Take-Aways
  Green buildings are important for
  controlling CO2 emissions
  High-performance buildings are
  feasible today
  No new technologies; just new
  Integrated Design Process

  Energy use metrics well established
  at 100-150 kWh/sqm/year
IEA Global Warming Study




IEA estimates that meeting a ≤2 C target would require $5 trillion in global energy
investments between now and 2020. Source: IEA, “Tracking Clean Energy Progress.”
Agenda
• LEED Platinum Case Studies
  – High-Performance Buildings
• Designing for High-Performance
  – Integrated Design Process
• Exercise
• Case Study:
  NREL Research Support Facility, USA
• Discussion
Manitoba Hydro Place
                   LEED Platinum



Winnipeg, Canada
Manitoba Hydro Place
LEED Platinum
2000 Tower Oaks
        Rockville, MD
2000 Tower Oaks
Kroon Hall




             Yale University
Kroon Hall
Ohlone College




 Newark, CA
Visible Enthalpy Wheel




                                             Rooftop PV System




                             Ohlone College
                         Center For Health Sciences & Technology
Twelve West
Double LEED
Platinum




Portland, OR
Twelve West
Annual Energy Use —Americas
Annual Energy Use —Europe
Annual Energy Use — Asia Pacific
ISSUES?

   • First-cost concerns
   • Demonstrate financial cost-effectiveness
      – ROI
      – Increase in building value
      – Risk mitigation
      – Intangibles
   • Concern over actual building performance
      – Projects need continuous
        commissioning
      – Renewables have to work as planned
      – Behavioral issues & plug loads must
        be managed
TRENDS?

   • Widespread low-energy design know-how
      – Cost premium for good design getting
        smaller
   • More stringent energy codes (US, EU, AUS)
      – Reduces first-cost premium for net-zero
      – Better products at conventional costs
   • Solar power cost reductions/efficiency gains
   • Increases in conventional energy costs
      – Shorter payback for savings
   • Carbon reduction goals by increased
     perceived/actual value of green or
     net-zero buildings
High Performance Design Approach
High Performance Buildings

•   Site selection & orientation
•   Passive solar design
•   Building envelope design & construction
•   Integration of low-energy building systems
•   Controlling lighting/plug loads
•   Occupant engagement
•   Renewable energy systems
Three Phases & Five Steps
   To Net-Zero Emissions Building
PHASE I: Pre-design
Step #1— Organize for zero carbon emissions:
  Develop plan for learning and approaches
Step #2—Accept design conditions: Define
  environmental, occupant comfort and project
  financial goals before beginning design.
PHASE II: Design and construction
Step #3—Resolve the macro-scale: Develop site
  and architectural strategies that reduce
  energy needs and optimize energy generation.
Step #4—Develop integrated solutions:
  Define whole building systems to “tunnel
  through cost barriers.”
PHASE III: Stewardship
                                                        Net Zero Building, Singapore
Step #5—Maintain zero: Provide a plan to
 operate building with Net-zero emissions.
(HOK and The Weidt Group, www.netzerocourt.com, 2010)
Key Elements Of Integrated Design
• Reduce loads
  – Orientation & massing
  – Envelope & daylighting
• Take advantage of climate
• Choose efficient &
  integrated systems
• Reduce “safety factors”
  in engineering design
  – “belt and suspenders”
    approach outmoded
• Use modeling effectively
• Renewables: a last resort!
Key Elements Of Integrated Design
• Reduce loads
  (>50% of total load)
   – Lighting
   – Plug loads
   – Process loads
   – Elevators/escalators
• Integrate systems
   – Garage ventilation
     vs. smoke exhaust
   – BIPV as sunshades
Key Elements Of Integrated Design
– Take advantage of climate
  • Eastgate Centre, Harare
– Free energy
  • Sun, wind, water, vegetation,
    topography, fog, etc.
  • Daylighting & natural
    ventilation/economizer cycle
  • Ground-coupled heat
    pumps/geo-exchange
  • Night-flush ventilation
– Adaptive thermal comfort
  • Radiant vs. Convective
Integrated Design Process
Cost Transfer

      • Total cost same
      • Engineering costs
        lower
      • Invest more in
        Architecture
      • Active to passive
        systems
      • Fragile to resilient
      • Longer life
      • Less cost over
        life-cycle
      • Simpler design
WHY IDP
• Collaboration         • Develop synergies
• Team-building/trust   • Systems integration
• Goal-setting          • Clearer direction
• Blue-sky ideas        • Reduced design time
• Better design         • Transparency of
  decisions               design decisions
• Improved overall      • Higher-performance
  decision-making
HOW IDP
• Commit to process      • Eco-charrette(s)
• Change procurement     • Team-building activity
  methods                • Collaborative team
• Broaden the team         meetings
• Set specific           • Contractor(s) on board
  performance goals        early
• Expect greater time    • Stay within budget &
  in early design          construction
• Early-stage modeling     capabilities
                         • Iterative design vs.
                           goals
WHEN?
STARTING EARLY
• Identify potential partners/collaborations
• Set clear goals and metrics
• Establish “must have’s” in design
• Don’t re-design at DD/CD phase
• Reduce/eliminate “value engineering”
• Provide a basis for evaluating design
  strategies
• Initiate a multidisciplinary design approach
• Induce creativity from team members
STARTING EARLY
• Ask the right question at the right time!
  –   Do we need this building at all? 
  –   How big does it need to be? Now? In 10 years?
  –   Can we design it for alternative uses in the future?
  –   How does carpet & desk color influence lighting
      design?
  –   What “free energy” can we take advantage of?
  –   How much money is available outside the building
      budget?
  –   What do the future occupants value most?
  –   What controls can future operators manage?
  –   How will we know if we’re successful?
USE MODELING
              EFFECTIVELY
• Pre-design:
  climate analysis/infrastructure issues
• Design charrette (goal setting, site design)
• Schematic design (shape, massing, daylighting,
  envelope, HVAC options, base case for energy)
• Design development (systems optimization, Green
  Star progress vs. goals)
• Construction documents (value engineering, final
  energy model, document for Green Star)
• Commissioning/M&V (calibrate model, troubleshoot)
Setting Project Goals
IDP TOOLKIT

• Collaborative team         • Evaluation & feedback
  meetings                     tools & processes
• Problem-solving            • Expert facilitation
  workshops                  • Modeling tools
• Specific goals/targets     • Green Star/LEED checklist
• Tracking tools             • Establish Owner’s Project
• Clear communication          Requirements (OPR)
  channels                   • Basis of design document
• Team-building activities     (BOD)
IDP OUTCOMES
• Clarity in overall project goals &
  measurements
• Clear sustainability goals of owner and
  project team
• Buy-in from all stakeholders
• Assess entire building life-cycle
  – vs. just construction costs
• Identify roles and responsibilities early on
• Introduce Green Star/LEED &
  set certification goals
Exercise
• Develop design issues and possible
  solutions for a building in Cape Town,
  using integrated design and high-
  performance goals
  – Office
  – Secondary School
  – University Classroom
  – Retail store of 50,000 sq.ft.
Case Study: NREL — Golden, CO, USA




Phase I: 20,446 sq.m.; Phase II: 12,825 sq.m. (occupied 18 months later)
US Department of Energy
  National Renewable Energy Lab
Research Support Facility (RSF)
Project Procurement
• Design/Build
   • 3 finalists from RFQ process
   • Design to 10% level to confirm cost
• $63 million fixed budget
• Government projects
• Outside “process” consultant
• “Fixed-price, variable-scope” approach
Project Objectives
       1. Mission Critical (3)
         • Safety
         • LEED Platinum
         • Energy Star (US)
Project Objectives
                   2. Highly Desirable (15)
• 800 staff capacity           • Flexible workspace
• 25,000 BTU/sq.ft./year       • Support future technologies
• Architectural integrity      • “How to” manual for occupants
• Support future staff needs   • “Real-time PR” campaign
• Meet ASHRAE 90.1-2007        • Secure collaboration with
• Support culture and           outsiders
 amenities                     • Building information modeling
• Expandable building          • Substantial completion by
• Ergonomics                    2010 (24 months)
Project Objectives
                 3. If Possible (8)
• Net-zero design approach
• Most energy-efficient building in the world
• LEED Platinum “Plus”
• ASHRAE 90.1-2007 + 50%
• Visual displays of current energy efficiency
• Support public tours
• National and global recognition and awards
• Support reduced personnel turnover
High-Performance
 Design Process
NREL Integrated Design Process

                Multiday Eco-Charrette
       • Kick off competition phase of the project
       • Include all disciplines in design-build team
       • Set low-energy goal
       • Determine ZONE and LEED Platinum/6-Star
         Green Star best practices and strategies
       • Develop section first
       • Explore relationship of site, program, plan,
         roof and section for low-energy strategies
       • Begin building simulations early in process.
Low-Energy Strategies
The Section
                    60’

PV System


Natural
Ventilation
                             Radiant Cooling
Thermal Mass                 Radiant Heating

Transpired                   Workplace
Collectors                   UFAD
Daylighting
                             Labyrinth
Orientation & Massing
East + West Orientations
Pre-Design Analysis
 • Shading Studies
 • Energy Demand
 • Natural Ventilation
 • Wall Sections
 • Window / Wall Ratios
 • Roof / Floor Ratios
 • PV Energy Supply
DOMEST HOT                           NREL RSF
                            VENT FANS        WATER
                                                         EXT USAGE

• Energy Demand                7%             0%                  LIGHTS
                                                             0%
                             PUMPS & AUX                            11%
                                                                                     LIG
                                 1%                               TASK LIGHTS        TA

• Transpired Collectors    SPACE COOLING
                                8%
                                                                      1%
                                                                                     SE
                                                                                     SE
                                                                                     SE

• Thermal Labyrinth     SPACE HEATING
                                                                                     MI
                                                                                     SP
                            15%

• Double-Skin Design
                                                         SERVER ELEC                 SP
                                                             32%                     PU
                                                                                     VE


• Data Center Heat Recovery
                                                                                     DO
                                                  MISC
                                                  24%                                EX
                                                                SERVER COOL

• Data Center Cooling                                                0%
                                                         SERVER RM FAN
                                                              1%


• Natural Ventilation
• Daylighting

    Design Simulations
LEED Platinum
Meets Site Energy, Source Energy,
Energy Emissions and Energy Cost
definitions of ZONE with only the
roof and parking
PV systems.                            RSF ROOF
                                        787 KW
                                     3544 MBTU/YR




ZONE- Renewable Energy               RSF PARKING
                                       540 KW
                                    2432 MBTU/YR
Beauty in the Numbers




           Zero
Take-Aways
  Green buildings are important for
  controlling CO2 emissions
  High-performance buildings are
  feasible today
  No new technologies; just new
  Integrated Design Process

  Energy use metrics well established
  at 100-150 kWh/sqm/year
High-Performance. . .
Just Do It!
Discussion
High Performance Building Design Workshop
High Performance Building Design Workshop

Más contenido relacionado

Similar a High Performance Building Design Workshop

Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processShanti Pless
 
Integrate Early; Integrate Often
Integrate Early; Integrate OftenIntegrate Early; Integrate Often
Integrate Early; Integrate OftenScott Bowman
 
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Shanti Pless
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Shanti Pless
 
Green building rating system on des innovations
Green building rating system on des innovationsGreen building rating system on des innovations
Green building rating system on des innovationssaif hasan
 
The Open University Construction Framework 2008 2011 Proving
The Open University Construction Framework 2008   2011 ProvingThe Open University Construction Framework 2008   2011 Proving
The Open University Construction Framework 2008 2011 ProvingMikeRhodesMCIOB
 
Energy Show 2022 - EXEED Outline and Sample Projects
Energy Show 2022 - EXEED Outline and Sample ProjectsEnergy Show 2022 - EXEED Outline and Sample Projects
Energy Show 2022 - EXEED Outline and Sample ProjectsSustainableEnergyAut
 
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Galala University
 
NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote
NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote
NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote Shanti Pless
 
Paths to Net-Zero Energy Sustainable Homes
Paths to Net-Zero Energy Sustainable HomesPaths to Net-Zero Energy Sustainable Homes
Paths to Net-Zero Energy Sustainable HomesDerek Satnik
 
Value Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptxValue Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptxPareshSwami2
 
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENTGreen Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENTReenaRanaGCET
 
Kerry mashford - nef - understanding, delivering and validating building perf...
Kerry mashford - nef - understanding, delivering and validating building perf...Kerry mashford - nef - understanding, delivering and validating building perf...
Kerry mashford - nef - understanding, delivering and validating building perf...constprod99
 
Modeling, It's Not Just For Calendars and Energy
Modeling, It's Not Just For Calendars and EnergyModeling, It's Not Just For Calendars and Energy
Modeling, It's Not Just For Calendars and EnergyIllinois ASHRAE
 

Similar a High Performance Building Design Workshop (20)

Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build process
 
Integrate Early; Integrate Often
Integrate Early; Integrate OftenIntegrate Early; Integrate Often
Integrate Early; Integrate Often
 
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
 
Cli Grp
Cli GrpCli Grp
Cli Grp
 
Green building rating system on des innovations
Green building rating system on des innovationsGreen building rating system on des innovations
Green building rating system on des innovations
 
The Open University Construction Framework 2008 2011 Proving
The Open University Construction Framework 2008   2011 ProvingThe Open University Construction Framework 2008   2011 Proving
The Open University Construction Framework 2008 2011 Proving
 
Energy Show 2022 - EXEED Outline and Sample Projects
Energy Show 2022 - EXEED Outline and Sample ProjectsEnergy Show 2022 - EXEED Outline and Sample Projects
Energy Show 2022 - EXEED Outline and Sample Projects
 
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
 
NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote
NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote
NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote
 
Paths to Net-Zero Energy Sustainable Homes
Paths to Net-Zero Energy Sustainable HomesPaths to Net-Zero Energy Sustainable Homes
Paths to Net-Zero Energy Sustainable Homes
 
Value Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptxValue Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptx
 
Saving the Environment One Building at a Time
Saving the Environment One Building at a TimeSaving the Environment One Building at a Time
Saving the Environment One Building at a Time
 
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENTGreen Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
 
Kerry mashford - nef - understanding, delivering and validating building perf...
Kerry mashford - nef - understanding, delivering and validating building perf...Kerry mashford - nef - understanding, delivering and validating building perf...
Kerry mashford - nef - understanding, delivering and validating building perf...
 
final
finalfinal
final
 
Leed for SWE WE 14
Leed for SWE WE 14Leed for SWE WE 14
Leed for SWE WE 14
 
Leadership in Energy and Environmental Design
Leadership in Energy and Environmental DesignLeadership in Energy and Environmental Design
Leadership in Energy and Environmental Design
 
Modeling, It's Not Just For Calendars and Energy
Modeling, It's Not Just For Calendars and EnergyModeling, It's Not Just For Calendars and Energy
Modeling, It's Not Just For Calendars and Energy
 
Managing the Unknown v2
Managing the Unknown v2Managing the Unknown v2
Managing the Unknown v2
 

Más de Jerry Yudelson

What Can We Learn from the Coronavirus Epidemic
What Can We Learn from the Coronavirus EpidemicWhat Can We Learn from the Coronavirus Epidemic
What Can We Learn from the Coronavirus EpidemicJerry Yudelson
 
The Real New Deal: Carbon-Free by 2030
The Real New Deal: Carbon-Free by 2030The Real New Deal: Carbon-Free by 2030
The Real New Deal: Carbon-Free by 2030Jerry Yudelson
 
Jerry Yudelson Keynote at WaterSmart Innovations 2018
Jerry Yudelson Keynote at WaterSmart Innovations 2018Jerry Yudelson Keynote at WaterSmart Innovations 2018
Jerry Yudelson Keynote at WaterSmart Innovations 2018Jerry Yudelson
 
Yudelson on Smart Buildings - Smart Cities
Yudelson on Smart Buildings - Smart CitiesYudelson on Smart Buildings - Smart Cities
Yudelson on Smart Buildings - Smart CitiesJerry Yudelson
 
2018 Green Building Update
2018 Green Building Update2018 Green Building Update
2018 Green Building UpdateJerry Yudelson
 
Yudelson Vilnius Keynote - Green Buildings and Sustainable Cities
Yudelson Vilnius Keynote - Green Buildings and Sustainable CitiesYudelson Vilnius Keynote - Green Buildings and Sustainable Cities
Yudelson Vilnius Keynote - Green Buildings and Sustainable CitiesJerry Yudelson
 
Green Building and Energy Efficiency
Green Building and Energy EfficiencyGreen Building and Energy Efficiency
Green Building and Energy EfficiencyJerry Yudelson
 
20/20 Vision: Green Building Megatrends
20/20 Vision: Green Building Megatrends20/20 Vision: Green Building Megatrends
20/20 Vision: Green Building MegatrendsJerry Yudelson
 
Reinventing Green Building: An African Challenge
Reinventing Green Building: An African ChallengeReinventing Green Building: An African Challenge
Reinventing Green Building: An African ChallengeJerry Yudelson
 
Green Building Megatrends
Green Building MegatrendsGreen Building Megatrends
Green Building MegatrendsJerry Yudelson
 
Sustainable Building Operations: New Technology Options
Sustainable Building Operations: New Technology OptionsSustainable Building Operations: New Technology Options
Sustainable Building Operations: New Technology OptionsJerry Yudelson
 
2017: Five Action Steps for Sustainable Cities
2017: Five Action Steps for Sustainable Cities2017: Five Action Steps for Sustainable Cities
2017: Five Action Steps for Sustainable CitiesJerry Yudelson
 
Reinventing Green Building: Why Certification Systems Don't Cut Enough Carbon...
Reinventing Green Building: Why Certification Systems Don't Cut Enough Carbon...Reinventing Green Building: Why Certification Systems Don't Cut Enough Carbon...
Reinventing Green Building: Why Certification Systems Don't Cut Enough Carbon...Jerry Yudelson
 
