Comparative characteristics of pert and cpm
1.
2.
3.
4. 3 1 2 4 6 5 1 2 4 6 5 3 1 2 4 6 5 3 JOB A JOB B JOB C STAGE I STAGE II 1 2 4 6 5 3 2 3 3 1 2 6 5 2 STAGE III TIME TIME JOB A JOB B JOB C TIME
5.
6. ACTIVITY ACTIVITY IMMEDIATE IDENTIFICATION DESCRIPTION PREDECESSOR{S} a CUT THE TOP - b MAKE THE LEGS - c LAMINATION a d MAKE THE STAND b e FINAL ASSEMBLY c,d f FINAL POLISHING ETC. e MAKING A DINING TABLE
7. START a b f e d c FINISH 3 2 5 4 6 e f AN ARROW DIAGRAM a b c d 1 AON DIAGRAM
12. 3 7 6 5 1 a a' c b D 1 D 2 d e 3 6 5 a a’ b d e c 1 2 2 4 4 D 1
13. 3 a b D 1 e c 2 1 4 2 5 a b d e c 3 1 5 6 D 2 d 3 a b e c 2 1 4 5 D 2 d D 1 D 1 D 2 4
14.
15. 2 6 2 3 1 1 4 5 8 5 4 7 1 1 3 3½ 2 ½ 1½ 0 0 5 7 13½ 8 11 1 ½ 13½ 4 9.½ 9½ 4 7 8 CRITICAL PATH IS 6½ 8½ 6 6 LEGEND/KEY T E T L EV.NO 1 1
16.
17.
18.
19. 4 6 2 3 1 5 7 8 t e = 4 t e = 2 t e = 3 t e = 1 t e = 7 t e = 10 t e = 2 t e = 9 t e = 6 t e = 5 v t = 1 v t = 1 v t = 1 v t = 1 v t = 1 v t = 1 v t = 16 v t = 8 v t = 2 v t = 5
20.
21. THE PRESIDENT OF ABC MANUFACTURING COMPANY HAS AN OPPORTUNITY TO PARTICIPATE IN A PROJECT THAT HAS A SALES PRICE OF RS.90,000 BUT IT MUST BE COMPLETED WITHIN 8 WEEKS. THE LETTER OF INTENT WAS RECEIVED FRIDAY AFTERNOON. BOTH THE PRODUCTION MANAGER AND THE COST ACCOUNTANT CAME IN ON SATURDAY AND COMPLETED THE APPROPRIATE TIME AND COST FOR YOU BASED UPON PAST JOBS. SINCE THE PRESIDENT NEEDS AN ANSWER AT 8:30 A.M. ON MONDAY (START OF THE 8 WEEKS), YOU HAVE BEEN REQUESTED TO DETERMINE THE PROFITABILITY OF THE PROJECT ON AN 8 WEEKS BASIS. AN ANSWER AT 8:30 A.M. ON MONDAY ALLOWS THE FIRM TO START THE PRODUCTION ORDER AT 10:00 A.M. IN ORDER TO STAY WITHIN THE 8 WEEKS DEMANDED BY THE CUSTOMER. THE TIME AND COST UNDER NORMAL CONDITIONS WITHOUT CRASHING THE PROJECT IS BASED UPON ON 11 WEEKS BASIS. WHAT ANSWER SHOULD THE PRESIDENT GIVE TO THE CUSTOMER ON MONDAY MORNING? A TABLE OF TIMES AND COSTS IS AS FOLLOWS: