Learning Objectives
   Describe the five project management (PM)
    process groups, the typical level of activity for
    each, and the interactions among them
   Understand how the PM process groups relate to
    the PM knowledge areas
   Discuss how organizations develop information
    technology PM methodologies to meet their needs
Learning Objectives (continued)
 Review a case study of an organization applying the
  project management process groups to manage an
  information technology project;
 Describe outputs of each process group; and
  understand the contribution that effective project
 Initiating,   planning, executing, monitoring and
  controlling, and closing make to project success
Project Management Process
Groups
 A process is a series of actions directed toward a
  particular result
 Project management can be viewed as a number of
  interlinked processes
 The project management process groups include:
   Initiating processes
   Planning processes
   Executing processes
   Monitoring and controlling processes
   Closing processes
Percentage of Time Spent on Each
Process Group
What Went Wrong?
 Philip A. Pell, PMP, commented on how the U.S. IRS needed to
  improve its project management process. “Pure and simple, good,
  methodology-centric,      predictable,    and     repeatable   project
  management is the SINGLE greatest factor in the success (or in this
  case failure) of any project… The project manager is ultimately
  responsible for the success or failure of the project.”*
 In 2006, the IRS lost more than $320 million due to a botched
  fraud-detection system project
 A 2008 U.S. Government Accountability Office (GAO) report stated
  that IRS had fixed just 29 of 98 information security weaknesses
  identified the previous year
Mapping the Process Groups to the
Knowledge Areas
 You can map the main activities of each PM process
  group into the nine knowledge areas using the
  PMBOK® Guide 2008
 Note that there are activities from each knowledge
  area under the planning and monitoring and
  controlling process groups
 Two new processes were added in 2008: identify
  stakeholders and collect requirements
Project Management Process Groups and
Knowledge Area Mapping*
Table (continued)
Table (continued)
Developing an IT Project
Management Methodology
 Just as projects are unique, so are approaches to
  project management
 Many organizations develop their own project
  management methodologies, especially for IT projects
 A methodology describes how things should be
  done; a standard describes what should be done
 PRINCE2, Agile, RUP, and Six Sigma provide different
  project management methodologies
What Went Right?
   AgenciaClick, an interactive advertising and online
    communications company based in São Paulo, Brazil,
    made PMI’s list of outstanding organizations in project
    management in 2007
   Since 2002, the company saw revenues jump 132 percent,
    primarily due to their five-year emphasis on practicing
    good project management across the entire company
Case Study: JWD Consulting’s
Project Management Intranet Site
 This case study provides an example of what’s involved
  in initiating, planning, executing, controlling, and
  closing an IT project
 Note: This case study provides a big picture view of
  managing a project; later chapters provide detailed
  information on each knowledge area
Project Pre-initiation
 It is good practice to lay the groundwork for a project
  before it officially starts
 Senior managers often perform several pre-initiation tasks,
  including the following:
   Determine the scope, time, and cost constraints for the project
   Identify the project sponsor
   Select the project manager
   Develop a business case for a project
   Meet with the project manager to review the process and expectations
    for managing the project
   Determine if the project should be divided into two or more smaller
    projects
Project Initiation
 Initiating a project includes recognizing and starting a
  new project or project phase
 The main goal is to formally select and start off projects
Stakeholder Register
Stakeholder Management Strategy
Project Charters and Kick-off Meetings
 See Table for an example of a charter
 Charters are normally short and include key project
  information and stakeholder signatures
 It’s good practice to hold a kick-off meeting at the
  beginning of a project so that stakeholders can meet
  each other, review the goals of the project, and
  discuss future plans
Kick-off Meeting Agenda
Project Planning
 The main purpose of project planning is to guide
  execution
 Every knowledge area includes planning information
 Key outputs included in the JWD project include:
   A team contract
   A project scope statement
   A work breakdown structure (WBS)
   A project schedule, in the form of a Gantt chart with all
    dependencies and resources entered
   A list of prioritized risks (part of a risk register)
JWD Consulting Intranet Site Project Baseline
Gantt Chart
List of Prioritized Risks
Project Executing
 Usually takes the most time and resources to perform
  project execution
 Project managers must use their leadership skills to
  handle the many challenges that occur during project
  execution
 lists the executing processes and outputs; many
  project sponsors and customers focus on deliverables
  related to providing the products, services, or results
  desired from the project
 A milestone report can help focus on completing
  major milestones
Part of Milestone Report
Project Monitoring and Controlling
 Involves measuring progress toward project objectives,
  monitoring deviation from the plan, and taking
  correction actions
 Affects all other process groups and occurs during all
  phases of the project life cycle
 Outputs include performance reports, change requests,
  and updates to various plans
Project Closing
 Involves gaining stakeholder and customer acceptance
  of the final products and services
 Even if projects are not completed, they should be
  closed out to learn from the past
 Outputs include project archives and lessons learned,
  part of organizational process assets
 Most projects also include a final report and
  presentation to the sponsor/senior management
Chapter Summary
 The five project management process groups are
  initiating, planning, executing, monitoring and
  controlling, and closing
 You can map the main activities of each process group
  to the nine knowledge areas
 Some organizations develop their own information
  technology project management methodologies
 The JWD Consulting case study provides an example
  of using the process groups and shows several
  important project documents
Chapter 3

