CADD SEMESTER PROJECT
SUSTAINABLE BUILDING DESIGN
Archlauds
Sr. # Name Designation Reg. #
1 Bilal Shahid Khokhar Chief Architect 20
2 Muaaz Bashir Dhudra LEED Engineer 84
3 Muazzam Ali Chief Engineer 45
4 Qasim Umer Manager – HR 96
5 Waleed Liaqat Field Engineer 122
Introduction
 The objective of the project was to design a green
building or renovate an existing building to make it
sustainable.
“Green or sustainable building is the practice of
creating healthier and more resource-efficient models
of construction, renovation, operation, maintenance,
and demolition.” © EPA
 LEED is a set of rating systems for the design,
construction, operation, and maintenance of green
buildings, homes and neighborhoods, developed by
the USGBC.
 “LEED 2009 For New Construction And Major
Renovations” served as the main reference material
for the project
THE BUILDING
Description and Drawings
Description
Type of building Mixed-use
Location/site Plot # 35,G-11 Markaz,
Shabbir Sharif Rd, Sector
G – 11, Islamabad.
Site Area 1600 sqyd
Number of floors 6
Number of shops 99
Number of offices 35
Number of flats – no
dining area
66
Number of flats – dining
area
6
Altitude Approx. 1850 ft above
sea level
Floor by Floor usage
Basement Commercial
Ground Commercial
1st Commercial
2nd Residential
3rd Residential
4th Residential
Description of areas (by floor)
Area Dimension
Basement
Shop
11’ x 10’-4”, 11’ x 26’,
11’ x 17’, 8’-9” x 10’-4”,
8’-9” x 26’
Corridor 8’ wide, 10’ wide
Passage 8’ wide, 7’wide
Ground floor
Shop 11’ x 64’, 11’ x 56’
Passage 6’ wide, 7’wide, 9’wide
1st floor
Office 11’ x 36’
Bath
8'-7" x 5'11“, 5’-7” x 5’-
11”
Kitchen
10’ x 8’-3”, 6’x7’, 5’ x 8’-
6”
Corridor 8’ wide
2nd , 3rd , 4th
Bed 11’ x 11’-4 ‘
T.V Lounge 11’ x 22’, 11’ x 14’
Bath 8'-7" x 5'11“, 5’-7” x 5’-11”
Kitchen 10’ x 8’-3”, 6’x7’, 5’ x 8’-6”
Dining Room 11’ x 13’
Corridor 8’ wide
Schedule of opening
Description Size
D1 3'-6"X8'
D2 3'-3"X8'
D3 3'X8'
All shop entrances 9'-6"X9'
All Bath doors 2'-6"X7'
All windows in corridors 4'X6'
Front Elevation
Cross-section
Basement (Plan)
Ground Floor Plan (shops)
1st Floor Plan (offices)
2nd , 3rd and 4th Floor Plan (Flats)
Building Site
 Building constructed in the heart of the G –
11 sector Islambad i.e. the G-11 Markaz.
 G-11 Markaz ; hub of commercial activity.
 Easily accessible by road.
 At Walking distance to nearby residential
areas (potential clients for shopkeepers)
 Access to basic infrastructure facilities,
amenities and services
 Is fairly clean and pollution free.
 The site is close to a main highway (Kashmir
Highway)
 Fulfills LEED’s Sustainable Site (SS) credit 2:
Density and Community Connectivity –
option 2 criteria. (5 credit points)
SUSTAINABILITY
FEATURES
Description and Implementation
Efficient Plumbing Fixtures
Intent
• Conserving water
• reducing water bills
Pertains to WE Credit 3: Water Use Reduction (2-4 credit points)
Technologies / Equipment
• Sensor Taps (infrared)
• Low output pressure fixtures (faucets, toilets,
shower heads)
• A few examples are shown below.
Calculations
• A water use (pressure) baseline must be
determined for the building.
• Fixtures with output pressures lower than the
baseline must be installed.
• Online calculator available at zurn.com
Fixture Product Max. Flow rate
LEED
Baseline
Price per unit
($)
Residential
bathroom faucet
(sinks)
Deva Vision Non
Concussive Self Closing
Basin Tap - VSN123
1.5 gpm 2.2 gpm 112
Residential
Bathroom Shower
head
MOEN Eco
Performance
Showerhead
1.75 gpm 2.5 gpm 58
Innovation in plan
Storm water Runoff control
Intent
• Reducing storm water run off
• Harvesting storm water for non-potable uses
such as toilet flushing
• Less stress on other water sources
Pertains to
SS Credit 6.1: Storm-water Design - Quantity Control
(1 credit point)
Technologies / Equipment
• Vegetation mats (roof)
• Flower boxes
• Large PVC Water tank for storm water storage
Feature Product Description
Price per
unit
($)
Vegetated
roof
Sika Sarnafil
Green Roof –
Intensive
 6 inch of growth medium is provided
that can grow a variety of plants.
 Fairly high maintenance will be
required.
 Storm-water retention up to 75 – 80%
25 – 40 per
sf
Rain water
Storage
PVC
rainwater
tank
 Tank installed within basement or
underground (near Building) to collect
storm-water.
 The tank will be connected to toilets on
the commercial floors of the building via
the building’s plumbing system.
variable
Grey Water Reuse
Intent
• Recycling grey water for non-potable uses
• Reducing stress on other water sources
• Reducing water bills
Pertains to
WE Credit 2: Innovative Wastewater Technologies (2
credit points)
Technologies /
Equipment
• Small scale recycling system (per bath)
Or
• Large scale recycling system for entire building
Feature Product Description
Price per unit
($)
Grey water
large scale
recycling
Huber
smartMBR
• It is an easy to use Membrane Bioreactor system
• It can be connected to underground rain water storage
tank, which in turn is connected to toilets in the building.
• Control functions are provided by an integrated
programmable logic controller (PLC).
• Treatment capacity : 10 – 75 m3 / day
Dependent on
certain variables
Grey water
small scale
recycling
SLOAN
AQUS
• Water flowing down wash basin or shower drain is treated
• Treated water stored in a 5.5 gallon reservoir.
• A centrifugal pump (DC power) pushes water via a
connecting pipe into storage tank of the toilet where it will be
used for flushing.
189 - 375
Cool or Green roof
Intent
• Reducing heat transfer into the building
• Reducing energy bills
Pertains to
SS Credit 7.2: Heat Island effect, EA Credit 1: Optimize
Energy Performance (1+(1 – 19) credit points)
Technologies /
Equipment
• Vegetation mats (cover 50% or more of roof)
• Reflective Coatings
Feature Product Description
Price per unit
($)
Reflective
roof coatings
Sikacoat®
roof coating
(white color
recommen
ded)
• It is a water-based acrylic technology
that is low in odor and volatile organic
compounds (VOCs).
• Sikacoat meets the cool roofing
requirements of Energy Star®,
California Title 24, LEED® and Green
Globes® programs.
• It has high solar reflectance.
0.75 – 3 per sqft
Innovation in plan
Efficient Building Envelope
Intent
• Preventing water ingress ,entry of pollutants, entry of insects and heat
transfer
• Reducing energy bills
• Maintaining indoor air quality
Pertains to EA Credit 1: Optimize Energy Performance (1 – 19 credit points)
Technologies /
Equipment
• Sealants (doors and windows), Caulks (floors)
• Double glazed openable windows
• Durable and heat reflecting exterior paints
Feature Product Description
Price per unit
($)
Glazed windows
WIN-PAK
Double glaze
glass
• Consists of two glass sheets separated by
an aluminum spacer.
• The spacer contains desiccant granules to
absorb moisture.
• can reduce the energy consumption of a
building by 30% or more.
Varies according to
size of the windows
Durable exterior
paint
ICI
Dulux Weather
shield Sun Reflect
(Various Shades)
• It is a high quality 100% acrylic based emulsion
paint.
• It can keep exterior walls upto 5 degrees
(Celcius) cooler.
Varies according to
required volume
Green Refrigerants
Intent • Use of refrigerants that cause little to no ozone depletion or other environmental damage
Pertains to EA Credit 4: Enhanced Refrigerant Management (2 credit points)
Calculations
• Determination of each HVACR equipment’s ozone depletion (ODP) and global warming potential (GWP) for its
life cycle
• Using GWP and ODP values to determine the refrigerant impact per ton
• The ozone depletion potential (ODP) of a chemical compound is the relative amount of degradation to the
ozone layer it can cause, with trichlorofluoromethane (R-11 or CFC-11) being fixed at an ODP of 1. Refrigerants
with ODP near to zero or less than 0 are not considered harmful to the ozone.
• The averaged refrigerant impact per ton for a building should be less than 100 (LEED standard)
Technologies /
Equipment
• Any HVACR systems using Ammonia (R717), Carbon dioxide (R744), Hydroflorocarbons (HFCs)(R410a most
common), Water (R718)
Refrigerant Companies that offer relevant products Examples of products
Ammonia,
, Carbon dioxide,
Water, HFCs
Carrier, SolarNext, Toshiba
Residential split systems,
Commercial Multi-split systems,
Industrial HVAC systems, Chilled
beam systems, Underfloor air
distribution systems.
Air Purification and Air Quality
Monitoring
Intent
• Removing foul odors, dust, pathogens and other contaminants from
the air
• Maintaining a high indoor air quality
Pertains to
IEQ Credit 5: Indoor Chemical and Pollutant Source Control (1credit
points)
Technologies /
Equipment
• Automatic Air purifiers (Hall ways, entrances, exits)
• Automatic dehumidifiers (offices and flats)
Feature Product Description
Price per unit
($)
Air purifier
Dr. Weil Single-Room Air
Purifier by Dansk®
 4-stage, "ozone free" filtration system removes 99.97% of dust, dander
and pollen, smoke and odors
 Neutralizes most airborne viruses, bacteria, mold and fungi as small
as 0.003 microns
 Features a smart sensor technology which allows it to continually
monitor and control air quality
 The purifier uses a HEPA (high efficiency particulate absorbing) filter
389
Dehumidifier
TrueDRY DR65 from
Honeywell
 Removes up to 65 pints of moisture per day
 Minimal maintenance required
 Increased comfort and energy savings
 Refrigerant Type: R-410A
1066
Innovation in plan
Geothermal System
Intent
• Using renewable energy for heating
• Reducing stress on non-renewable resources
• Reducing the building’s energy costs (40 to 60 %)
Pertains to EA Credit 2: On-site Renewable Energy (7 credit points)
Technologies /
Equipment
• Horizontally loop (preferred because of low
penetration depth)
• Vertical loop
• Slinky loop
• Pond loop
• Radiators
Feature Local companies that offer relevant
products and services
Estimated cost
($)
Geothermal
system
Shan Geothermal Technologies,
Blueline Technologies, Tecnasia
International
Depends upon scope
of work needed to
implement the
technology
Innovation in plan
Material Recycling
Intent
• Reducing construction cost
• Conserving natural resources and energy
• Conserving landfill space
Pertains to MR Credit 3: Materials Reuse (1 – 2 points)
Implementation
• Using Recycled materials (steel , wood etc.) in
construction
• Providing separate containers for different kinds of
solid waste (paper, plastics, glass) at waste disposal
areas within the building to encourage waste sorting
• Sending any sorted solid waste to local waste
management or recycling companies or organizations
Use of recycled
materials
• Furniture
• Plumbing fixtures
• Electrical Fixtures
• Beams, columns
Local waste recycling organizations
Waste busters, Ali traders waste management, Environmental Protection Department for
recycling
Interior finishes and use of adhesives
Intent
• Maintaining high indoor air quality
• Reducing VOC emissions and ultimately reducing environmental
pollution
• Reducing VOC related health problems (Eye and throat irritation,
headaches, cancer, liver or kidney damage)
Pertains to
IEQ Credit 4.2: Low-Emitting Materials - Paints and Coatings (1 credit
point)
Technologies /
Equipment
• Low VOC interior paints
• Low VOC polishes and varnishes
• Low VOC glues and adhesives
Feature Product Description
Price per unit
($)
Interior wall finish
Berger Breathe Easy
Paints
 can be applied on all types of smooth plasters, false ceiling,
asbestos sheet, concrete etc.
 Available in 3.6 liters and 0.9 liters pack
 Available in 101 shades
Depends on shade
and volume
required
Adhesives/glues
Loctite PL 375 VOC
Heavy Duty
Construction
Adhesive
 It is a versatile premium grade water-based adhesive for
demanding construction jobs
 It is non-flammable, environmentally friendly, and meets US
state and federal VOC limit regulations
 Sets in just 20 minutes and cures in 48 hours
4.98
Flooring systems
Intent
• Maintaining high indoor air quality
• Reducing VOC emissions and ultimately reducing environmental
pollution
• Reducing VOC related health problems (Eye and throat irritation,
headaches, cancer, liver or kidney damage)
• Reducing deforestation
Pertains to IEQ Credit 4.3: Low-Emitting Materials - Flooring systems ( 1 credit points)
Technologies /
Equipment
• Bamboo flooring (high growth and renewal rate, insect and water
resistant, cheap, hard and dense, low processing and maintenance)
• Ceramic and stone tiles (use of low VOC grouts possible)
Feature Product Description
Bamboo flooring
Teragren®
flooring
 Has earned FloorScore®-certification, the highest air quality
standard in the world
 All panels and 1/8" veneer are SCS Indoor Advantage™
Gold certified ( low VOC emissions)
 Optimum 5.5® Moso bamboo (matured bamboo) used
 Available in a variety of textures, shades and designs
Ceramic & stone tiles
 Available locally at Hadayatsons, Millat Marble, Asia Marble, S. Abdullah etc.
 Variety of designs available
Innovation in plan
Low Emissivity Films
Intent
• Maintaining indoor air temperature
• Reducing heat transfer without
compromising much on light
• Reducing energy costs
Pertains to
EA Credit 1: Optimize Energy Performance (1 –
19 credit points)
Implementation
• Double glazed glass used in the building can
be coated with Low E films made from silver
or aluminum
• Low E films should be applied to both sheets
of a double glazed window
• Low E films cost 0.5$ /sqft to apply
• They can remain effective in temperatures of
upto 60 degree Celsius
• Reapplication required after 4 years of use
Innovation in plan
Wireless Fire Detection And Alarm
System
Intent
• Providing safety against fires
• Reducing response time to fires
• Reducing energy bills (use of battery powered detectors and
alarms)
• Reducing environmental pollution
Technologies
/ Equipment
• Wireless (battery powered) Detectors and alarms
• Radio linked Alarms (one alarm triggered, others triggered
automatically)
• Environment friendly fire extinguishers
• Multiple Fire Escape routes ( stairs on both ends of a building)
Feature Product Description Price per unit ($)
Smoke
detector
and alarm
system
Radio-Interlinked
Smoke and Heat
Alarms - Ei3100RF
Series
• A maximum of 12 alarms can be interconnected
• RF range 150 metres (minimum) in free space and up to 30 metres in buildings
• 5 year Warranty
63 - 89
Fire
Extinguishers
PurafoamTM Fire
Extiguisher
• Purafoam™ is readily biodegradable, therefore less harmful to the environment.
• Effective at fighting Class A (solid) and Class B (liquid) fires
• Comes in a variety of sizes
90 (large)
Efficient Electrical Fixtures
Intent
• Reducing energy bills
• Reducing stress on energy
production
• Reducing Environmental
pollution caused by
energy production
Technologies /
Equipment
• Low wattage lights (LEDs,
Compact fluorescent
lights)
• Intensity control switches
(brightness)
Usage
• Skylights and other exterior
lighting
• Interior lighting
Companies
Philips, Energy Focus, Osaka,
Metro
From
Eartheasy.com
Innovation in plan
Conclusion
Anticipated Benefits of Sustainable Features
and Possible Implementation Problems
Concluding Statements
Anticipated Benefits of
Sustainable Features
 Reduced health problems such as allergic
reactions, asthma attacks, headaches etc.
(cleaner air)
 Reduced electrical bills
 Reduced water bills
 Improved safety against fires
 Lowered maintenance costs of structural and
architectural elements (such as floors)
 Lowered Carbon – footprint of the building
(Low Global Warming Impact)
 Increased social contact (Vegetated roofs
can serve as community parks)
 Conservation of non renewable energy
sources
 Conservation of landfill space
Possible Implementation
Problems
 One technology may undermine the
function of another e.g. use of certain
ceramic tiles clashes with the function of
the use of low VOC paints
 Unanticipated costs related to
implementation e.g. installation of
geothermal heating system may cost a
lot more than the estimated cost
 Use of incompetent personnel for
implementation may reduce impact of
the features.
 Requirement of separate personnel for
implementation of each feature may
arise
LEED 2009 applied to a mixed - use building

