SlideShare una empresa de Scribd logo
1 de 16
Sustainable Operations Through Better
Asset Lifecycle Management
Sustainable Operations Through Better
Asset Lifecycle ManagementAsset Lifecycle ManagementAsset Lifecycle Management
Sid Snitkin
Vice-President & GM
Enterprise Advisory Services
ARC Advisory Group
srsnitkin@arcweb.com
AgendaAgenda
What is Sustainability?
What Makes a Sustainable Mfg Operation?
How Does This Relate to Asset Lifecycle
Management (ALM)?
How Can You Use this to Develop a Strategy for
Sustainable Operations?Sustainable Operations?
2© ARC Advisory Group
What is Sustainability?
Many Perspectives, Many Challenges
What is Sustainability?
Many Perspectives, Many Challenges
Focus on the Environment – Planet’s Survival
• Use of Natural Resources – Renewable Rational Use etc• Use of Natural Resources Renewable, Rational Use, etc.
• Product Footprint - Recyclable, Decomposable, etc
• Process Footprint – CO2, Water, Other effluentsp , ,
Focus on the Business - Corporate Survival
• Satisfying Customer – Features, Cost, Delivery, Service, etc.y g , , y, ,
• Satisfying Shareholders – Profit, RONA, etc.
• Satisfying Regulators – Product Safety, OSHA, etc.
Focus on Everything – “Green to Gold”
• Aligning Corporate and Human Survival Goals
3© ARC Advisory Group
What Does Sustainability Mean to Mfgrs?
Operations That Meet all Sustainability Goals
What Does Sustainability Mean to Mfgrs?
Operations That Meet all Sustainability Goals
A Sustainable Manufacturing Operation Has:
• The Right Set of Assets for the Job• The Right Set of Assets for the Job
• Fast, bumpless response to changing requirements
• Minimum use of energy, labor and materials
Th Ri ht P ti t O ti i U f All A t• The Right Practices to Optimize Use of All Assets
• Strategically - to satisfy the most important demand
• Tactically - in the most efficient manner
• Balanced to maximize returns x lifetime
• The Right Programs to Ensure High Availability
• Assets that are reliable and ready when neededy
• Assets that maintain peak performance over the long run
4© ARC Advisory Group
Sustainability = Excellent ALM Performance
ALM Provides a Good Basis for Sustainability Efforts
Sustainability = Excellent ALM Performance
ALM Provides a Good Basis for Sustainability Efforts
The Right
Capability
High
Availability
Optimal
Utilization
Optimum
PerformanceX X =
Design MaintainOperate Win!
DOM E ll i h f
Capability AvailabilityUtilization Performance
ARC’s DOM Model for Asset Performance
DOM Excellence is the outcome of a proper
Asset Lifecycle Management (ALM) Strategy …
» Establishing a Good ALM Strategy will satisfy many» Establishing a Good ALM Strategy will satisfy many
of your Sustainability Goals
» Investments in ALM can be justified on the basis of
S t i bl O timore Sustainable Operations
» Making the Right Investments requires a solid
understanding of ALM!
5© ARC Advisory Group
ALM begins with a proper view of the Asset
Productive Assets are More Than Equipment
ALM begins with a proper view of the Asset
Productive Assets are More Than Equipment
Primary
F iliti
Project-Centric
P j t M t
HumanPhysical
Facilities
Equipment
Remote
Project Mgmt
Engr/Design
Procurement
Construction
Support
IT HW/SW
Mobile
MRO Material
Asset-Centric
Operations
Process Engr
Maintenance
Virtual
R f D t
MRO Material Maintenance
Reliability
A ti it R dReference Data
Functional
Design
Procedural
Activity Records
Commercial
Status
History
6© ARC Advisory Group
The Three Asset Classes are Equally Important to
Plant Success !
Add a proper definition of an Asset Lifecycle
Stages in the Life of a Real Physical Asset
Add a proper definition of an Asset Lifecycle
Stages in the Life of a Real Physical Asset
Time
Asset
Ramp
Up
Oper
Rdy
Func
Asset
tsfortheA
Rdy
Peak
Perf
Assm
Asset
Asset
eldProject
ModsSpec
ofBrownfie
Mods
P j
Spec
feCycleso
Liab
Cash
Des
Proj
Plan
7© ARC Advisory Group
Lif
Cash
Idea
Basis
And, the processes that must be managed
ALM is the Management of Several Key Processes
And, the processes that must be managed
ALM is the Management of Several Key Processes
Time
Asset
Ramp
Up
Oper
Rdy
Func
Asset
tsfortheA
Rdy
Peak
Perf
Assm
Asset
Asset
Operate &
Optimize
eldProject
ModsSpec
p
ofBrownfie
Mods
P j
Spec
Design &
Build
Maintain &
Improve
feCycleso
Liab
Cash
Des
Proj
Plan
Build Improve
8© ARC Advisory Group
Lif
Cash
Idea
Basis
And, the Many Parties Involved in ALM
ALM Requires Extensive Collaboration
And, the Many Parties Involved in ALM
ALM Requires Extensive Collaboration
Engr & Project
Mgmt Services
(EPC/AEC)
Owner/Operator
(EPC/AEC)
Fabricators &
Constructors
O&M Service
ProvidersOperate
&
Optimize
MRO
Material
IT Services
Providers
Design
&
Build
Maintain
&
Improve
Virtual
Suppliers
Providers
9© ARC Advisory Group
Shareholders Regulators
Results in Some Level of Asset Performance
ALM Performance = Project & Plant Performance
Results in Some Level of Asset Performance
ALM Performance = Project & Plant Performancejj
• Financial
• Cost, Cash Flow
• Functional
• Work Quality
• Design Compliance
• Design Accuracy
• Release Mgmt
• C/N Mgmt
• Equip Selection
• Const Planning
• Material Mgmt
• Site Mgmt
• Labor Efficiency
Timely, Right
X
Design
Optimal
Build
• Design Compliance
• Personal EH&S
• Schedule
Equip Selection
• Material Specs
y
• EH&S
Timely, Right Projecte y, g
Information
MaximumOptimal
X
MaintainOperate
Execution
ALM
Performance
e y, g
Information
The Right
j
Performance
A tMaximum
Availability
Optimal
Utilization XX
• Product Range
• Throughput
• Product Mix
• Prod Planning
• Maint Strategy Mgmt
• Maint Planning
• Financial
• Profit, Ratios (ROA)
The Right
Capability
Asset
Performance
oug pu
• Quality
• Product Unit Cost
• EH&S Capability
od a g
• Prime %
• Material Cost
• Labor Cost
• EH&S
a a g
• Maint Efficiency
• MRO Material Mgmt
• Labor Cost
• EH&S
o , a o ( O )
• Functional
• Process EH&S
• Personal EH&S
• Product/Service
• Cost, Quality, Delivery
10© ARC Advisory Group
Optimal Performance Occurs When all DOM Processes Are
“Jointly” Optimized Across All Lifecycle Stages!
Developing an ALM Strategy
Performance Depends Upon Several Factors
Developing an ALM Strategy
Performance Depends Upon Several Factors
11© ARC Advisory Group
ALM Requires Strategies for Design, Operate & Maintain!
ALM Performance is Challenging
ALM Needs Interoperability Across ALM Processes
ALM Performance is Challenging
ALM Needs Interoperability Across ALM Processes
Consistent
Shared GoalsStrategyOperate
Compatible Tools
Consistent
ProcessesPeople | Processes
TechnologyOptimum
Performance
Complementary
Data Models
Information
Design Maintain Design Operate Maintain
Maximizing Performance requires Teamwork …
AIM helps Teamwork “Work” !
12© ARC Advisory Group
AIM helps Teamwork Work !
Developing an ALM Strategy
ALM is a Collection of Interdependent Strategies
Developing an ALM Strategy
ALM is a Collection of Interdependent Strategies
Asset Lifecycle Management
A Collection of Interdependent Business Strategies
Capital Projects Management
(Design & Build)
Capital Assets Management
(Maintenance& Reliability)
Human
Virtual
Physical Human
Virtual
Physical
AssetInformationManagement
Time
et
Ramp
Functional
• Process
Specs
• Process
Models
• Process Calcs
• Flow Diags
• Equip Calcs
Design
• Process
Design
• P&ID
• Equip Layout,
Design,
BOMs
• System
Procedures
• Project Mgmt
• Install/Test
• Descriptions
of Operation
• Operating
• Insp & Maint
• Certification
Commercial
• Financial Analysis
• CAPEX
• Depreciation
• OPEX
• Purchasing
Records
• Warranty &
Status
• Project & Site
• Procurement
• Operational
Status
• MRO
Inventory
• Training
History
• Source &
Build History
• Operating
History
• Maint History
• Inspection
Records
BrownfieldProjectsfortheAsse
Up
Oper
Rdy
Peak
Perf
ModsSpec
Assm
Asset
Func
Asset
13© ARC Advisory Group
Equip Calcs
• Equip Specs
• Func Designs
y
Detail Design
• MRO BOMs
• Certification
Reqs
• Lockout &
Safety Reqs
• Warranty &
Repair Records
• O&M Service
Agreements
Training
• Incident
Reports
• People
Certifications
Reference Data Activity Records
LifeCyclesof
Liab
Cash
Idea
Des
Basis
Proj
Plan
Where Can ALM Help with Sustainability
Many Opportunities, Many Victories
Where Can ALM Help with Sustainability
Many Opportunities, Many Victories
Focus on the Environment – Planet’s Survival
• Use of Natural Resources – Renewable Rational Use etc• Use of Natural Resources Renewable, Rational Use, etc.
• Product Footprint - Recyclable, Decomposable, etc
• Process Footprint – CO2, Water, Other effluentsp , ,
Focus on the Business - Corporate Survival
• Satisfying Customer – Features, Cost, Delivery, Service, etc.y g , , y, ,
• Satisfying Shareholders – Profit, RONA, etc.
• Satisfying Regulators – Product Safety, OSHA, etc.
Focus on Everything – “Green to Gold”
• Aligning Corporate and Human Survival Goals
?
14© ARC Advisory Group
?
Conclusions & RecommendationsConclusions & Recommendations
Asset Lifecycle Management (ALM) programs
address many of the issues that are now being
identified as Sustainability Goals
» Consider ALM as the foundation for your own Sustainability
ProgramProgram
Effective ALM strategies are based upon a
proper understanding of assets, asset lifecycles,p p g , y ,
ALM processes and ALM Stakeholders
» ARC’s ALM research addresses these issues and may be
helpful in your efforts to achieve various Sustainability goalshelpful in your efforts to achieve various Sustainability goals
» Learn more about ALM through ARC’s ALM newsletter,
research reports, workshops and events.
15© ARC Advisory Group
For a free copy of a full ARC report on this topic please
contact the author at srsnitkin@arcweb com
Thank YouThank You
contact the author at srsnitkin@arcweb.com
For more information about Asset Lifecycle Management
please visit our web site at www.arcweb.com and look
16© ARC Advisory Group
p
under “Domains/Asset Lifecycle Management”

Más contenido relacionado

La actualidad más candente

Customisable Agile readiness assessment
Customisable Agile readiness assessmentCustomisable Agile readiness assessment
Customisable Agile readiness assessmentExo Futures
 
Training Workshop on Lean Project Management to Participants of Coir Cluster...
Training Workshop on Lean Project Management  to Participants of Coir Cluster...Training Workshop on Lean Project Management  to Participants of Coir Cluster...
Training Workshop on Lean Project Management to Participants of Coir Cluster...SN Panigrahi, PMP
 
SDLC Transformation: How Paychex Began Adopting Rational CLM (+ Agile) & Adap...
SDLC Transformation: How Paychex Began Adopting Rational CLM (+ Agile) & Adap...SDLC Transformation: How Paychex Began Adopting Rational CLM (+ Agile) & Adap...
SDLC Transformation: How Paychex Began Adopting Rational CLM (+ Agile) & Adap...Tom Sylvester
 
Successful change - good culture and governance matter Conference - Joanne Br...
Successful change - good culture and governance matter Conference - Joanne Br...Successful change - good culture and governance matter Conference - Joanne Br...
Successful change - good culture and governance matter Conference - Joanne Br...Association for Project Management
 
Auburn Technical Assistance Center - Overview
Auburn Technical Assistance Center - OverviewAuburn Technical Assistance Center - Overview
Auburn Technical Assistance Center - OverviewHank Czarnecki
 
Getting execs to let go of waterfall vs agile (mha 2019)
Getting execs to let go of waterfall vs agile (mha 2019)Getting execs to let go of waterfall vs agile (mha 2019)
Getting execs to let go of waterfall vs agile (mha 2019)Richard Dolman
 
History of the action learning team process questionnaire the path to high pe...
History of the action learning team process questionnaire the path to high pe...History of the action learning team process questionnaire the path to high pe...
History of the action learning team process questionnaire the path to high pe...Catherine (Cass) Mercer Bing
 
Disciplined Agile Delivery: An Introduction
Disciplined Agile Delivery: An IntroductionDisciplined Agile Delivery: An Introduction
Disciplined Agile Delivery: An IntroductionIBM Rational software
 
Seeing the Whole - Creating Lean Supply Chains
Seeing the Whole - Creating Lean Supply ChainsSeeing the Whole - Creating Lean Supply Chains
Seeing the Whole - Creating Lean Supply ChainsLean Enterprise Academy
 
Disciplined Agile Delivery: Foundation for Scaling Agile
Disciplined Agile Delivery: Foundation for Scaling AgileDisciplined Agile Delivery: Foundation for Scaling Agile
Disciplined Agile Delivery: Foundation for Scaling AgileSoftware Guru
 
Beyond Kanban: Lean Thinking for Agile Teams
Beyond Kanban: Lean Thinking for Agile TeamsBeyond Kanban: Lean Thinking for Agile Teams
Beyond Kanban: Lean Thinking for Agile Teamsavpereira
 

La actualidad más candente (15)

Customisable Agile readiness assessment
Customisable Agile readiness assessmentCustomisable Agile readiness assessment
Customisable Agile readiness assessment
 
Lean Project Management
Lean Project ManagementLean Project Management
Lean Project Management
 
Training Workshop on Lean Project Management to Participants of Coir Cluster...
Training Workshop on Lean Project Management  to Participants of Coir Cluster...Training Workshop on Lean Project Management  to Participants of Coir Cluster...
Training Workshop on Lean Project Management to Participants of Coir Cluster...
 
SDLC Transformation: How Paychex Began Adopting Rational CLM (+ Agile) & Adap...
SDLC Transformation: How Paychex Began Adopting Rational CLM (+ Agile) & Adap...SDLC Transformation: How Paychex Began Adopting Rational CLM (+ Agile) & Adap...
SDLC Transformation: How Paychex Began Adopting Rational CLM (+ Agile) & Adap...
 
Successful change - good culture and governance matter Conference - Joanne Br...
Successful change - good culture and governance matter Conference - Joanne Br...Successful change - good culture and governance matter Conference - Joanne Br...
Successful change - good culture and governance matter Conference - Joanne Br...
 
Auburn Technical Assistance Center - Overview
Auburn Technical Assistance Center - OverviewAuburn Technical Assistance Center - Overview
Auburn Technical Assistance Center - Overview
 
Getting execs to let go of waterfall vs agile (mha 2019)
Getting execs to let go of waterfall vs agile (mha 2019)Getting execs to let go of waterfall vs agile (mha 2019)
Getting execs to let go of waterfall vs agile (mha 2019)
 
History of the action learning team process questionnaire the path to high pe...
History of the action learning team process questionnaire the path to high pe...History of the action learning team process questionnaire the path to high pe...
History of the action learning team process questionnaire the path to high pe...
 
Building a Business Case for Lean
Building a Business Case for Lean Building a Business Case for Lean
Building a Business Case for Lean
 
Disciplined Agile Delivery: An Introduction
Disciplined Agile Delivery: An IntroductionDisciplined Agile Delivery: An Introduction
Disciplined Agile Delivery: An Introduction
 
Lean Thinking Past and Future
Lean Thinking Past and FutureLean Thinking Past and Future
Lean Thinking Past and Future
 
Seeing the Whole - Creating Lean Supply Chains
Seeing the Whole - Creating Lean Supply ChainsSeeing the Whole - Creating Lean Supply Chains
Seeing the Whole - Creating Lean Supply Chains
 
Disciplined Agile Delivery: Foundation for Scaling Agile
Disciplined Agile Delivery: Foundation for Scaling AgileDisciplined Agile Delivery: Foundation for Scaling Agile
Disciplined Agile Delivery: Foundation for Scaling Agile
 
Beyond Kanban: Lean Thinking for Agile Teams
Beyond Kanban: Lean Thinking for Agile TeamsBeyond Kanban: Lean Thinking for Agile Teams
Beyond Kanban: Lean Thinking for Agile Teams
 
ITIL® endlich Agile
ITIL® endlich AgileITIL® endlich Agile
ITIL® endlich Agile
 

Destacado

ARC's Sid Snitkin & Ralph Rio's AIM Workshop at ARC's 2009 Industry Forum
ARC's Sid Snitkin & Ralph Rio's AIM Workshop at ARC's 2009 Industry ForumARC's Sid Snitkin & Ralph Rio's AIM Workshop at ARC's 2009 Industry Forum
ARC's Sid Snitkin & Ralph Rio's AIM Workshop at ARC's 2009 Industry ForumARC Advisory Group
 
ARC's Greg Gorbach Rapid Product Innovation Presentation @ ARC Industry Forum...
ARC's Greg Gorbach Rapid Product Innovation Presentation @ ARC Industry Forum...ARC's Greg Gorbach Rapid Product Innovation Presentation @ ARC Industry Forum...
ARC's Greg Gorbach Rapid Product Innovation Presentation @ ARC Industry Forum...ARC Advisory Group
 
ARC's Bob Mick Asset Performance Management Presentation @ ARC Industry Forum...
ARC's Bob Mick Asset Performance Management Presentation @ ARC Industry Forum...ARC's Bob Mick Asset Performance Management Presentation @ ARC Industry Forum...
ARC's Bob Mick Asset Performance Management Presentation @ ARC Industry Forum...ARC Advisory Group
 
Appropriate Crisis Management Infrastructure Is Essential to Your Long Term V...
Appropriate Crisis Management Infrastructure Is Essential to Your Long Term V...Appropriate Crisis Management Infrastructure Is Essential to Your Long Term V...
Appropriate Crisis Management Infrastructure Is Essential to Your Long Term V...ARC Advisory Group
 
Excellence in asset information management sid snitkin arc 2008
Excellence in asset information management sid snitkin arc 2008Excellence in asset information management sid snitkin arc 2008
Excellence in asset information management sid snitkin arc 2008ARC Advisory Group
 
ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010
ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010
ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010ARC Advisory Group
 
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry ForumAsset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry ForumARC Advisory Group
 
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010ARC Advisory Group
 

Destacado (9)

ARC's Sid Snitkin & Ralph Rio's AIM Workshop at ARC's 2009 Industry Forum
ARC's Sid Snitkin & Ralph Rio's AIM Workshop at ARC's 2009 Industry ForumARC's Sid Snitkin & Ralph Rio's AIM Workshop at ARC's 2009 Industry Forum
ARC's Sid Snitkin & Ralph Rio's AIM Workshop at ARC's 2009 Industry Forum
 
ARC's Greg Gorbach Rapid Product Innovation Presentation @ ARC Industry Forum...
ARC's Greg Gorbach Rapid Product Innovation Presentation @ ARC Industry Forum...ARC's Greg Gorbach Rapid Product Innovation Presentation @ ARC Industry Forum...
ARC's Greg Gorbach Rapid Product Innovation Presentation @ ARC Industry Forum...
 
ARC's Bob Mick Asset Performance Management Presentation @ ARC Industry Forum...
ARC's Bob Mick Asset Performance Management Presentation @ ARC Industry Forum...ARC's Bob Mick Asset Performance Management Presentation @ ARC Industry Forum...
ARC's Bob Mick Asset Performance Management Presentation @ ARC Industry Forum...
 
