Minimum Standards For USACE Evaluation of Levee Systems For the National Flood Insurance Program Christopher N. Dunn, P.E., Director Hydrologic Engineering Center SAME 2009 Water Conference 26-28 October, 2009 Sacramento, CA
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Levee Evaluation Topics
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],*  Slide title with red first letter is a definition slide D efinitions*
L evee System ,[object Object],t Riversburg Greentown Metroville This diagram shows one levee “project” and three levee systems
CFR  C ertified Levee System ,[object Object]
A ccredited Levee System ,[object Object]
Roles and Responsibilities ,[object Object],[object Object],[object Object]
D eterministic Analysis ,[object Object],[object Object],[object Object],[object Object],P robabilistic Analysis
Flood Damage Assessment Policies ,[object Object],[object Object],Risk-Based Analysis ,[object Object],[object Object],[object Object]
Risk Analysis Outputs ,[object Object],[object Object],[object Object],[object Object],[object Object]
Conditional Non-exceedance Probability (CNP) ,[object Object],[object Object]
USACE Levee Certification Guidance ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Levee System Evaluation Engineer Circular (EC) ,[object Object],[object Object],[object Object]
Systems Approach ,[object Object],[object Object],[object Object]
Validity Period ,[object Object],[object Object],[object Object]
USACE Levee System Evaluation ,[object Object],[object Object],[object Object],[object Object],[object Object]
Review Available Information ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Evaluation Site Visit ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Probabilistic H&H Analysis ,[object Object],[object Object],[object Object]
Stage - Probability Derivation Initial Criteria – CNP > 90% for 0.01 event Exceedance Probability Discharge cfs) Discharge (cfs) Stage (feet) Stage (feet) Exceedance Probability 0.01
CNP Concepts Elevation PDF for base flood event; e.g. 0.01 exceedance event. Say 60%CNP Say 80%CNP Say 90%CNP Levee 1 – CNP = 94% Levee 2 – CNP = 83% Elev. 3 Note:  PDF is  NOT  symmetrical; depends on Q-f, rating curve, & failure prob. Curve. Elev. 1 Elev. 2
CNP Criteria ,[object Object],[object Object],[object Object],[object Object],/
CNP Criteria Quiz 0.01 Expected WS (50% Stage) = 516.3’ 0.52 0.86 0.97 0.99 1.00 Levee Raise to El. 518’ 0.22 0.39 0.49 0.83 0.97 Levee Raise to El. 515’ 0.14 0.23 0.37 0.69 0.83 Levee Raise to El. 512’ 0.02 0.11 0.28 0.56 0.74 Levee Raise to El. 510’ 0.2% 0.4% 1% 2% 4% Plan Conditional Non-Exceedance Probability by Events
[object Object],Geotechnical Analysis ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Identify Potential Modes of Failure Using  EM 1110-2-1913, Design and Construction of Levees”
Other Deterministic Analyses ,[object Object],[object Object],[object Object],[object Object],[object Object]
Authorities and Programs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],CECW-P/CECW-E Memorandum, “Authority and Funding Guidance for USACE Levee Certification Activities”, 15 August, 2006
Authorities and Programs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],CECW-P/CECW-E Memorandum, “Authority and Funding Guidance for USACE Levee Certification Activities”, 15 August, 2006
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Authorities and Programs
ETL vs EC ,[object Object],[object Object],[object Object],[object Object],[object Object]
QUESTIONS ?

Más contenido relacionado

La actualidad más candente

Download-manuals-surface water-waterlevel-24howtocorrectandcompletewaterleve...
 Download-manuals-surface water-waterlevel-24howtocorrectandcompletewaterleve... Download-manuals-surface water-waterlevel-24howtocorrectandcompletewaterleve...
Download-manuals-surface water-waterlevel-24howtocorrectandcompletewaterleve...
hydrologyproject001
 
Brett C. Mahon's Resume
Brett C. Mahon's ResumeBrett C. Mahon's Resume
Brett C. Mahon's Resume
Brett Mahon
 
George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16
Bert Yates
 
Download-manuals-surface water-waterlevel-28howtocarryoutprimaryvalidationof...
 Download-manuals-surface water-waterlevel-28howtocarryoutprimaryvalidationof... Download-manuals-surface water-waterlevel-28howtocarryoutprimaryvalidationof...
Download-manuals-surface water-waterlevel-28howtocarryoutprimaryvalidationof...
hydrologyproject001
 
Download-manuals-surface water-waterlevel-22howtocarryoutprimaryvalidationof...
 Download-manuals-surface water-waterlevel-22howtocarryoutprimaryvalidationof... Download-manuals-surface water-waterlevel-22howtocarryoutprimaryvalidationof...
Download-manuals-surface water-waterlevel-22howtocarryoutprimaryvalidationof...
hydrologyproject001
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample Memo
Chad Colton
 