Water Wizardry: Real and Immediate Solutions to California's Drought
Water Wizardry: Real and Immediate Solutions to California's DroughtWater Wizardry: Real and Immediate Solutions to California's Drought
Water Wizardry: Real and Immediate Solutions to California's DroughtJerry Yudelson
 
Water conservation:Become a Water Wizard, Not a Water Wastrel!
Water conservation:Become a Water Wizard, Not a Water Wastrel!Water conservation:Become a Water Wizard, Not a Water Wastrel!
Water conservation:Become a Water Wizard, Not a Water Wastrel!Jerry Yudelson
 
The World's Greenest Buildings: Promise vs Performance in Sustainable Design
The World's Greenest Buildings: Promise vs Performance in Sustainable DesignThe World's Greenest Buildings: Promise vs Performance in Sustainable Design
The World's Greenest Buildings: Promise vs Performance in Sustainable DesignJerry Yudelson
 
2020 Vision: Sustainable Buildings for Sustainable Cities
2020 Vision: Sustainable Buildings for Sustainable Cities2020 Vision: Sustainable Buildings for Sustainable Cities
2020 Vision: Sustainable Buildings for Sustainable CitiesJerry Yudelson
 
Jerry Yudelson: The Business Case for Net Zero Energy Buildings
Jerry Yudelson: The Business Case for Net Zero Energy BuildingsJerry Yudelson: The Business Case for Net Zero Energy Buildings
Jerry Yudelson: The Business Case for Net Zero Energy BuildingsJerry Yudelson
 
Univerity of Hawaii - World's Greenest Buildings Presentation
Univerity of Hawaii - World's Greenest Buildings PresentationUniverity of Hawaii - World's Greenest Buildings Presentation
Univerity of Hawaii - World's Greenest Buildings PresentationJerry Yudelson
 
High Performance Green Building Design - Lessons From Practice
High Performance Green Building Design - Lessons From PracticeHigh Performance Green Building Design - Lessons From Practice
High Performance Green Building Design - Lessons From PracticeJerry Yudelson
 

Más de Jerry Yudelson (20)

What Can We Learn from the Coronavirus Epidemic
What Can We Learn from the Coronavirus EpidemicWhat Can We Learn from the Coronavirus Epidemic
What Can We Learn from the Coronavirus Epidemic
 
The Real New Deal: Carbon-Free by 2030
The Real New Deal: Carbon-Free by 2030The Real New Deal: Carbon-Free by 2030
The Real New Deal: Carbon-Free by 2030
 
Jerry Yudelson Keynote at WaterSmart Innovations 2018
Jerry Yudelson Keynote at WaterSmart Innovations 2018Jerry Yudelson Keynote at WaterSmart Innovations 2018
Jerry Yudelson Keynote at WaterSmart Innovations 2018
 
Yudelson on Smart Buildings - Smart Cities
Yudelson on Smart Buildings - Smart CitiesYudelson on Smart Buildings - Smart Cities
Yudelson on Smart Buildings - Smart Cities
 
2018 Green Building Update
2018 Green Building Update2018 Green Building Update
2018 Green Building Update
 
Yudelson Vilnius Keynote - Green Buildings and Sustainable Cities
Yudelson Vilnius Keynote - Green Buildings and Sustainable CitiesYudelson Vilnius Keynote - Green Buildings and Sustainable Cities
Yudelson Vilnius Keynote - Green Buildings and Sustainable Cities
 
Green Building and Energy Efficiency
Green Building and Energy EfficiencyGreen Building and Energy Efficiency
Green Building and Energy Efficiency
 
20/20 Vision: Green Building Megatrends
20/20 Vision: Green Building Megatrends20/20 Vision: Green Building Megatrends
20/20 Vision: Green Building Megatrends
 
Reinventing Green Building: An African Challenge
Reinventing Green Building: An African ChallengeReinventing Green Building: An African Challenge
Reinventing Green Building: An African Challenge
 
Green Building Megatrends
Green Building MegatrendsGreen Building Megatrends
Green Building Megatrends
 
Sustainable Building Operations: New Technology Options
Sustainable Building Operations: New Technology OptionsSustainable Building Operations: New Technology Options
Sustainable Building Operations: New Technology Options
 
2017: Five Action Steps for Sustainable Cities
2017: Five Action Steps for Sustainable Cities2017: Five Action Steps for Sustainable Cities
2017: Five Action Steps for Sustainable Cities
 
Reinventing Green Building: Why Certification Systems Don't Cut Enough Carbon...
Reinventing Green Building: Why Certification Systems Don't Cut Enough Carbon...Reinventing Green Building: Why Certification Systems Don't Cut Enough Carbon...
Reinventing Green Building: Why Certification Systems Don't Cut Enough Carbon...
 
