SlideShare una empresa de Scribd logo
1 de 30
Chapter 6
                           Major Recreational
                          Activities and Facilities
                         World of Resorts: From Development to Management
                                            Third Edition
                                        (424TXT or 424CIN)


© 2010, Educational Institute
Competencies for
Major Recreational Activities and Facilities
     1. Identify factors that affect how a sports and recreation
        mix is chosen.
     2. Detail the many factors involved in developing and
        operating golf facilities at a resort.
     3. Detail the many factors involved in developing and
        operating tennis facilities at a resort.
     4. Detail the many factors involved in developing and
        operating a ski resort.
     5. Identify several alternative sports and explain why
        they are significant. (continued)
© 2010, Educational Institute                                      2
Competencies for
Major Recreational Activities and Facilities
                                (continued)


     1. Detail the many factors involved in developing and
        operating a resort with boating facilities and a marina.
     2. Detail the many factors involved in developing and
        operating swimming facilities at a resort.
     3. Detail the many factors involved in developing and
        operating health club and spa facilities at a resort.
     4. Describe the role that infrastructure and striking
        natural surroundings play in the success of a resort’s
        recreational offerings.
© 2010, Educational Institute                                      3
Considerations in Deciding Recreational
          Activities/Facilities to Offer
          • What is the nature of the resort?
          • What are the primary market segments to be
            served? Niche markets?
          • Should the resort develop a specific sport or
            recreation as a signature draw?
          • Will climatic conditions (on the average) in the
            area support the signature sport(s) or recreation for
            an adequate number of revenue days?
          • Will there be outdoor or indoor facilities?

© 2010, Educational Institute    (continued)                        4
Considerations in Deciding Recreational
          Activities/Facilities to Offer
                                 (continued)

          • What type of access can be created for people with
            disabilities?
          • What is the acreage of land required for target
            sports and recreational activities?
          • What are the environmental constraints?
          • Are there unusual land forms offering distinctive
            advantages for a specific sport or recreation?
          • How much capital will be required?
© 2010, Educational Institute    (continued)                     5
Considerations in Deciding Recreational
          Activities/Facilities to Offer
                                 (continued)

          • What is the cost of recreational and maintenance
            equipment, parts, supplies, and accessories?
          • What are the costs of energy and other utilities?
          • Are tournaments involved? What is the cost of
            promotion?
          • What are the liability coverage requirements?
          • Will recreational activities be self-managed or
            outsourced?
© 2010, Educational Institute                                   6
Classifications of Resorts by
                                 Seasonality
                                • Summer resorts
                                • Cold winter resorts
                                • Warm winter resorts
                                • Four-season resorts



© 2010, Educational Institute                           7
Elements of a Full-Service Golf Course
                     • Clubhouse
                       • Locker rooms, restrooms, and showers
                       • Dining room and snack bar
                       • Short-order kitchen with pantry and
                          employee restroom
                       • Golf pro’s office
                       • Pro shop
                       • Lobby
                       • Bar
                       • Lounge and card-playing area
                       • Areas for club and cart storage,
                          maintenance,(continued)
© 2010, Educational Institute
                                       and repair               8
Elements of a Full-Service Golf Course
                                              (continued)

                        •       Eighteen-hole golf course
                        •       Practice fairway
                        •       Small putting green
                        •       Maintenance building
                                 • Golf course superintendent’s office,
                                   restroom, and shower
                                 • Maintenance crew’s locker room,
                                   restroom, and showers
                                 • Repair shop and areas for equipment
                                   and materials storage
© 2010, Educational Institute                                             9
Golf Course Development Costs
          • Course construction costs: Clearing and grubbing,
            grading and mobilization, drainage, rough and finish
            shaping, practice green, tee construction, fairway
            bunkers, bridge construction, grassing and seed
            preparation, cart path construction, lakes and water
            features, irrigation system, pumping plant, and grow-
            in period (maturation).
          • Design and architecture-related costs: Architect’s fee,
            permits, financing, sand for traps, rest stations,
            maintenance building, maintenance equipment, and
            clubhouse.
© 2010, Educational Institute     (continued)                         10
Golf Course Development Costs
                                   (continued)

          • Owner/developer preferences: Scope of amenities,
            qualitative factors, choice of golf architect (signature
            name or general designer), and equipment options
            (golf carts, etc.).
          • Equipment-related costs: Mowing equipment, tractors
            and trucks, maintenance equipment, golf course
            accessories, general tools, and hand tools.



© 2010, Educational Institute                                          11
Factors Affecting the Provision of
                     Tennis Facilities
          • Estimated guest demand and maximum number to
            be accommodated
          • Actual or potential tennis-playing populations
            within one to one-and-a-half hour’s drive
          • Number of competing public and private tennis
            facilities nearby
          • Land requirement
          • Weather patterns—number of fair days, average
            temperatures, and wind factor—if the courts are to
            be constructed outdoors
          • Length of the resort’s operating season
© 2010, Educational Institute    (continued)                     12
Factors Affecting the Provision of
                      Tennis Facilities
                                (continued)

          • Length of the playing day
          • Possible demand for night tennis
          • Court design and orientation
          • Type of court playing surface—fast, moderately
            fast, or slow
          • Clubhouse for sale/rental of equipment, video
            lessons, etc.
          • Management by tennis professional
          • Tournaments and other promotional opportunities
© 2010, Educational Institute                                 13
Advantages of Centralized
                               Tennis Courts
          • It encourages socializing and patronage of
            revenue-generating services.
          • It decreases the cost of construction and the
            amount of landscaping needed.
          • It allows for easier court maintenance.
          • It improves management efficiency through better
            control of court reservations and player behavior.
          • It optimizes the scheduling of lessons and other
            tennis-related activities.
© 2010, Educational Institute                                    14
Roles and Responsibilities of the
                        Tennis Director
          • Providing leadership in developing an innovative
            tennis program at the resort
          • Promoting and publicizing tennis to build the
            resort’s image
          • Inviting tournaments consistent with general
            management policy
          • Developing and directing tennis-related activities
            for guests

