First Quarter Report
                        CY 2012 LIST of PROGRAMS/PROJECTS
                            CORDILLERA ADMINISTRATIVE REGION
                                     As of March 2012

                                            IMPLEMEN-    PROJECT COST     FUNDING       Status/
          PROGRAM/PROJECT                  TING AGENCY     (PhP M)         SOURCE      Remarks
                                                                                      As of March
                                                                                         2012

          SOCIAL SECTOR
1. Pantawid Pamilyang Pilipino Program      DSWD               706.332 World        *Educ. &
(4Ps)                                                                  Bank &       Health:
                                                                       ADB          97.17%

                                                                                    *Family
                                                                                    Development
                                                                                    Session:
                                                                                    91.87%
2. National Household Targeting System      DSWD                35.427 GOP,         On-going
for Poverty Reduction Program                                          Loan
3. Red and Black School Building            DepEd               146.54 GOP          88.44 %
Program                                                       (CY 2011)
4. Rehabilitation of School Building        DepEd               29.340 GOP          On-going
including Water Sanitation Facilities
5. Philippine Response to Indigenous        DepEd                3.978 AusAid       On-going
People’s (IP) and Muslim Education
(PRIME)
6. Construction of Various Health            DOH               117.866 GOP          37%
Facility
7. Water System                              DOH               184.500 GOP          3.61%
8. Cordillera-wide Strengthening of         DOH &                   43 JBIC         The project
Local Health System for Effective and      LGUs Abra                                is on its early
Efficient Delivery of Maternal and Child    Apayao                                  stage since it
Health Services                             Benguet                                 was only
                                                                                    launched on
                                                                                    March
                                                                                    13,2012
Sub-Total                                                    1,266.983
        ECONOMIC SECTOR
9. Second Cordillera Highland                 DA                 3.081 IFAD,        18%
Agricultural Resource Management                                       ADB.
(CHARM 2) Project                                                      OFID
10. Agrarian Reform Infrastructure           DAR               903.863 Loan         33.37%
Support Project Phase III                                              GOP

11. Farm-to-Market Roads                      DA                    53 Grant        On-going
12. Irrigation Projects                       NIA            1,184.838 GOP          8.04%
13. One Town One Product Program              DTI                2.273 GOP          100%
(OTOP)

                                                                                             1
First Quarter Report
                         CY 2012 LIST of PROGRAMS/PROJECTS
                             CORDILLERA ADMINISTRATIVE REGION
                                      As of March 2012

                                          IMPLEMEN-    PROJECT COST    FUNDING       Status/
          PROGRAM/PROJECT                TING AGENCY     (PhP M)        SOURCE      Remarks
                                                                                   As of March
                                                                                      2012

14. Rural Micro Enterprise Promotion        DTI                   1.8 IFAD        100%
Programme (RuMEPP)                                                    with
                                                                      GOP
                                                                      Counter
                                                                      part
15. Shared Service Facilities Project       DTI                1.125 NEDAC        Proposal
(SSF)                                                                 Fund        endorsed to
                                                                      (Nationa    RODG, DTI
                                                                      l Export    for approval
                                                                      Develop     and
                                                                      ment        downloading
                                                                      and         of funds.
                                                                      Competi
                                                                      tiveness)
16. Small Enterprise Technology            DOST               28.673 GOP          3.05%
Upgrading Program (SETUP) Core and
Non-Core Funded Projects
17. Packaging and Labeling                 DOST               688.00 GOP          11.43%
18. National Greening Program (NGP)        DENR              100.527 GOP          19%
Sub-Total                                                  2,279.868
     INFRASTRUCTURE SECTOR
Abra
19. Abra-Ilocos Sur Road                   DPWH              106.195 GOP          NTP issued
                                                                                  March 29,
                                                                                  2012
20.Abra-Kalinga Road, K0467+000-           DPWH              147.691 GOP          Failure of
K0474+305                                                                         bidding. Re-
                                                                                  advertised
21. Abra-Ilocos Norte, K0436+700-          DPWH                   62 GOP          Short of
K0439+395                                                                         award.
                                                                                  Awaiting for
                                                                                  the SARO
                                                                                  indicating the
                                                                                  realigned
                                                                                  project.
22. Road Upgrading along Abra-             DPWH                   60 GOP          Short of
Cervantes Road (Realigned from Sto.                                               award.
Tomas-Manabo Bridge)                                                              Awaiting for
                                                                                  the SARO