Appropriate Crisis Management Infrastructure Is Essential to Your Long Term V...
Appropriate Crisis Management Infrastructure Is Essential to Your Long Term V...Appropriate Crisis Management Infrastructure Is Essential to Your Long Term V...
Appropriate Crisis Management Infrastructure Is Essential to Your Long Term V...
 
Excellence in asset information management sid snitkin arc 2008
Excellence in asset information management sid snitkin arc 2008Excellence in asset information management sid snitkin arc 2008
Excellence in asset information management sid snitkin arc 2008
 
ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010
ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010
ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010
 
Eam guide-video-2015
Eam guide-video-2015Eam guide-video-2015
Eam guide-video-2015
 
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry ForumAsset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
 
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
 

Similar a ARC's Sid Snitkin ALM Presentation @ ARC Industry Forum 2009

Sustainability Reporting
Sustainability ReportingSustainability Reporting
Sustainability ReportingRSM GC
 
Small-medium business sustainability metrics yalonis-SEC5.12
Small-medium business sustainability metrics yalonis-SEC5.12Small-medium business sustainability metrics yalonis-SEC5.12
Small-medium business sustainability metrics yalonis-SEC5.12chrisyalonis
 
Introduction à l'agilité - Martin Goyette
Introduction à l'agilité - Martin GoyetteIntroduction à l'agilité - Martin Goyette
Introduction à l'agilité - Martin GoyetteAgile Montréal
 
Hi Performance Manufacturing
Hi Performance ManufacturingHi Performance Manufacturing
Hi Performance ManufacturingAlex Diong
 
FedEx_A7_eng_20070607_chs
FedEx_A7_eng_20070607_chsFedEx_A7_eng_20070607_chs
FedEx_A7_eng_20070607_chsJohn Suzanne
 
Worley Parsons Overview Sept 09
Worley Parsons Overview Sept 09Worley Parsons Overview Sept 09
Worley Parsons Overview Sept 09rosalyndru
 
Chapter 08 Measuring and Managing Life-Cycle Costs
Chapter 08 Measuring and Managing Life-Cycle CostsChapter 08 Measuring and Managing Life-Cycle Costs
Chapter 08 Measuring and Managing Life-Cycle CostsManami
 
2009 Flow Impacting Private Equity
2009 Flow   Impacting Private Equity2009 Flow   Impacting Private Equity
2009 Flow Impacting Private Equityreesebourgeois
 
Horizon 2013 Driving Global Adoption to Procurement Technology - A Cargill Ap...
Horizon 2013 Driving Global Adoption to Procurement Technology - A Cargill Ap...Horizon 2013 Driving Global Adoption to Procurement Technology - A Cargill Ap...
Horizon 2013 Driving Global Adoption to Procurement Technology - A Cargill Ap...Zycus
 
The Five Phases of Agile Maturity (Part 3): Phase 5
The Five Phases of Agile Maturity (Part 3): Phase 5The Five Phases of Agile Maturity (Part 3): Phase 5
The Five Phases of Agile Maturity (Part 3): Phase 5Cprime
 
ERM - Global Company Presentation Slides (revised)
ERM - Global Company Presentation Slides (revised)ERM - Global Company Presentation Slides (revised)
ERM - Global Company Presentation Slides (revised)Michael Dillard
 
Agile = scrum = no Project Managers!
Agile = scrum = no Project Managers!Agile = scrum = no Project Managers!
Agile = scrum = no Project Managers!Darren Wilmshurst
 
Governing Agile Teams: Disciplined Strategies to Increase Agile Effectiveness
Governing Agile Teams: Disciplined Strategies to Increase Agile EffectivenessGoverning Agile Teams: Disciplined Strategies to Increase Agile Effectiveness
Governing Agile Teams: Disciplined Strategies to Increase Agile EffectivenessTechWell
 
The power of being understood by Mike Ward - Shaping your portfolio to realis...
The power of being understood by Mike Ward - Shaping your portfolio to realis...The power of being understood by Mike Ward - Shaping your portfolio to realis...
The power of being understood by Mike Ward - Shaping your portfolio to realis...Association for Project Management
 
Making Lean Work in Your Company
Making Lean Work in Your CompanyMaking Lean Work in Your Company
Making Lean Work in Your CompanyUBMCanon
 
Leading Lean Six Sigma
Leading Lean Six SigmaLeading Lean Six Sigma
Leading Lean Six Sigmajackkahler
 
How to Deliver a Successful Oracle E-Business Suite Upgrade
How to Deliver a Successful Oracle E-Business Suite UpgradeHow to Deliver a Successful Oracle E-Business Suite Upgrade
How to Deliver a Successful Oracle E-Business Suite UpgradeCapgemini
 
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi Rapid Deployment of ERP solutions using agile practices by Husni Roukbi
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi Agile ME
 

Similar a ARC's Sid Snitkin ALM Presentation @ ARC Industry Forum 2009 (20)

Sustainability Reporting
Sustainability ReportingSustainability Reporting
Sustainability Reporting
 
Small-medium business sustainability metrics yalonis-SEC5.12
Small-medium business sustainability metrics yalonis-SEC5.12Small-medium business sustainability metrics yalonis-SEC5.12
Small-medium business sustainability metrics yalonis-SEC5.12
 
