VIBRATION METHOD FOR
GROUND IMPROVEMENT
TECHNIQUE
By : Abhishek Thakkar
Rocket Education
INTRODUCTION
 Transportation contributes to the industrial, economic,
social and cultural development of nation
 Transportation by road or highways is the only mode
which could give maximum service to one and all.
 When the soil on a project site cannot support the
loads, ground improvement to increase strength, reduce
compressibility, and enhance performance under
applied loadings may be required.
 Various methods are discussed below:
METHODS FOR GROUND IMPROVEMENT
1. VERTICAL DRAINS
2. SOIL NAILING
3. STONE COLUMNS
4. VIBRO COMPACTION
5. DYNAMIC COMPACTION
VERTICAL DRAINS
 These consist of a column of pervious material placed in
cylindrical vertical holes at sufficiently close spaces.
 All drains should be connected at the ground surface to a
drainage blanket.
 Vertical drains accelerate consolidation by facilitating drainage
of pore water.
 Vertical drains are laid out in rows, staggered, or aligned to
form patterns of equilateral triangles or squares.
 Two types of drains are discussed below
A SAND DRAIN IS A SIMPLE
PROCESS, EMPLOYING A COLUMN
OF AT LEAST 10 INCHES IN
WIDTH AUGERED INTO GROUND
TO BE SURCHARGED &
CONSOLIDATED.
THE COLUMN IS THEN FILLED
WITH SAND AND CONNECTED TO
A FREE-DRAINING BLANKET OF
GRANULAR SOIL.
SAND DRAINS
WICK DRAIN
 A wick drain is usually about,
4 inches wide, 1/8-inch thick
which acts as a high-
permeability conduit for water
to flow out of the soil and to
the surface.
 Most common application of
wick drains is for accelerating
the settlement rate of
compressible soils.
SOIL NAILING
 This ground reinforcement process uses steel tendons
which are drilled and grouted into the soil to create a
composite mass.
 A shotcrete facing is typically applied.
 Soil Nailing is an in situ technique for reinforcing,
stabilizing and retaining excavations and deep cuts.
Shotcreteing
Holes are drilled though machine
Soil Nailing
STONE COLUMN
 Also known as vibro-replacement or vibro-
displacement, is a ground improvement process
where vertical columns of compacted aggregate are
formed through the soils to be improved.
 The vibrator first penetrates to the required depth by
vibration and air or water jetting or by vibration
alone.
 Gravel is then added at the tip of the vibrator and
progressive raising and repenetration of the vibrator
results in the gravel being pushed into the
surrounding soil.
 The soil-column matrix results in an overall mass
having a high shear strength and a low
compressibility.
STONE COLUMN
VIBRO COMPACTION
 It is a ground improvement process for densifying loose
sands to create stable foundation soils.
 The action of the vibrator, usually accompanied by water
jetting, reduces the inter-granular forces between the soil
particles, allowing them to move into a denser
configuration, typically achieving a relative density of 70
to 85 percent.
 Compaction is achieved above and below the water table.
CRANE MOUNTED VIBRATOR
PROCESS OF VIBRO COMPACTION
DYNAMIC COMPACTION
 Dynamic Compaction is the dropping of heavy weights
on the ground surface to densify the soils at depth.
 It involves the repeated dropping of large steel tampers
by means of crawler cranes.
 Tampers typically range from 6 to 20 tons and are
dropped from heights of about 40 to 80 feet.
MACHINE WITH TAMPER COMPACTION BY TAMPER
CONCLUSION
 Soil conditions can frequently be improved using soil
improvement techniques. A variety of soil improvement
techniques have been developed. However a suitable
technique has to be adopt according to necessity of the
structure and economy.
REFERENCE
 http://www.ce.washington.edu/~vibro/html/what/wha
t1.html
 http://www2.usgs.gov/faq/categories/9829/3301
 http://geology.com/usgs/vibration/
 http://global.britannica.com/science/soil-vibration
For more Civil Engineering Related PPT search
“Rocket Education”
If u find this PPT helpful.
Plzz Like it 
Vibration method for ground improvement technique