© 2010, Educational Institute    (continued)                     15
Roles and Responsibilities of the
                        Tennis Director
                                (continued)

          • Supervising the daily management and control of
            court reservations and monitoring player conduct
          • Managing tennis revenues (player fees, instruction
            fees, rentals)
          • Controlling operating costs
          • Supervising proper maintenance of the courts


© 2010, Educational Institute                                    16
Features of a Generic Vacation
                           Ski Resort
        • Drops: In the U.S., 3,000–4,000 vertical feet; in the
          Northeast, 1,500 vertical feet; in the Midwest and
          South, no standard has been set.
        • Ski site orientation: North or northeast exposure
          maximizes snow retention and protects against wind.
        • Snow requirement: Area should receive at least 200
          inches of new snow per season or have average
          sub-freezing temperatures for snowmaking.
        • Slope grades: For intermediate skiers, terrain
          gradients should be 25–45 percent; for beginners, 25
          percent or less; for experts, 50–70 percent.
                                 (continued)
© 2010, Educational Institute                                     17
Features of a Generic Vacation
                           Ski Resort
                                (continued)

        • Climate/temperature: Average temperature must be
          cold enough to maintain snow for skiing, generally
          sunny during the day, and most of the snowfall
          should occur at night.
        • Water: Must be an adequate source of water to
          support anticipated level of snowmaking.
        • Base terrain: Must be adequate base terrain to
          accommodate amenities planned for the total ski lift
          facility.
© 2010, Educational Institute                                    18
Necessary Factors for a Profitable
                       Ski Resort
          • Seasonality: The site must have summer use
            potential.
          • Access: The site must be readily accessible by
            road and air.
          • Distance: Research indicates that people will drive
            a one-way distance of up to three hours to a day
            ski area and up to eight hours to a weekend area,
            but will drive or fly thousands of miles to major
            vacation ski resorts.

© 2010, Educational Institute                                     19
Three Basic Types of Lift Systems
          1. Aerial lifts: Aerial tramways, funitels, funifors,
             gondola lifts, chair lifts
          2. Surface lifts: T-bars, J-bars, disks or platters,
             rope tows
          3. Cable railways: Funiculars (also known as
             inclined railways), plane railways, and cliff
             railways



© 2010, Educational Institute                                     20
Common Characteristics of Ski Resorts
      • Heavy capital investment in fixed assets and lift
        equipment
      • Heavy dependence on lift ticket sales, which often
        account for more than half of the revenue stream
      • High fixed costs in relation to revenue—permanent
        staff salaries, maintenance, depreciation, and overhead
      • Low variable costs in lift revenue—economy of scale
        produces only marginal cost benefits
      • Low cash flow, making it difficult for all but larger,
        diversified companies to attract investment in capital
© 2010, Educational Institute                                     21
Necessary Provisions of a Marina/
                       Dock Area
              • A high degree of safety from wind, tide, and
                current action that could damage boats.
              • A sheltered channel for entrance and exit, wide
                and deep enough to handle a range of boat sizes
                and types.
              • Ease of accessibility to open waters.


© 2010, Educational Institute                                     22
Cost Factors in Calculating Initial
                  Capital Requirements
          • Dredging, filling, and other work required to prepare
            the site for the marina (channels, basin, and slips)
          • Bulkhead walls and all shore protection
          • The breakwater system and related items for offshore
            protection
          • Options for disposing of wastewater
          • Piers, wharves, catwalks, hoists, floats, and similar
            items related to the basic marina structure
          • Buildings, service stations, storage sheds, and related
            equipment
© 2010, Educational Institute      (continued)                        23
Cost Factors in Calculating Initial
                  Capital Requirements
                                  (continued)

          • Roads, walkways, parking areas, utility systems and
            hookups, and landscaping
          • Stock of merchandise for sale—gasoline, lubricants,
            engines and other parts, safety gear, fishing equipment,
            boating accessories, etc.
          • Engineering, architectural, and other planning costs
          • Legal fees related to the preparation of all required
            governmental planning documents (including
            environmental impact statements)
          • Inspection and supervision
          • Operation and maintenance cost and a sinking fund
© 2010, Educational Institute                                          24
Agencies/Regulatory Bodies Concerned
    with Beaches, Marinas, and Docks
          • U.S. Army Corps of Engineers
          • U.S. Departments of Agriculture and the Interior
          • Federal, state, and local environmental protection
            agencies
          • County government
          • Local chambers of commerce or other
            governmental agencies


© 2010, Educational Institute                                    25
Components of Marina Vacation
                         Resorts
                • Covered and open berths
                   • 110- to 120-volt single-phase and 220-volt
                     three-phase power at most slips
                   • Dial telephone
                   • Television cable
                   • Public address system
                   • Refuse service
                • Boat rentals
                • Dry storage rental
                • Dredged entrance channel
                • Fuel pumps for unleaded gasoline, diesel, and
                  premixed outboard fuel, oil-changing and battery
                  service, and services for minor boat repairs
© 2010, Educational Institute        (continued)                     26
Components of Marina Vacation
                         Resorts
                                      (continued)