Introduction à l'agilité - Martin Goyette
Introduction à l'agilité - Martin GoyetteIntroduction à l'agilité - Martin Goyette
Introduction à l'agilité - Martin Goyette
 
Hi Performance Manufacturing
Hi Performance ManufacturingHi Performance Manufacturing
Hi Performance Manufacturing
 
Lean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence ConsultingLean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence Consulting
 
FedEx_A7_eng_20070607_chs
FedEx_A7_eng_20070607_chsFedEx_A7_eng_20070607_chs
FedEx_A7_eng_20070607_chs
 
Worley Parsons Overview Sept 09
Worley Parsons Overview Sept 09Worley Parsons Overview Sept 09
Worley Parsons Overview Sept 09
 
Agile = scrum = no project managers
Agile =  scrum =  no project managersAgile =  scrum =  no project managers
Agile = scrum = no project managers
 
Chapter 08 Measuring and Managing Life-Cycle Costs
Chapter 08 Measuring and Managing Life-Cycle CostsChapter 08 Measuring and Managing Life-Cycle Costs
Chapter 08 Measuring and Managing Life-Cycle Costs
 
2009 Flow Impacting Private Equity
2009 Flow   Impacting Private Equity2009 Flow   Impacting Private Equity
2009 Flow Impacting Private Equity
 
Horizon 2013 Driving Global Adoption to Procurement Technology - A Cargill Ap...
Horizon 2013 Driving Global Adoption to Procurement Technology - A Cargill Ap...Horizon 2013 Driving Global Adoption to Procurement Technology - A Cargill Ap...
Horizon 2013 Driving Global Adoption to Procurement Technology - A Cargill Ap...
 
The Five Phases of Agile Maturity (Part 3): Phase 5
The Five Phases of Agile Maturity (Part 3): Phase 5The Five Phases of Agile Maturity (Part 3): Phase 5
The Five Phases of Agile Maturity (Part 3): Phase 5
 
ERM - Global Company Presentation Slides (revised)
ERM - Global Company Presentation Slides (revised)ERM - Global Company Presentation Slides (revised)
ERM - Global Company Presentation Slides (revised)
 
Agile = scrum = no Project Managers!
Agile = scrum = no Project Managers!Agile = scrum = no Project Managers!
Agile = scrum = no Project Managers!
 
Governing Agile Teams: Disciplined Strategies to Increase Agile Effectiveness
Governing Agile Teams: Disciplined Strategies to Increase Agile EffectivenessGoverning Agile Teams: Disciplined Strategies to Increase Agile Effectiveness
Governing Agile Teams: Disciplined Strategies to Increase Agile Effectiveness
 
The power of being understood by Mike Ward - Shaping your portfolio to realis...
The power of being understood by Mike Ward - Shaping your portfolio to realis...The power of being understood by Mike Ward - Shaping your portfolio to realis...
The power of being understood by Mike Ward - Shaping your portfolio to realis...
 
Making Lean Work in Your Company
Making Lean Work in Your CompanyMaking Lean Work in Your Company
Making Lean Work in Your Company
 
Leading Lean Six Sigma
Leading Lean Six SigmaLeading Lean Six Sigma
Leading Lean Six Sigma
 
How to Deliver a Successful Oracle E-Business Suite Upgrade
How to Deliver a Successful Oracle E-Business Suite UpgradeHow to Deliver a Successful Oracle E-Business Suite Upgrade
How to Deliver a Successful Oracle E-Business Suite Upgrade
 
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi Rapid Deployment of ERP solutions using agile practices by Husni Roukbi
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi
 

Más de ARC Advisory Group

Information Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected WorldInformation Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected WorldARC Advisory Group
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)ARC Advisory Group
 
Three market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelThree market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelARC Advisory Group
 
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum ARC Advisory Group
 
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...ARC Advisory Group
 
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...ARC Advisory Group
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...ARC Advisory Group
 
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum ARC Advisory Group
 
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...ARC Advisory Group
 
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum ARC Advisory Group
 
Current Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortCurrent Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortARC Advisory Group
 
CPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumCPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumARC Advisory Group
 
Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?ARC Advisory Group
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayARC Advisory Group
 
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersComponent Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersARC Advisory Group
 
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsCombined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsARC Advisory Group
 
Collaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesCollaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesARC Advisory Group
 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingARC Advisory Group
 
Cautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover FairCautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover FairARC Advisory Group
 
Capital Expenditure Survey 2003
Capital Expenditure Survey 2003Capital Expenditure Survey 2003
Capital Expenditure Survey 2003ARC Advisory Group
 

Más de ARC Advisory Group (20)

Information Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected WorldInformation Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected World
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
 
Three market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelThree market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next level
 
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
 
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
 
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
 
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
 
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
 
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
 
Current Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortCurrent Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall Short
 
CPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumCPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC Forum
 
Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
 
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersComponent Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
 
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsCombined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
 
Collaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesCollaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and Strategies
 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital Manufacturing
 
Cautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover FairCautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover Fair
 
Capital Expenditure Survey 2003
Capital Expenditure Survey 2003Capital Expenditure Survey 2003
Capital Expenditure Survey 2003
 

Último

Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 

Último (20)

Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 

ARC's Sid Snitkin ALM Presentation @ ARC Industry Forum 2009

  • 1. Sustainable Operations Through Better Asset Lifecycle Management Sustainable Operations Through Better Asset Lifecycle ManagementAsset Lifecycle ManagementAsset Lifecycle Management Sid Snitkin Vice-President & GM Enterprise Advisory Services ARC Advisory Group srsnitkin@arcweb.com
  • 2. AgendaAgenda What is Sustainability? What Makes a Sustainable Mfg Operation? How Does This Relate to Asset Lifecycle Management (ALM)? How Can You Use this to Develop a Strategy for Sustainable Operations?Sustainable Operations? 2© ARC Advisory Group
  • 3. What is Sustainability? Many Perspectives, Many Challenges What is Sustainability? Many Perspectives, Many Challenges Focus on the Environment – Planet’s Survival • Use of Natural Resources – Renewable Rational Use etc• Use of Natural Resources Renewable, Rational Use, etc. • Product Footprint - Recyclable, Decomposable, etc • Process Footprint – CO2, Water, Other effluentsp , , Focus on the Business - Corporate Survival • Satisfying Customer – Features, Cost, Delivery, Service, etc.y g , , y, , • Satisfying Shareholders – Profit, RONA, etc. • Satisfying Regulators – Product Safety, OSHA, etc. Focus on Everything – “Green to Gold” • Aligning Corporate and Human Survival Goals 3© ARC Advisory Group
  • 4. What Does Sustainability Mean to Mfgrs? Operations That Meet all Sustainability Goals What Does Sustainability Mean to Mfgrs? Operations That Meet all Sustainability Goals A Sustainable Manufacturing Operation Has: • The Right Set of Assets for the Job• The Right Set of Assets for the Job • Fast, bumpless response to changing requirements • Minimum use of energy, labor and materials Th Ri ht P ti t O ti i U f All A t• The Right Practices to Optimize Use of All Assets • Strategically - to satisfy the most important demand • Tactically - in the most efficient manner • Balanced to maximize returns x lifetime • The Right Programs to Ensure High Availability • Assets that are reliable and ready when neededy • Assets that maintain peak performance over the long run 4© ARC Advisory Group
  • 5. Sustainability = Excellent ALM Performance ALM Provides a Good Basis for Sustainability Efforts Sustainability = Excellent ALM Performance ALM Provides a Good Basis for Sustainability Efforts The Right Capability High Availability Optimal Utilization Optimum PerformanceX X = Design MaintainOperate Win! DOM E ll i h f Capability AvailabilityUtilization Performance ARC’s DOM Model for Asset Performance DOM Excellence is the outcome of a proper Asset Lifecycle Management (ALM) Strategy … » Establishing a Good ALM Strategy will satisfy many» Establishing a Good ALM Strategy will satisfy many of your Sustainability Goals » Investments in ALM can be justified on the basis of S t i bl O timore Sustainable Operations » Making the Right Investments requires a solid understanding of ALM! 5© ARC Advisory Group
  • 6. ALM begins with a proper view of the Asset Productive Assets are More Than Equipment ALM begins with a proper view of the Asset Productive Assets are More Than Equipment Primary F iliti Project-Centric P j t M t HumanPhysical Facilities Equipment Remote Project Mgmt Engr/Design Procurement Construction Support IT HW/SW Mobile MRO Material Asset-Centric Operations Process Engr Maintenance Virtual R f D t MRO Material Maintenance Reliability A ti it R dReference Data Functional Design Procedural Activity Records Commercial Status History 6© ARC Advisory Group The Three Asset Classes are Equally Important to Plant Success !
  • 7. Add a proper definition of an Asset Lifecycle Stages in the Life of a Real Physical Asset Add a proper definition of an Asset Lifecycle Stages in the Life of a Real Physical Asset Time Asset Ramp Up Oper Rdy Func Asset tsfortheA Rdy Peak Perf Assm Asset Asset eldProject ModsSpec ofBrownfie Mods P j Spec feCycleso Liab Cash Des Proj Plan 7© ARC Advisory Group Lif Cash Idea Basis
  • 8. And, the processes that must be managed ALM is the Management of Several Key Processes And, the processes that must be managed ALM is the Management of Several Key Processes Time Asset Ramp Up Oper Rdy Func Asset tsfortheA Rdy Peak Perf Assm Asset Asset Operate & Optimize eldProject ModsSpec p ofBrownfie Mods P j Spec Design & Build Maintain & Improve feCycleso Liab Cash Des Proj Plan Build Improve 8© ARC Advisory Group Lif Cash Idea Basis
  • 9. And, the Many Parties Involved in ALM ALM Requires Extensive Collaboration And, the Many Parties Involved in ALM ALM Requires Extensive Collaboration Engr & Project Mgmt Services (EPC/AEC) Owner/Operator (EPC/AEC) Fabricators & Constructors O&M Service ProvidersOperate & Optimize MRO Material IT Services Providers Design & Build Maintain & Improve Virtual Suppliers Providers 9© ARC Advisory Group Shareholders Regulators
