The contents of this presentation were originally created as part of comprehensive datacentre relocation planning activities.
The presentation depicts the key focus areas for creating a technical and solution based workshop agenda to extract relevant information as quickly as possible.
2. neil@chilliwizz.com | +44 (0) 7776195939
Presentation Content Overview
2
• The contents of this presentation
were originally created as part of
comprehensive datacentre relocation
planning activities.
• The presentation depicts the key focus
areas for creating a technical and
solution based workshop agenda to
extract relevant information as quickly
as possible.
• Hopefully this information is
informative and useful for your own
datacentre relocation or similar
project / programme.
• Feel free to contact me for further
advice and assistance.
3. neil@chilliwizz.com | +44 (0) 7776195939
3
Overall Approach
USING
INFORMS
Trawl
Validate
Gap Analysis
Resolve Gaps
Plan
TECHNIQUESFOCUS AREAS
Connectivity
(between systems)
Data
Infrastructure
Location
Network
Security
Architecture /
Solution Config
Testing /
Troubleshooting
Timeline
Manpower /
Expertise
OUTPUT
Dependencies
Task List
Accountabilities /
RACI
Confidence Rating
Risks
Logical Work
Order
Things Not Known
Current Issues
Steps to Budget
Clarity
• Rapid workshop sessions are held in order to quickly define the required tasks and activities, capture
risks and issues as well as create a joined up and logical timeline
• Accelerated techniques are used to reduce time impacts on technical teams and overall business
The workshop structure is comprised as follows:
4. neil@chilliwizz.com | +44 (0) 7776195939
4
Focus Areas – Architecture / Solution Config
• Software installation
• Application Installations and Configuration
• Monitoring tools configuration / setup
• SMS Service Configuration
• Backup Configuration
• Scheduler Tool Setup
• Batch File Services
• Comms Services
• Oracle Configuration
Connectivity
(between systems)
Data
Infrastructure
Location
Network
Security
Architecture /
Solution Config
Testing /
Troubleshooting
Timeline
Manpower /
Expertise
• The comprising logical components of each solution, the
formal roles activities that they perform and configuration.
• Diagrams / schematics of each of the solutions will need to be
provided and validated to ensure that a single and shared
version of the truth exists as a reference for follow-on work.
To include:
5. neil@chilliwizz.com | +44 (0) 7776195939
5
Focus Areas – Connectivity (Between Systems)
• Interface Configuration
• Gateway Configuration
• MFT Configuration
• MSP Configuration
• MQ Server Configuration
Connectivity
(between systems)
Data
Infrastructure
Location
Network
Security
Architecture /
Solution Config
Testing /
Troubleshooting
Timeline
Manpower /
Expertise
• How connectivity between system components and other
systems is currently performed
• The protocols and methods of intercommunication will need to
be validated, agreed and documented for possible replication in
another location
To include:
6. neil@chilliwizz.com | +44 (0) 7776195939
6
Focus Areas – Data
• Schema Configuration
• Data Synchronisation Methods / Configuration
• Data Transfer (temporary or production)
• Data Storage
Connectivity
(between systems)
Data
Infrastructure
Location
Network
Security
Architecture /
Solution Config
Testing /
Troubleshooting
Timeline
Manpower /
Expertise
• The repositories of data as well as how data flows from
component to component and system to system
• The data flows will need to be validated and documented to be
able to be used in designing an appropriate test approach and
therefore ensuring the system is working as planned
To include:
7. neil@chilliwizz.com | +44 (0) 7776195939
7
Focus Areas – Infrastructure
• Physical Server Purchase and Delivery
• Physical Servers Preparation and Assembly
• Operating System Setup
Connectivity
(between systems)
Data
Infrastructure
Location
Network
Security
Architecture /
Solution Config
Testing /
Troubleshooting
Timeline
Manpower /
Expertise
• The physical components that make up each of the solutions
• The types of hardware, cabling, as well as ancillary physical
items that are required for the solution to work, and how they
relate to each other.
• These may need to be replicated in the new location
To include:
8. neil@chilliwizz.com | +44 (0) 7776195939
8
Focus Areas – Testing / Troubleshooting
• Test Data Requirement / Creation
• Application Testing
• Connectivity Testing
• Integration Testing
• Operating System Setup
Connectivity
(between systems)
Data
Infrastructure
Location
Network
Security
Architecture /
Solution Config
Testing /
Troubleshooting
Timeline
Manpower /
Expertise
• How each physical and logical component part of a solution,
as well as the solution itself can be validated as working
correctly
• Existing methods as well as possibly new methods need to be
identified and included in test governance and plan
To include:
9. neil@chilliwizz.com | +44 (0) 7776195939
9
Focus Areas – Location
• Floor Space
• Rack Space
• Power Requirements
• Air Conditioning Requirements
Connectivity
(between systems)
Data
Infrastructure
Location
Network
Security
Architecture /
Solution Config
Testing /
Troubleshooting
Timeline
Manpower /
Expertise
• The requirements for each solution on the co-location and
dedicated data centre
• Information will be used to perform capacity planning as well as
understand the logistical requirements of physically moving the
equipment
To include:
10. neil@chilliwizz.com | +44 (0) 7776195939
10
Focus Areas – Network
• IP & DNS Hostname
• Active Directory Configuration
• Application Traffic Specification
• Firewall Configuration
• VPN Configuration
• Network Cabling
• Lease Lines
• PRI Lines
Connectivity
(between systems)
Data
Infrastructure
Location
Network
Security
Architecture /
Solution Config
Testing /
Troubleshooting
Timeline
Manpower /
Expertise
• The network requirements of the solution, as well as any
current limitations.
• Identification of IP Address usage and approach to change
• Establishment of network diagram for each solution
To include:
11. neil@chilliwizz.com | +44 (0) 7776195939
11
Focus Areas – Security
• OS Hardening Requirements
• DB Hardening Requirements
• Admin ID Creation
• Concession requests
Connectivity
(between systems)
Data
Infrastructure
Location
Network
Security
Architecture /
Solution Config
Testing /
Troubleshooting
Timeline
Manpower /
Expertise
• The current, interim and end state security requirements
• What levels of security are currently imposed on the system
and need to be replicated.
• Will additional changes be required in the interim
• Will concessions be required to be sought?
To include:
12. neil@chilliwizz.com | +44 (0) 7776195939
12
Focus Areas – Timeline
• Delivery Lead Times
• Constraints
• Dependencies
• Effort
• Durations
• Priorities
Connectivity
(between systems)
Data
Infrastructure
Location
Network
Security
Architecture /
Solution Config
Testing /
Troubleshooting
Timeline
Manpower /
Expertise
• Capture of external activities that may constrain the
relocation, as well as any logical technical prioritisations
• Informs and provides information for the overall plan of
activities. Allows activities to be formally tracked and progress
to be measured.
To include:
13. neil@chilliwizz.com | +44 (0) 7776195939
13
Focus Areas – Manpower / Expertise
• Capability Assessments
• Resource Availability (Annual Leave)
• Department Capacities
• 3rd Party Assistance
Connectivity
(between systems)
Data
Infrastructure
Location
Network
Security
Architecture /
Solution Config
Testing /
Troubleshooting
Timeline
Manpower /
Expertise
• Assess the availability of required skills and specific
individuals to undertake relocation work
• Identify any limitations in skillset and knowledge as well as
methods to fulfil gaps
• Team and department capacity issues
To include: