SlideShare una empresa de Scribd logo
1 de 30
P/C and L/H:
BCAR-The New Generation
Status Update on
Stochastic Based BCAR
08 April 2015
Matthew Mosher, Senior Vice President
Thomas Mount, Vice President
George Hansen, Assistant Vice President
Disclaimer
BCAR – The New Generation 2
© AM Best Company (AMB) and/or its licensors and affiliates. All rights reserved. ALL INFORMATION CONTAINED HEREIN IS
PROTECTED BY COPYRIGHT LAW AND NONE OF SUCH INFORMATION MAY BE COPIED OR OTHERWISE
REPRODUCED, REPACKAGED, FURTHER TRANSMITTED, TRANSFERRED, DISSEMINATED, REDISTRIBUTED OR
RESOLD, OR STORED FOR SUBSEQUENT USE FOR ANY SUCH PURPOSE, IN WHOLE OR IN PART, IN ANY FORM OR
MANNER OR BY ANY MEANS WHATSOEVER, BY ANY PERSON WITHOUT AMB’s PRIOR WRITTEN CONSENT. All
information contained herein is obtained by AMB from sources believed by it to be accurate and reliable. Because of the possibility
of human or mechanical error as well as other factors, however, all information contained herein is provided “AS IS” without
warranty of any kind. Under no circumstances shall AMB have any liability to any person or entity for (a) any loss or damage in
whole or in part caused by, resulting from, or relating to, any error (negligent or otherwise) or other circumstance or contingency
within or outside the control of AMB or any of its directors, officers, employees or agents in connection with the procurement,
collection, compilation, analysis, interpretation, communication, publication or delivery of any such information, or (b) any direct,
indirect, special, consequential, compensatory or incidental damages whatsoever (including without limitation, lost profits), even if
AMB is advised in advance of the possibility of such damages, resulting from the use of or inability to use, any such information.
The credit ratings, financial reporting analysis, projections, and other observations, if any, constituting part of the information
contained herein are, and must be construed solely as, statements of opinion and not statements of fact or recommendations to
purchase, sell or hold any securities, insurance policies, contracts or any other financial obligations, nor does it address the
suitability of any particular financial obligation for a specific purpose or purchaser. Credit risk is the risk that an entity may not meet
its contractual, financial obligations as they come due. Credit ratings do not address any other risk, including but not limited to,
liquidity risk, market value risk or price volatility of rated securities. NO WARRANTY, EXPRESS OR IMPLIED, AS TO THE
ACCURACY, TIMELINESS, COMPLETENESS, MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE OF ANY
SUCH RATING OR OTHER OPINION OR INFORMATION IS GIVEN OR MADE BY AMB IN ANY FORM OR MANNER
WHATSOEVER. Each credit rating or other opinion must be weighed solely as one factor in any investment or purchasing decision
made by or on behalf of any user of the information contained herein, and each such user must accordingly make its own study
and evaluation of each security or other financial obligation and of each issuer and guarantor of, and each provider of credit
support for, each security or other financial obligation that it may consider purchasing, holding or selling.
Purpose of Webinar
BCAR – The New Generation 3
o Informational
o Improve direct communication
o Set expectations
o Provide ongoing status updates of the project
Agenda
BCAR – The New Generation 4
o AMB Rating Methodology – role of BCAR in the
determination of a credit rating
o Current BCAR structure
o Reasons for proposed changes
o Overview of proposed changes & work to date
o Preliminary observations
o Next Steps
o Proposed implementation time frame
What is the relationship between BCAR and a rating level?
Balance Sheet
Strength
Operating
Performance
Business Profile
Country Risk
Enterprise Risk
Management
General Rating Process
BCAR
Cash Flow
Asset Quality
Asset Liquidity
Financial Lev/Flex
Actuarial Reports
ALM
QAR
STAT/GAAP Statements
Company Forecasts
MD&A
Lines of Business
Management Team
Geographic SpreadGrowth
Risk Impact Worksheet
Event Risk Reins Program
Benchmarking
ICM
SRQ
Loss Reserve Model / LRD
Lift/Drag from Affiliates
Risk Appetite, Tolerance, etc.
Distribution Channel(s)
Rating
BCAR – The New Generation 5
AMB Projections
How is BCAR Used?
6
o As an analytical tool
o Indication of current balance sheet strength
o Proforma projections
o Stress tests…Natural Cats…Terrorism
o Other what if scenarios
• Changes to reinsurance
• Business acquisition or disposition
• Changes in asset (or liability) mix
• US government default
BCAR – The New Generation
Current Structure – PC BCAR
Adjusted Surplus (APHS)
Reported Surplus (PHS)
Equity Adjustments:
Unearned Premiums (DAC)
Equalization/Contingency Reserves
Loss Reserves
Assets
Debt Adjustments:
Surplus Notes
Debt Service Requirements
Other Adjustments:
Future Operating Losses
Potential Catastrophe Loss
Future Dividends
Goodwill
Other Intangible Assets
Minority Interests, etc.
7
Net Required Capital
Gross Required Capital (GRC):
(B1) Fixed Income Securities
(B2) Equity Securities
(B3) Interest Rate
(B4) Credit
(B5) Loss and LAE Reserves
(B6) Net Premiums Written
(B7) Off-Balance Sheet
Covariance Adjustment
Net Required Capital (NRC)*
BCAR Ratio = Adjusted Surplus / Net Required Capital
*NRC= SQRT [ (B1)²+(B2)²+(B3)²+(0.5*B4)² +[(0.5*B4)+B5)]²+(B6)² ] + B7
BCAR – The New Generation
Current Structure – LH BCAR
Adjusted Surplus (APHS)
Reported Surplus (PHS)
Equity Adjustments:
AVR Reserves
Interest Maintenance Reserve
Unearned Premiums (DAC)
Debt Adjustments:
Surplus Notes
Debt Service Requirements
Other Adjustments:
Future Operating Losses
Future Dividends
Derivatives Off Balance Sheet
Goodwill
Other Intangible Assets
Minority Interests, etc.
Net Required Capital
Gross Required Capital (GRC):
(C1) Asset Risk
(C2) Insurance Risk
(C3) Interest Rate/Market Risk
(C4) Business Risk
Covariance Adjustment
Net Required Capital (NRC)*
*NRC= SQRT [ (C1NonEq + C3interest)² + (C1Eq + C3market)² + (C2)² ] + C4
BCAR Ratio = Adjusted Surplus / Net Required Capital
8BCAR – The New Generation
Reasons for Proposed Changes
o More sophisticated and faster software available now
• Simulations / probability curves
• Economic scenario generators (ESGs)
• Correlations / diversification
• Company specific detail
• Assets
• Reinsurers
• Profitability
• Volatility
BCAR – The New Generation 9
Reasons for Proposed Changes
o Metrics better understood and utilized by industry
• Tail Value at Risk (TVaR)…aka Conditional Tail
Expectation (CTE)
Average loss beyond a given threshold
Threshold is a percentile (ie 99%)
Considers size of losses beyond threshold (Financial Strength)
• Value at Risk (VAR) … aka Probability of Default
Probability loss will exceed a given threshold
o Consistent confidence intervals across risks
• 95%, 97.5%, 99%, 99.5%, 99.9%
BCAR – The New Generation 10
Reasons for Proposed Changes
o Consistent Time Horizon for risk factors
• Runoff to Ultimate basis for PC UW capital factors
Protects policyholders & claimants
No change from current view
• Some risks will need to use duration of liabilities as
indicator for ultimate risk
Credit risk on recoverables
• Bonds – duration of bonds
• Common stocks – one year
BCAR – The New Generation 11
Overview of Proposed Changes
& Work to Date
o Do not intend to change underlying view of the risks
• Bonds – default risk
• Common stock – price volatility
• Reinsurance credit risk – uncollectible recoverables
• Pricing risk – potential for UW loss on business written
next year
• Reserve risk – potential for unanticipated adverse reserve
development
o Do not intend to change the main structure of the model
o Goal is to generate risk factors using stochastic
simulations from probability curves
BCAR – The New Generation 12
o Phase 1 – Bonds
• Use Economic Scenario Generator
• Update bond default risk factors
Reflect duration of company’s bond portfolio (SRQ)
Reflect asset quality of company’s bond portfolio (SRQ)
Reflect volatility in bond default assumptions (stochastic portion -
tied to ESG)
Can offset default with recovery on defaults (vary by rating?)
TVaR metric – (currently 5 year, 5% probability of ruin)
VaR metric?
BCAR – The New Generation 13
Overview of Proposed Changes
& Work to Date
Bond Quality & Maturity SRQ question:
BCAR – The New Generation 14
Overview of Proposed Changes
& Work to Date
o Phase 1 – Common Stock
• Use Economic Scenario Generator
• Update common stock risk factors
Reflect type of stocks held by company (SRQ – Beta)
Reflect volatility (stochastic portion – tied to ESG)
Can cap simulated downside risk
TVaR metric – (currently 1% EPD, 1 year)
VaR metric?
BCAR – The New Generation 15
Overview of Proposed Changes
& Work to Date
Common Stock Beta SRQ Question:
BCAR – The New Generation 16
Overview of Proposed Changes
& Work to Date
o Phase 1 – Reinsurance
• Update reinsurance credit risk factors
Reflect type of recoverable (paid, unpaid, upr)
Reflect rating of each reinsurer (Schedule F/S and ratings data)
Reflect duration of recoverables
Can reflect partial recovery when reins defaults
Simulate 10,000 scenarios for each reinsurer
Reflects concentration risk
TVaR metric (currently based on FSR)
VaR metric?
BCAR – The New Generation 17
Overview of Proposed Changes
& Work to Date
o Phase 1 – PC Premium
• Update PC premium risk factors
Create Industry UW Loss probability curves
– 21 Schedule P lines and 4 NPW size categories (VS,S,M,L)
– 84 industry probability curves for premiums
Use company NPW size to select industry probability curve
– use company profitability to adjust curve
Simulate 10,000 UW profit/loss scenarios for each line
Reflect diversification across lines
– use one of 4 industry correlation matrices
– based on size of company’s total NPW (VS,S,M,L)
Risk factors based on TVaR metric (currently 1% EPD – ultimate)
VaR metric?
BCAR – The New Generation 18
Overview of Proposed Changes
& Work to Date
o Phase 1 – PC Reserves
• Update PC reserve risk Factors
 Create industry unanticipated adverse development probability curves
– 21 Schedule P lines and 4 reserve size categories (VS,S,M,L)
– 84 industry probability curves for reserves
 Use company Reserve size to select industry probability curve
– use company volatility to adjust curve
 Simulate 10,000 reserve development scenarios for each line
 Reflect diversification across lines
– use one of 4 industry correlation matrices
– based on size of company’s total net reserves (VS,S,M,L)
 Risk factors based on TVaR metric (currently 1% EPD – ultimate)
 VaR metric?
BCAR – The New Generation 19
Overview of Proposed Changes
& Work to Date
o Phase 1 – Natural Catastrophe
• Update natural catastrophe approach
Var or TVaR metric?
Occurrence vs. aggregate season?
Total all perils?
Currently different VaRs for EQ and Wind
Straight charge to PHS or add to NRC?
Confidence level?
Continue stress test approach?
BCAR – The New Generation 20
Overview of Proposed Changes
& Work to Date
Potential Structure – PC BCAR
Adjusted Surplus (APHS)
Reported Surplus (PHS)
Equity Adjustments:
Unearned Premiums (DAC)
Equalization/Contingency Reserves
Loss Reserves
Assets
Debt Adjustments:
Surplus Notes
Debt Service Requirements
Other Adjustments:
Future Operating Losses
Potential Loss
Future Dividends
Goodwill
Other Intangible Assets
Minority Interests, etc.
21
Net Required Capital
Gross Required Capital (GRC):
(B1) Fixed Income Securities
(B2) Equity Securities
(B3) Interest Rate
(B4) Credit
(B5) Loss and LAE Reserves
(B6) Net Premiums Written
(B7) Off-Balance Sheet
(B8) Catastrophe Exposure
Covariance Adjustment
Net Required Capital (NRC)*
BCAR Ratio = Adjusted Surplus / Net Required Capital
*NRC= SQRT [ (B1)²+(B2)²+(B3)²+(0.5*B4)² +[(0.5*B4)+B5)]²+(B6)² ] + B7 + B8
BCAR – The New Generation
Example of Impact to PC Model
22
Current Calculation
APHS (ex Potential Cat Losses) = $150M
Potential cat Losses = $30M
NRC = $80M
BCAR =
(150-30)
=
120
= 15080 80
Potential Calculation
APHS (ex Potential Cat Losses) = $150M
Potential cat Losses = $30M
NRC = $80M
BCAR =
150
=
150
= 136(80+30) 110
BCAR – The New Generation
Overview of Proposed Changes
o Phase 2
• Remaining asset classes
• Life and annuity risks
Mortality
Longevity
Disintermediation
Product Guarantees
Long Term Care/Disability
• Change net required capital formula to correlation matrix
approach (instead of the square root rule)
BCAR – The New Generation 23
Observations
o Investments
• Greater risk than previous considered
• Particularly in equities
o Reinsurance
• Initial charges came out high and this is being reviewed
o PC Underwriting (Reserves and Premium)
• Auto is coming out lower – not surprised by this
• Made sure we are not double counting catastrophe charge
• TVaR very high at high confidence levels
• More differentiation between lines of business
• By line correlation matrices – no real surprises
o BCAR Guidelines
• May need to change
BCAR – The New Generation 24
Observations
o Next generation BCAR as an indication of current balance
sheet strength…what do scores say about relative financial
strength?
95% 98% 99%
Company A 178 (A++) 111 83
Company B 178 (A++) 126 103
Company C 152 (A) 128 116
BCAR – The New Generation 25
Observations
o Next generation BCAR as an indication of current balance
sheet strength…what do scores say about relative financial
strength?
95% 98% 99%
Company A 178 (A++) 111 83
Company B 178 (A++) 126 103
Company C 152 (A) 128 116
BCAR – The New Generation 26
Observations
o Next generation BCAR as an indication of current balance
sheet strength…what do scores say about relative financial
strength?
95% 98% 99%
Company A 178 (A++) 111 83
Company B 178 (A++) 126 103
Company C 152 (A) 128 116
BCAR – The New Generation 27
Observations & Next Steps
o TVaR
• Issues with catastrophe losses and the impact of extreme tail events
• May go beyond what is needed from BCAR
o Further review needed
• Does VaR provide sufficient information?
o Next Steps
• Continue to evaluate TVaR based output (Life and Universal models)
• Also evaluate VaR based output
• Additional discussions with key industry constituents
• Begin to develop Draft Criteria
BCAR – The New Generation 28
Expected Timeline
o Model being developed in phases
• Phase 1 built – testing internally with 2013 YE data
Initial Parameters completed
Run parallel BCARs (PC; LH; Universal) internally with 2014 YE
data
Draft criteria expected to be released this summer for comment
We do anticipate sharing 2014 YE output with companies as draft
criteria are released
Time frames for final criteria release will be impacted by
comments received on criteria, changes based on comments,
& LH impact study
• Phase 2 – 1 year after Phase 1 finalized
BCAR – The New Generation 29
Questions/Comments?
matthew.mosher@ambest.com
thomas.mount@ambest.com
george.hansen@ambest.com
BCAR – The New Generation 30
Thank You!