Más contenido relacionado

La actualidad más candente

Sustainable Design - Mixed Residential/Commercial Use
Sustainable Design - Mixed Residential/Commercial UseSustainable Design - Mixed Residential/Commercial Use
Sustainable Design - Mixed Residential/Commercial Userajensen00
 
case study sustainibility indian office highrise
case study sustainibility indian office highrisecase study sustainibility indian office highrise
case study sustainibility indian office highriseAnurag Biswas
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case studySimi Sayed
 
Sustainable Office Buildings
Sustainable Office BuildingsSustainable Office Buildings
Sustainable Office BuildingsRohan Narvekar
 
Case study on Mixed use building
Case study on Mixed use buildingCase study on Mixed use building
Case study on Mixed use buildingTonmoy Barua
 
HOUSING LITERATURE STUDY M.ARCH CCA
HOUSING LITERATURE STUDY M.ARCH CCAHOUSING LITERATURE STUDY M.ARCH CCA
HOUSING LITERATURE STUDY M.ARCH CCAAr. Prerna Chouhan
 
CASE STUDY NEHRU PLACE,DELHI
CASE STUDY NEHRU PLACE,DELHICASE STUDY NEHRU PLACE,DELHI
CASE STUDY NEHRU PLACE,DELHIAashna Arora
 
Tara housing by Charles correa
Tara housing by Charles correa Tara housing by Charles correa
Tara housing by Charles correa Sonali Shah
 
Hostel literature study
Hostel literature study Hostel literature study
Hostel literature study Idrees Ali
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building ShrushtiAhirrao1
 
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentMasters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentAr. M. Senthil [ senthilmani ]
 
TYPES OF HOUSING AND RESIDINTIAL BLOCKS
TYPES OF HOUSING AND RESIDINTIAL BLOCKSTYPES OF HOUSING AND RESIDINTIAL BLOCKS
TYPES OF HOUSING AND RESIDINTIAL BLOCKSSipAn Hayran
 
leed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team workleed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team workgatti Teja
 
Housing/ Apartment Case Study Nepal
Housing/ Apartment Case Study NepalHousing/ Apartment Case Study Nepal
Housing/ Apartment Case Study NepalSeasonShakya
 
A new urban forest rises in milan
A new urban forest rises in milanA new urban forest rises in milan
A new urban forest rises in milanDania Abdel-aziz
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case studyVishwas Sahni
 
150316 case studies
150316 case studies150316 case studies
150316 case studiesTieng Wei
 

La actualidad más candente (20)

Sustainable Design - Mixed Residential/Commercial Use
Sustainable Design - Mixed Residential/Commercial UseSustainable Design - Mixed Residential/Commercial Use
Sustainable Design - Mixed Residential/Commercial Use
 
case study sustainibility indian office highrise
case study sustainibility indian office highrisecase study sustainibility indian office highrise
case study sustainibility indian office highrise
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
 
