margin
Sending Distortion
Audio Signal Output
Current Consumption Full Power
Phone OFF maximum current
Stand-by current
Talking Time
Stanby Time
Charger Algorithm
9. Reliability Test
Function Test
Durability Tests (Life of operating elements)
Chemical Tests
Mechanical tests
Climatic testing of cellular phones
Aging of cellular phones
Package Test
Individual components
Radio frequency test
10. Stress test (auto test)
MO call rate.
MT call rate.
SMS rate.
EMS / MMS rate.
WAP / GPRS rate.
Dynamic call test.
Speech quality.
Auto test will be included.