                                                                                           2
First Quarter Report
                       CY 2012 LIST of PROGRAMS/PROJECTS
                          CORDILLERA ADMINISTRATIVE REGION
                                   As of March 2012

                                         IMPLEMEN-    PROJECT COST   FUNDING      Status/
         PROGRAM/PROJECT                TING AGENCY     (PhP M)       SOURCE     Remarks
                                                                                As of March
                                                                                   2012

                                                                               indicating the
                                                                               realigned
                                                                               project.
23. Sto. Tomas-Manabo Bridge (P 160.0    DPWH                   160 GOP        49.44%
M)
24. Abra-Kalinga Road K0410+000-         DPWH                 50.45 GOP        95.63%
K0413+810
25. Abra-Kalinga Road K0437+490-         DPWH                143.67 GOP        75.80%
K0455+890, K0432+000-K0450+800
Apayao
26. Kabugao-Pudtol-Luna-Cagayan          DPWH                58.827 GOP        5% Memo
Boundary Road                                                                  (Nov. 3,
K0661+000 - K0661+321, K0643+646 -                                             2011) from
K0645+825 Gravel to Concrete                                                   Secretary
                                                                               Singson:
                                                                               Approved for
                                                                               upgrading
                                                                               from
                                                                               Secondary to
                                                                               Arterial Road
27. Kabugao- Solsona (Apayao- Ilocos     DPWH                   100 GOP        Not yet
Norte Road)                                                                    started due to
                                                                               failure to
                                                                               bidding.
                                                                               There were
                                                                               no takers due
                                                                               to relatively
                                                                               low
                                                                               estimated
                                                                               unit cost.
                                                                               Project is for
                                                                               rebidding.
Benguet
28. Rehab./Reconst’n/Upgrading of        DPWH                54.433 GOP        Advertised
Kennon Road                                                                    March 23,
                                                                               2012. Bids
                                                                               opening
                                                                               April 16,
                                                                               2012


                                                                                        3
First Quarter Report
                       CY 2012 LIST of PROGRAMS/PROJECTS
                          CORDILLERA ADMINISTRATIVE REGION
                                   As of March 2012

                                         IMPLEMEN-    PROJECT COST   FUNDING      Status/
         PROGRAM/PROJECT                TING AGENCY     (PhP M)       SOURCE     Remarks
                                                                                As of March
                                                                                   2012

29. Baguio-Bontoc Road (Pico-Lamtang     DPWH                98.674 GOP        Advertised
Rd., Baguio Itogon & Baguio-Bontoc)                                            March
                                                                               23,2012
30. Baguio-Bontoc Road, K0269+000-       DPWH               109.332 GOP        Bids opening
K0275+000 (v.s.)& K0299+000-                                                   April 23,
K0300+900 (v.s.) & K0305+000-                                                  2012
K0308+500 (v.s.) & K0309+000-
K0311+000 (v.s.), K0317+415-
K0318+500 (v.s.), & K0323+000 –
K0328+000 (v.s.)
31. Gurel-Bokod-Kabayan-Buguias-         DPWH                  98.5 GOP        46.81%
Abatan Road
32. Gurel-Bokod-Kabayan-Buguias-         DPWH                 116.5 GOP        69.30%
Abatan Road K0303+600-K03012+000
33. Rehab./Impv’t. of Gurel-Bokod-       DPWH                   148 GOP        Bids opened:
Kabayan-Buguias Road including                                                 March 28,
RROW                                                                           2012
34. Gurel-Bokod-Kabayan-Buguias-         DPWH                68.921 GOP        Plans &
Abatan Road, K0345+513-K0359+300                                               POW
(vs.)                                                                          submitted to
                                                                               Central
                                                                               office Feb.
                                                                               29, 2012.
                                                                               Advertised:
                                                                               March 23-29,
                                                                               2012.
                                                                               Opening of
                                                                               Bids: April
                                                                               16, 2012
Ifugao
35. Banaue-Mayoyao-A Lista-Isabela       DPWH                58.064 GOP        Failure of
Bdry. Road                                                                     bidding. Re-
                                                                               advertised.
36. Nueva Vizcaya-Ifugao-Mt. Province    DPWH                54.163 GOP        Bids opened:
Road                                                                           March 28,
                                                                               2012
Kalinga
37. Kalinga-Abra Road, K0470+000-        DPWH                53.057 GOP        Bids opened:
K0472+267                                                                      March 21,
                                                                               2012.