Más contenido relacionado

La actualidad más candente

Credit risk management lecture
Credit risk management lectureCredit risk management lecture
Credit risk management lecture
Aloke Saborna
 
Stress Testing the Loan Portfolio
Stress Testing the Loan PortfolioStress Testing the Loan Portfolio
Stress Testing the Loan Portfolio
Libby Bierman
 
Assets liability management
Assets liability managementAssets liability management
Assets liability management
Ujjwal 'Shanu'
 
capital management and stress test
capital management and stress testcapital management and stress test
capital management and stress test
sarojkdas
 
Risk management ppt
Risk management pptRisk management ppt
Risk management ppt
TharadeviK
 
Understanding and Predicting Ultimate Loss-Given-Default on Bonds and Loans
Understanding and Predicting Ultimate Loss-Given-Default on Bonds and LoansUnderstanding and Predicting Ultimate Loss-Given-Default on Bonds and Loans
Understanding and Predicting Ultimate Loss-Given-Default on Bonds and Loans
Michael Jacobs, Jr.
 
Asset liability management-in_the_indian_banks_issues_and_implications
Asset liability management-in_the_indian_banks_issues_and_implicationsAsset liability management-in_the_indian_banks_issues_and_implications
Asset liability management-in_the_indian_banks_issues_and_implications
Vikas Patro
 
A study of credit risk management in commercial banks
A study of credit risk management in commercial banksA study of credit risk management in commercial banks
A study of credit risk management in commercial banks
WriteKraft Dissertations
 

La actualidad más candente (20)

Counterparty Credit Risk and CVA under Basel III
Counterparty Credit Risk and CVA under Basel IIICounterparty Credit Risk and CVA under Basel III
Counterparty Credit Risk and CVA under Basel III
 
Credit risk management lecture
Credit risk management lectureCredit risk management lecture
Credit risk management lecture
 
An introduction to Asset Liability Management
An introduction to Asset Liability ManagementAn introduction to Asset Liability Management
An introduction to Asset Liability Management
 
Stress Testing the Loan Portfolio
Stress Testing the Loan PortfolioStress Testing the Loan Portfolio
Stress Testing the Loan Portfolio
 
Assets liability management
Assets liability managementAssets liability management
Assets liability management
 
The future of bank risk management full report
The future of bank risk management full reportThe future of bank risk management full report
The future of bank risk management full report
 
capital management and stress test
capital management and stress testcapital management and stress test
capital management and stress test
 
Capital Adequacy Stress Tests: Pre-Provision Net Revenue and Scenario Design
Capital Adequacy Stress Tests: Pre-Provision Net Revenue and Scenario DesignCapital Adequacy Stress Tests: Pre-Provision Net Revenue and Scenario Design
Capital Adequacy Stress Tests: Pre-Provision Net Revenue and Scenario Design
 
OFSAA-ALM
OFSAA-ALMOFSAA-ALM
OFSAA-ALM
 
A Tale of Two Risk Measures: Economic Capital vs. Stress Testing and a Call f...
A Tale of Two Risk Measures: Economic Capital vs. Stress Testing and a Call f...A Tale of Two Risk Measures: Economic Capital vs. Stress Testing and a Call f...
A Tale of Two Risk Measures: Economic Capital vs. Stress Testing and a Call f...
 