Alan C Greyer resume II
Alan C Greyer resume IIAlan C Greyer resume II
Alan C Greyer resume II
Chris Greyer
 
gi-ukepr-ci-01-close-out
gi-ukepr-ci-01-close-outgi-ukepr-ci-01-close-out
gi-ukepr-ci-01-close-out
Dijesh Das
 
service transcripts
service transcriptsservice transcripts
service transcripts
Schan Seay
 

La actualidad más candente (20)

Risk Assessment Hazardous Liquid Pipeline Integrity
Risk Assessment Hazardous Liquid Pipeline IntegrityRisk Assessment Hazardous Liquid Pipeline Integrity
Risk Assessment Hazardous Liquid Pipeline Integrity
 
Sopaqu
SopaquSopaqu
Sopaqu
 
Keeping Bowties Alive
Keeping Bowties AliveKeeping Bowties Alive
Keeping Bowties Alive
 
Download-manuals-surface water-waterlevel-24howtocorrectandcompletewaterleve...
 Download-manuals-surface water-waterlevel-24howtocorrectandcompletewaterleve... Download-manuals-surface water-waterlevel-24howtocorrectandcompletewaterleve...
Download-manuals-surface water-waterlevel-24howtocorrectandcompletewaterleve...
 
RWhite Resume v15.2.
RWhite Resume v15.2.RWhite Resume v15.2.
RWhite Resume v15.2.
 
Advanced Reservoir Testing
Advanced Reservoir TestingAdvanced Reservoir Testing
Advanced Reservoir Testing
 
Max Gap Tim Final
Max Gap Tim FinalMax Gap Tim Final
Max Gap Tim Final
 
Brett C. Mahon's Resume
Brett C. Mahon's ResumeBrett C. Mahon's Resume
Brett C. Mahon's Resume
 
George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16
 
Download-manuals-surface water-waterlevel-28howtocarryoutprimaryvalidationof...
 Download-manuals-surface water-waterlevel-28howtocarryoutprimaryvalidationof... Download-manuals-surface water-waterlevel-28howtocarryoutprimaryvalidationof...
Download-manuals-surface water-waterlevel-28howtocarryoutprimaryvalidationof...
 
Riley Sess3 101309
Riley Sess3 101309Riley Sess3 101309
Riley Sess3 101309
 
HENDERSON RESUME TEST SPECIALIST
HENDERSON RESUME TEST SPECIALISTHENDERSON RESUME TEST SPECIALIST
HENDERSON RESUME TEST SPECIALIST
 
Download-manuals-surface water-waterlevel-22howtocarryoutprimaryvalidationof...
 Download-manuals-surface water-waterlevel-22howtocarryoutprimaryvalidationof... Download-manuals-surface water-waterlevel-22howtocarryoutprimaryvalidationof...
Download-manuals-surface water-waterlevel-22howtocarryoutprimaryvalidationof...
 
Gem sfeatures
Gem sfeaturesGem sfeatures
Gem sfeatures
 
sommer resume new
sommer resume newsommer resume new
sommer resume new
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample Memo
 
Alan C Greyer resume II
Alan C Greyer resume IIAlan C Greyer resume II
Alan C Greyer resume II
 
gi-ukepr-ci-01-close-out
gi-ukepr-ci-01-close-outgi-ukepr-ci-01-close-out
gi-ukepr-ci-01-close-out
 
service transcripts
service transcriptsservice transcripts
service transcripts
 
1 s2.0-s0360319915300094-main
1 s2.0-s0360319915300094-main1 s2.0-s0360319915300094-main
1 s2.0-s0360319915300094-main
 

Destacado (10)

Steve Vogt 7 21 16
Steve Vogt 7 21 16Steve Vogt 7 21 16
Steve Vogt 7 21 16
 
Biografía mía!
Biografía mía!Biografía mía!
Biografía mía!
 
PUBLIC TRANSPORT SYSTEM PRODUCT DEVELOPMENT AND MARKETING GUIDELINES FOR A SO...
PUBLIC TRANSPORT SYSTEM PRODUCT DEVELOPMENT AND MARKETING GUIDELINES FOR A SO...PUBLIC TRANSPORT SYSTEM PRODUCT DEVELOPMENT AND MARKETING GUIDELINES FOR A SO...
PUBLIC TRANSPORT SYSTEM PRODUCT DEVELOPMENT AND MARKETING GUIDELINES FOR A SO...
 
