SMARTDEK™ 51 Structural Decking System
Overview




      Menara Imperium, Jakarta, Indonesia




    LYSAGHT SMARTDEK™ 51 Structural Decking System is                       SMARTDEK™ 51 is suitable for typical applications as it
    an innovative high strength zinc-coated steel decking system            provides widest cover per weight of steel and also minimises
    designed for use in the construction of composite floor slabs. It is    the requirement for reinforcement. It acts as a permanent
    specifically developed for the Indian Construction Industry and is      formwork for a composite concrete slab, which in its assembled
    one of the most economical structural steel decking in the country.     state can be used as a working platform as well as a formwork to
    SMARTDEK™ 51 system complements the LYSAGHT profiles,    ®
                                                                            support wet concrete, construction materials and trades. When
    which is a premium range of roofing and wall cladding solutions.        the concrete hardens, it acts as the bottom tensile reinforcement.
    The high quality LYSAGHT SMARTDEK™ 51 Structural Decking                SMARTDEK™ 51 system is a complete structural steel decking
    System reinforces the principles of trust and reliability that Tata     system for concrete, masonry and steel frame construction and
    BlueScope Steel represents.                                             has an exceptional composite performance.


              History of LYSAGHT® Decking Profile
       1964                    1968                 1989                   1992                 1998                  2006




       TROFDEK®                CELDEK®              BONDEK® II             W-DEK®               POWERDEK®             SMARTDEKTM 51




2
Designed to Perfection

LYSAGHT SMARTDEK™ 51 Structural Decking System is an                             SMARTDEK™ 51 panel has a rib depth of 51 mm and provides
innovative “W” profile structural steel decking system. It brings                an effective cover width of 960 mm as shown in the figure 1.1.
greater economy and design freedom as it is precision engineered                 Embossments on top of the flange provide excellent mechanical
and provides ease of use as well as safety. SMARTDEK™ 51                         interlocking between steel and concrete. In the assembled state,
system has excellent spanning capacities that ensure greater                     the profile compromises of intermediate male and female ribs for
strength and less deflection.                                                    every interlocking side-lap joint.



     LYSAGHT SMARTDEK™ 51
                                                    Stiffener

                                  Embossment




                                                                                             Reinforcement
                                                                                                                                 Mesh Reinforcement
                                                                   Embossments
                                        Stiffener
  Concrete                                               b



    51 mm


     SMARTDEK™ 51
                                                                                                                         Cover width 960mm
Figure 1.1




                                                       SMARTDEK™ 51 Section Properties
                                                        SMARTDEK™ 51 Self Weight      Full        Zinc   Steel                                         Inertia       Section
                                                          Thickness    (kg/m2)   Cross-Sectional Coating Grade                                         Moment        Modulus
                                                             (BMT) (mm)                                Area (mm2/m)            (g/m2)*     (MPa)**     lx1 (mm4/m)   Zx1 (mm3/m)

                                                                 0.70                 7.35                  888.9               275          550       409687.50     15156.25

                                                                 1.00                10.34                 1269.7               275          550       526562.50     19479.17

                                                                 1.20                12.33                 1523.9               275          500       701979.17     25958.33

                                                       Note:
                                                       * Nominal coating thickness
 Jin Mao Tower, Shanghai, China                        ** Minimum yield strength of steel
                                                          Please contact nearest Tata BlueScope Steel office for other thickness and coating options




                                                                                                                                                                                   3
Benefits of LYSAGHT SMARTDEK™ 51 system

                   Comparison Chart
                                            Conventional RCC Slab                             Lost Formwork Decking Slab

                          Temporary Shuttering removed after concrete curing                   Decking acts as a lost formwork material
    Structural Element




                               Temporary                                                  Lost
                               Shuttering                                                 Formwork




                               Temporary Shuttering removed after slab sets                  No bonding between steel sheet & concrete
    Composite Action




                               Temporary                                                                                     No
                               Shuttering                                                                                    Bonding



                                 Concrete volume as per required slab depth                  Extra concrete required at the profile valleys
    Concrete Saving




                                                    Concrete as Required


                                                                                         b

                           a


                                                                                              Extra Concrete


                                            Reinforcement steel as required                      Decking acts as extra steel to the slab
    Steel Saving




                                                                                         Top
                                                                                         Reinforcement
                                                                                         Bottom
                                                                                         Reinforcement
                           Top Reinforcement
                                                                                         Lost Formwork
                           Bottom Reinforcement
                                                                                         (Extra Steel)