Credit Rate Risk Management In Banks-B.V.Raghunandan
Credit  Rate  Risk  Management In  Banks-B.V.RaghunandanCredit  Rate  Risk  Management In  Banks-B.V.Raghunandan
Credit Rate Risk Management In Banks-B.V.Raghunandan
 
Risk management ppt
Risk management pptRisk management ppt
Risk management ppt
 
Understanding and Predicting Ultimate Loss-Given-Default on Bonds and Loans
Understanding and Predicting Ultimate Loss-Given-Default on Bonds and LoansUnderstanding and Predicting Ultimate Loss-Given-Default on Bonds and Loans
Understanding and Predicting Ultimate Loss-Given-Default on Bonds and Loans
 
Interest rate risk modeling day sun_gard_ambit banking
Interest rate risk modeling day sun_gard_ambit bankingInterest rate risk modeling day sun_gard_ambit banking
Interest rate risk modeling day sun_gard_ambit banking
 
Strategic implications of IFRS9 oliver wyman
Strategic implications of IFRS9 oliver wymanStrategic implications of IFRS9 oliver wyman
Strategic implications of IFRS9 oliver wyman
 
Asset liability management-in_the_indian_banks_issues_and_implications
Asset liability management-in_the_indian_banks_issues_and_implicationsAsset liability management-in_the_indian_banks_issues_and_implications
Asset liability management-in_the_indian_banks_issues_and_implications
 
Types of Risks and its Management in Banking
Types of Risks and its Management in BankingTypes of Risks and its Management in Banking
Types of Risks and its Management in Banking
 
Overview of basel 2 by s k mishra cbi
Overview of basel 2 by s k mishra cbiOverview of basel 2 by s k mishra cbi
Overview of basel 2 by s k mishra cbi
 
CH&Cie_GRA_Stress-testing offer
CH&Cie_GRA_Stress-testing offerCH&Cie_GRA_Stress-testing offer
CH&Cie_GRA_Stress-testing offer
 
A study of credit risk management in commercial banks
A study of credit risk management in commercial banksA study of credit risk management in commercial banks
A study of credit risk management in commercial banks
 

Similar a BCAR: The New Generation

Credit Risk Management Presentation
Credit Risk Management PresentationCredit Risk Management Presentation
Credit Risk Management Presentation
Sumant Palwankar
 
How a New Insurance Company Hit the Ground Running Using Kyriba
How a New Insurance Company Hit the Ground Running Using KyribaHow a New Insurance Company Hit the Ground Running Using Kyriba
How a New Insurance Company Hit the Ground Running Using Kyriba
Kyriba Corporation
 
PayNet AbsolutePD
PayNet AbsolutePDPayNet AbsolutePD
PayNet AbsolutePD
Zane Roelen
 

Similar a BCAR: The New Generation (20)

Evaluation of Capital Needs in Insurance
Evaluation of Capital Needs in InsuranceEvaluation of Capital Needs in Insurance
Evaluation of Capital Needs in Insurance
 
CECL Methodology Series for Off-Balance-Sheet Credit Exposures
CECL Methodology Series for Off-Balance-Sheet Credit ExposuresCECL Methodology Series for Off-Balance-Sheet Credit Exposures
CECL Methodology Series for Off-Balance-Sheet Credit Exposures
 
BFSM Unit - III .pptx
BFSM Unit - III .pptxBFSM Unit - III .pptx
BFSM Unit - III .pptx
 
Nick Wade Using A Structural Model For Enterprise Risk, Dst Conference 2011...
Nick Wade   Using A Structural Model For Enterprise Risk, Dst Conference 2011...Nick Wade   Using A Structural Model For Enterprise Risk, Dst Conference 2011...
Nick Wade Using A Structural Model For Enterprise Risk, Dst Conference 2011...
 
CECL becomes effective in 2020
CECL becomes effective in 2020 CECL becomes effective in 2020
CECL becomes effective in 2020
 
Credit Risk Management Presentation
Credit Risk Management PresentationCredit Risk Management Presentation
Credit Risk Management Presentation
 
Credit appraisal in banking sector ppt @ bec doms
Credit appraisal in banking sector ppt @ bec doms Credit appraisal in banking sector ppt @ bec doms
Credit appraisal in banking sector ppt @ bec doms
 
Credit appraisal in banking sbi
Credit appraisal in banking sbi Credit appraisal in banking sbi
Credit appraisal in banking sbi
 