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Chap03 the project management process groups
Chap03 the project management process groupsChap03 the project management process groups
Chap03 the project management process groups
 
Step by Step Guide to Project Management
Step by Step Guide to Project ManagementStep by Step Guide to Project Management
Step by Step Guide to Project Management
 
SOFTWARE PROJECT MANAGEMENT TOOL PPT
SOFTWARE PROJECT MANAGEMENT TOOL PPTSOFTWARE PROJECT MANAGEMENT TOOL PPT
SOFTWARE PROJECT MANAGEMENT TOOL PPT
 
Project Charter
Project CharterProject Charter
Project Charter
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposal
 
Prince2 Methodology
Prince2 MethodologyPrince2 Methodology
Prince2 Methodology
 
Project initiation
Project initiationProject initiation
Project initiation
 
Agile Product Roadmaps
Agile Product RoadmapsAgile Product Roadmaps
Agile Product Roadmaps
 
Project integration management
Project integration managementProject integration management
Project integration management
 
Statement of-work
Statement of-workStatement of-work
Statement of-work
 
An Introduction to Project Management
An Introduction to Project Management An Introduction to Project Management
An Introduction to Project Management
 
Uses of Project Status field
Uses of  Project Status field Uses of  Project Status field
Uses of Project Status field
 
Pmbok Processes Flow, ALL!
Pmbok Processes Flow, ALL!Pmbok Processes Flow, ALL!
Pmbok Processes Flow, ALL!
 
10.1 Plan Communication Management
10.1 Plan Communication Management10.1 Plan Communication Management
10.1 Plan Communication Management
 
Legal feasibility
Legal feasibilityLegal feasibility
Legal feasibility
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Project Management
Project ManagementProject Management
Project Management
 
Web Project Management
Web Project ManagementWeb Project Management
Web Project Management
 
PMP_Project Quality Management
PMP_Project Quality ManagementPMP_Project Quality Management
PMP_Project Quality Management
 

Destacado

inSPAration workshop
inSPAration workshopinSPAration workshop
inSPAration workshopspanederland
 
Turismo efímero
Turismo efímeroTurismo efímero
Turismo efímeropaopao2812
 

Destacado (20)

Lmg gender webinar
Lmg gender webinarLmg gender webinar
Lmg gender webinar
 
2012 AM&C Photos
2012 AM&C Photos2012 AM&C Photos
2012 AM&C Photos
 
Per què les dones no trien ciències? Debat al aula.
Per què les dones no trien ciències? Debat al aula.Per què les dones no trien ciències? Debat al aula.
Per què les dones no trien ciències? Debat al aula.
 
What the Future Holds for CUs
What the Future Holds for CUsWhat the Future Holds for CUs
What the Future Holds for CUs
 
Power point
Power pointPower point
Power point
 
inSPAration workshop
inSPAration workshopinSPAration workshop
inSPAration workshop
 
Service that rocks nebrcul[1]
Service that rocks   nebrcul[1]Service that rocks   nebrcul[1]
Service that rocks nebrcul[1]
 
A backstage pass to capitol hill
A backstage pass to capitol hillA backstage pass to capitol hill
A backstage pass to capitol hill
 
Turismo efímero
Turismo efímeroTurismo efímero
Turismo efímero
 
Stories, Sweets and Tweets: Storytelling and Social Media
Stories, Sweets and Tweets: Storytelling and Social MediaStories, Sweets and Tweets: Storytelling and Social Media
Stories, Sweets and Tweets: Storytelling and Social Media
 