Formació Linkedin EUSS, controla la teva identitat digital.
Formació Linkedin EUSS, controla la teva identitat digital.Formació Linkedin EUSS, controla la teva identitat digital.
Formació Linkedin EUSS, controla la teva identitat digital.
 
Maio Mall Product-WBC
Maio Mall Product-WBCMaio Mall Product-WBC
Maio Mall Product-WBC
 
Fotos Mangles
Fotos ManglesFotos Mangles
Fotos Mangles
 
ở đâu dịch vụ giúp việc quận gò vấp ở hồ chí minh
ở đâu dịch vụ giúp việc quận gò vấp ở hồ chí minhở đâu dịch vụ giúp việc quận gò vấp ở hồ chí minh
ở đâu dịch vụ giúp việc quận gò vấp ở hồ chí minh
 
Bananera orgánica.
Bananera orgánica.Bananera orgánica.
Bananera orgánica.
 
Planificación paseo parque O´higgins
Planificación paseo parque O´higginsPlanificación paseo parque O´higgins
Planificación paseo parque O´higgins
 
Finance - Using Budgets
Finance - Using BudgetsFinance - Using Budgets
Finance - Using Budgets
 

Similar a Dunn Sess4 101509

Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)
Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)
Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)
Robert Byrd
 
Wind Exchange 2015 Report
Wind Exchange 2015 ReportWind Exchange 2015 Report
Wind Exchange 2015 Report
Joshua Chokera
 
GORDON JOHN CARLON JR (4)
GORDON JOHN CARLON JR (4)GORDON JOHN CARLON JR (4)
GORDON JOHN CARLON JR (4)
Gordon Carlon
 
10 - CIP-002-5.1 Medley - Carr
10 - CIP-002-5.1 Medley - Carr10 - CIP-002-5.1 Medley - Carr
10 - CIP-002-5.1 Medley - Carr
Bryan Carr
 
18 Apr 2015 NWFSC PMI presentation v7
18 Apr 2015 NWFSC PMI presentation v718 Apr 2015 NWFSC PMI presentation v7
18 Apr 2015 NWFSC PMI presentation v7
Michael Cary
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
hydrologyproject001
 
2016 ATSS Charlotte Resume Final
2016 ATSS Charlotte Resume Final2016 ATSS Charlotte Resume Final
2016 ATSS Charlotte Resume Final
Dennis Heidenfeldt
 
MUKUL PATEL 21042016
MUKUL PATEL 21042016MUKUL PATEL 21042016
MUKUL PATEL 21042016
Mukul Patel
 
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
ZaidMasoodKhan
 

Similar a Dunn Sess4 101509 (20)

Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)
Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)
Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)
 
361
361361
361
 
361
361361
361
 
Jonathan Naughton - V&V of Models for Wind Turbine and Wind Plant Aerodynamic...
Jonathan Naughton - V&V of Models for Wind Turbine and Wind Plant Aerodynamic...Jonathan Naughton - V&V of Models for Wind Turbine and Wind Plant Aerodynamic...
Jonathan Naughton - V&V of Models for Wind Turbine and Wind Plant Aerodynamic...
 
Wind Exchange 2015 Report
Wind Exchange 2015 ReportWind Exchange 2015 Report
Wind Exchange 2015 Report
 
GORDON JOHN CARLON JR (4)
GORDON JOHN CARLON JR (4)GORDON JOHN CARLON JR (4)
GORDON JOHN CARLON JR (4)
 
Inamine Final Sess4 102709
Inamine Final Sess4 102709Inamine Final Sess4 102709
Inamine Final Sess4 102709
 
Metrology & The Consequences of Bad Measurement Decisions
Metrology & The Consequences of Bad Measurement DecisionsMetrology & The Consequences of Bad Measurement Decisions
Metrology & The Consequences of Bad Measurement Decisions
 
10 - CIP-002-5.1 Medley - Carr
10 - CIP-002-5.1 Medley - Carr10 - CIP-002-5.1 Medley - Carr
10 - CIP-002-5.1 Medley - Carr
 
Mullins Sess8 101509
Mullins Sess8 101509Mullins Sess8 101509
Mullins Sess8 101509
 
22223.pdf
22223.pdf22223.pdf
22223.pdf
 
The GM-VV
The GM-VVThe GM-VV
The GM-VV
 
Asset Integrity Management approach to achieve excellence in Process Safety
Asset Integrity Management approach to achieve excellence in Process SafetyAsset Integrity Management approach to achieve excellence in Process Safety
Asset Integrity Management approach to achieve excellence in Process Safety
 
Poster
PosterPoster
Poster
 
18 Apr 2015 NWFSC PMI presentation v7
18 Apr 2015 NWFSC PMI presentation v718 Apr 2015 NWFSC PMI presentation v7
18 Apr 2015 NWFSC PMI presentation v7
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
2016 ATSS Charlotte Resume Final
2016 ATSS Charlotte Resume Final2016 ATSS Charlotte Resume Final
2016 ATSS Charlotte Resume Final
 
MUKUL PATEL 21042016
MUKUL PATEL 21042016MUKUL PATEL 21042016
MUKUL PATEL 21042016
 
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
 
Structural R.
Structural R.Structural R.
Structural R.
 