          •     Launching facilities for boats up to a specified length
          •     Full tackle and marina shop
          •     Fishing licenses
          •     Restroom stations with showers
          •     Laundry facilities
          •     Waterfront grill
          •     Luxury restaurant and lounge
          •     Weather station
          •     Fish photo gallery
          •     Shuttle service between hotel and marina
          •     Access to hotel services
© 2010, Educational Institute                                             27
Seven Main Types of Spas
                                •   Destination spa
                                •   Resort/hotel spa
                                •   Day spa
                                •   Medical spa
                                •   Mineral springs spa
                                •   Club/fitness spa
                                •   Cruise ship spa


© 2010, Educational Institute                             28
Potential Benefits of On-Premises
               Health and Fitness Facilities

                                • Increased occupancy
                                • Competitive
                                  advantage
                                • Increased room rates
                                • Marketing asset
                                • Positive image

© 2010, Educational Institute                            29
Factors Affecting the Success of
                  Health and Fitness Facilities
                                1. Concept and philosophy
                                2. Objectives
                                3. Market
                                4. Program
                                5. Revenue projections
                                6. Costs
                                7. Facility design
                                8. Financing
                                9. Management
                                10. Planning
                                11. Operations
© 2010, Educational Institute                               30

Más contenido relacionado

La actualidad más candente

Resorts, Themed Lodgig and Special Lodging Establishments
Resorts, Themed Lodgig and Special Lodging EstablishmentsResorts, Themed Lodgig and Special Lodging Establishments
Resorts, Themed Lodgig and Special Lodging EstablishmentsCris dela Peña
 
Classification of Hotel on the basis of target market, location, guests, serv...
Classification of Hotel on the basis of target market, location, guests, serv...Classification of Hotel on the basis of target market, location, guests, serv...
Classification of Hotel on the basis of target market, location, guests, serv...MuhammadAliHassan12
 
Introduction To Hotel Management
Introduction To Hotel ManagementIntroduction To Hotel Management
Introduction To Hotel ManagementLakesia Wright
 
Mountain based resort development process,site and design guidelines
Mountain based resort development process,site and design guidelinesMountain based resort development process,site and design guidelines
Mountain based resort development process,site and design guidelinesAMALDASKH
 
Attractions, Entertainment, Recreation, and Other Sectors - Tourism
Attractions, Entertainment, Recreation, and Other Sectors - TourismAttractions, Entertainment, Recreation, and Other Sectors - Tourism
Attractions, Entertainment, Recreation, and Other Sectors - TourismCris dela Peña
 
Hilton Marketing Project
Hilton Marketing ProjectHilton Marketing Project
Hilton Marketing ProjectDebbie Orr
 
HOTEL CLASSIFICATION AND HOTEL ORGANIZATION
HOTEL CLASSIFICATION AND HOTEL ORGANIZATIONHOTEL CLASSIFICATION AND HOTEL ORGANIZATION
HOTEL CLASSIFICATION AND HOTEL ORGANIZATIONindian chefrecipe
 
InterContinental Hotels Group IHG®
InterContinental Hotels Group IHG®InterContinental Hotels Group IHG®
InterContinental Hotels Group IHG®Fazlea Allahie
 
CULTURE AND HERITAGE TOURISM
CULTURE AND HERITAGE TOURISMCULTURE AND HERITAGE TOURISM
CULTURE AND HERITAGE TOURISMERICK MAINA
 
Food and Beverage Sector - Tourism
Food and Beverage Sector - TourismFood and Beverage Sector - Tourism
Food and Beverage Sector - TourismCris dela Peña
 
Introduction to resort (1).pptx
Introduction to resort (1).pptxIntroduction to resort (1).pptx
Introduction to resort (1).pptxMilcah6
 
Anchal's presentation
Anchal's presentationAnchal's presentation
Anchal's presentationmemymyself
 
Brief History of the Hospitality Industry
Brief History of the Hospitality IndustryBrief History of the Hospitality Industry
Brief History of the Hospitality Industryaysconsulting
 

La actualidad más candente (20)

ITFT - resort mgt
ITFT - resort mgtITFT - resort mgt
ITFT - resort mgt
 
Resorts, Themed Lodgig and Special Lodging Establishments
Resorts, Themed Lodgig and Special Lodging EstablishmentsResorts, Themed Lodgig and Special Lodging Establishments
Resorts, Themed Lodgig and Special Lodging Establishments
 
Accomodation
AccomodationAccomodation
Accomodation
 
Classification of Hotel on the basis of target market, location, guests, serv...
Classification of Hotel on the basis of target market, location, guests, serv...Classification of Hotel on the basis of target market, location, guests, serv...
Classification of Hotel on the basis of target market, location, guests, serv...
 
Introduction To Hotel Management
Introduction To Hotel ManagementIntroduction To Hotel Management
Introduction To Hotel Management
 
Classification of Hotel
Classification of HotelClassification of Hotel
Classification of Hotel
 
Mountain based resort development process,site and design guidelines
Mountain based resort development process,site and design guidelinesMountain based resort development process,site and design guidelines
Mountain based resort development process,site and design guidelines
 
Attractions, Entertainment, Recreation, and Other Sectors - Tourism
Attractions, Entertainment, Recreation, and Other Sectors - TourismAttractions, Entertainment, Recreation, and Other Sectors - Tourism
Attractions, Entertainment, Recreation, and Other Sectors - Tourism
 
Hotel past & present
Hotel past & presentHotel past & present
Hotel past & present
 
Hilton Marketing Project
Hilton Marketing ProjectHilton Marketing Project
Hilton Marketing Project
 
HOTEL CLASSIFICATION AND HOTEL ORGANIZATION
HOTEL CLASSIFICATION AND HOTEL ORGANIZATIONHOTEL CLASSIFICATION AND HOTEL ORGANIZATION
HOTEL CLASSIFICATION AND HOTEL ORGANIZATION
 
planning resort planning
planning resort planningplanning resort planning
planning resort planning
 
HILTON
HILTONHILTON
HILTON
 
InterContinental Hotels Group IHG®
InterContinental Hotels Group IHG®InterContinental Hotels Group IHG®
InterContinental Hotels Group IHG®
 
CULTURE AND HERITAGE TOURISM
CULTURE AND HERITAGE TOURISMCULTURE AND HERITAGE TOURISM
CULTURE AND HERITAGE TOURISM
 
Food and Beverage Sector - Tourism
Food and Beverage Sector - TourismFood and Beverage Sector - Tourism
Food and Beverage Sector - Tourism
 
Introduction to resort (1).pptx
Introduction to resort (1).pptxIntroduction to resort (1).pptx
Introduction to resort (1).pptx
 
Resort management
Resort managementResort management
Resort management
 
Anchal's presentation
Anchal's presentationAnchal's presentation
Anchal's presentation
 
Brief History of the Hospitality Industry
Brief History of the Hospitality IndustryBrief History of the Hospitality Industry
Brief History of the Hospitality Industry
 

Destacado (15)

Chapter 3
Chapter 3Chapter 3
Chapter 3
 
Case study on Resort
Case study on ResortCase study on Resort
Case study on Resort
 
resort complex casestudy
resort complex casestudyresort complex casestudy
resort complex casestudy
 
resort casestudy
resort casestudyresort casestudy
resort casestudy
 
Resort design pdf
Resort design pdfResort design pdf
Resort design pdf
 
Eco resorts-Indian Context
Eco resorts-Indian ContextEco resorts-Indian Context
Eco resorts-Indian Context
 
KATAFANGA RESORT AND SPA CASE STUDY
KATAFANGA RESORT AND SPA CASE STUDY KATAFANGA RESORT AND SPA CASE STUDY
KATAFANGA RESORT AND SPA CASE STUDY
 
Data collaction of resort
Data collaction of resortData collaction of resort
Data collaction of resort
 
Chapter 12
Chapter 12Chapter 12
Chapter 12
 
Chapter 9
Chapter 9Chapter 9
Chapter 9
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 
Chapter 11
Chapter 11Chapter 11
Chapter 11
 
Chapter 10
Chapter 10Chapter 10
Chapter 10
 
NHÀ HÀNG - BAR TRONG RESORT
NHÀ HÀNG - BAR TRONG RESORTNHÀ HÀNG - BAR TRONG RESORT
NHÀ HÀNG - BAR TRONG RESORT
 
Tennis Surface Construction Basics
Tennis Surface Construction BasicsTennis Surface Construction Basics
Tennis Surface Construction Basics
 

Similar a Chapter 6

Auskor Australasia - Student Accommodation Project Planning - October 2010
Auskor Australasia - Student Accommodation Project Planning - October 2010Auskor Australasia - Student Accommodation Project Planning - October 2010
Auskor Australasia - Student Accommodation Project Planning - October 2010blisweb
 
London 2012 business opportunities & competefor -Mike Mulvey
London 2012 business opportunities & competefor -Mike MulveyLondon 2012 business opportunities & competefor -Mike Mulvey
London 2012 business opportunities & competefor -Mike MulveyThink London
 
Athletic Facilities Presentation from Feb 2015
Athletic Facilities Presentation from Feb 2015Athletic Facilities Presentation from Feb 2015
Athletic Facilities Presentation from Feb 2015Steven Baule
 
Fitness, Spa And Gaming Facilities For The A R W L H C
Fitness,  Spa And  Gaming  Facilities For The  A R W L H CFitness,  Spa And  Gaming  Facilities For The  A R W L H C
Fitness, Spa And Gaming Facilities For The A R W L H CMartin Mongiello
 
Facility Operations Project
Facility Operations Project Facility Operations Project
Facility Operations Project Taylor Lomax
 
UNF facility proposal
UNF facility proposalUNF facility proposal
UNF facility proposalHassan Smith
 
Chisholm creek presentation final
Chisholm creek presentation finalChisholm creek presentation final
Chisholm creek presentation finalkrgc
 
Due Dilligence_Oil Shale_Colorado 2014_Sabanov
Due Dilligence_Oil Shale_Colorado 2014_SabanovDue Dilligence_Oil Shale_Colorado 2014_Sabanov
Due Dilligence_Oil Shale_Colorado 2014_SabanovSergei Sabanov
 

Similar a Chapter 6 (13)

Auskor Australasia - Student Accommodation Project Planning - October 2010
Auskor Australasia - Student Accommodation Project Planning - October 2010Auskor Australasia - Student Accommodation Project Planning - October 2010
Auskor Australasia - Student Accommodation Project Planning - October 2010
 
London 2012 business opportunities & competefor -Mike Mulvey
London 2012 business opportunities & competefor -Mike MulveyLondon 2012 business opportunities & competefor -Mike Mulvey
London 2012 business opportunities & competefor -Mike Mulvey
 
Athletic Facilities Presentation from Feb 2015
Athletic Facilities Presentation from Feb 2015Athletic Facilities Presentation from Feb 2015
Athletic Facilities Presentation from Feb 2015
 