Power point
Power pointPower point
Power point
 
How to be a Financials Rock Star
How to be a Financials Rock StarHow to be a Financials Rock Star
How to be a Financials Rock Star
 
Introduction to electricity 1
Introduction to electricity 1Introduction to electricity 1
Introduction to electricity 1
 
Introduction to electricity 2
Introduction to electricity 2Introduction to electricity 2
Introduction to electricity 2
 
Hss and its relation to l+m+g
Hss and its relation to l+m+gHss and its relation to l+m+g
Hss and its relation to l+m+g
 
LMG Project Overview Presentation
LMG Project Overview Presentation LMG Project Overview Presentation
LMG Project Overview Presentation
 
Genes and DNA
Genes and DNAGenes and DNA
Genes and DNA
 
Uhc june 2013 cpm
Uhc june 2013 cpm Uhc june 2013 cpm
Uhc june 2013 cpm
 
Mitosis & Meiosis
Mitosis & MeiosisMitosis & Meiosis
Mitosis & Meiosis
 
The Evolution of Living Things
The Evolution of Living ThingsThe Evolution of Living Things
The Evolution of Living Things
 

Similar a Chapter 3

Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slidesdotesch
 
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3:The Project Management Process Groups: A Case StudyChapter 3:The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case StudyShahid Riaz
 
It Project Management
It Project ManagementIt Project Management
It Project ManagementTJ Rains
 
L01 introduction to pm
L01 introduction to pmL01 introduction to pm
L01 introduction to pmAsa Chan
 
project management process groups
project management process groupsproject management process groups
project management process groupserick chuwa
 
3The Project Management ProcessGroups A Case StudyAft.docx
3The Project Management ProcessGroups A Case StudyAft.docx3The Project Management ProcessGroups A Case StudyAft.docx
3The Project Management ProcessGroups A Case StudyAft.docxgilbertkpeters11344
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.pptnatisil1
 
romi-pm-03-process-april2013.pptx
romi-pm-03-process-april2013.pptxromi-pm-03-process-april2013.pptx
romi-pm-03-process-april2013.pptxummi1206
 
The project management process groups a case study
The project management process groups a case studyThe project management process groups a case study
The project management process groups a case studyAfdalArifAmandaPutra
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course reviewAsa Chan
 
Project integration management ch 4
Project integration management ch 4Project integration management ch 4
Project integration management ch 4Sammer Qader
 

Similar a Chapter 3 (20)

Ch03
Ch03Ch03
Ch03
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slides
 
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3:The Project Management Process Groups: A Case StudyChapter 3:The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case Study
 
1. introduction
1. introduction1. introduction
1. introduction
 
It Project Management
It Project ManagementIt Project Management
It Project Management
 
Lecture 3
Lecture 3Lecture 3
Lecture 3
 
Pmbok
PmbokPmbok
Pmbok
 
L01 introduction to pm
L01 introduction to pmL01 introduction to pm
L01 introduction to pm
 
project management process groups
project management process groupsproject management process groups
project management process groups
 
ch04.ppt
ch04.pptch04.ppt
ch04.ppt
 
3The Project Management ProcessGroups A Case StudyAft.docx
3The Project Management ProcessGroups A Case StudyAft.docx3The Project Management ProcessGroups A Case StudyAft.docx
3The Project Management ProcessGroups A Case StudyAft.docx
 
Ch04
Ch04Ch04
Ch04
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.ppt
 
Ch01
Ch01Ch01
Ch01
 
romi-pm-03-process-april2013.pptx
romi-pm-03-process-april2013.pptxromi-pm-03-process-april2013.pptx
romi-pm-03-process-april2013.pptx
 
Lecture 3
Lecture 3Lecture 3
Lecture 3
 
The project management process groups a case study
The project management process groups a case studyThe project management process groups a case study
The project management process groups a case study
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
 
Introduction.ppt
Introduction.pptIntroduction.ppt
Introduction.ppt
 
Project integration management ch 4
Project integration management ch 4Project integration management ch 4
Project integration management ch 4
 

Último

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 

Último (20)