Más contenido relacionado

La actualidad más candente

1)methods of exploration
1)methods of exploration1)methods of exploration
1)methods of exploration
jagadish108
 
Civil Engineering-Dewatering
Civil Engineering-DewateringCivil Engineering-Dewatering
Civil Engineering-Dewatering
Moe Abadla
 

La actualidad más candente (20)

Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavements
 
What is Ground Improvement Techniques?
What is Ground Improvement Techniques?What is Ground Improvement Techniques?
What is Ground Improvement Techniques?
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road construction
 
Deep compaction techniques
Deep compaction techniquesDeep compaction techniques
Deep compaction techniques
 
Ground Improvement Techniques
Ground Improvement TechniquesGround Improvement Techniques
Ground Improvement Techniques
 
GROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODSGROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODS
 
Field control of compaction and compaction Equipment
Field control of compaction and compaction EquipmentField control of compaction and compaction Equipment
Field control of compaction and compaction Equipment
 
Ground Improvement Techniques
Ground Improvement TechniquesGround Improvement Techniques
Ground Improvement Techniques
 
Study of Prefabricated Vertical Drains
Study of Prefabricated Vertical DrainsStudy of Prefabricated Vertical Drains
Study of Prefabricated Vertical Drains
 
Grouting
Grouting Grouting
Grouting
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Stone column
Stone columnStone column
Stone column
 
SOIL EXPLORATION
SOIL EXPLORATIONSOIL EXPLORATION
SOIL EXPLORATION
 
1)methods of exploration
1)methods of exploration1)methods of exploration
1)methods of exploration
 
Soil stabilisation (1)
Soil stabilisation (1)Soil stabilisation (1)
Soil stabilisation (1)
 
Dynamic compaction
Dynamic compactionDynamic compaction
Dynamic compaction
 
Civil Engineering-Dewatering
Civil Engineering-DewateringCivil Engineering-Dewatering
Civil Engineering-Dewatering
 
4. wbm roads 10 sep
4. wbm roads 10 sep4. wbm roads 10 sep
4. wbm roads 10 sep
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Reinforced earth structures
Reinforced earth structuresReinforced earth structures
Reinforced earth structures
 

Similar a Vibration method for ground improvement technique

1206765 634528654292080000
1206765 6345286542920800001206765 634528654292080000
1206765 634528654292080000
Civil Engineers
 
118039141-Soil-Improvement-Techniques.ppt
118039141-Soil-Improvement-Techniques.ppt118039141-Soil-Improvement-Techniques.ppt
118039141-Soil-Improvement-Techniques.ppt
FlittiAbdelhamid
 
Ground improvement welcome to a new era
Ground improvement   welcome to a new eraGround improvement   welcome to a new era
Ground improvement welcome to a new era
Mikhail Villamor
 
Ground Improvement - Welcome to a new Era
Ground Improvement - Welcome to a new EraGround Improvement - Welcome to a new Era
Ground Improvement - Welcome to a new Era
Mikhail Villamor
 
Ground improvement welcome to a new era
Ground improvement   welcome to a new eraGround improvement   welcome to a new era
Ground improvement welcome to a new era
Mikhail Villamor
 
Ground improvement welcome to a new era
Ground improvement   welcome to a new eraGround improvement   welcome to a new era
Ground improvement welcome to a new era
Mikhail Villamor
 
Ground improvement welcome to a new era
Ground improvement   welcome to a new eraGround improvement   welcome to a new era
Ground improvement welcome to a new era
Mikhail Villamor
 
Ground Improvement - Welcome to a New Era
Ground Improvement - Welcome to a New EraGround Improvement - Welcome to a New Era
Ground Improvement - Welcome to a New Era
Mikhail Villamor
 
Ground improvement welcome to a new era
Ground improvement   welcome to a new eraGround improvement   welcome to a new era
Ground improvement welcome to a new era
Mikhail Villamor
 

Similar a Vibration method for ground improvement technique (20)

1206765 634528654292080000
1206765 6345286542920800001206765 634528654292080000
1206765 634528654292080000
 
Ground improvement techniques
Ground improvement techniquesGround improvement techniques
Ground improvement techniques
 