Stress Testing Commercial Real Estate Loans – No Time Like the Present
Stress Testing Commercial Real Estate Loans – No Time Like the PresentStress Testing Commercial Real Estate Loans – No Time Like the Present
Stress Testing Commercial Real Estate Loans – No Time Like the Present
 
TCF Investor Presentation - November 2019
TCF Investor Presentation - November 2019TCF Investor Presentation - November 2019
TCF Investor Presentation - November 2019
 
How a New Insurance Company Hit the Ground Running Using Kyriba
How a New Insurance Company Hit the Ground Running Using KyribaHow a New Insurance Company Hit the Ground Running Using Kyriba
How a New Insurance Company Hit the Ground Running Using Kyriba
 
Current Write-off Rates and Q-factors in Roll-rate Method
Current Write-off Rates and Q-factors in Roll-rate MethodCurrent Write-off Rates and Q-factors in Roll-rate Method
Current Write-off Rates and Q-factors in Roll-rate Method
 
Q3 2020 Earnings Presentation
Q3 2020 Earnings PresentationQ3 2020 Earnings Presentation
Q3 2020 Earnings Presentation
 
fiinratings-corporate-credit-rating-methodology.pdf
fiinratings-corporate-credit-rating-methodology.pdffiinratings-corporate-credit-rating-methodology.pdf
fiinratings-corporate-credit-rating-methodology.pdf
 
Criteria Review Seminar 2015 Stochastic-Based BCAR (Best’s Capital Adequacy ...
Criteria Review Seminar 2015  Stochastic-Based BCAR (Best’s Capital Adequacy ...Criteria Review Seminar 2015  Stochastic-Based BCAR (Best’s Capital Adequacy ...
Criteria Review Seminar 2015 Stochastic-Based BCAR (Best’s Capital Adequacy ...
 
PayNet AbsolutePD
PayNet AbsolutePDPayNet AbsolutePD
PayNet AbsolutePD
 
CECL is coming
CECL is comingCECL is coming
CECL is coming
 
Supervisory Review Readiness post CCAR March 2015 Results- Somanshu Jend
Supervisory Review Readiness post CCAR March 2015 Results- Somanshu JendSupervisory Review Readiness post CCAR March 2015 Results- Somanshu Jend
Supervisory Review Readiness post CCAR March 2015 Results- Somanshu Jend
 
Establishing a successful PPP framework
Establishing a successful PPP frameworkEstablishing a successful PPP framework
Establishing a successful PPP framework
 
Toronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfToronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdf
 

Más de A.M. Best Company

Más de A.M. Best Company (10)

Securization of Life-Related Traditional Premium Finance Loans
Securization of Life-Related Traditional Premium Finance LoansSecurization of Life-Related Traditional Premium Finance Loans
Securization of Life-Related Traditional Premium Finance Loans
 
State of the Global Reinsurance Market
State of the Global Reinsurance MarketState of the Global Reinsurance Market
State of the Global Reinsurance Market
 
Overview of A.M. Best's Stochastic Based BCAR for U.S. P/C Insurers
Overview of A.M. Best's Stochastic Based BCAR for U.S. P/C InsurersOverview of A.M. Best's Stochastic Based BCAR for U.S. P/C Insurers
Overview of A.M. Best's Stochastic Based BCAR for U.S. P/C Insurers
 
Revisions to Best's Credit Rating Methodology
Revisions to Best's Credit Rating MethodologyRevisions to Best's Credit Rating Methodology
Revisions to Best's Credit Rating Methodology
 
European Insurers: Pressures on Capital Efficiency and Expansion into Emergin...
European Insurers: Pressures on Capital Efficiency and Expansion into Emergin...European Insurers: Pressures on Capital Efficiency and Expansion into Emergin...
European Insurers: Pressures on Capital Efficiency and Expansion into Emergin...
 
Debt Trends in the Capital Structure of European Insurers
Debt Trends in the Capital Structure of European InsurersDebt Trends in the Capital Structure of European Insurers
Debt Trends in the Capital Structure of European Insurers
 
Insurance Market Briefing Europe- EMEA Overview
Insurance Market Briefing Europe- EMEA OverviewInsurance Market Briefing Europe- EMEA Overview
Insurance Market Briefing Europe- EMEA Overview
 
Building the Insurance Market
Building the Insurance MarketBuilding the Insurance Market
Building the Insurance Market
 
Andrea Keenan, Latin American Reinsurance Group Seminar- June, 2015
Andrea Keenan, Latin American Reinsurance Group Seminar- June, 2015Andrea Keenan, Latin American Reinsurance Group Seminar- June, 2015
Andrea Keenan, Latin American Reinsurance Group Seminar- June, 2015
 