Sustainable Office Buildings
Sustainable Office BuildingsSustainable Office Buildings
Sustainable Office Buildings
 
The interlace singapore
The interlace singaporeThe interlace singapore
The interlace singapore
 
Case study on Mixed use building
Case study on Mixed use buildingCase study on Mixed use building
Case study on Mixed use building
 
HOUSING LITERATURE STUDY M.ARCH CCA
HOUSING LITERATURE STUDY M.ARCH CCAHOUSING LITERATURE STUDY M.ARCH CCA
HOUSING LITERATURE STUDY M.ARCH CCA
 
CASE STUDY NEHRU PLACE,DELHI
CASE STUDY NEHRU PLACE,DELHICASE STUDY NEHRU PLACE,DELHI
CASE STUDY NEHRU PLACE,DELHI
 
Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
 
Tara housing by Charles correa
Tara housing by Charles correa Tara housing by Charles correa
Tara housing by Charles correa
 
Hostel literature study
Hostel literature study Hostel literature study
Hostel literature study
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building
 
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentMasters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
 
TYPES OF HOUSING AND RESIDINTIAL BLOCKS
TYPES OF HOUSING AND RESIDINTIAL BLOCKSTYPES OF HOUSING AND RESIDINTIAL BLOCKS
TYPES OF HOUSING AND RESIDINTIAL BLOCKS
 
leed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team workleed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team work
 
Housing/ Apartment Case Study Nepal
Housing/ Apartment Case Study NepalHousing/ Apartment Case Study Nepal
Housing/ Apartment Case Study Nepal
 
A new urban forest rises in milan
A new urban forest rises in milanA new urban forest rises in milan
A new urban forest rises in milan
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
150316 case studies
150316 case studies150316 case studies
150316 case studies
 
Courtyards
CourtyardsCourtyards
Courtyards
 

Destacado

MIXED USED BUILDING (APARTEMENT & SCHOOL)
MIXED USED BUILDING (APARTEMENT & SCHOOL)MIXED USED BUILDING (APARTEMENT & SCHOOL)
MIXED USED BUILDING (APARTEMENT & SCHOOL)Aditya Yudi Kurniawan
 
Detroit's Housing & Mixed Use Projects
Detroit's Housing & Mixed Use ProjectsDetroit's Housing & Mixed Use Projects
Detroit's Housing & Mixed Use ProjectsJim Bieri
 
Chapter 5 mixed use design guidelines
Chapter 5   mixed use design guidelinesChapter 5   mixed use design guidelines
Chapter 5 mixed use design guidelinessikushina
 
Assignment mixed land use
Assignment mixed land useAssignment mixed land use
Assignment mixed land usearpriyank
 
Nj future redevelopment forum 2014 mixed use paladino
Nj future redevelopment forum 2014 mixed use paladinoNj future redevelopment forum 2014 mixed use paladino
Nj future redevelopment forum 2014 mixed use paladinoNew Jersey Future
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research DocumentNicholas Socrates
 
Theatre and mixed-use building
Theatre and mixed-use buildingTheatre and mixed-use building
Theatre and mixed-use buildingSERGIO MEANA
 
131_Orange_11_22_16
131_Orange_11_22_16131_Orange_11_22_16
131_Orange_11_22_16Nick Jones
 
Case Study: Essex Mixed Use May 2016
Case Study: Essex Mixed Use May 2016Case Study: Essex Mixed Use May 2016
Case Study: Essex Mixed Use May 2016Proplend Ltd
 
Mixed Use Development Project Presentation to Merrimack Town Council/School B...
Mixed Use Development Project Presentation to Merrimack Town Council/School B...Mixed Use Development Project Presentation to Merrimack Town Council/School B...
Mixed Use Development Project Presentation to Merrimack Town Council/School B...Tim Thompson, AICP
 
Defining Mixed Use: What? Why? .... (How??)
Defining Mixed Use:  What? Why? .... (How??)Defining Mixed Use:  What? Why? .... (How??)
Defining Mixed Use: What? Why? .... (How??)urbangreen
 
Mixed use - Common Problems Under Condominium Law
Mixed use - Common Problems Under Condominium LawMixed use - Common Problems Under Condominium Law
Mixed use - Common Problems Under Condominium LawLeks&Co
 
Mms Mixed Use Architectural Ii Final Project
Mms Mixed  Use Architectural Ii Final ProjectMms Mixed  Use Architectural Ii Final Project
Mms Mixed Use Architectural Ii Final Projectmmeyer118
 
Eco Park Apartemen and Retail
Eco Park Apartemen and RetailEco Park Apartemen and Retail
Eco Park Apartemen and RetailRahmawati Muslan
 
perancangan-hotel-bintang-4
perancangan-hotel-bintang-4perancangan-hotel-bintang-4
perancangan-hotel-bintang-4Subandri Oo
 
Architectural case study of Apartments
Architectural case study of ApartmentsArchitectural case study of Apartments
Architectural case study of ApartmentsTanzil Faraz
 
analysis of high rise building
analysis of high rise buildinganalysis of high rise building
analysis of high rise buildingishant_kukreja
 

Destacado (20)

MIXED USED BUILDING (APARTEMENT & SCHOOL)
MIXED USED BUILDING (APARTEMENT & SCHOOL)MIXED USED BUILDING (APARTEMENT & SCHOOL)
MIXED USED BUILDING (APARTEMENT & SCHOOL)
 
Detroit's Housing & Mixed Use Projects
Detroit's Housing & Mixed Use ProjectsDetroit's Housing & Mixed Use Projects
Detroit's Housing & Mixed Use Projects
 
Chapter 5 mixed use design guidelines
Chapter 5   mixed use design guidelinesChapter 5   mixed use design guidelines
Chapter 5 mixed use design guidelines
 
Assignment mixed land use
Assignment mixed land useAssignment mixed land use
Assignment mixed land use
 
Nj future redevelopment forum 2014 mixed use paladino
Nj future redevelopment forum 2014 mixed use paladinoNj future redevelopment forum 2014 mixed use paladino
Nj future redevelopment forum 2014 mixed use paladino
 
Mixed use
Mixed useMixed use
Mixed use
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
 
Theatre and mixed-use building
Theatre and mixed-use buildingTheatre and mixed-use building
Theatre and mixed-use building
 
131_Orange_11_22_16
131_Orange_11_22_16131_Orange_11_22_16
131_Orange_11_22_16
 
Case Study: Essex Mixed Use May 2016
Case Study: Essex Mixed Use May 2016Case Study: Essex Mixed Use May 2016
Case Study: Essex Mixed Use May 2016
 
Mixed Use Development Project Presentation to Merrimack Town Council/School B...
Mixed Use Development Project Presentation to Merrimack Town Council/School B...Mixed Use Development Project Presentation to Merrimack Town Council/School B...
Mixed Use Development Project Presentation to Merrimack Town Council/School B...
 