118039141-Soil-Improvement-Techniques.ppt
118039141-Soil-Improvement-Techniques.ppt118039141-Soil-Improvement-Techniques.ppt
118039141-Soil-Improvement-Techniques.ppt
 
Chapter 6.0 modern foundation tech. & ground improvement
Chapter 6.0   modern foundation tech. & ground improvement Chapter 6.0   modern foundation tech. & ground improvement
Chapter 6.0 modern foundation tech. & ground improvement
 
sand drain for consolidation settlement
sand drain for consolidation settlementsand drain for consolidation settlement
sand drain for consolidation settlement
 
A Discussion of Liquefaction Mitigation Methods
A Discussion of Liquefaction Mitigation MethodsA Discussion of Liquefaction Mitigation Methods
A Discussion of Liquefaction Mitigation Methods
 
CTRS unit 2_Lect 1.pptx
CTRS unit 2_Lect 1.pptxCTRS unit 2_Lect 1.pptx
CTRS unit 2_Lect 1.pptx
 
Liquifecation.ppt
Liquifecation.pptLiquifecation.ppt
Liquifecation.ppt
 
Methods Of Improving Soil Bearing Capacity
Methods Of Improving Soil Bearing CapacityMethods Of Improving Soil Bearing Capacity
Methods Of Improving Soil Bearing Capacity
 
Ground improvement welcome to a new era
Ground improvement   welcome to a new eraGround improvement   welcome to a new era
Ground improvement welcome to a new era
 
W16 ground improvement techniques-dycus
W16 ground improvement techniques-dycusW16 ground improvement techniques-dycus
W16 ground improvement techniques-dycus
 
Ground Improvement - Welcome to a new Era
Ground Improvement - Welcome to a new EraGround Improvement - Welcome to a new Era
Ground Improvement - Welcome to a new Era
 
Ground improvement welcome to a new era
Ground improvement   welcome to a new eraGround improvement   welcome to a new era
Ground improvement welcome to a new era
 
Ground improvement welcome to a new era
Ground improvement   welcome to a new eraGround improvement   welcome to a new era
Ground improvement welcome to a new era
 
Ground improvement welcome to a new era
Ground improvement   welcome to a new eraGround improvement   welcome to a new era
Ground improvement welcome to a new era
 
Ground Improvement - Welcome to a New Era
Ground Improvement - Welcome to a New EraGround Improvement - Welcome to a New Era
Ground Improvement - Welcome to a New Era
 
Ground improvement welcome to a new era
Ground improvement   welcome to a new eraGround improvement   welcome to a new era
Ground improvement welcome to a new era
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Power point presentation on Soil Liquefaction
Power point presentation on Soil LiquefactionPower point presentation on Soil Liquefaction
Power point presentation on Soil Liquefaction
 
Liquefaction final
Liquefaction finalLiquefaction final
Liquefaction final
 

Más de ABHISHEK THAKKAE

Más de ABHISHEK THAKKAE (9)

GTU | Civil Engineering Diploma | 3rd Hydraulic Ch 1 | Gujarati
GTU | Civil Engineering Diploma | 3rd Hydraulic Ch 1 | GujaratiGTU | Civil Engineering Diploma | 3rd Hydraulic Ch 1 | Gujarati
GTU | Civil Engineering Diploma | 3rd Hydraulic Ch 1 | Gujarati
 
Building bye laws
Building bye lawsBuilding bye laws
Building bye laws
 
Ad. sur. repetition method (gtu) (1)
Ad. sur. repetition method (gtu) (1)Ad. sur. repetition method (gtu) (1)
Ad. sur. repetition method (gtu) (1)
 
Classification of concrete
Classification of concreteClassification of concrete
Classification of concrete
 
Methods of water distribution system
Methods of water distribution systemMethods of water distribution system
Methods of water distribution system
 
Layouts of water distribution systems
Layouts of water distribution systemsLayouts of water distribution systems
Layouts of water distribution systems
 
Diaphragm wall construction
Diaphragm wall constructionDiaphragm wall construction
Diaphragm wall construction
 
Trixial test
Trixial testTrixial test
Trixial test
 
India’s Infrastructure Challenges Experimenting with the Public Private Partn...
India’s Infrastructure Challenges Experimenting with the Public Private Partn...India’s Infrastructure Challenges Experimenting with the Public Private Partn...
India’s Infrastructure Challenges Experimenting with the Public Private Partn...
 