                                                                                        4
First Quarter Report
                        CY 2012 LIST of PROGRAMS/PROJECTS
                           CORDILLERA ADMINISTRATIVE REGION
                                    As of March 2012

                                          IMPLEMEN-    PROJECT COST   FUNDING      Status/
         PROGRAM/PROJECT                 TING AGENCY     (PhP M)       SOURCE     Remarks
                                                                                 As of March
                                                                                    2012

                                                                                Post
                                                                                evaluation
                                                                                on-going
38. Kalinga-Abra Road, K0476+000-         DPWH                135.27 GOP        Failure of
K0480+1000, K0480+1000-K0482+700                                                bidding. Re-
(with exceptions)                                                               advertised.
39. Balbalan-Pinukpuk Road                DPWH                   100 GOP        31.32%
40. Balbalan-Pinukpuk Road                DPWH                   245 GOP        10.60%
41.Mt. Province Bdry. –Calanan-           DPWH                   209 GOP        14.94%
Pinukpuk –Abbut Road (Pinukpuk)
(P209.0 M) K0499+674-K0509+294
(I.S.)
42. Balbalan-Pinukpuk Road, Abut A of     DPWH               183.239 GOP        Design
Baay Bridge+(-18502) to Abut A of Baay                                          Concept
Bridge+0                                                                        Approved.
                                                                                For
                                                                                procurement
                                                                                at CPO.
Mountain Province
43. Mt. Province –Ilocos Sur via Tue      DPWH                81.815 GOP        4%
Road
44. Mt. Province-Ilocos Sur via Kayan     DPWH                    92 GOP        2%
               Sub-Total                                   2,794.801

                Total                                6,341.652
Sources: Agencies' RPMES PMC Form I-1 and RPMES PMC Form I-2 as of March 2012




                                                                                       5

Más contenido relacionado

La actualidad más candente

Organisational change for improved programming
Organisational change for improved programmingOrganisational change for improved programming
Organisational change for improved programmingIRC
 
Building Vibrant Communities: Community Benefits of Land Revitalization
Building Vibrant Communities: Community Benefits of Land RevitalizationBuilding Vibrant Communities: Community Benefits of Land Revitalization
Building Vibrant Communities: Community Benefits of Land RevitalizationGeoAnitia
 
NYSERDA Incentives
NYSERDA IncentivesNYSERDA Incentives
NYSERDA IncentivesRyan Slack
 
Energy Challenges in Eastern Europe and CIS
Energy Challenges in Eastern Europe and CISEnergy Challenges in Eastern Europe and CIS
Energy Challenges in Eastern Europe and CISUNDP Eurasia
 
CDBG Annual Action Plan 2009
CDBG Annual Action Plan 2009CDBG Annual Action Plan 2009
CDBG Annual Action Plan 2009Rob May
 
Pine River Healthy Green Communities Partnership
Pine River Healthy Green Communities PartnershipPine River Healthy Green Communities Partnership
Pine River Healthy Green Communities PartnershipUniversity of Minnesota
 

La actualidad más candente (10)

Organisational change for improved programming
Organisational change for improved programmingOrganisational change for improved programming
Organisational change for improved programming
 
Building Vibrant Communities: Community Benefits of Land Revitalization
Building Vibrant Communities: Community Benefits of Land RevitalizationBuilding Vibrant Communities: Community Benefits of Land Revitalization
Building Vibrant Communities: Community Benefits of Land Revitalization
 
The ecowas small scale hydro power program
The ecowas small scale hydro power programThe ecowas small scale hydro power program
The ecowas small scale hydro power program
 
NYSERDA Incentives
NYSERDA IncentivesNYSERDA Incentives
NYSERDA Incentives
 
Energy Challenges in Eastern Europe and CIS
Energy Challenges in Eastern Europe and CISEnergy Challenges in Eastern Europe and CIS
Energy Challenges in Eastern Europe and CIS
 