Mailer - Lev 3Q15 Final
Mailer - Lev 3Q15 FinalMailer - Lev 3Q15 Final
Mailer - Lev 3Q15 Final
 
Mixed Use Sample
Mixed Use SampleMixed Use Sample
Mixed Use Sample
 
Defining Mixed Use: What? Why? .... (How??)
Defining Mixed Use:  What? Why? .... (How??)Defining Mixed Use:  What? Why? .... (How??)
Defining Mixed Use: What? Why? .... (How??)
 
Mixed use - Common Problems Under Condominium Law
Mixed use - Common Problems Under Condominium LawMixed use - Common Problems Under Condominium Law
Mixed use - Common Problems Under Condominium Law
 
Mms Mixed Use Architectural Ii Final Project
Mms Mixed  Use Architectural Ii Final ProjectMms Mixed  Use Architectural Ii Final Project
Mms Mixed Use Architectural Ii Final Project
 
Eco Park Apartemen and Retail
Eco Park Apartemen and RetailEco Park Apartemen and Retail
Eco Park Apartemen and Retail
 
perancangan-hotel-bintang-4
perancangan-hotel-bintang-4perancangan-hotel-bintang-4
perancangan-hotel-bintang-4
 
Architectural case study of Apartments
Architectural case study of ApartmentsArchitectural case study of Apartments
Architectural case study of Apartments
 
analysis of high rise building
analysis of high rise buildinganalysis of high rise building
analysis of high rise building
 

Similar a LEED 2009 applied to a mixed - use building

Similar a LEED 2009 applied to a mixed - use building (20)

2.pdf
2.pdf2.pdf
2.pdf
 
Leed
Leed Leed
Leed
 
2.pptx
2.pptx2.pptx
2.pptx
 
Green building Technology
Green building TechnologyGreen building Technology
Green building Technology
 
Sustainable
SustainableSustainable
Sustainable
 
LEED Study & Case study of Plummy fashion ltd.
LEED Study & Case study of Plummy fashion ltd.LEED Study & Case study of Plummy fashion ltd.
LEED Study & Case study of Plummy fashion ltd.
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
 
Green Building
Green BuildingGreen Building
Green Building
 
LEED-EB Presentation
LEED-EB PresentationLEED-EB Presentation
LEED-EB Presentation
 
Presentation_LeedCD_245
Presentation_LeedCD_245Presentation_LeedCD_245
Presentation_LeedCD_245
 
Green buildings dec 14
Green buildings dec 14Green buildings dec 14
Green buildings dec 14
 
Energy efficiency in Green Building
Energy efficiency in Green BuildingEnergy efficiency in Green Building
Energy efficiency in Green Building
 
Boston Architectural College CEU Weekend 2007
Boston Architectural College CEU Weekend 2007Boston Architectural College CEU Weekend 2007
Boston Architectural College CEU Weekend 2007
 
Usgbc intro
Usgbc introUsgbc intro
Usgbc intro
 
LEED
LEEDLEED
LEED
 
Green stragies
Green stragiesGreen stragies
Green stragies
 
The Green Roundtable Green Residential Case Studies
The Green Roundtable Green Residential Case StudiesThe Green Roundtable Green Residential Case Studies
The Green Roundtable Green Residential Case Studies
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
 
Willbrook greenbiz5
Willbrook greenbiz5Willbrook greenbiz5
Willbrook greenbiz5
 

Más de Waleed Liaqat

The Three Step Writing Process (Technical & Business Writing)
The Three Step Writing Process (Technical & Business Writing)The Three Step Writing Process (Technical & Business Writing)
The Three Step Writing Process (Technical & Business Writing)Waleed Liaqat
 
Nietzsche's Philosophies
Nietzsche's Philosophies Nietzsche's Philosophies
Nietzsche's Philosophies Waleed Liaqat
 
Selected verses from the quran
Selected verses from the quranSelected verses from the quran
Selected verses from the quranWaleed Liaqat
 
Brief Introduction to Architecture
Brief Introduction to ArchitectureBrief Introduction to Architecture
Brief Introduction to ArchitectureWaleed Liaqat
 
Urban Planning Types, Processes and History
Urban Planning Types, Processes and HistoryUrban Planning Types, Processes and History
Urban Planning Types, Processes and HistoryWaleed Liaqat
 
Construction machinery - Associated costs and basic concepts
Construction machinery - Associated costs and basic conceptsConstruction machinery - Associated costs and basic concepts
Construction machinery - Associated costs and basic conceptsWaleed Liaqat
 
Fundamentals of Effective Business Communication
Fundamentals of Effective Business CommunicationFundamentals of Effective Business Communication
Fundamentals of Effective Business CommunicationWaleed Liaqat
 
Introduction to town and Urban planning
Introduction to town and Urban planningIntroduction to town and Urban planning
Introduction to town and Urban planningWaleed Liaqat
 
Brief Introduction to Project Life Cycle And Organizational Structures
Brief Introduction to Project Life Cycle And Organizational StructuresBrief Introduction to Project Life Cycle And Organizational Structures
Brief Introduction to Project Life Cycle And Organizational StructuresWaleed Liaqat
 
Brief Introduction to Project Management
Brief Introduction to Project ManagementBrief Introduction to Project Management
Brief Introduction to Project ManagementWaleed Liaqat
 
Resource Levelling - PMBOK - Example
Resource Levelling - PMBOK - ExampleResource Levelling - PMBOK - Example
Resource Levelling - PMBOK - ExampleWaleed Liaqat
 
Public Health Engineering - Concepts Regarding Water
Public Health Engineering - Concepts Regarding WaterPublic Health Engineering - Concepts Regarding Water
Public Health Engineering - Concepts Regarding WaterWaleed Liaqat
 
Youth and Education in Pakistan
Youth and Education in PakistanYouth and Education in Pakistan
Youth and Education in PakistanWaleed Liaqat
 
An Overview of the History of Pakistan: 1947 - 1973
An Overview of the History of Pakistan: 1947 - 1973 An Overview of the History of Pakistan: 1947 - 1973
An Overview of the History of Pakistan: 1947 - 1973 Waleed Liaqat
 
Richter scale and mercalli scale
Richter scale and mercalli scaleRichter scale and mercalli scale
Richter scale and mercalli scaleWaleed Liaqat
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionWaleed Liaqat
 
Plain Concrete - General concepts
Plain Concrete - General conceptsPlain Concrete - General concepts
Plain Concrete - General conceptsWaleed Liaqat
 