                                      Requires complex prop arrangement                                        Reduction in props
    Prop Arrangement




                                                                              Props at
                                                                                                                                Props at
                                                                              Regular
                                                                                                                                Regular
                                                                              Interval
                                                                                                                                Interval



                                             Normal speed of construction                 Decking application enhances construction speed
    Construction Time




                           Level 1                                                                   Level 2




                                                                                                     Level 1




4
Smart Software
    SMARTDEKTM 51 Structural Decking Slab
                                                                     Excel based SMARTDEK™ 51 software and MEGAFLOOR
      SMARTDEK™ 51 acts as an integral structural element            structural decking software for the design of composite slabs with
                                                                     SMARTDEK™ 51 profile will be available to assist engineers and
                                                                     consultants in deriving an optimal solution. SMARTDEK™ 51

         Structural
                                                                     software should be used in conjunction with the SMARTDEK™
         Decking
                                                                     51 design manual.


Embossments provide mechanical interlock between steel & concrete




                                     Embossments
                                     (Strong Mechanical Interlock)




         Concrete saving makes construction economical

                                                                     Smart Construction
         c                                                           SMARTDEK™ 51 system provides a safe working platform that
                                                                     is fast and easy to set up and therefore minimises multi-storey
                                                                     construction time. Faster construction time allows optimisation on
          Concrete Saving
                                                          c<a&b
                                                                     construction schedule delivering faster value to the developers.
SMARTDEK™ 51 acts as bottom tensile reinforcement –Steel Saving


                                                                     Smart Application
         Top
         Reinforcement                                               Besides its application in composite floors in multi-storey
         Smartdek™ 51                                                buildings and commercial establishments, it is extensively used
         (As Bottom
         Reinforcement)                                              for Mezzanine applications. Corrosion resistant coating makes
     High tensile steel (G550) provides large unpropped spans        it the best solution for typical applications like parking sheds,
                                                                     where SMARTDEK™ 51 system provides better appearance to
                                                                     exposed ceilings.



                                                        Few or
                                                        No Props




  SMARTDEK™ 51 application delivers faster value to developers

             Level 3




             Level 2




             Level 1                                                   ICBC Headquarter Building,Beijing



                                                                                                                                          5
Specifications

    Material Specifications                                                               Tested to Extreme Conditions
    SMARTDEK™ 51 panel is manufactured from hot dipped zinc                               SMARTDEK™ 51 panels have been subjected to rigorous tests
    coated high strength steel with minimum 550 MPa yield strength                        such as slip block test, formwork tests including shear and
    and coating mass of Z275 (min 275g/m2 total of zinc coating on                        bearing, full scale slab test, composite slab cycle test, fire rating
    both sides). The available thickness ranges from 0.70 mm to                           test, formwork-air pressure test, formwork-four point load test
    1.2 mm BMT (Base Metal Thickness). The steel conforms to                              and concentrated load test. These tests are carried out in the
    AS1397 and BS EN 10147:2000.                                                          labs of LYSAGHT® technology centre in Chester Hill, Sydney,
    Optional: SMARTDEK™ 51 system is available in pre-painted galvanised steel.           Australia, to ensure maximum performance and quality of our
                                                                                          decking profiles. (Ref. figure 2.1 to 2.4)




    Fig. 2.1 - Formwork - Point Load          Fig. 2.2 - Formwork - Air Pressure Test    Fig. 2.3 - Composite - Slip Block Test   Fig. 2.4 - Fire Test - Victoria University


    Quality Assurance
    The LYSAGHT® brand name is synonymous with quality
    and performance. As with all other LYSAGHT® products,
    SMARTDEK™ 51 steel sheets comply with major Indian standards
    and design standards adopted across Asia. Manufactured using
    high tensile steel, it is optimally configured and uses advanced
    design and construction method.                                                        Roll Forming Machine


                                                      SMARTDEK™ Span Table Formwork Stage*
                           Span              Single                                       Continuous End                                   Continuous interior
                           Type

                             BMT
                             	       0.7	      1	          1.2	    	              0.7	            1	           1.2	 	               0.7	             1	            1.2

                              100	   2360	   2600	        2600	 	                2610	          3200	         3200	 	              2610	           3200	          3200

                              110	   2280	   2620	        2800	 	                2520	          3290	         3580	 	              2520	           3130	          3340

                              120	   2200	   2540	        2710	 	                2430	          3200	         3490	 	              2430	           3030	          3240