The International Experience: REC Mechanism
The International Experience: REC MechanismThe International Experience: REC Mechanism
The International Experience: REC Mechanism
 
ANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive WasteANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive Waste
 
CDBG Annual Action Plan 2009
CDBG Annual Action Plan 2009CDBG Annual Action Plan 2009
CDBG Annual Action Plan 2009
 
Pine River Healthy Green Communities Partnership
Pine River Healthy Green Communities PartnershipPine River Healthy Green Communities Partnership
Pine River Healthy Green Communities Partnership
 
Fixing nhs
Fixing nhsFixing nhs
Fixing nhs
 

Destacado

State of the Nation Address 2012
State of the Nation Address 2012State of the Nation Address 2012
State of the Nation Address 2012Rdc Cordillera
 
ARISP III Inspection Report
ARISP III Inspection ReportARISP III Inspection Report
ARISP III Inspection ReportRdc Cordillera
 
Kabugao-Pudtol-Luna-Cagayan Boundary Road
Kabugao-Pudtol-Luna-Cagayan Boundary RoadKabugao-Pudtol-Luna-Cagayan Boundary Road
Kabugao-Pudtol-Luna-Cagayan Boundary RoadRdc Cordillera
 
2nd qtr major program projects
2nd qtr major program projects2nd qtr major program projects
2nd qtr major program projectsRdc Cordillera
 

Destacado (8)

State of the Nation Address 2012
State of the Nation Address 2012State of the Nation Address 2012
State of the Nation Address 2012
 
Eo no. 78 2012
Eo no. 78 2012Eo no. 78 2012
Eo no. 78 2012
 
ARISP III Inspection Report
ARISP III Inspection ReportARISP III Inspection Report
ARISP III Inspection Report
 
Kabugao-Pudtol-Luna-Cagayan Boundary Road
Kabugao-Pudtol-Luna-Cagayan Boundary RoadKabugao-Pudtol-Luna-Cagayan Boundary Road
Kabugao-Pudtol-Luna-Cagayan Boundary Road
 
2nd qtr rpmes 2012
2nd qtr rpmes 20122nd qtr rpmes 2012
2nd qtr rpmes 2012
 
2nd qtr rpmes report
2nd qtr rpmes report2nd qtr rpmes report
2nd qtr rpmes report
 
Da charmp 2 2nd qtr_f
Da charmp 2 2nd qtr_fDa charmp 2 2nd qtr_f
Da charmp 2 2nd qtr_f
 
2nd qtr major program projects
2nd qtr major program projects2nd qtr major program projects
2nd qtr major program projects
 

Similar a Summary of programs and projects as of first quarter 2012

Summary of priority sectoral program projects
Summary of priority sectoral program projectsSummary of priority sectoral program projects
Summary of priority sectoral program projectsRdc Cordillera
 
Introduction to the CoP Concept
Introduction to the CoP ConceptIntroduction to the CoP Concept
Introduction to the CoP Conceptm.mangiafico
 
Research paper: Reducing REDD: Implementation issues for lower Mekong subre...
Research paper:  	Reducing REDD: Implementation issues for lower Mekong subre...Research paper:  	Reducing REDD: Implementation issues for lower Mekong subre...
Research paper: Reducing REDD: Implementation issues for lower Mekong subre...SPERI
 
CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...
CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...
CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...OECD Environment
 
Dar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_fDar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_fRdc Cordillera
 
Integrating Environment in Local Planning in Tajikistan and AR Crimea
Integrating Environment in Local Planning in Tajikistan and AR CrimeaIntegrating Environment in Local Planning in Tajikistan and AR Crimea
Integrating Environment in Local Planning in Tajikistan and AR CrimeaUNDP Eurasia
 
Climate finance pauw (die)private sector adaptation&role ccxg gf march2014
Climate finance pauw (die)private sector adaptation&role ccxg gf march2014Climate finance pauw (die)private sector adaptation&role ccxg gf march2014
Climate finance pauw (die)private sector adaptation&role ccxg gf march2014OECD Environment
 