S-curve analysis for development of hydrographs
S-curve analysis for development of hydrographsS-curve analysis for development of hydrographs
S-curve analysis for development of hydrographsWaleed Liaqat
 
Activity on Arrow Diagram
Activity on Arrow DiagramActivity on Arrow Diagram
Activity on Arrow DiagramWaleed Liaqat
 
Remote sensing and it's applications
Remote sensing and it's applicationsRemote sensing and it's applications
Remote sensing and it's applicationsWaleed Liaqat
 

Más de Waleed Liaqat (20)

The Three Step Writing Process (Technical & Business Writing)
The Three Step Writing Process (Technical & Business Writing)The Three Step Writing Process (Technical & Business Writing)
The Three Step Writing Process (Technical & Business Writing)
 
Nietzsche's Philosophies
Nietzsche's Philosophies Nietzsche's Philosophies
Nietzsche's Philosophies
 
Selected verses from the quran
Selected verses from the quranSelected verses from the quran
Selected verses from the quran
 
Brief Introduction to Architecture
Brief Introduction to ArchitectureBrief Introduction to Architecture
Brief Introduction to Architecture
 
Urban Planning Types, Processes and History
Urban Planning Types, Processes and HistoryUrban Planning Types, Processes and History
Urban Planning Types, Processes and History
 
Construction machinery - Associated costs and basic concepts
Construction machinery - Associated costs and basic conceptsConstruction machinery - Associated costs and basic concepts
Construction machinery - Associated costs and basic concepts
 
Fundamentals of Effective Business Communication
Fundamentals of Effective Business CommunicationFundamentals of Effective Business Communication
Fundamentals of Effective Business Communication
 
Introduction to town and Urban planning
Introduction to town and Urban planningIntroduction to town and Urban planning
Introduction to town and Urban planning
 
Brief Introduction to Project Life Cycle And Organizational Structures
Brief Introduction to Project Life Cycle And Organizational StructuresBrief Introduction to Project Life Cycle And Organizational Structures
Brief Introduction to Project Life Cycle And Organizational Structures
 
Brief Introduction to Project Management
Brief Introduction to Project ManagementBrief Introduction to Project Management
Brief Introduction to Project Management
 
Resource Levelling - PMBOK - Example
Resource Levelling - PMBOK - ExampleResource Levelling - PMBOK - Example
Resource Levelling - PMBOK - Example
 
Public Health Engineering - Concepts Regarding Water
Public Health Engineering - Concepts Regarding WaterPublic Health Engineering - Concepts Regarding Water
Public Health Engineering - Concepts Regarding Water
 
Youth and Education in Pakistan
Youth and Education in PakistanYouth and Education in Pakistan
Youth and Education in Pakistan
 
An Overview of the History of Pakistan: 1947 - 1973
An Overview of the History of Pakistan: 1947 - 1973 An Overview of the History of Pakistan: 1947 - 1973
An Overview of the History of Pakistan: 1947 - 1973
 
Richter scale and mercalli scale
Richter scale and mercalli scaleRichter scale and mercalli scale
Richter scale and mercalli scale
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
Plain Concrete - General concepts
Plain Concrete - General conceptsPlain Concrete - General concepts
Plain Concrete - General concepts
 
S-curve analysis for development of hydrographs
S-curve analysis for development of hydrographsS-curve analysis for development of hydrographs
S-curve analysis for development of hydrographs
 
Activity on Arrow Diagram
Activity on Arrow DiagramActivity on Arrow Diagram
Activity on Arrow Diagram
 
Remote sensing and it's applications
Remote sensing and it's applicationsRemote sensing and it's applications
Remote sensing and it's applications
 

Último

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 

Último (20)