Tennis
TennisTennis
Tennis
 
Fitness, Spa And Gaming Facilities For The A R W L H C
Fitness,  Spa And  Gaming  Facilities For The  A R W L H CFitness,  Spa And  Gaming  Facilities For The  A R W L H C
Fitness, Spa And Gaming Facilities For The A R W L H C
 
Corporate Outreach
Corporate OutreachCorporate Outreach
Corporate Outreach
 
Subham resort
Subham resortSubham resort
Subham resort
 
Facility Operations Project
Facility Operations Project Facility Operations Project
Facility Operations Project
 
UNF facility proposal
UNF facility proposalUNF facility proposal
UNF facility proposal
 
Chisholm creek presentation final
Chisholm creek presentation finalChisholm creek presentation final
Chisholm creek presentation final
 
20100206
2010020620100206
20100206
 
ITFT-Resort planing
ITFT-Resort planingITFT-Resort planing
ITFT-Resort planing
 
Due Dilligence_Oil Shale_Colorado 2014_Sabanov
Due Dilligence_Oil Shale_Colorado 2014_SabanovDue Dilligence_Oil Shale_Colorado 2014_Sabanov
Due Dilligence_Oil Shale_Colorado 2014_Sabanov
 

Último

Albania Vs Spain Albania is Loaded with Defensive Talent on their Roster.docx
Albania Vs Spain Albania is Loaded with Defensive Talent on their Roster.docxAlbania Vs Spain Albania is Loaded with Defensive Talent on their Roster.docx
Albania Vs Spain Albania is Loaded with Defensive Talent on their Roster.docxWorld Wide Tickets And Hospitality
 
08448380779 Call Girls In IIT Women Seeking Men
08448380779 Call Girls In IIT Women Seeking Men08448380779 Call Girls In IIT Women Seeking Men
08448380779 Call Girls In IIT Women Seeking MenDelhi Call girls
 
CALL ON ➥8923113531 🔝Call Girls Telibagh Lucknow best Night Fun service 🧣
CALL ON ➥8923113531 🔝Call Girls Telibagh Lucknow best Night Fun service  🧣CALL ON ➥8923113531 🔝Call Girls Telibagh Lucknow best Night Fun service  🧣
CALL ON ➥8923113531 🔝Call Girls Telibagh Lucknow best Night Fun service 🧣anilsa9823
 
ppt on Myself, Occupation and my Interest
ppt on Myself, Occupation and my Interestppt on Myself, Occupation and my Interest
ppt on Myself, Occupation and my InterestNagaissenValaydum
 
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...Eticketing.co
 
08448380779 Call Girls In Lajpat Nagar Women Seeking Men
08448380779 Call Girls In Lajpat Nagar Women Seeking Men08448380779 Call Girls In Lajpat Nagar Women Seeking Men
08448380779 Call Girls In Lajpat Nagar Women Seeking MenDelhi Call girls
 
Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...
Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...
Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...World Wide Tickets And Hospitality
 
VIP Kolkata Call Girl Liluah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Liluah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Liluah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Liluah 👉 8250192130 Available With Roomdivyansh0kumar0
 
08448380779 Call Girls In Karol Bagh Women Seeking Men
08448380779 Call Girls In Karol Bagh Women Seeking Men08448380779 Call Girls In Karol Bagh Women Seeking Men
08448380779 Call Girls In Karol Bagh Women Seeking MenDelhi Call girls
 
CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best Female service 🦺
CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best Female service  🦺CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best Female service  🦺
CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best Female service 🦺anilsa9823
 
Atlanta Dream Exec Dan Gadd on Driving Fan Engagement and Growth, Serving the...
Atlanta Dream Exec Dan Gadd on Driving Fan Engagement and Growth, Serving the...Atlanta Dream Exec Dan Gadd on Driving Fan Engagement and Growth, Serving the...
Atlanta Dream Exec Dan Gadd on Driving Fan Engagement and Growth, Serving the...Neil Horowitz
 
大学假文凭《原版英国Imperial文凭》帝国理工学院毕业证制作成绩单修改
大学假文凭《原版英国Imperial文凭》帝国理工学院毕业证制作成绩单修改大学假文凭《原版英国Imperial文凭》帝国理工学院毕业证制作成绩单修改
大学假文凭《原版英国Imperial文凭》帝国理工学院毕业证制作成绩单修改atducpo
 
Jankipuram / Call Girls Lucknow | Whatsapp No 🫗 8923113531 🎳 VIP Escorts Serv...
Jankipuram / Call Girls Lucknow | Whatsapp No 🫗 8923113531 🎳 VIP Escorts Serv...Jankipuram / Call Girls Lucknow | Whatsapp No 🫗 8923113531 🎳 VIP Escorts Serv...
Jankipuram / Call Girls Lucknow | Whatsapp No 🫗 8923113531 🎳 VIP Escorts Serv...gurkirankumar98700
 
JORNADA 5 LIGA MURO 2024INSUGURACION.pdf
JORNADA 5 LIGA MURO 2024INSUGURACION.pdfJORNADA 5 LIGA MURO 2024INSUGURACION.pdf
JORNADA 5 LIGA MURO 2024INSUGURACION.pdfArturo Pacheco Alvarez
 
Plan d'orientations stratégiques rugby féminin
Plan d'orientations stratégiques rugby fémininPlan d'orientations stratégiques rugby féminin
Plan d'orientations stratégiques rugby fémininThibaut TATRY
 
TAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdf
TAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdfTAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdf
TAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdfSocial Samosa
 