                              130	   2140	   2460	        2630	 	                2360	          3110	         3400	 	              2360	           2950	          3150
     Slab Thickness (mm)




                              140	   2080	   2400	        2560	 	                2290	          3040	         3320	 	              2290	           2840	          3070

                              150	   2030	   2340	        2500	 	                2230	          2950	         3240	 	              2230	           2740	          2990

                              160	   1980	   2290	        2450	 	                2180	          2870	         3170	 	              2160	           2650	          2930

                              170	   1930	   2240	        2390	 	                2120	          2800	         3100	 	              2090	           2570	          2840

                              180	   1890	   2190	        2350	 	                2080	          2740	         3040	 	              2030	           2490	          2750

                              200	   1810	   2110	        2260	 	                1990	          2620	         2900	 	              1920	           2360	          2610

                              220	   1740	   2040	        2190	 	                1910	          2510	         2790	 	              1820	           2240	          2480

    * Please refer to SMARTDEK 51 Design and Construction Manual for detail design of composite slab.
                                      TM




6
Connection Details

Steel Connection Details




                                                                                        SMARTDEK™ 51 profile


                                                                      Shear Studs

                                                           Universal Beam




SMARTDEK™ 51 fixing detail: The accessories are added as per design requirement




                                                      Steel Bracket
           Shear Stud




  Edge
  Form




                                                         Universal Beam                 SMARTDEK™ 51 profile




End details-Flush Type: Standard end closure detail adopted for steel frame structure


                                                                                        Above connection details for guidance purpose only.


                                                                                                                                              7
Connection Details


                        As Required

                                                       Steel Bracket
                 Stud on Beam
                 Centerline




     Edge
     Form
               Cantilever Length

                                                                         Universal Beam          SMARTDEK™ 51 profile




    End details - Option 1: Detail adopted for cantilever end projections




                        As Required




                                                 Steel Bracket

                                                           Shear Stud



        Edge
        Form




                     Cantilever                              Universal Beam
                     Length
                                                                                                 SMARTDEK™ 51 profile




    End details-Option 2: Alternate details for structures where projections are necessary


                                                                                             Above connection details for guidance purpose only.


8
Connection Details




                                                                                         Shear Stud
                   SMARTDEK™ 51 profile




                                                                                              Universal Beam




Butt joint details: Standard joint detail for continuous casting of slab




                                                                           SMARTDEK™ 51 profile
                    Universal Beam

                                                                                                             Wooden Support




                                                                                                                      Temporary Prop




Temporary support details (If required): SMARTDEK™ 51 profile spans longer than conventional system where possibility of
temporary support is less. Please refer to SMARTDEK™ 51 Design & Construction Manual for details

                                                                                                  Above connection details for guidance purpose only.


                                                                                                                                                        9
Connection Details


                                                              Reinforcement Bar

                                           Steel Bracket



                      Shear Stud




        Edge
        Form




                                                                  SMARTDEK™ 51 profile


     Corner details: The ends are closed to make sure the concrete slurry takes the required shape quickly



     Concrete Connection Details




                                                                                                    Edge Form
                                                                                              Formwork
                                                                                                              Reinforcement Bar

                                                                                                          Stirrups
                                                                                                                      SMARTDEK™ 51 profile


     Concrete fixing details: The casting of beam & slab is done simultaneously. This saves time and brings economy.


                                                                                                   Above connection details for guidance purpose only.


10
Connections Details

Fire Details

                                    SMARTDEK™ 51 profile




                                                                                                                                           Mesh
                                                                                                                        Additional Fire
                                                                                                                        Reinforcement
                                                                                                                        (Astf)-
                                                                                               0.3Ln                            Ln

            Negative Reinforcement (Ast -)


                                                                     Universal Beam

Option 1



                                    SMARTDEK™ 51 profile




                                                                                                                                          Mesh
                                                                                                                   Additional Fire
                                                                                                                   Reinforcement
                                                                                                                   (Astf)+
                                                                                             0.3Ln                          Ln

            Negative Reinforcement (Ast -)


                                                                     Universal Beam

Option 2                                                                                                                                  Above details for guidance purpose only.
                                                                                                                                          Please refer SMARTDEKTM 51 design and
                                                                                                                                          construction 	manual

Sequence of Construction




  1                                            2                                        3                                                 4
Open SMARTDEK 51 sheet bundles
                 TM
                                           Place temporary support if required        Place on steel or concrete beam                Clinch male and female lip