2011 RDC Accomplishments
2011 RDC Accomplishments2011 RDC Accomplishments
2011 RDC AccomplishmentsRdc Cordillera
 
2012 RDC-CAR Workprogram
2012 RDC-CAR Workprogram2012 RDC-CAR Workprogram
2012 RDC-CAR WorkprogramRdc Cordillera
 
Red and Black School Building Program
Red and Black School Building ProgramRed and Black School Building Program
Red and Black School Building ProgramRdc Cordillera
 
20160229_GEF-6_RE-EE_Project
20160229_GEF-6_RE-EE_Project20160229_GEF-6_RE-EE_Project
20160229_GEF-6_RE-EE_ProjectDanny Nekitel
 
An Analysis of the Concept of Public Participation Using the third World Bank...
An Analysis of the Concept of Public Participation Using the third World Bank...An Analysis of the Concept of Public Participation Using the third World Bank...
An Analysis of the Concept of Public Participation Using the third World Bank...Abdulrazaq Abdulkareem
 
Day 1. Presentation 2. iwan wibisono
Day 1. Presentation 2. iwan wibisonoDay 1. Presentation 2. iwan wibisono
Day 1. Presentation 2. iwan wibisonoThe Forests Dialogue
 

Similar a Summary of programs and projects as of first quarter 2012 (20)

2nd qtr rpmes 2012
2nd qtr rpmes 20122nd qtr rpmes 2012
2nd qtr rpmes 2012
 
2nd qtr rpmes report
2nd qtr rpmes report2nd qtr rpmes report
2nd qtr rpmes report
 
Summary of priority sectoral program projects
Summary of priority sectoral program projectsSummary of priority sectoral program projects
Summary of priority sectoral program projects
 
Introduction to the CoP Concept
Introduction to the CoP ConceptIntroduction to the CoP Concept
Introduction to the CoP Concept
 
Research paper: Reducing REDD: Implementation issues for lower Mekong subre...
Research paper:  	Reducing REDD: Implementation issues for lower Mekong subre...Research paper:  	Reducing REDD: Implementation issues for lower Mekong subre...
Research paper: Reducing REDD: Implementation issues for lower Mekong subre...
 
CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...
CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...
CCCXG Global Forum March 2017 BG3 Indonesia NDC Experience in Communicating M...
 
Dar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_fDar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_f
 
Planning in india
Planning in indiaPlanning in india
Planning in india
 
Integrating Environment in Local Planning in Tajikistan and AR Crimea
Integrating Environment in Local Planning in Tajikistan and AR CrimeaIntegrating Environment in Local Planning in Tajikistan and AR Crimea
Integrating Environment in Local Planning in Tajikistan and AR Crimea
 
Climate finance pauw (die)private sector adaptation&role ccxg gf march2014
Climate finance pauw (die)private sector adaptation&role ccxg gf march2014Climate finance pauw (die)private sector adaptation&role ccxg gf march2014
Climate finance pauw (die)private sector adaptation&role ccxg gf march2014
 
3rd qtr rpmes report
3rd qtr rpmes report3rd qtr rpmes report
3rd qtr rpmes report
 
2nd qtr rpmes 2013
2nd qtr rpmes 20132nd qtr rpmes 2013
2nd qtr rpmes 2013
 
2011 RDC Accomplishments
2011 RDC Accomplishments2011 RDC Accomplishments
2011 RDC Accomplishments
 
2012 yearend report
2012 yearend report2012 yearend report
2012 yearend report
 
2012 RDC-CAR Workprogram
2012 RDC-CAR Workprogram2012 RDC-CAR Workprogram
2012 RDC-CAR Workprogram
 
Red and Black School Building Program
Red and Black School Building ProgramRed and Black School Building Program
Red and Black School Building Program
 
20160229_GEF-6_RE-EE_Project
20160229_GEF-6_RE-EE_Project20160229_GEF-6_RE-EE_Project
20160229_GEF-6_RE-EE_Project
 
An Analysis of the Concept of Public Participation Using the third World Bank...
An Analysis of the Concept of Public Participation Using the third World Bank...An Analysis of the Concept of Public Participation Using the third World Bank...
An Analysis of the Concept of Public Participation Using the third World Bank...
 