Chennai Call Girls Anna Nagar Phone 🍆 8250192130 👅 celebrity escorts service
Chennai Call Girls Anna Nagar Phone 🍆 8250192130 👅 celebrity escorts serviceChennai Call Girls Anna Nagar Phone 🍆 8250192130 👅 celebrity escorts service
Chennai Call Girls Anna Nagar Phone 🍆 8250192130 👅 celebrity escorts servicevipmodelshub1
 
大学学位办理《原版美国USD学位证书》圣地亚哥大学毕业证制作成绩单修改
大学学位办理《原版美国USD学位证书》圣地亚哥大学毕业证制作成绩单修改大学学位办理《原版美国USD学位证书》圣地亚哥大学毕业证制作成绩单修改
大学学位办理《原版美国USD学位证书》圣地亚哥大学毕业证制作成绩单修改atducpo
 
Tableaux 9ème étape circuit fédéral 2024
Tableaux 9ème étape circuit fédéral 2024Tableaux 9ème étape circuit fédéral 2024
Tableaux 9ème étape circuit fédéral 2024HechemLaameri
 

Último (20)

Albania Vs Spain Albania is Loaded with Defensive Talent on their Roster.docx
Albania Vs Spain Albania is Loaded with Defensive Talent on their Roster.docxAlbania Vs Spain Albania is Loaded with Defensive Talent on their Roster.docx
Albania Vs Spain Albania is Loaded with Defensive Talent on their Roster.docx
 
08448380779 Call Girls In IIT Women Seeking Men
08448380779 Call Girls In IIT Women Seeking Men08448380779 Call Girls In IIT Women Seeking Men
08448380779 Call Girls In IIT Women Seeking Men
 
CALL ON ➥8923113531 🔝Call Girls Telibagh Lucknow best Night Fun service 🧣
CALL ON ➥8923113531 🔝Call Girls Telibagh Lucknow best Night Fun service  🧣CALL ON ➥8923113531 🔝Call Girls Telibagh Lucknow best Night Fun service  🧣
CALL ON ➥8923113531 🔝Call Girls Telibagh Lucknow best Night Fun service 🧣
 
ppt on Myself, Occupation and my Interest
ppt on Myself, Occupation and my Interestppt on Myself, Occupation and my Interest
ppt on Myself, Occupation and my Interest
 
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
 
08448380779 Call Girls In Lajpat Nagar Women Seeking Men
08448380779 Call Girls In Lajpat Nagar Women Seeking Men08448380779 Call Girls In Lajpat Nagar Women Seeking Men
08448380779 Call Girls In Lajpat Nagar Women Seeking Men
 
Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...
Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...
Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...
 
VIP Kolkata Call Girl Liluah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Liluah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Liluah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Liluah 👉 8250192130 Available With Room
 
08448380779 Call Girls In Karol Bagh Women Seeking Men
08448380779 Call Girls In Karol Bagh Women Seeking Men08448380779 Call Girls In Karol Bagh Women Seeking Men
08448380779 Call Girls In Karol Bagh Women Seeking Men
 
CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best Female service 🦺
CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best Female service  🦺CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best Female service  🦺
CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best Female service 🦺
 
Atlanta Dream Exec Dan Gadd on Driving Fan Engagement and Growth, Serving the...
Atlanta Dream Exec Dan Gadd on Driving Fan Engagement and Growth, Serving the...Atlanta Dream Exec Dan Gadd on Driving Fan Engagement and Growth, Serving the...
Atlanta Dream Exec Dan Gadd on Driving Fan Engagement and Growth, Serving the...
 
大学假文凭《原版英国Imperial文凭》帝国理工学院毕业证制作成绩单修改
大学假文凭《原版英国Imperial文凭》帝国理工学院毕业证制作成绩单修改大学假文凭《原版英国Imperial文凭》帝国理工学院毕业证制作成绩单修改
大学假文凭《原版英国Imperial文凭》帝国理工学院毕业证制作成绩单修改
 
Jankipuram / Call Girls Lucknow | Whatsapp No 🫗 8923113531 🎳 VIP Escorts Serv...
Jankipuram / Call Girls Lucknow | Whatsapp No 🫗 8923113531 🎳 VIP Escorts Serv...Jankipuram / Call Girls Lucknow | Whatsapp No 🫗 8923113531 🎳 VIP Escorts Serv...
Jankipuram / Call Girls Lucknow | Whatsapp No 🫗 8923113531 🎳 VIP Escorts Serv...
 
JORNADA 5 LIGA MURO 2024INSUGURACION.pdf
JORNADA 5 LIGA MURO 2024INSUGURACION.pdfJORNADA 5 LIGA MURO 2024INSUGURACION.pdf
JORNADA 5 LIGA MURO 2024INSUGURACION.pdf
 
Call Girls In Vasundhara 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Vasundhara 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Vasundhara 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Vasundhara 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
Plan d'orientations stratégiques rugby féminin
Plan d'orientations stratégiques rugby fémininPlan d'orientations stratégiques rugby féminin
Plan d'orientations stratégiques rugby féminin
 
TAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdf
TAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdfTAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdf
TAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdf
 
Chennai Call Girls Anna Nagar Phone 🍆 8250192130 👅 celebrity escorts service
Chennai Call Girls Anna Nagar Phone 🍆 8250192130 👅 celebrity escorts serviceChennai Call Girls Anna Nagar Phone 🍆 8250192130 👅 celebrity escorts service
Chennai Call Girls Anna Nagar Phone 🍆 8250192130 👅 celebrity escorts service
 
大学学位办理《原版美国USD学位证书》圣地亚哥大学毕业证制作成绩单修改
大学学位办理《原版美国USD学位证书》圣地亚哥大学毕业证制作成绩单修改大学学位办理《原版美国USD学位证书》圣地亚哥大学毕业证制作成绩单修改
大学学位办理《原版美国USD学位证书》圣地亚哥大学毕业证制作成绩单修改
 
Tableaux 9ème étape circuit fédéral 2024
Tableaux 9ème étape circuit fédéral 2024Tableaux 9ème étape circuit fédéral 2024
Tableaux 9ème étape circuit fédéral 2024
 

Chapter 6

  • 1. Chapter 6 Major Recreational Activities and Facilities World of Resorts: From Development to Management Third Edition (424TXT or 424CIN) © 2010, Educational Institute
  • 2. Competencies for Major Recreational Activities and Facilities 1. Identify factors that affect how a sports and recreation mix is chosen. 2. Detail the many factors involved in developing and operating golf facilities at a resort. 3. Detail the many factors involved in developing and operating tennis facilities at a resort. 4. Detail the many factors involved in developing and operating a ski resort. 5. Identify several alternative sports and explain why they are significant. (continued) © 2010, Educational Institute 2
  • 3. Competencies for Major Recreational Activities and Facilities (continued) 1. Detail the many factors involved in developing and operating a resort with boating facilities and a marina. 2. Detail the many factors involved in developing and operating swimming facilities at a resort. 3. Detail the many factors involved in developing and operating health club and spa facilities at a resort. 4. Describe the role that infrastructure and striking natural surroundings play in the success of a resort’s recreational offerings. © 2010, Educational Institute 3
  • 4. Considerations in Deciding Recreational Activities/Facilities to Offer • What is the nature of the resort? • What are the primary market segments to be served? Niche markets? • Should the resort develop a specific sport or recreation as a signature draw? • Will climatic conditions (on the average) in the area support the signature sport(s) or recreation for an adequate number of revenue days? • Will there be outdoor or indoor facilities? © 2010, Educational Institute (continued) 4
  • 5. Considerations in Deciding Recreational Activities/Facilities to Offer (continued) • What type of access can be created for people with disabilities? • What is the acreage of land required for target sports and recreational activities? • What are the environmental constraints? • Are there unusual land forms offering distinctive advantages for a specific sport or recreation? • How much capital will be required? © 2010, Educational Institute (continued) 5
  • 6. Considerations in Deciding Recreational Activities/Facilities to Offer (continued) • What is the cost of recreational and maintenance equipment, parts, supplies, and accessories? • What are the costs of energy and other utilities? • Are tournaments involved? What is the cost of promotion? • What are the liability coverage requirements? • Will recreational activities be self-managed or outsourced? © 2010, Educational Institute 6
  • 7. Classifications of Resorts by Seasonality • Summer resorts • Cold winter resorts • Warm winter resorts • Four-season resorts © 2010, Educational Institute 7
  • 8. Elements of a Full-Service Golf Course • Clubhouse • Locker rooms, restrooms, and showers • Dining room and snack bar • Short-order kitchen with pantry and employee restroom • Golf pro’s office • Pro shop • Lobby • Bar • Lounge and card-playing area • Areas for club and cart storage, maintenance,(continued) © 2010, Educational Institute and repair 8
  • 9. Elements of a Full-Service Golf Course (continued) • Eighteen-hole golf course • Practice fairway • Small putting green • Maintenance building • Golf course superintendent’s office, restroom, and shower • Maintenance crew’s locker room, restroom, and showers • Repair shop and areas for equipment and materials storage © 2010, Educational Institute 9
  • 10. Golf Course Development Costs • Course construction costs: Clearing and grubbing, grading and mobilization, drainage, rough and finish shaping, practice green, tee construction, fairway bunkers, bridge construction, grassing and seed preparation, cart path construction, lakes and water features, irrigation system, pumping plant, and grow- in period (maturation). • Design and architecture-related costs: Architect’s fee, permits, financing, sand for traps, rest stations, maintenance building, maintenance equipment, and clubhouse. © 2010, Educational Institute (continued) 10
  • 11. Golf Course Development Costs (continued) • Owner/developer preferences: Scope of amenities, qualitative factors, choice of golf architect (signature name or general designer), and equipment options (golf carts, etc.). • Equipment-related costs: Mowing equipment, tractors and trucks, maintenance equipment, golf course accessories, general tools, and hand tools. © 2010, Educational Institute 11
  • 12. Factors Affecting the Provision of Tennis Facilities • Estimated guest demand and maximum number to be accommodated • Actual or potential tennis-playing populations within one to one-and-a-half hour’s drive • Number of competing public and private tennis facilities nearby • Land requirement • Weather patterns—number of fair days, average temperatures, and wind factor—if the courts are to be constructed outdoors • Length of the resort’s operating season © 2010, Educational Institute (continued) 12
  • 13. Factors Affecting the Provision of Tennis Facilities (continued) • Length of the playing day • Possible demand for night tennis • Court design and orientation • Type of court playing surface—fast, moderately fast, or slow • Clubhouse for sale/rental of equipment, video lessons, etc. • Management by tennis professional • Tournaments and other promotional opportunities © 2010, Educational Institute 13
  • 14. Advantages of Centralized Tennis Courts • It encourages socializing and patronage of revenue-generating services. • It decreases the cost of construction and the amount of landscaping needed. • It allows for easier court maintenance. • It improves management efficiency through better control of court reservations and player behavior. • It optimizes the scheduling of lessons and other tennis-related activities. © 2010, Educational Institute 14