  • 10. Results in Some Level of Asset Performance ALM Performance = Project & Plant Performance Results in Some Level of Asset Performance ALM Performance = Project & Plant Performancejj • Financial • Cost, Cash Flow • Functional • Work Quality • Design Compliance • Design Accuracy • Release Mgmt • C/N Mgmt • Equip Selection • Const Planning • Material Mgmt • Site Mgmt • Labor Efficiency Timely, Right X Design Optimal Build • Design Compliance • Personal EH&S • Schedule Equip Selection • Material Specs y • EH&S Timely, Right Projecte y, g Information MaximumOptimal X MaintainOperate Execution ALM Performance e y, g Information The Right j Performance A tMaximum Availability Optimal Utilization XX • Product Range • Throughput • Product Mix • Prod Planning • Maint Strategy Mgmt • Maint Planning • Financial • Profit, Ratios (ROA) The Right Capability Asset Performance oug pu • Quality • Product Unit Cost • EH&S Capability od a g • Prime % • Material Cost • Labor Cost • EH&S a a g • Maint Efficiency • MRO Material Mgmt • Labor Cost • EH&S o , a o ( O ) • Functional • Process EH&S • Personal EH&S • Product/Service • Cost, Quality, Delivery 10© ARC Advisory Group Optimal Performance Occurs When all DOM Processes Are “Jointly” Optimized Across All Lifecycle Stages!
  • 11. Developing an ALM Strategy Performance Depends Upon Several Factors Developing an ALM Strategy Performance Depends Upon Several Factors 11© ARC Advisory Group ALM Requires Strategies for Design, Operate & Maintain!
  • 12. ALM Performance is Challenging ALM Needs Interoperability Across ALM Processes ALM Performance is Challenging ALM Needs Interoperability Across ALM Processes Consistent Shared GoalsStrategyOperate Compatible Tools Consistent ProcessesPeople | Processes TechnologyOptimum Performance Complementary Data Models Information Design Maintain Design Operate Maintain Maximizing Performance requires Teamwork … AIM helps Teamwork “Work” ! 12© ARC Advisory Group AIM helps Teamwork Work !
  • 13. Developing an ALM Strategy ALM is a Collection of Interdependent Strategies Developing an ALM Strategy ALM is a Collection of Interdependent Strategies Asset Lifecycle Management A Collection of Interdependent Business Strategies Capital Projects Management (Design & Build) Capital Assets Management (Maintenance& Reliability) Human Virtual Physical Human Virtual Physical AssetInformationManagement Time et Ramp Functional • Process Specs • Process Models • Process Calcs • Flow Diags • Equip Calcs Design • Process Design • P&ID • Equip Layout, Design, BOMs • System Procedures • Project Mgmt • Install/Test • Descriptions of Operation • Operating • Insp & Maint • Certification Commercial • Financial Analysis • CAPEX • Depreciation • OPEX • Purchasing Records • Warranty & Status • Project & Site • Procurement • Operational Status • MRO Inventory • Training History • Source & Build History • Operating History • Maint History • Inspection Records BrownfieldProjectsfortheAsse Up Oper Rdy Peak Perf ModsSpec Assm Asset Func Asset 13© ARC Advisory Group Equip Calcs • Equip Specs • Func Designs y Detail Design • MRO BOMs • Certification Reqs • Lockout & Safety Reqs • Warranty & Repair Records • O&M Service Agreements Training • Incident Reports • People Certifications Reference Data Activity Records LifeCyclesof Liab Cash Idea Des Basis Proj Plan
  • 14. Where Can ALM Help with Sustainability Many Opportunities, Many Victories Where Can ALM Help with Sustainability Many Opportunities, Many Victories Focus on the Environment – Planet’s Survival • Use of Natural Resources – Renewable Rational Use etc• Use of Natural Resources Renewable, Rational Use, etc. • Product Footprint - Recyclable, Decomposable, etc • Process Footprint – CO2, Water, Other effluentsp , , Focus on the Business - Corporate Survival • Satisfying Customer – Features, Cost, Delivery, Service, etc.y g , , y, , • Satisfying Shareholders – Profit, RONA, etc. • Satisfying Regulators – Product Safety, OSHA, etc. Focus on Everything – “Green to Gold” • Aligning Corporate and Human Survival Goals ? 14© ARC Advisory Group ?
  • 15. Conclusions & RecommendationsConclusions & Recommendations Asset Lifecycle Management (ALM) programs address many of the issues that are now being identified as Sustainability Goals » Consider ALM as the foundation for your own Sustainability ProgramProgram Effective ALM strategies are based upon a proper understanding of assets, asset lifecycles,p p g , y , ALM processes and ALM Stakeholders » ARC’s ALM research addresses these issues and may be helpful in your efforts to achieve various Sustainability goalshelpful in your efforts to achieve various Sustainability goals » Learn more about ALM through ARC’s ALM newsletter, research reports, workshops and events. 15© ARC Advisory Group
  • 16. For a free copy of a full ARC report on this topic please contact the author at srsnitkin@arcweb com Thank YouThank You contact the author at srsnitkin@arcweb.com For more information about Asset Lifecycle Management please visit our web site at www.arcweb.com and look 16© ARC Advisory Group p under “Domains/Asset Lifecycle Management”