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 

LEED 2009 applied to a mixed - use building

  • 2. Archlauds Sr. # Name Designation Reg. # 1 Bilal Shahid Khokhar Chief Architect 20 2 Muaaz Bashir Dhudra LEED Engineer 84 3 Muazzam Ali Chief Engineer 45 4 Qasim Umer Manager – HR 96 5 Waleed Liaqat Field Engineer 122
  • 3. Introduction  The objective of the project was to design a green building or renovate an existing building to make it sustainable. “Green or sustainable building is the practice of creating healthier and more resource-efficient models of construction, renovation, operation, maintenance, and demolition.” © EPA  LEED is a set of rating systems for the design, construction, operation, and maintenance of green buildings, homes and neighborhoods, developed by the USGBC.  “LEED 2009 For New Construction And Major Renovations” served as the main reference material for the project
  • 5. Description Type of building Mixed-use Location/site Plot # 35,G-11 Markaz, Shabbir Sharif Rd, Sector G – 11, Islamabad. Site Area 1600 sqyd Number of floors 6 Number of shops 99 Number of offices 35 Number of flats – no dining area 66 Number of flats – dining area 6 Altitude Approx. 1850 ft above sea level Floor by Floor usage Basement Commercial Ground Commercial 1st Commercial 2nd Residential 3rd Residential 4th Residential
  • 6. Description of areas (by floor) Area Dimension Basement Shop 11’ x 10’-4”, 11’ x 26’, 11’ x 17’, 8’-9” x 10’-4”, 8’-9” x 26’ Corridor 8’ wide, 10’ wide Passage 8’ wide, 7’wide Ground floor Shop 11’ x 64’, 11’ x 56’ Passage 6’ wide, 7’wide, 9’wide 1st floor Office 11’ x 36’ Bath 8'-7" x 5'11“, 5’-7” x 5’- 11” Kitchen 10’ x 8’-3”, 6’x7’, 5’ x 8’- 6” Corridor 8’ wide 2nd , 3rd , 4th Bed 11’ x 11’-4 ‘ T.V Lounge 11’ x 22’, 11’ x 14’ Bath 8'-7" x 5'11“, 5’-7” x 5’-11” Kitchen 10’ x 8’-3”, 6’x7’, 5’ x 8’-6” Dining Room 11’ x 13’ Corridor 8’ wide Schedule of opening Description Size D1 3'-6"X8' D2 3'-3"X8' D3 3'X8' All shop entrances 9'-6"X9' All Bath doors 2'-6"X7' All windows in corridors 4'X6'
  • 10. Ground Floor Plan (shops)
  • 11. 1st Floor Plan (offices)
  • 12. 2nd , 3rd and 4th Floor Plan (Flats)
  • 13. Building Site  Building constructed in the heart of the G – 11 sector Islambad i.e. the G-11 Markaz.  G-11 Markaz ; hub of commercial activity.  Easily accessible by road.  At Walking distance to nearby residential areas (potential clients for shopkeepers)  Access to basic infrastructure facilities, amenities and services  Is fairly clean and pollution free.  The site is close to a main highway (Kashmir Highway)  Fulfills LEED’s Sustainable Site (SS) credit 2: Density and Community Connectivity – option 2 criteria. (5 credit points)
  • 15. Efficient Plumbing Fixtures Intent • Conserving water • reducing water bills Pertains to WE Credit 3: Water Use Reduction (2-4 credit points) Technologies / Equipment • Sensor Taps (infrared) • Low output pressure fixtures (faucets, toilets, shower heads) • A few examples are shown below. Calculations • A water use (pressure) baseline must be determined for the building. • Fixtures with output pressures lower than the baseline must be installed. • Online calculator available at zurn.com Fixture Product Max. Flow rate LEED Baseline Price per unit ($) Residential bathroom faucet (sinks) Deva Vision Non Concussive Self Closing Basin Tap - VSN123 1.5 gpm 2.2 gpm 112 Residential Bathroom Shower head MOEN Eco Performance Showerhead 1.75 gpm 2.5 gpm 58
  • 17. Storm water Runoff control Intent • Reducing storm water run off • Harvesting storm water for non-potable uses such as toilet flushing • Less stress on other water sources Pertains to SS Credit 6.1: Storm-water Design - Quantity Control (1 credit point) Technologies / Equipment • Vegetation mats (roof) • Flower boxes • Large PVC Water tank for storm water storage Feature Product Description Price per unit ($) Vegetated roof Sika Sarnafil Green Roof – Intensive  6 inch of growth medium is provided that can grow a variety of plants.  Fairly high maintenance will be required.  Storm-water retention up to 75 – 80% 25 – 40 per sf Rain water Storage PVC rainwater tank  Tank installed within basement or underground (near Building) to collect storm-water.  The tank will be connected to toilets on the commercial floors of the building via the building’s plumbing system. variable
  • 18. Grey Water Reuse Intent • Recycling grey water for non-potable uses • Reducing stress on other water sources • Reducing water bills Pertains to WE Credit 2: Innovative Wastewater Technologies (2 credit points) Technologies / Equipment • Small scale recycling system (per bath) Or • Large scale recycling system for entire building Feature Product Description Price per unit ($) Grey water large scale recycling Huber smartMBR • It is an easy to use Membrane Bioreactor system • It can be connected to underground rain water storage tank, which in turn is connected to toilets in the building. • Control functions are provided by an integrated programmable logic controller (PLC). • Treatment capacity : 10 – 75 m3 / day Dependent on certain variables Grey water small scale recycling SLOAN AQUS • Water flowing down wash basin or shower drain is treated • Treated water stored in a 5.5 gallon reservoir. • A centrifugal pump (DC power) pushes water via a connecting pipe into storage tank of the toilet where it will be used for flushing. 189 - 375
  • 19. Cool or Green roof Intent • Reducing heat transfer into the building • Reducing energy bills Pertains to SS Credit 7.2: Heat Island effect, EA Credit 1: Optimize Energy Performance (1+(1 – 19) credit points) Technologies / Equipment • Vegetation mats (cover 50% or more of roof) • Reflective Coatings Feature Product Description Price per unit ($) Reflective roof coatings Sikacoat® roof coating (white color recommen ded) • It is a water-based acrylic technology that is low in odor and volatile organic compounds (VOCs). • Sikacoat meets the cool roofing requirements of Energy Star®, California Title 24, LEED® and Green Globes® programs. • It has high solar reflectance. 0.75 – 3 per sqft
  • 21. Efficient Building Envelope Intent • Preventing water ingress ,entry of pollutants, entry of insects and heat transfer • Reducing energy bills • Maintaining indoor air quality Pertains to EA Credit 1: Optimize Energy Performance (1 – 19 credit points) Technologies / Equipment • Sealants (doors and windows), Caulks (floors) • Double glazed openable windows • Durable and heat reflecting exterior paints Feature Product Description Price per unit ($) Glazed windows WIN-PAK Double glaze glass • Consists of two glass sheets separated by an aluminum spacer. • The spacer contains desiccant granules to absorb moisture. • can reduce the energy consumption of a building by 30% or more. Varies according to size of the windows Durable exterior paint ICI Dulux Weather shield Sun Reflect (Various Shades) • It is a high quality 100% acrylic based emulsion paint. • It can keep exterior walls upto 5 degrees (Celcius) cooler. Varies according to required volume
  • 22. Green Refrigerants Intent • Use of refrigerants that cause little to no ozone depletion or other environmental damage Pertains to EA Credit 4: Enhanced Refrigerant Management (2 credit points) Calculations • Determination of each HVACR equipment’s ozone depletion (ODP) and global warming potential (GWP) for its life cycle • Using GWP and ODP values to determine the refrigerant impact per ton • The ozone depletion potential (ODP) of a chemical compound is the relative amount of degradation to the ozone layer it can cause, with trichlorofluoromethane (R-11 or CFC-11) being fixed at an ODP of 1. Refrigerants with ODP near to zero or less than 0 are not considered harmful to the ozone. • The averaged refrigerant impact per ton for a building should be less than 100 (LEED standard) Technologies / Equipment • Any HVACR systems using Ammonia (R717), Carbon dioxide (R744), Hydroflorocarbons (HFCs)(R410a most common), Water (R718) Refrigerant Companies that offer relevant products Examples of products Ammonia, , Carbon dioxide, Water, HFCs Carrier, SolarNext, Toshiba Residential split systems, Commercial Multi-split systems, Industrial HVAC systems, Chilled beam systems, Underfloor air distribution systems.