  • 15. Roles and Responsibilities of the Tennis Director • Providing leadership in developing an innovative tennis program at the resort • Promoting and publicizing tennis to build the resort’s image • Inviting tournaments consistent with general management policy • Developing and directing tennis-related activities for guests © 2010, Educational Institute (continued) 15
  • 16. Roles and Responsibilities of the Tennis Director (continued) • Supervising the daily management and control of court reservations and monitoring player conduct • Managing tennis revenues (player fees, instruction fees, rentals) • Controlling operating costs • Supervising proper maintenance of the courts © 2010, Educational Institute 16
  • 17. Features of a Generic Vacation Ski Resort • Drops: In the U.S., 3,000–4,000 vertical feet; in the Northeast, 1,500 vertical feet; in the Midwest and South, no standard has been set. • Ski site orientation: North or northeast exposure maximizes snow retention and protects against wind. • Snow requirement: Area should receive at least 200 inches of new snow per season or have average sub-freezing temperatures for snowmaking. • Slope grades: For intermediate skiers, terrain gradients should be 25–45 percent; for beginners, 25 percent or less; for experts, 50–70 percent. (continued) © 2010, Educational Institute 17
  • 18. Features of a Generic Vacation Ski Resort (continued) • Climate/temperature: Average temperature must be cold enough to maintain snow for skiing, generally sunny during the day, and most of the snowfall should occur at night. • Water: Must be an adequate source of water to support anticipated level of snowmaking. • Base terrain: Must be adequate base terrain to accommodate amenities planned for the total ski lift facility. © 2010, Educational Institute 18
  • 19. Necessary Factors for a Profitable Ski Resort • Seasonality: The site must have summer use potential. • Access: The site must be readily accessible by road and air. • Distance: Research indicates that people will drive a one-way distance of up to three hours to a day ski area and up to eight hours to a weekend area, but will drive or fly thousands of miles to major vacation ski resorts. © 2010, Educational Institute 19
  • 20. Three Basic Types of Lift Systems 1. Aerial lifts: Aerial tramways, funitels, funifors, gondola lifts, chair lifts 2. Surface lifts: T-bars, J-bars, disks or platters, rope tows 3. Cable railways: Funiculars (also known as inclined railways), plane railways, and cliff railways © 2010, Educational Institute 20
  • 21. Common Characteristics of Ski Resorts • Heavy capital investment in fixed assets and lift equipment • Heavy dependence on lift ticket sales, which often account for more than half of the revenue stream • High fixed costs in relation to revenue—permanent staff salaries, maintenance, depreciation, and overhead • Low variable costs in lift revenue—economy of scale produces only marginal cost benefits • Low cash flow, making it difficult for all but larger, diversified companies to attract investment in capital © 2010, Educational Institute 21
  • 22. Necessary Provisions of a Marina/ Dock Area • A high degree of safety from wind, tide, and current action that could damage boats. • A sheltered channel for entrance and exit, wide and deep enough to handle a range of boat sizes and types. • Ease of accessibility to open waters. © 2010, Educational Institute 22
  • 23. Cost Factors in Calculating Initial Capital Requirements • Dredging, filling, and other work required to prepare the site for the marina (channels, basin, and slips) • Bulkhead walls and all shore protection • The breakwater system and related items for offshore protection • Options for disposing of wastewater • Piers, wharves, catwalks, hoists, floats, and similar items related to the basic marina structure • Buildings, service stations, storage sheds, and related equipment © 2010, Educational Institute (continued) 23
  • 24. Cost Factors in Calculating Initial Capital Requirements (continued) • Roads, walkways, parking areas, utility systems and hookups, and landscaping • Stock of merchandise for sale—gasoline, lubricants, engines and other parts, safety gear, fishing equipment, boating accessories, etc. • Engineering, architectural, and other planning costs • Legal fees related to the preparation of all required governmental planning documents (including environmental impact statements) • Inspection and supervision • Operation and maintenance cost and a sinking fund © 2010, Educational Institute 24
  • 25. Agencies/Regulatory Bodies Concerned with Beaches, Marinas, and Docks • U.S. Army Corps of Engineers • U.S. Departments of Agriculture and the Interior • Federal, state, and local environmental protection agencies • County government • Local chambers of commerce or other governmental agencies © 2010, Educational Institute 25
  • 26. Components of Marina Vacation Resorts • Covered and open berths • 110- to 120-volt single-phase and 220-volt three-phase power at most slips • Dial telephone • Television cable • Public address system • Refuse service • Boat rentals • Dry storage rental • Dredged entrance channel • Fuel pumps for unleaded gasoline, diesel, and premixed outboard fuel, oil-changing and battery service, and services for minor boat repairs © 2010, Educational Institute (continued) 26
  • 27. Components of Marina Vacation Resorts (continued) • Launching facilities for boats up to a specified length • Full tackle and marina shop • Fishing licenses • Restroom stations with showers • Laundry facilities • Waterfront grill • Luxury restaurant and lounge • Weather station • Fish photo gallery • Shuttle service between hotel and marina • Access to hotel services © 2010, Educational Institute 27
  • 28. Seven Main Types of Spas • Destination spa • Resort/hotel spa • Day spa • Medical spa • Mineral springs spa • Club/fitness spa • Cruise ship spa © 2010, Educational Institute 28
  • 29. Potential Benefits of On-Premises Health and Fitness Facilities • Increased occupancy • Competitive advantage • Increased room rates • Marketing asset • Positive image © 2010, Educational Institute 29
  • 30. Factors Affecting the Success of Health and Fitness Facilities 1. Concept and philosophy 2. Objectives 3. Market 4. Program 5. Revenue projections 6. Costs 7. Facility design 8. Financing 9. Management 10. Planning 11. Operations © 2010, Educational Institute 30