Más de SAME 2009 California Water Conference

Más de SAME 2009 California Water Conference (20)

W Wright Sess8 102709
W Wright Sess8 102709W Wright Sess8 102709
W Wright Sess8 102709
 
Wise Sess11 102509
Wise Sess11 102509Wise Sess11 102509
Wise Sess11 102509
 
Wijsman Sess2 102309
Wijsman Sess2 102309Wijsman Sess2 102309
Wijsman Sess2 102309
 
V Wright Sess2 102109
V Wright Sess2 102109V Wright Sess2 102109
V Wright Sess2 102109
 
Travis Tuesdaynoon 102709
Travis Tuesdaynoon 102709Travis Tuesdaynoon 102709
Travis Tuesdaynoon 102709
 
Tibbitts Sess14 102009
Tibbitts Sess14 102009Tibbitts Sess14 102009
Tibbitts Sess14 102009
 
Suedel Sess5 102309[1]
Suedel Sess5 102309[1]Suedel Sess5 102309[1]
Suedel Sess5 102309[1]
 
Stockton Wednesday8am 102809
Stockton Wednesday8am 102809Stockton Wednesday8am 102809
Stockton Wednesday8am 102809
 
Stockton Wed Am 102809
Stockton Wed Am 102809Stockton Wed Am 102809
Stockton Wed Am 102809
 
Sorci Sess7 101309
Sorci Sess7 101309Sorci Sess7 101309
Sorci Sess7 101309
 
Shewbridge Sess05 101309
Shewbridge Sess05 101309Shewbridge Sess05 101309
Shewbridge Sess05 101309
 
Seed Wed Am 102109
Seed Wed Am 102109Seed Wed Am 102109
Seed Wed Am 102109
 
Sabol Sess3 100909
Sabol Sess3 100909Sabol Sess3 100909
Sabol Sess3 100909
 
Ragain Sess1 102209
Ragain Sess1 102209Ragain Sess1 102209
Ragain Sess1 102209
 
Mc Knight Sess13 102309
Mc Knight Sess13 102309Mc Knight Sess13 102309
Mc Knight Sess13 102309
 
Millet Sess5 102709
Millet Sess5 102709Millet Sess5 102709
Millet Sess5 102709
 
Mc Quirk Sess1 101509
Mc Quirk Sess1 101509Mc Quirk Sess1 101509
Mc Quirk Sess1 101509
 
Mayer Wed Am 102809
Mayer Wed Am 102809Mayer Wed Am 102809
Mayer Wed Am 102809
 
Martin Sess13 101309
Martin Sess13 101309Martin Sess13 101309
Martin Sess13 101309
 
Marks Sess13 102309
Marks Sess13 102309Marks Sess13 102309
Marks Sess13 102309
 

Último

CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Último (20)

ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 

Dunn Sess4 101509

  • 1. Minimum Standards For USACE Evaluation of Levee Systems For the National Flood Insurance Program Christopher N. Dunn, P.E., Director Hydrologic Engineering Center SAME 2009 Water Conference 26-28 October, 2009 Sacramento, CA
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20. Stage - Probability Derivation Initial Criteria – CNP > 90% for 0.01 event Exceedance Probability Discharge cfs) Discharge (cfs) Stage (feet) Stage (feet) Exceedance Probability 0.01
  • 21. CNP Concepts Elevation PDF for base flood event; e.g. 0.01 exceedance event. Say 60%CNP Say 80%CNP Say 90%CNP Levee 1 – CNP = 94% Levee 2 – CNP = 83% Elev. 3 Note: PDF is NOT symmetrical; depends on Q-f, rating curve, & failure prob. Curve. Elev. 1 Elev. 2
  • 22.
  • 23. CNP Criteria Quiz 0.01 Expected WS (50% Stage) = 516.3’ 0.52 0.86 0.97 0.99 1.00 Levee Raise to El. 518’ 0.22 0.39 0.49 0.83 0.97 Levee Raise to El. 515’ 0.14 0.23 0.37 0.69 0.83 Levee Raise to El. 512’ 0.02 0.11 0.28 0.56 0.74 Levee Raise to El. 510’ 0.2% 0.4% 1% 2% 4% Plan Conditional Non-Exceedance Probability by Events