  5                                            6                                        7                                                 8
Fix steel edge form wherever required        Fix SMARTDEK 51 profiles to steel
                                                           TM
                                                                                      Place reinforcement                            Place concrete
                                             or concrete beam

                                                                                                                                                                                     11
Key Benefits

               • Excellent spanning capacities for greater strength
                   and less deflection
               • Embossments provide mechanical interlock
                   ensuring adequate composite action
               • Precision Engineered; brings greater economy
                   and design freedom
               • Ease of installation combined with safety
               • Saves on concrete and reinforcement cost
               • Greater corrosion resistance provides long life                                                                   Fusionpolis, Singapore




Emirates Towers, Dubai                                                                                                    Petronas Tower, Kuala Lumpur, Malaysia




     For more information, please contact:
     • North Region                  Gurgaon:         Tel: +91 124 4263051
     • East Region                   Kolkata:         Tel: +91 33 65502335
     • West Region                   Pune:            Tel: +91 20 66218000
     • South Region                  Chennai:         Tel: +91 44 42693319
                                                                                                                                        The Metropolitan, Final Plot No. 27,
     Note:
                                                                                                                                            Survey No. 21, Wakdewadi,
     No part of this brochure may be reproduced, stored in retrieval system or transmitted in any form or by any means,
     electronic, mechanical, recording or otherwise, without written permission from Tata BlueScope Steel Limited.
                                                                                                                                        Shivaji Nagar, Pune - 411005. India.
                                                                                                                                 Tel: + 91 20 6674 2000 Fax: +91 20 6674 2001
                                                                                                                                                                                BP/PM/7.3/0210




     TROFDEK®, CELDEK®, BONDEK® II, W-DEK®, POWERDEK®, SMARTDEKTM 51 and LYSAGHT® are registered
     trademarks of BlueScope Steel Limited. BONDEK® II, W-DEK®, POWERDEK®, SMARTDEKTM 51 and LYSAGHT® are                             Website: www.tatabluescopesteel.com
     under license to Tata BlueScope Steel Limited.                                                                                 Email: smartdek@tatabluescopesteel.com

Más contenido relacionado

La actualidad más candente

Lecture 12 equivalent frame method
Lecture 12 equivalent frame methodLecture 12 equivalent frame method
Lecture 12 equivalent frame methodalialhussainawi
 
SSL, FFL, SFL Abbreviations
SSL, FFL, SFL AbbreviationsSSL, FFL, SFL Abbreviations
SSL, FFL, SFL AbbreviationsEhlelt Mancha
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridgejupallipavan2911
 
Pre-tensioning Prestresssed Devices
Pre-tensioning Prestresssed DevicesPre-tensioning Prestresssed Devices
Pre-tensioning Prestresssed DevicesDavinderpal Singh
 
Peb structures (1)
Peb structures (1)Peb structures (1)
Peb structures (1)hlksd
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)Waseem Akbar
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)AMSYSCO Inc.
 
Pre engineered building ppt rit
Pre engineered building ppt ritPre engineered building ppt rit
Pre engineered building ppt ritShubham Parab
 
Civil v-hydrology and irrigation engineering [10 cv55]-notes
Civil v-hydrology and irrigation engineering [10 cv55]-notesCivil v-hydrology and irrigation engineering [10 cv55]-notes
Civil v-hydrology and irrigation engineering [10 cv55]-notesSuryenn Edwie Mon
 
Servicing large buildings
Servicing large buildingsServicing large buildings
Servicing large buildingsJulian Swindell
 
footing
footingfooting
footingillpa
 
52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girdersSaleem Malik
 

La actualidad más candente (20)

Lecture 12 equivalent frame method
Lecture 12 equivalent frame methodLecture 12 equivalent frame method
Lecture 12 equivalent frame method
 
SSL, FFL, SFL Abbreviations
SSL, FFL, SFL AbbreviationsSSL, FFL, SFL Abbreviations
SSL, FFL, SFL Abbreviations
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
 
Compression member
Compression memberCompression member
Compression member
 
Pre-tensioning Prestresssed Devices
Pre-tensioning Prestresssed DevicesPre-tensioning Prestresssed Devices
Pre-tensioning Prestresssed Devices
 
Peb structures (1)
Peb structures (1)Peb structures (1)
Peb structures (1)
 
Steel structures
Steel structuresSteel structures
Steel structures
 
Flat slab ppt
Flat slab pptFlat slab ppt
Flat slab ppt
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)
 