Último

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

Vibration method for ground improvement technique

  • 1. VIBRATION METHOD FOR GROUND IMPROVEMENT TECHNIQUE By : Abhishek Thakkar Rocket Education
  • 2. INTRODUCTION  Transportation contributes to the industrial, economic, social and cultural development of nation  Transportation by road or highways is the only mode which could give maximum service to one and all.  When the soil on a project site cannot support the loads, ground improvement to increase strength, reduce compressibility, and enhance performance under applied loadings may be required.  Various methods are discussed below:
  • 3. METHODS FOR GROUND IMPROVEMENT 1. VERTICAL DRAINS 2. SOIL NAILING 3. STONE COLUMNS 4. VIBRO COMPACTION 5. DYNAMIC COMPACTION
  • 4. VERTICAL DRAINS  These consist of a column of pervious material placed in cylindrical vertical holes at sufficiently close spaces.  All drains should be connected at the ground surface to a drainage blanket.  Vertical drains accelerate consolidation by facilitating drainage of pore water.  Vertical drains are laid out in rows, staggered, or aligned to form patterns of equilateral triangles or squares.  Two types of drains are discussed below
  • 5. A SAND DRAIN IS A SIMPLE PROCESS, EMPLOYING A COLUMN OF AT LEAST 10 INCHES IN WIDTH AUGERED INTO GROUND TO BE SURCHARGED & CONSOLIDATED. THE COLUMN IS THEN FILLED WITH SAND AND CONNECTED TO A FREE-DRAINING BLANKET OF GRANULAR SOIL. SAND DRAINS
  • 6. WICK DRAIN  A wick drain is usually about, 4 inches wide, 1/8-inch thick which acts as a high- permeability conduit for water to flow out of the soil and to the surface.  Most common application of wick drains is for accelerating the settlement rate of compressible soils.
  • 7. SOIL NAILING  This ground reinforcement process uses steel tendons which are drilled and grouted into the soil to create a composite mass.  A shotcrete facing is typically applied.  Soil Nailing is an in situ technique for reinforcing, stabilizing and retaining excavations and deep cuts.
  • 9. Holes are drilled though machine
  • 11. STONE COLUMN  Also known as vibro-replacement or vibro- displacement, is a ground improvement process where vertical columns of compacted aggregate are formed through the soils to be improved.  The vibrator first penetrates to the required depth by vibration and air or water jetting or by vibration alone.  Gravel is then added at the tip of the vibrator and progressive raising and repenetration of the vibrator results in the gravel being pushed into the surrounding soil.  The soil-column matrix results in an overall mass having a high shear strength and a low compressibility.
  • 13.
  • 14. VIBRO COMPACTION  It is a ground improvement process for densifying loose sands to create stable foundation soils.  The action of the vibrator, usually accompanied by water jetting, reduces the inter-granular forces between the soil particles, allowing them to move into a denser configuration, typically achieving a relative density of 70 to 85 percent.  Compaction is achieved above and below the water table.
  • 16. PROCESS OF VIBRO COMPACTION
  • 17. DYNAMIC COMPACTION  Dynamic Compaction is the dropping of heavy weights on the ground surface to densify the soils at depth.  It involves the repeated dropping of large steel tampers by means of crawler cranes.  Tampers typically range from 6 to 20 tons and are dropped from heights of about 40 to 80 feet.
  • 18. MACHINE WITH TAMPER COMPACTION BY TAMPER
  • 19. CONCLUSION  Soil conditions can frequently be improved using soil improvement techniques. A variety of soil improvement techniques have been developed. However a suitable technique has to be adopt according to necessity of the structure and economy.
  • 20. REFERENCE  http://www.ce.washington.edu/~vibro/html/what/wha t1.html  http://www2.usgs.gov/faq/categories/9829/3301  http://geology.com/usgs/vibration/  http://global.britannica.com/science/soil-vibration
  • 21. For more Civil Engineering Related PPT search “Rocket Education” If u find this PPT helpful. Plzz Like it 