Solvency II, A Rating Agency Perspective
Solvency II, A Rating Agency PerspectiveSolvency II, A Rating Agency Perspective
Solvency II, A Rating Agency Perspective
 

Último

Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get CytotecAbortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Riyadh +966572737505 get cytotec
 
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
amitlee9823
 
Call Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night StandCall Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
➥🔝 7737669865 🔝▻ Thrissur Call-girls in Women Seeking Men 🔝Thrissur🔝 Escor...
➥🔝 7737669865 🔝▻ Thrissur Call-girls in Women Seeking Men  🔝Thrissur🔝   Escor...➥🔝 7737669865 🔝▻ Thrissur Call-girls in Women Seeking Men  🔝Thrissur🔝   Escor...
➥🔝 7737669865 🔝▻ Thrissur Call-girls in Women Seeking Men 🔝Thrissur🔝 Escor...
amitlee9823
 
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
amitlee9823
 
Mg Road Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Banga...
Mg Road Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Banga...Mg Road Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Banga...
Mg Road Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Banga...
amitlee9823
 
➥🔝 7737669865 🔝▻ Dindigul Call-girls in Women Seeking Men 🔝Dindigul🔝 Escor...
➥🔝 7737669865 🔝▻ Dindigul Call-girls in Women Seeking Men  🔝Dindigul🔝   Escor...➥🔝 7737669865 🔝▻ Dindigul Call-girls in Women Seeking Men  🔝Dindigul🔝   Escor...
➥🔝 7737669865 🔝▻ Dindigul Call-girls in Women Seeking Men 🔝Dindigul🔝 Escor...
amitlee9823
 
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
amitlee9823
 
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts ServiceCall Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
only4webmaster01
 
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 

Último (20)

Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get CytotecAbortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get Cytotec
 
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
 
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
 
Call Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night StandCall Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night Stand
 
Discover Why Less is More in B2B Research
Discover Why Less is More in B2B ResearchDiscover Why Less is More in B2B Research
Discover Why Less is More in B2B Research
 
Predicting Loan Approval: A Data Science Project
Predicting Loan Approval: A Data Science ProjectPredicting Loan Approval: A Data Science Project
Predicting Loan Approval: A Data Science Project
 
➥🔝 7737669865 🔝▻ Thrissur Call-girls in Women Seeking Men 🔝Thrissur🔝 Escor...
➥🔝 7737669865 🔝▻ Thrissur Call-girls in Women Seeking Men  🔝Thrissur🔝   Escor...➥🔝 7737669865 🔝▻ Thrissur Call-girls in Women Seeking Men  🔝Thrissur🔝   Escor...
➥🔝 7737669865 🔝▻ Thrissur Call-girls in Women Seeking Men 🔝Thrissur🔝 Escor...
 
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
 
Mg Road Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Banga...
Mg Road Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Banga...Mg Road Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Banga...
Mg Road Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Banga...
 
Midocean dropshipping via API with DroFx
Midocean dropshipping via API with DroFxMidocean dropshipping via API with DroFx
Midocean dropshipping via API with DroFx
 
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24  Building Real-Time Pipelines With FLaNKDATA SUMMIT 24  Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
 
➥🔝 7737669865 🔝▻ Dindigul Call-girls in Women Seeking Men 🔝Dindigul🔝 Escor...
➥🔝 7737669865 🔝▻ Dindigul Call-girls in Women Seeking Men  🔝Dindigul🔝   Escor...➥🔝 7737669865 🔝▻ Dindigul Call-girls in Women Seeking Men  🔝Dindigul🔝   Escor...
➥🔝 7737669865 🔝▻ Dindigul Call-girls in Women Seeking Men 🔝Dindigul🔝 Escor...
 
BDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort Service
 
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
 
Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
 
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts ServiceCall Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
 