Pre engineered building ppt rit
Pre engineered building ppt ritPre engineered building ppt rit
Pre engineered building ppt rit
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
 
ONE WAY SLAB DESIGN
ONE WAY SLAB DESIGNONE WAY SLAB DESIGN
ONE WAY SLAB DESIGN
 
Column math
Column mathColumn math
Column math
 
Civil v-hydrology and irrigation engineering [10 cv55]-notes
Civil v-hydrology and irrigation engineering [10 cv55]-notesCivil v-hydrology and irrigation engineering [10 cv55]-notes
Civil v-hydrology and irrigation engineering [10 cv55]-notes
 
Servicing large buildings
Servicing large buildingsServicing large buildings
Servicing large buildings
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
Watertank
WatertankWatertank
Watertank
 
footing
footingfooting
footing
 
52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders
 

Similar a Smartdeck

Ejot Solar Fasteners
Ejot Solar FastenersEjot Solar Fasteners
Ejot Solar Fastenersklubbering
 
Steel fibers for reinforced concrete kasturi metal
Steel fibers for reinforced concrete   kasturi metalSteel fibers for reinforced concrete   kasturi metal
Steel fibers for reinforced concrete kasturi metalKasturi Metal
 
Steel fibers vs steel mesh in concrete reinforcement
Steel fibers vs steel mesh in concrete reinforcementSteel fibers vs steel mesh in concrete reinforcement
Steel fibers vs steel mesh in concrete reinforcementBekaert
 
Mega prefab post tension catalog
Mega prefab post tension catalog Mega prefab post tension catalog
Mega prefab post tension catalog bassamnakfour
 
B tech individual report
B tech individual reportB tech individual report
B tech individual reportong93
 
Design of Metal Deck Sheet and Composite I-Section as secondary member
Design of Metal Deck Sheet and Composite I-Section as secondary memberDesign of Metal Deck Sheet and Composite I-Section as secondary member
Design of Metal Deck Sheet and Composite I-Section as secondary memberIRJET Journal
 
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...IRJET Journal
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post TensioningAMSYSCO Inc.
 
IRJET- Comparative Analysis on Seismic Behavior of R.C.C, Composite Encased a...
IRJET- Comparative Analysis on Seismic Behavior of R.C.C, Composite Encased a...IRJET- Comparative Analysis on Seismic Behavior of R.C.C, Composite Encased a...
IRJET- Comparative Analysis on Seismic Behavior of R.C.C, Composite Encased a...IRJET Journal
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETEghildiyal8811
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETEghildiyal8811
 
Research Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and ScienceResearch Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and Scienceresearchinventy
 
Block 19 Compacitons Background 13
Block 19   Compacitons Background 13Block 19   Compacitons Background 13
Block 19 Compacitons Background 13Chris Yarnell
 
IRJET- An Experimental Study of Ductile Behavior of Ferrocement Slab
IRJET- An Experimental Study of Ductile Behavior of Ferrocement SlabIRJET- An Experimental Study of Ductile Behavior of Ferrocement Slab
IRJET- An Experimental Study of Ductile Behavior of Ferrocement SlabIRJET Journal
 

Similar a Smartdeck (20)

Ejot Solar Fasteners
Ejot Solar FastenersEjot Solar Fasteners
Ejot Solar Fasteners
 
RnM Brochure
RnM BrochureRnM Brochure
RnM Brochure
 
Steel fibers for reinforced concrete kasturi metal
Steel fibers for reinforced concrete   kasturi metalSteel fibers for reinforced concrete   kasturi metal
Steel fibers for reinforced concrete kasturi metal
 
Steel fibers vs steel mesh in concrete reinforcement
Steel fibers vs steel mesh in concrete reinforcementSteel fibers vs steel mesh in concrete reinforcement
Steel fibers vs steel mesh in concrete reinforcement
 
Mega prefab post tension catalog
Mega prefab post tension catalog Mega prefab post tension catalog
Mega prefab post tension catalog
 
M.Tech PPT.pptx
M.Tech PPT.pptxM.Tech PPT.pptx
M.Tech PPT.pptx
 
B tech individual report
B tech individual reportB tech individual report
B tech individual report
 
Design of Metal Deck Sheet and Composite I-Section as secondary member
Design of Metal Deck Sheet and Composite I-Section as secondary memberDesign of Metal Deck Sheet and Composite I-Section as secondary member
Design of Metal Deck Sheet and Composite I-Section as secondary member
 