  • 23. Air Purification and Air Quality Monitoring Intent • Removing foul odors, dust, pathogens and other contaminants from the air • Maintaining a high indoor air quality Pertains to IEQ Credit 5: Indoor Chemical and Pollutant Source Control (1credit points) Technologies / Equipment • Automatic Air purifiers (Hall ways, entrances, exits) • Automatic dehumidifiers (offices and flats) Feature Product Description Price per unit ($) Air purifier Dr. Weil Single-Room Air Purifier by Dansk®  4-stage, "ozone free" filtration system removes 99.97% of dust, dander and pollen, smoke and odors  Neutralizes most airborne viruses, bacteria, mold and fungi as small as 0.003 microns  Features a smart sensor technology which allows it to continually monitor and control air quality  The purifier uses a HEPA (high efficiency particulate absorbing) filter 389 Dehumidifier TrueDRY DR65 from Honeywell  Removes up to 65 pints of moisture per day  Minimal maintenance required  Increased comfort and energy savings  Refrigerant Type: R-410A 1066
  • 25. Geothermal System Intent • Using renewable energy for heating • Reducing stress on non-renewable resources • Reducing the building’s energy costs (40 to 60 %) Pertains to EA Credit 2: On-site Renewable Energy (7 credit points) Technologies / Equipment • Horizontally loop (preferred because of low penetration depth) • Vertical loop • Slinky loop • Pond loop • Radiators Feature Local companies that offer relevant products and services Estimated cost ($) Geothermal system Shan Geothermal Technologies, Blueline Technologies, Tecnasia International Depends upon scope of work needed to implement the technology
  • 27. Material Recycling Intent • Reducing construction cost • Conserving natural resources and energy • Conserving landfill space Pertains to MR Credit 3: Materials Reuse (1 – 2 points) Implementation • Using Recycled materials (steel , wood etc.) in construction • Providing separate containers for different kinds of solid waste (paper, plastics, glass) at waste disposal areas within the building to encourage waste sorting • Sending any sorted solid waste to local waste management or recycling companies or organizations Use of recycled materials • Furniture • Plumbing fixtures • Electrical Fixtures • Beams, columns Local waste recycling organizations Waste busters, Ali traders waste management, Environmental Protection Department for recycling
  • 28.
  • 29. Interior finishes and use of adhesives Intent • Maintaining high indoor air quality • Reducing VOC emissions and ultimately reducing environmental pollution • Reducing VOC related health problems (Eye and throat irritation, headaches, cancer, liver or kidney damage) Pertains to IEQ Credit 4.2: Low-Emitting Materials - Paints and Coatings (1 credit point) Technologies / Equipment • Low VOC interior paints • Low VOC polishes and varnishes • Low VOC glues and adhesives Feature Product Description Price per unit ($) Interior wall finish Berger Breathe Easy Paints  can be applied on all types of smooth plasters, false ceiling, asbestos sheet, concrete etc.  Available in 3.6 liters and 0.9 liters pack  Available in 101 shades Depends on shade and volume required Adhesives/glues Loctite PL 375 VOC Heavy Duty Construction Adhesive  It is a versatile premium grade water-based adhesive for demanding construction jobs  It is non-flammable, environmentally friendly, and meets US state and federal VOC limit regulations  Sets in just 20 minutes and cures in 48 hours 4.98
  • 30. Flooring systems Intent • Maintaining high indoor air quality • Reducing VOC emissions and ultimately reducing environmental pollution • Reducing VOC related health problems (Eye and throat irritation, headaches, cancer, liver or kidney damage) • Reducing deforestation Pertains to IEQ Credit 4.3: Low-Emitting Materials - Flooring systems ( 1 credit points) Technologies / Equipment • Bamboo flooring (high growth and renewal rate, insect and water resistant, cheap, hard and dense, low processing and maintenance) • Ceramic and stone tiles (use of low VOC grouts possible) Feature Product Description Bamboo flooring Teragren® flooring  Has earned FloorScore®-certification, the highest air quality standard in the world  All panels and 1/8" veneer are SCS Indoor Advantage™ Gold certified ( low VOC emissions)  Optimum 5.5® Moso bamboo (matured bamboo) used  Available in a variety of textures, shades and designs Ceramic & stone tiles  Available locally at Hadayatsons, Millat Marble, Asia Marble, S. Abdullah etc.  Variety of designs available
  • 32. Low Emissivity Films Intent • Maintaining indoor air temperature • Reducing heat transfer without compromising much on light • Reducing energy costs Pertains to EA Credit 1: Optimize Energy Performance (1 – 19 credit points) Implementation • Double glazed glass used in the building can be coated with Low E films made from silver or aluminum • Low E films should be applied to both sheets of a double glazed window • Low E films cost 0.5$ /sqft to apply • They can remain effective in temperatures of upto 60 degree Celsius • Reapplication required after 4 years of use
  • 34. Wireless Fire Detection And Alarm System Intent • Providing safety against fires • Reducing response time to fires • Reducing energy bills (use of battery powered detectors and alarms) • Reducing environmental pollution Technologies / Equipment • Wireless (battery powered) Detectors and alarms • Radio linked Alarms (one alarm triggered, others triggered automatically) • Environment friendly fire extinguishers • Multiple Fire Escape routes ( stairs on both ends of a building) Feature Product Description Price per unit ($) Smoke detector and alarm system Radio-Interlinked Smoke and Heat Alarms - Ei3100RF Series • A maximum of 12 alarms can be interconnected • RF range 150 metres (minimum) in free space and up to 30 metres in buildings • 5 year Warranty 63 - 89 Fire Extinguishers PurafoamTM Fire Extiguisher • Purafoam™ is readily biodegradable, therefore less harmful to the environment. • Effective at fighting Class A (solid) and Class B (liquid) fires • Comes in a variety of sizes 90 (large)
  • 35. Efficient Electrical Fixtures Intent • Reducing energy bills • Reducing stress on energy production • Reducing Environmental pollution caused by energy production Technologies / Equipment • Low wattage lights (LEDs, Compact fluorescent lights) • Intensity control switches (brightness) Usage • Skylights and other exterior lighting • Interior lighting Companies Philips, Energy Focus, Osaka, Metro From Eartheasy.com
  • 37. Conclusion Anticipated Benefits of Sustainable Features and Possible Implementation Problems
  • 38. Concluding Statements Anticipated Benefits of Sustainable Features  Reduced health problems such as allergic reactions, asthma attacks, headaches etc. (cleaner air)  Reduced electrical bills  Reduced water bills  Improved safety against fires  Lowered maintenance costs of structural and architectural elements (such as floors)  Lowered Carbon – footprint of the building (Low Global Warming Impact)  Increased social contact (Vegetated roofs can serve as community parks)  Conservation of non renewable energy sources  Conservation of landfill space Possible Implementation Problems  One technology may undermine the function of another e.g. use of certain ceramic tiles clashes with the function of the use of low VOC paints  Unanticipated costs related to implementation e.g. installation of geothermal heating system may cost a lot more than the estimated cost  Use of incompetent personnel for implementation may reduce impact of the features.  Requirement of separate personnel for implementation of each feature may arise

Notas del editor

  1. LEED – Leadership in Energy and Environmental Design USGBC – US green building council LEED Image -http://www.emeraldskyline.com/wp-content/uploads/2013/01/LEED-symbols1.png
  2. OPTION 2. Community Connectivity Construct or renovate a building on a site that meets the following criteria: Is located on a previously developed site Is within 1/2 mile of a residential area or neighborhood with an average density of 10 units per acre net Is within 1/2 mile of at least 10 basic services Has pedestrian access between the building and the services