Key notes of day 2
Key notes of day 2Key notes of day 2
Key notes of day 2
 
Day 1. Presentation 2. iwan wibisono
Day 1. Presentation 2. iwan wibisonoDay 1. Presentation 2. iwan wibisono
Day 1. Presentation 2. iwan wibisono
 

Más de Rdc Cordillera

Search for cordillera champions
Search for cordillera championsSearch for cordillera champions
Search for cordillera championsRdc Cordillera
 
Dep ed red & black school buildngs_2nd qtr_f
Dep ed red & black school buildngs_2nd qtr_fDep ed red & black school buildngs_2nd qtr_f
Dep ed red & black school buildngs_2nd qtr_fRdc Cordillera
 
Doh local health system 2nd_qtr_f
Doh local health system 2nd_qtr_fDoh local health system 2nd_qtr_f
Doh local health system 2nd_qtr_fRdc Cordillera
 
Dpwh kabugao pudtol_2nd qtr_f
Dpwh kabugao pudtol_2nd qtr_fDpwh kabugao pudtol_2nd qtr_f
Dpwh kabugao pudtol_2nd qtr_fRdc Cordillera
 
Dpwh kabugao solsona_2nd qtr_f
Dpwh kabugao solsona_2nd qtr_fDpwh kabugao solsona_2nd qtr_f
Dpwh kabugao solsona_2nd qtr_fRdc Cordillera
 
State of the region address cordillera administrative region
State of the region address   cordillera administrative regionState of the region address   cordillera administrative region
State of the region address cordillera administrative regionRdc Cordillera
 
Red and black schoolbuilding program inspection report
Red and black schoolbuilding program inspection reportRed and black schoolbuilding program inspection report
Red and black schoolbuilding program inspection reportRdc Cordillera
 
National greening program inspection report
National greening program inspection reportNational greening program inspection report
National greening program inspection reportRdc Cordillera
 
2012 rpmc inspection reports
2012 rpmc inspection reports2012 rpmc inspection reports
2012 rpmc inspection reportsRdc Cordillera
 

Más de Rdc Cordillera (15)

1st qtr rpmes 2013
1st qtr rpmes 20131st qtr rpmes 2013
1st qtr rpmes 2013
 
Search for cordillera champions
Search for cordillera championsSearch for cordillera champions
Search for cordillera champions
 
Nomination form
Nomination formNomination form
Nomination form
 
Vacaciesjan2012 1
Vacaciesjan2012 1Vacaciesjan2012 1
Vacaciesjan2012 1
 
Dpwh kabugao
Dpwh kabugaoDpwh kabugao
Dpwh kabugao
 
Dep ed red & black school buildngs_2nd qtr_f
Dep ed red & black school buildngs_2nd qtr_fDep ed red & black school buildngs_2nd qtr_f
Dep ed red & black school buildngs_2nd qtr_f
 
Doh local health system 2nd_qtr_f
Doh local health system 2nd_qtr_fDoh local health system 2nd_qtr_f
Doh local health system 2nd_qtr_f
 
Dpwh kabugao pudtol_2nd qtr_f
Dpwh kabugao pudtol_2nd qtr_fDpwh kabugao pudtol_2nd qtr_f
Dpwh kabugao pudtol_2nd qtr_f
 
Dpwh kabugao solsona_2nd qtr_f
Dpwh kabugao solsona_2nd qtr_fDpwh kabugao solsona_2nd qtr_f
Dpwh kabugao solsona_2nd qtr_f
 
Dswd 4 ps_2nd qtr_f
Dswd 4 ps_2nd qtr_fDswd 4 ps_2nd qtr_f
Dswd 4 ps_2nd qtr_f
 
Denr ngp 2nd qtr_f
Denr ngp 2nd qtr_fDenr ngp 2nd qtr_f
Denr ngp 2nd qtr_f
 
State of the region address cordillera administrative region
State of the region address   cordillera administrative regionState of the region address   cordillera administrative region
State of the region address cordillera administrative region
 
Red and black schoolbuilding program inspection report
Red and black schoolbuilding program inspection reportRed and black schoolbuilding program inspection report
Red and black schoolbuilding program inspection report
 
National greening program inspection report
National greening program inspection reportNational greening program inspection report
National greening program inspection report
 
2012 rpmc inspection reports
2012 rpmc inspection reports2012 rpmc inspection reports
2012 rpmc inspection reports
 

Último

DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 

Último (20)

DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 

Summary of programs and projects as of first quarter 2012

  • 1. First Quarter Report CY 2012 LIST of PROGRAMS/PROJECTS CORDILLERA ADMINISTRATIVE REGION As of March 2012 IMPLEMEN- PROJECT COST FUNDING Status/ PROGRAM/PROJECT TING AGENCY (PhP M) SOURCE Remarks As of March 2012 SOCIAL SECTOR 1. Pantawid Pamilyang Pilipino Program DSWD 706.332 World *Educ. & (4Ps) Bank & Health: ADB 97.17% *Family Development Session: 91.87% 2. National Household Targeting System DSWD 35.427 GOP, On-going for Poverty Reduction Program Loan 3. Red and Black School Building DepEd 146.54 GOP 88.44 % Program (CY 2011) 4. Rehabilitation of School Building DepEd 29.340 GOP On-going including Water Sanitation Facilities 5. Philippine Response to Indigenous DepEd 3.978 AusAid On-going People’s (IP) and Muslim Education (PRIME) 6. Construction of Various Health DOH 117.866 GOP 37% Facility 7. Water System DOH 184.500 GOP 3.61% 8. Cordillera-wide Strengthening of DOH & 43 JBIC The project Local Health System for Effective and LGUs Abra is on its early Efficient Delivery of Maternal and Child Apayao stage since it Health Services Benguet was only launched on March 13,2012 Sub-Total 1,266.983 ECONOMIC SECTOR 9. Second Cordillera Highland DA 3.081 IFAD, 18% Agricultural Resource Management ADB. (CHARM 2) Project OFID 10. Agrarian Reform Infrastructure DAR 903.863 Loan 33.37% Support Project Phase III GOP 11. Farm-to-Market Roads DA 53 Grant On-going 12. Irrigation Projects NIA 1,184.838 GOP 8.04% 13. One Town One Product Program DTI 2.273 GOP 100% (OTOP) 1
  • 2. First Quarter Report CY 2012 LIST of PROGRAMS/PROJECTS CORDILLERA ADMINISTRATIVE REGION As of March 2012 IMPLEMEN- PROJECT COST FUNDING Status/ PROGRAM/PROJECT TING AGENCY (PhP M) SOURCE Remarks As of March 2012 14. Rural Micro Enterprise Promotion DTI 1.8 IFAD 100% Programme (RuMEPP) with GOP Counter part 15. Shared Service Facilities Project DTI 1.125 NEDAC Proposal (SSF) Fund endorsed to (Nationa RODG, DTI l Export for approval Develop and ment downloading and of funds. Competi tiveness) 16. Small Enterprise Technology DOST 28.673 GOP 3.05% Upgrading Program (SETUP) Core and Non-Core Funded Projects 17. Packaging and Labeling DOST 688.00 GOP 11.43% 18. National Greening Program (NGP) DENR 100.527 GOP 19% Sub-Total 2,279.868 INFRASTRUCTURE SECTOR Abra 19. Abra-Ilocos Sur Road DPWH 106.195 GOP NTP issued March 29, 2012 20.Abra-Kalinga Road, K0467+000- DPWH 147.691 GOP Failure of K0474+305 bidding. Re- advertised 21. Abra-Ilocos Norte, K0436+700- DPWH 62 GOP Short of K0439+395 award. Awaiting for the SARO indicating the realigned project. 22. Road Upgrading along Abra- DPWH 60 GOP Short of Cervantes Road (Realigned from Sto. award. Tomas-Manabo Bridge) Awaiting for the SARO 2