Water Wizardry: Real and Immediate Solutions to California's Drought
Water Wizardry: Real and Immediate Solutions to California's DroughtWater Wizardry: Real and Immediate Solutions to California's Drought
Water Wizardry: Real and Immediate Solutions to California's Drought
 
Water conservation:Become a Water Wizard, Not a Water Wastrel!
Water conservation:Become a Water Wizard, Not a Water Wastrel!Water conservation:Become a Water Wizard, Not a Water Wastrel!
Water conservation:Become a Water Wizard, Not a Water Wastrel!
 
The World's Greenest Buildings: Promise vs Performance in Sustainable Design
The World's Greenest Buildings: Promise vs Performance in Sustainable DesignThe World's Greenest Buildings: Promise vs Performance in Sustainable Design
The World's Greenest Buildings: Promise vs Performance in Sustainable Design
 
2020 Vision: Sustainable Buildings for Sustainable Cities
2020 Vision: Sustainable Buildings for Sustainable Cities2020 Vision: Sustainable Buildings for Sustainable Cities
2020 Vision: Sustainable Buildings for Sustainable Cities
 
Jerry Yudelson: The Business Case for Net Zero Energy Buildings
Jerry Yudelson: The Business Case for Net Zero Energy BuildingsJerry Yudelson: The Business Case for Net Zero Energy Buildings
Jerry Yudelson: The Business Case for Net Zero Energy Buildings
 
Univerity of Hawaii - World's Greenest Buildings Presentation
Univerity of Hawaii - World's Greenest Buildings PresentationUniverity of Hawaii - World's Greenest Buildings Presentation
Univerity of Hawaii - World's Greenest Buildings Presentation
 
High Performance Green Building Design - Lessons From Practice
High Performance Green Building Design - Lessons From PracticeHigh Performance Green Building Design - Lessons From Practice
High Performance Green Building Design - Lessons From Practice
 

Último

Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000dlhescort
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...lizamodels9
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 

Último (20)

Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 

High Performance Building Design Workshop

  • 1. Master Class: High-Performance Building Design Jerry Yudelson, PE, LEED Fellow Yudelson Associates
  • 2. Take-Aways Green buildings are important for controlling CO2 emissions High-performance buildings are feasible today No new technologies; just new Integrated Design Process Energy use metrics well established at 100-150 kWh/sqm/year
  • 3. IEA Global Warming Study IEA estimates that meeting a ≤2 C target would require $5 trillion in global energy investments between now and 2020. Source: IEA, “Tracking Clean Energy Progress.”
  • 4. Agenda • LEED Platinum Case Studies – High-Performance Buildings • Designing for High-Performance – Integrated Design Process • Exercise • Case Study: NREL Research Support Facility, USA • Discussion
  • 5. Manitoba Hydro Place LEED Platinum Winnipeg, Canada
  • 7. 2000 Tower Oaks Rockville, MD
  • 9. Kroon Hall Yale University
  • 12. Visible Enthalpy Wheel Rooftop PV System Ohlone College Center For Health Sciences & Technology
  • 15. Annual Energy Use —Americas
  • 16. Annual Energy Use —Europe
  • 17. Annual Energy Use — Asia Pacific
  • 18. ISSUES? • First-cost concerns • Demonstrate financial cost-effectiveness – ROI – Increase in building value – Risk mitigation – Intangibles • Concern over actual building performance – Projects need continuous commissioning – Renewables have to work as planned – Behavioral issues & plug loads must be managed
  • 19. TRENDS? • Widespread low-energy design know-how – Cost premium for good design getting smaller • More stringent energy codes (US, EU, AUS) – Reduces first-cost premium for net-zero – Better products at conventional costs • Solar power cost reductions/efficiency gains • Increases in conventional energy costs – Shorter payback for savings • Carbon reduction goals by increased perceived/actual value of green or net-zero buildings
  • 21. High Performance Buildings • Site selection & orientation • Passive solar design • Building envelope design & construction • Integration of low-energy building systems • Controlling lighting/plug loads • Occupant engagement • Renewable energy systems
  • 22. Three Phases & Five Steps To Net-Zero Emissions Building PHASE I: Pre-design Step #1— Organize for zero carbon emissions: Develop plan for learning and approaches Step #2—Accept design conditions: Define environmental, occupant comfort and project financial goals before beginning design. PHASE II: Design and construction Step #3—Resolve the macro-scale: Develop site and architectural strategies that reduce energy needs and optimize energy generation. Step #4—Develop integrated solutions: Define whole building systems to “tunnel through cost barriers.” PHASE III: Stewardship Net Zero Building, Singapore Step #5—Maintain zero: Provide a plan to operate building with Net-zero emissions. (HOK and The Weidt Group, www.netzerocourt.com, 2010)
  • 23. Key Elements Of Integrated Design • Reduce loads – Orientation & massing – Envelope & daylighting • Take advantage of climate • Choose efficient & integrated systems • Reduce “safety factors” in engineering design – “belt and suspenders” approach outmoded • Use modeling effectively • Renewables: a last resort!
  • 24. Key Elements Of Integrated Design • Reduce loads (>50% of total load) – Lighting – Plug loads – Process loads – Elevators/escalators • Integrate systems – Garage ventilation vs. smoke exhaust – BIPV as sunshades
  • 25. Key Elements Of Integrated Design – Take advantage of climate • Eastgate Centre, Harare – Free energy • Sun, wind, water, vegetation, topography, fog, etc. • Daylighting & natural ventilation/economizer cycle • Ground-coupled heat pumps/geo-exchange • Night-flush ventilation – Adaptive thermal comfort • Radiant vs. Convective
  • 27.
  • 28.
  • 29. Cost Transfer • Total cost same • Engineering costs lower • Invest more in Architecture • Active to passive systems • Fragile to resilient • Longer life • Less cost over life-cycle • Simpler design
  • 30. WHY IDP • Collaboration • Develop synergies • Team-building/trust • Systems integration • Goal-setting • Clearer direction • Blue-sky ideas • Reduced design time • Better design • Transparency of decisions design decisions • Improved overall • Higher-performance decision-making
  • 31. HOW IDP • Commit to process • Eco-charrette(s) • Change procurement • Team-building activity methods • Collaborative team • Broaden the team meetings • Set specific • Contractor(s) on board performance goals early • Expect greater time • Stay within budget & in early design construction • Early-stage modeling capabilities • Iterative design vs. goals
  • 32. WHEN?
  • 33. STARTING EARLY • Identify potential partners/collaborations • Set clear goals and metrics • Establish “must have’s” in design • Don’t re-design at DD/CD phase • Reduce/eliminate “value engineering” • Provide a basis for evaluating design strategies • Initiate a multidisciplinary design approach • Induce creativity from team members
  • 34. STARTING EARLY • Ask the right question at the right time! – Do we need this building at all?  – How big does it need to be? Now? In 10 years? – Can we design it for alternative uses in the future? – How does carpet & desk color influence lighting design? – What “free energy” can we take advantage of? – How much money is available outside the building budget? – What do the future occupants value most? – What controls can future operators manage? – How will we know if we’re successful?
  • 35. USE MODELING EFFECTIVELY • Pre-design: climate analysis/infrastructure issues • Design charrette (goal setting, site design) • Schematic design (shape, massing, daylighting, envelope, HVAC options, base case for energy) • Design development (systems optimization, Green Star progress vs. goals) • Construction documents (value engineering, final energy model, document for Green Star) • Commissioning/M&V (calibrate model, troubleshoot)
  • 36.
  • 38.
  • 39. IDP TOOLKIT • Collaborative team • Evaluation & feedback meetings tools & processes • Problem-solving • Expert facilitation workshops • Modeling tools • Specific goals/targets • Green Star/LEED checklist • Tracking tools • Establish Owner’s Project • Clear communication Requirements (OPR) channels • Basis of design document • Team-building activities (BOD)
  • 40. IDP OUTCOMES • Clarity in overall project goals & measurements • Clear sustainability goals of owner and project team • Buy-in from all stakeholders • Assess entire building life-cycle – vs. just construction costs • Identify roles and responsibilities early on • Introduce Green Star/LEED & set certification goals
  • 41. Exercise • Develop design issues and possible solutions for a building in Cape Town, using integrated design and high- performance goals – Office – Secondary School – University Classroom – Retail store of 50,000 sq.ft.
  • 42.
  • 43. Case Study: NREL — Golden, CO, USA Phase I: 20,446 sq.m.; Phase II: 12,825 sq.m. (occupied 18 months later)
  • 44. US Department of Energy National Renewable Energy Lab Research Support Facility (RSF)
  • 45. Project Procurement • Design/Build • 3 finalists from RFQ process • Design to 10% level to confirm cost • $63 million fixed budget • Government projects • Outside “process” consultant • “Fixed-price, variable-scope” approach
  • 46. Project Objectives 1. Mission Critical (3) • Safety • LEED Platinum • Energy Star (US)
  • 47. Project Objectives 2. Highly Desirable (15) • 800 staff capacity • Flexible workspace • 25,000 BTU/sq.ft./year • Support future technologies • Architectural integrity • “How to” manual for occupants • Support future staff needs • “Real-time PR” campaign • Meet ASHRAE 90.1-2007 • Secure collaboration with • Support culture and outsiders amenities • Building information modeling • Expandable building • Substantial completion by • Ergonomics 2010 (24 months)
  • 48. Project Objectives 3. If Possible (8) • Net-zero design approach • Most energy-efficient building in the world • LEED Platinum “Plus” • ASHRAE 90.1-2007 + 50% • Visual displays of current energy efficiency • Support public tours • National and global recognition and awards • Support reduced personnel turnover
  • 50. NREL Integrated Design Process Multiday Eco-Charrette • Kick off competition phase of the project • Include all disciplines in design-build team • Set low-energy goal • Determine ZONE and LEED Platinum/6-Star Green Star best practices and strategies • Develop section first • Explore relationship of site, program, plan, roof and section for low-energy strategies • Begin building simulations early in process.
  • 52. The Section 60’ PV System Natural Ventilation Radiant Cooling Thermal Mass Radiant Heating Transpired Workplace Collectors UFAD Daylighting Labyrinth
  • 54. East + West Orientations
  • 55. Pre-Design Analysis • Shading Studies • Energy Demand • Natural Ventilation • Wall Sections • Window / Wall Ratios • Roof / Floor Ratios • PV Energy Supply
  • 56. DOMEST HOT NREL RSF VENT FANS WATER EXT USAGE • Energy Demand 7% 0% LIGHTS 0% PUMPS & AUX 11% LIG 1% TASK LIGHTS TA • Transpired Collectors SPACE COOLING 8% 1% SE SE SE • Thermal Labyrinth SPACE HEATING MI SP 15% • Double-Skin Design SERVER ELEC SP 32% PU VE • Data Center Heat Recovery DO MISC 24% EX SERVER COOL • Data Center Cooling 0% SERVER RM FAN 1% • Natural Ventilation • Daylighting Design Simulations
  • 58. Meets Site Energy, Source Energy, Energy Emissions and Energy Cost definitions of ZONE with only the roof and parking PV systems. RSF ROOF 787 KW 3544 MBTU/YR ZONE- Renewable Energy RSF PARKING 540 KW 2432 MBTU/YR
  • 59. Beauty in the Numbers Zero
  • 60. Take-Aways Green buildings are important for controlling CO2 emissions High-performance buildings are feasible today No new technologies; just new Integrated Design Process Energy use metrics well established at 100-150 kWh/sqm/year