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 

Chapter 3

  • 1.
  • 2. Learning Objectives  Describe the five project management (PM) process groups, the typical level of activity for each, and the interactions among them  Understand how the PM process groups relate to the PM knowledge areas  Discuss how organizations develop information technology PM methodologies to meet their needs
  • 3. Learning Objectives (continued)  Review a case study of an organization applying the project management process groups to manage an information technology project;  Describe outputs of each process group; and understand the contribution that effective project  Initiating, planning, executing, monitoring and controlling, and closing make to project success
  • 4. Project Management Process Groups  A process is a series of actions directed toward a particular result  Project management can be viewed as a number of interlinked processes  The project management process groups include:  Initiating processes  Planning processes  Executing processes  Monitoring and controlling processes  Closing processes
  • 5. Percentage of Time Spent on Each Process Group
  • 6. What Went Wrong?  Philip A. Pell, PMP, commented on how the U.S. IRS needed to improve its project management process. “Pure and simple, good, methodology-centric, predictable, and repeatable project management is the SINGLE greatest factor in the success (or in this case failure) of any project… The project manager is ultimately responsible for the success or failure of the project.”*  In 2006, the IRS lost more than $320 million due to a botched fraud-detection system project  A 2008 U.S. Government Accountability Office (GAO) report stated that IRS had fixed just 29 of 98 information security weaknesses identified the previous year
  • 7. Mapping the Process Groups to the Knowledge Areas  You can map the main activities of each PM process group into the nine knowledge areas using the PMBOK® Guide 2008  Note that there are activities from each knowledge area under the planning and monitoring and controlling process groups  Two new processes were added in 2008: identify stakeholders and collect requirements
  • 8. Project Management Process Groups and Knowledge Area Mapping*
  • 11. Developing an IT Project Management Methodology  Just as projects are unique, so are approaches to project management  Many organizations develop their own project management methodologies, especially for IT projects  A methodology describes how things should be done; a standard describes what should be done  PRINCE2, Agile, RUP, and Six Sigma provide different project management methodologies
  • 12. What Went Right?  AgenciaClick, an interactive advertising and online communications company based in São Paulo, Brazil, made PMI’s list of outstanding organizations in project management in 2007  Since 2002, the company saw revenues jump 132 percent, primarily due to their five-year emphasis on practicing good project management across the entire company
  • 13. Case Study: JWD Consulting’s Project Management Intranet Site  This case study provides an example of what’s involved in initiating, planning, executing, controlling, and closing an IT project  Note: This case study provides a big picture view of managing a project; later chapters provide detailed information on each knowledge area
  • 14. Project Pre-initiation  It is good practice to lay the groundwork for a project before it officially starts  Senior managers often perform several pre-initiation tasks, including the following:  Determine the scope, time, and cost constraints for the project  Identify the project sponsor  Select the project manager  Develop a business case for a project  Meet with the project manager to review the process and expectations for managing the project  Determine if the project should be divided into two or more smaller projects
  • 15. Project Initiation  Initiating a project includes recognizing and starting a new project or project phase  The main goal is to formally select and start off projects
  • 18. Project Charters and Kick-off Meetings  See Table for an example of a charter  Charters are normally short and include key project information and stakeholder signatures  It’s good practice to hold a kick-off meeting at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans
  • 20. Project Planning  The main purpose of project planning is to guide execution  Every knowledge area includes planning information  Key outputs included in the JWD project include:  A team contract  A project scope statement  A work breakdown structure (WBS)  A project schedule, in the form of a Gantt chart with all dependencies and resources entered  A list of prioritized risks (part of a risk register)
  • 21. JWD Consulting Intranet Site Project Baseline Gantt Chart
  • 23. Project Executing  Usually takes the most time and resources to perform project execution  Project managers must use their leadership skills to handle the many challenges that occur during project execution  lists the executing processes and outputs; many project sponsors and customers focus on deliverables related to providing the products, services, or results desired from the project  A milestone report can help focus on completing major milestones
  • 25. Project Monitoring and Controlling  Involves measuring progress toward project objectives, monitoring deviation from the plan, and taking correction actions  Affects all other process groups and occurs during all phases of the project life cycle  Outputs include performance reports, change requests, and updates to various plans
  • 26. Project Closing  Involves gaining stakeholder and customer acceptance of the final products and services  Even if projects are not completed, they should be closed out to learn from the past  Outputs include project archives and lessons learned, part of organizational process assets  Most projects also include a final report and presentation to the sponsor/senior management
  • 27. Chapter Summary  The five project management process groups are initiating, planning, executing, monitoring and controlling, and closing  You can map the main activities of each process group to the nine knowledge areas  Some organizations develop their own information technology project management methodologies  The JWD Consulting case study provides an example of using the process groups and shows several important project documents