  • 3. First Quarter Report CY 2012 LIST of PROGRAMS/PROJECTS CORDILLERA ADMINISTRATIVE REGION As of March 2012 IMPLEMEN- PROJECT COST FUNDING Status/ PROGRAM/PROJECT TING AGENCY (PhP M) SOURCE Remarks As of March 2012 indicating the realigned project. 23. Sto. Tomas-Manabo Bridge (P 160.0 DPWH 160 GOP 49.44% M) 24. Abra-Kalinga Road K0410+000- DPWH 50.45 GOP 95.63% K0413+810 25. Abra-Kalinga Road K0437+490- DPWH 143.67 GOP 75.80% K0455+890, K0432+000-K0450+800 Apayao 26. Kabugao-Pudtol-Luna-Cagayan DPWH 58.827 GOP 5% Memo Boundary Road (Nov. 3, K0661+000 - K0661+321, K0643+646 - 2011) from K0645+825 Gravel to Concrete Secretary Singson: Approved for upgrading from Secondary to Arterial Road 27. Kabugao- Solsona (Apayao- Ilocos DPWH 100 GOP Not yet Norte Road) started due to failure to bidding. There were no takers due to relatively low estimated unit cost. Project is for rebidding. Benguet 28. Rehab./Reconst’n/Upgrading of DPWH 54.433 GOP Advertised Kennon Road March 23, 2012. Bids opening April 16, 2012 3
  • 4. First Quarter Report CY 2012 LIST of PROGRAMS/PROJECTS CORDILLERA ADMINISTRATIVE REGION As of March 2012 IMPLEMEN- PROJECT COST FUNDING Status/ PROGRAM/PROJECT TING AGENCY (PhP M) SOURCE Remarks As of March 2012 29. Baguio-Bontoc Road (Pico-Lamtang DPWH 98.674 GOP Advertised Rd., Baguio Itogon & Baguio-Bontoc) March 23,2012 30. Baguio-Bontoc Road, K0269+000- DPWH 109.332 GOP Bids opening K0275+000 (v.s.)& K0299+000- April 23, K0300+900 (v.s.) & K0305+000- 2012 K0308+500 (v.s.) & K0309+000- K0311+000 (v.s.), K0317+415- K0318+500 (v.s.), & K0323+000 – K0328+000 (v.s.) 31. Gurel-Bokod-Kabayan-Buguias- DPWH 98.5 GOP 46.81% Abatan Road 32. Gurel-Bokod-Kabayan-Buguias- DPWH 116.5 GOP 69.30% Abatan Road K0303+600-K03012+000 33. Rehab./Impv’t. of Gurel-Bokod- DPWH 148 GOP Bids opened: Kabayan-Buguias Road including March 28, RROW 2012 34. Gurel-Bokod-Kabayan-Buguias- DPWH 68.921 GOP Plans & Abatan Road, K0345+513-K0359+300 POW (vs.) submitted to Central office Feb. 29, 2012. Advertised: March 23-29, 2012. Opening of Bids: April 16, 2012 Ifugao 35. Banaue-Mayoyao-A Lista-Isabela DPWH 58.064 GOP Failure of Bdry. Road bidding. Re- advertised. 36. Nueva Vizcaya-Ifugao-Mt. Province DPWH 54.163 GOP Bids opened: Road March 28, 2012 Kalinga 37. Kalinga-Abra Road, K0470+000- DPWH 53.057 GOP Bids opened: K0472+267 March 21, 2012. 4
  • 5. First Quarter Report CY 2012 LIST of PROGRAMS/PROJECTS CORDILLERA ADMINISTRATIVE REGION As of March 2012 IMPLEMEN- PROJECT COST FUNDING Status/ PROGRAM/PROJECT TING AGENCY (PhP M) SOURCE Remarks As of March 2012 Post evaluation on-going 38. Kalinga-Abra Road, K0476+000- DPWH 135.27 GOP Failure of K0480+1000, K0480+1000-K0482+700 bidding. Re- (with exceptions) advertised. 39. Balbalan-Pinukpuk Road DPWH 100 GOP 31.32% 40. Balbalan-Pinukpuk Road DPWH 245 GOP 10.60% 41.Mt. Province Bdry. –Calanan- DPWH 209 GOP 14.94% Pinukpuk –Abbut Road (Pinukpuk) (P209.0 M) K0499+674-K0509+294 (I.S.) 42. Balbalan-Pinukpuk Road, Abut A of DPWH 183.239 GOP Design Baay Bridge+(-18502) to Abut A of Baay Concept Bridge+0 Approved. For procurement at CPO. Mountain Province 43. Mt. Province –Ilocos Sur via Tue DPWH 81.815 GOP 4% Road 44. Mt. Province-Ilocos Sur via Kayan DPWH 92 GOP 2% Sub-Total 2,794.801 Total 6,341.652 Sources: Agencies' RPMES PMC Form I-1 and RPMES PMC Form I-2 as of March 2012 5