Notas del editor

  1. 2000 workers in bldg.; 700,000 sq.ft.Difficult climate:-35C to +35C (-31F – 95F)22-story solar chimney Passive solar designUrban regenerationGreen roofsPassive moisture control111 kWh/sqm/year;35,000 Btu/sq.ft./yr
  2. 800 workers in bldg.; 360,000 sq.ft.Design/build; $254/sq.ft.Cold, dry climate - Passive solar design1600-kW Solar PVLabyrinth thermal massDaylighting designControl plug loads111 kWh/sqm/year;35,000 Btu/sq.ft./yr
  3. Integrated Design Process Critical to SuccessStarted with the Procurement ProcessSet BSAGs – Big, Scary, Audacious Goals
  4. 200,000-sq.ft., commercial officeVedic architectural designLEED-CS/CILong axis north/south, to maximize morning sunHVAC: Enthalpy wheel, frictionless chillerSpace H/C only 13% 41% less water use182 kWh/sq.m./year;58,000 Btu/sq.ft./yr
  5. 56,000 sq.ft. academic building; narrow floorplateCold winters, humid summers100-KW BIPV system; 16% of annual electricity4 solar DHW collectorsGeothermal wells; four at 400’ deepRainwater harvesting91 kWh/sq.m./year; 29,000 Btu/sq.ft./yr
  6. 130,000-sq.ft., 2-story academic buildingSF Bay Area; mild climate35,000-sq.ft. BIPV system; 450 kW (peak)PV >50% of energy use26 miles of horizontal geothermal tubingTwo 16-ft dia., enthalpy (heat recovery) wheels102 kWh/sq.m./year;32,000 Btu/sq.ft./yr
  7. Double LEED Platinum, CS/CIFour stories commercial office, with17 stories rental apartmentsUnderfloor air w/chilled beamsDesigned to meet 2030 Challenge targets for 20104 turbines produce 1% of demandSolar water heaters provide 24%Operable windowsHarvested rainwater; 6500 sq.ft. green roofEnergy: 138 kWh/sq.m./year; 44,000 Btu/sq.ft.
  8. Project Team?
  9. SETTING PROJECT GOALS
  10. Project Goals
  11. GREEN-STAR/LEED GOALS?