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post Tensioning
 
IRJET- Comparative Analysis on Seismic Behavior of R.C.C, Composite Encased a...
IRJET- Comparative Analysis on Seismic Behavior of R.C.C, Composite Encased a...IRJET- Comparative Analysis on Seismic Behavior of R.C.C, Composite Encased a...
IRJET- Comparative Analysis on Seismic Behavior of R.C.C, Composite Encased a...
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 
Research Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and ScienceResearch Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and Science
 
Beam design
Beam designBeam design
Beam design
 
Design of reinforced concrete beam
Design of reinforced concrete beamDesign of reinforced concrete beam
Design of reinforced concrete beam
 
Block 19 Compacitons Background 13
Block 19   Compacitons Background 13Block 19   Compacitons Background 13
Block 19 Compacitons Background 13
 
IRJET- An Experimental Study of Ductile Behavior of Ferrocement Slab
IRJET- An Experimental Study of Ductile Behavior of Ferrocement SlabIRJET- An Experimental Study of Ductile Behavior of Ferrocement Slab
IRJET- An Experimental Study of Ductile Behavior of Ferrocement Slab
 
G012543846
G012543846G012543846
G012543846
 
V2 Media Kit
V2 Media KitV2 Media Kit
V2 Media Kit
 

Último

Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 

Último (20)

Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 

Smartdeck

  • 1. SMARTDEK™ 51 Structural Decking System
  • 2. Overview Menara Imperium, Jakarta, Indonesia LYSAGHT SMARTDEK™ 51 Structural Decking System is SMARTDEK™ 51 is suitable for typical applications as it an innovative high strength zinc-coated steel decking system provides widest cover per weight of steel and also minimises designed for use in the construction of composite floor slabs. It is the requirement for reinforcement. It acts as a permanent specifically developed for the Indian Construction Industry and is formwork for a composite concrete slab, which in its assembled one of the most economical structural steel decking in the country. state can be used as a working platform as well as a formwork to SMARTDEK™ 51 system complements the LYSAGHT profiles, ® support wet concrete, construction materials and trades. When which is a premium range of roofing and wall cladding solutions. the concrete hardens, it acts as the bottom tensile reinforcement. The high quality LYSAGHT SMARTDEK™ 51 Structural Decking SMARTDEK™ 51 system is a complete structural steel decking System reinforces the principles of trust and reliability that Tata system for concrete, masonry and steel frame construction and BlueScope Steel represents. has an exceptional composite performance. History of LYSAGHT® Decking Profile 1964 1968 1989 1992 1998 2006 TROFDEK® CELDEK® BONDEK® II W-DEK® POWERDEK® SMARTDEKTM 51 2
  • 3. Designed to Perfection LYSAGHT SMARTDEK™ 51 Structural Decking System is an SMARTDEK™ 51 panel has a rib depth of 51 mm and provides innovative “W” profile structural steel decking system. It brings an effective cover width of 960 mm as shown in the figure 1.1. greater economy and design freedom as it is precision engineered Embossments on top of the flange provide excellent mechanical and provides ease of use as well as safety. SMARTDEK™ 51 interlocking between steel and concrete. In the assembled state, system has excellent spanning capacities that ensure greater the profile compromises of intermediate male and female ribs for strength and less deflection. every interlocking side-lap joint. LYSAGHT SMARTDEK™ 51 Stiffener Embossment Reinforcement Mesh Reinforcement Embossments Stiffener Concrete b 51 mm SMARTDEK™ 51 Cover width 960mm Figure 1.1 SMARTDEK™ 51 Section Properties SMARTDEK™ 51 Self Weight Full Zinc Steel Inertia Section Thickness (kg/m2) Cross-Sectional Coating Grade Moment Modulus (BMT) (mm) Area (mm2/m) (g/m2)* (MPa)** lx1 (mm4/m) Zx1 (mm3/m) 0.70 7.35 888.9 275 550 409687.50 15156.25 1.00 10.34 1269.7 275 550 526562.50 19479.17 1.20 12.33 1523.9 275 500 701979.17 25958.33 Note: * Nominal coating thickness Jin Mao Tower, Shanghai, China ** Minimum yield strength of steel Please contact nearest Tata BlueScope Steel office for other thickness and coating options 3
  • 4. Benefits of LYSAGHT SMARTDEK™ 51 system Comparison Chart Conventional RCC Slab Lost Formwork Decking Slab Temporary Shuttering removed after concrete curing Decking acts as a lost formwork material Structural Element Temporary Lost Shuttering Formwork Temporary Shuttering removed after slab sets No bonding between steel sheet & concrete Composite Action Temporary No Shuttering Bonding Concrete volume as per required slab depth Extra concrete required at the profile valleys Concrete Saving Concrete as Required b a Extra Concrete Reinforcement steel as required Decking acts as extra steel to the slab Steel Saving Top Reinforcement Bottom Reinforcement Top Reinforcement Lost Formwork Bottom Reinforcement (Extra Steel) Requires complex prop arrangement Reduction in props Prop Arrangement Props at Props at Regular Regular Interval Interval Normal speed of construction Decking application enhances construction speed Construction Time Level 1 Level 2 Level 1 4
  • 5. Smart Software SMARTDEKTM 51 Structural Decking Slab Excel based SMARTDEK™ 51 software and MEGAFLOOR SMARTDEK™ 51 acts as an integral structural element structural decking software for the design of composite slabs with SMARTDEK™ 51 profile will be available to assist engineers and consultants in deriving an optimal solution. SMARTDEK™ 51 Structural software should be used in conjunction with the SMARTDEK™ Decking 51 design manual. Embossments provide mechanical interlock between steel & concrete Embossments (Strong Mechanical Interlock) Concrete saving makes construction economical Smart Construction c SMARTDEK™ 51 system provides a safe working platform that is fast and easy to set up and therefore minimises multi-storey construction time. Faster construction time allows optimisation on Concrete Saving c<a&b construction schedule delivering faster value to the developers. SMARTDEK™ 51 acts as bottom tensile reinforcement –Steel Saving Smart Application Top Reinforcement Besides its application in composite floors in multi-storey Smartdek™ 51 buildings and commercial establishments, it is extensively used (As Bottom Reinforcement) for Mezzanine applications. Corrosion resistant coating makes High tensile steel (G550) provides large unpropped spans it the best solution for typical applications like parking sheds, where SMARTDEK™ 51 system provides better appearance to exposed ceilings. Few or No Props SMARTDEK™ 51 application delivers faster value to developers Level 3 Level 2 Level 1 ICBC Headquarter Building,Beijing 5
  • 6. Specifications Material Specifications Tested to Extreme Conditions SMARTDEK™ 51 panel is manufactured from hot dipped zinc SMARTDEK™ 51 panels have been subjected to rigorous tests coated high strength steel with minimum 550 MPa yield strength such as slip block test, formwork tests including shear and and coating mass of Z275 (min 275g/m2 total of zinc coating on bearing, full scale slab test, composite slab cycle test, fire rating both sides). The available thickness ranges from 0.70 mm to test, formwork-air pressure test, formwork-four point load test 1.2 mm BMT (Base Metal Thickness). The steel conforms to and concentrated load test. These tests are carried out in the AS1397 and BS EN 10147:2000. labs of LYSAGHT® technology centre in Chester Hill, Sydney, Optional: SMARTDEK™ 51 system is available in pre-painted galvanised steel. Australia, to ensure maximum performance and quality of our decking profiles. (Ref. figure 2.1 to 2.4) Fig. 2.1 - Formwork - Point Load Fig. 2.2 - Formwork - Air Pressure Test Fig. 2.3 - Composite - Slip Block Test Fig. 2.4 - Fire Test - Victoria University Quality Assurance The LYSAGHT® brand name is synonymous with quality and performance. As with all other LYSAGHT® products, SMARTDEK™ 51 steel sheets comply with major Indian standards and design standards adopted across Asia. Manufactured using high tensile steel, it is optimally configured and uses advanced design and construction method. Roll Forming Machine SMARTDEK™ Span Table Formwork Stage* Span Single Continuous End Continuous interior Type BMT 0.7 1 1.2 0.7 1 1.2 0.7 1 1.2 100 2360 2600 2600 2610 3200 3200 2610 3200 3200 110 2280 2620 2800 2520 3290 3580 2520 3130 3340 120 2200 2540 2710 2430 3200 3490 2430 3030 3240 130 2140 2460 2630 2360 3110 3400 2360 2950 3150 Slab Thickness (mm) 140 2080 2400 2560 2290 3040 3320 2290 2840 3070 150 2030 2340 2500 2230 2950 3240 2230 2740 2990 160 1980 2290 2450 2180 2870 3170 2160 2650 2930 170 1930 2240 2390 2120 2800 3100 2090 2570 2840 180 1890 2190 2350 2080 2740 3040 2030 2490 2750 200 1810 2110 2260 1990 2620 2900 1920 2360 2610 220 1740 2040 2190 1910 2510 2790 1820 2240 2480 * Please refer to SMARTDEK 51 Design and Construction Manual for detail design of composite slab. TM 6
  • 7. Connection Details Steel Connection Details SMARTDEK™ 51 profile Shear Studs Universal Beam SMARTDEK™ 51 fixing detail: The accessories are added as per design requirement Steel Bracket Shear Stud Edge Form Universal Beam SMARTDEK™ 51 profile End details-Flush Type: Standard end closure detail adopted for steel frame structure Above connection details for guidance purpose only. 7
  • 8. Connection Details As Required Steel Bracket Stud on Beam Centerline Edge Form Cantilever Length Universal Beam SMARTDEK™ 51 profile End details - Option 1: Detail adopted for cantilever end projections As Required Steel Bracket Shear Stud Edge Form Cantilever Universal Beam Length SMARTDEK™ 51 profile End details-Option 2: Alternate details for structures where projections are necessary Above connection details for guidance purpose only. 8
  • 9. Connection Details Shear Stud SMARTDEK™ 51 profile Universal Beam Butt joint details: Standard joint detail for continuous casting of slab SMARTDEK™ 51 profile Universal Beam Wooden Support Temporary Prop Temporary support details (If required): SMARTDEK™ 51 profile spans longer than conventional system where possibility of temporary support is less. Please refer to SMARTDEK™ 51 Design & Construction Manual for details Above connection details for guidance purpose only. 9
  • 10. Connection Details Reinforcement Bar Steel Bracket Shear Stud Edge Form SMARTDEK™ 51 profile Corner details: The ends are closed to make sure the concrete slurry takes the required shape quickly Concrete Connection Details Edge Form Formwork Reinforcement Bar Stirrups SMARTDEK™ 51 profile Concrete fixing details: The casting of beam & slab is done simultaneously. This saves time and brings economy. Above connection details for guidance purpose only. 10
  • 11. Connections Details Fire Details SMARTDEK™ 51 profile Mesh Additional Fire Reinforcement (Astf)- 0.3Ln Ln Negative Reinforcement (Ast -) Universal Beam Option 1 SMARTDEK™ 51 profile Mesh Additional Fire Reinforcement (Astf)+ 0.3Ln Ln Negative Reinforcement (Ast -) Universal Beam Option 2 Above details for guidance purpose only. Please refer SMARTDEKTM 51 design and construction manual Sequence of Construction 1 2 3 4 Open SMARTDEK 51 sheet bundles TM Place temporary support if required Place on steel or concrete beam Clinch male and female lip 5 6 7 8 Fix steel edge form wherever required Fix SMARTDEK 51 profiles to steel TM Place reinforcement Place concrete or concrete beam 11
  • 12. Key Benefits • Excellent spanning capacities for greater strength and less deflection • Embossments provide mechanical interlock ensuring adequate composite action • Precision Engineered; brings greater economy and design freedom • Ease of installation combined with safety • Saves on concrete and reinforcement cost • Greater corrosion resistance provides long life Fusionpolis, Singapore Emirates Towers, Dubai Petronas Tower, Kuala Lumpur, Malaysia For more information, please contact: • North Region Gurgaon: Tel: +91 124 4263051 • East Region Kolkata: Tel: +91 33 65502335 • West Region Pune: Tel: +91 20 66218000 • South Region Chennai: Tel: +91 44 42693319 The Metropolitan, Final Plot No. 27, Note: Survey No. 21, Wakdewadi, No part of this brochure may be reproduced, stored in retrieval system or transmitted in any form or by any means, electronic, mechanical, recording or otherwise, without written permission from Tata BlueScope Steel Limited. Shivaji Nagar, Pune - 411005. India. Tel: + 91 20 6674 2000 Fax: +91 20 6674 2001 BP/PM/7.3/0210 TROFDEK®, CELDEK®, BONDEK® II, W-DEK®, POWERDEK®, SMARTDEKTM 51 and LYSAGHT® are registered trademarks of BlueScope Steel Limited. BONDEK® II, W-DEK®, POWERDEK®, SMARTDEKTM 51 and LYSAGHT® are Website: www.tatabluescopesteel.com under license to Tata BlueScope Steel Limited. Email: smartdek@tatabluescopesteel.com