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
 
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
 
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 

BCAR: The New Generation

  • 1. P/C and L/H: BCAR-The New Generation Status Update on Stochastic Based BCAR 08 April 2015 Matthew Mosher, Senior Vice President Thomas Mount, Vice President George Hansen, Assistant Vice President
  • 2. Disclaimer BCAR – The New Generation 2 © AM Best Company (AMB) and/or its licensors and affiliates. All rights reserved. ALL INFORMATION CONTAINED HEREIN IS PROTECTED BY COPYRIGHT LAW AND NONE OF SUCH INFORMATION MAY BE COPIED OR OTHERWISE REPRODUCED, REPACKAGED, FURTHER TRANSMITTED, TRANSFERRED, DISSEMINATED, REDISTRIBUTED OR RESOLD, OR STORED FOR SUBSEQUENT USE FOR ANY SUCH PURPOSE, IN WHOLE OR IN PART, IN ANY FORM OR MANNER OR BY ANY MEANS WHATSOEVER, BY ANY PERSON WITHOUT AMB’s PRIOR WRITTEN CONSENT. All information contained herein is obtained by AMB from sources believed by it to be accurate and reliable. Because of the possibility of human or mechanical error as well as other factors, however, all information contained herein is provided “AS IS” without warranty of any kind. Under no circumstances shall AMB have any liability to any person or entity for (a) any loss or damage in whole or in part caused by, resulting from, or relating to, any error (negligent or otherwise) or other circumstance or contingency within or outside the control of AMB or any of its directors, officers, employees or agents in connection with the procurement, collection, compilation, analysis, interpretation, communication, publication or delivery of any such information, or (b) any direct, indirect, special, consequential, compensatory or incidental damages whatsoever (including without limitation, lost profits), even if AMB is advised in advance of the possibility of such damages, resulting from the use of or inability to use, any such information. The credit ratings, financial reporting analysis, projections, and other observations, if any, constituting part of the information contained herein are, and must be construed solely as, statements of opinion and not statements of fact or recommendations to purchase, sell or hold any securities, insurance policies, contracts or any other financial obligations, nor does it address the suitability of any particular financial obligation for a specific purpose or purchaser. Credit risk is the risk that an entity may not meet its contractual, financial obligations as they come due. Credit ratings do not address any other risk, including but not limited to, liquidity risk, market value risk or price volatility of rated securities. NO WARRANTY, EXPRESS OR IMPLIED, AS TO THE ACCURACY, TIMELINESS, COMPLETENESS, MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE OF ANY SUCH RATING OR OTHER OPINION OR INFORMATION IS GIVEN OR MADE BY AMB IN ANY FORM OR MANNER WHATSOEVER. Each credit rating or other opinion must be weighed solely as one factor in any investment or purchasing decision made by or on behalf of any user of the information contained herein, and each such user must accordingly make its own study and evaluation of each security or other financial obligation and of each issuer and guarantor of, and each provider of credit support for, each security or other financial obligation that it may consider purchasing, holding or selling.
  • 3. Purpose of Webinar BCAR – The New Generation 3 o Informational o Improve direct communication o Set expectations o Provide ongoing status updates of the project
  • 4. Agenda BCAR – The New Generation 4 o AMB Rating Methodology – role of BCAR in the determination of a credit rating o Current BCAR structure o Reasons for proposed changes o Overview of proposed changes & work to date o Preliminary observations o Next Steps o Proposed implementation time frame
  • 5. What is the relationship between BCAR and a rating level? Balance Sheet Strength Operating Performance Business Profile Country Risk Enterprise Risk Management General Rating Process BCAR Cash Flow Asset Quality Asset Liquidity Financial Lev/Flex Actuarial Reports ALM QAR STAT/GAAP Statements Company Forecasts MD&A Lines of Business Management Team Geographic SpreadGrowth Risk Impact Worksheet Event Risk Reins Program Benchmarking ICM SRQ Loss Reserve Model / LRD Lift/Drag from Affiliates Risk Appetite, Tolerance, etc. Distribution Channel(s) Rating BCAR – The New Generation 5 AMB Projections
  • 6. How is BCAR Used? 6 o As an analytical tool o Indication of current balance sheet strength o Proforma projections o Stress tests…Natural Cats…Terrorism o Other what if scenarios • Changes to reinsurance • Business acquisition or disposition • Changes in asset (or liability) mix • US government default BCAR – The New Generation
  • 7. Current Structure – PC BCAR Adjusted Surplus (APHS) Reported Surplus (PHS) Equity Adjustments: Unearned Premiums (DAC) Equalization/Contingency Reserves Loss Reserves Assets Debt Adjustments: Surplus Notes Debt Service Requirements Other Adjustments: Future Operating Losses Potential Catastrophe Loss Future Dividends Goodwill Other Intangible Assets Minority Interests, etc. 7 Net Required Capital Gross Required Capital (GRC): (B1) Fixed Income Securities (B2) Equity Securities (B3) Interest Rate (B4) Credit (B5) Loss and LAE Reserves (B6) Net Premiums Written (B7) Off-Balance Sheet Covariance Adjustment Net Required Capital (NRC)* BCAR Ratio = Adjusted Surplus / Net Required Capital *NRC= SQRT [ (B1)²+(B2)²+(B3)²+(0.5*B4)² +[(0.5*B4)+B5)]²+(B6)² ] + B7 BCAR – The New Generation
  • 8. Current Structure – LH BCAR Adjusted Surplus (APHS) Reported Surplus (PHS) Equity Adjustments: AVR Reserves Interest Maintenance Reserve Unearned Premiums (DAC) Debt Adjustments: Surplus Notes Debt Service Requirements Other Adjustments: Future Operating Losses Future Dividends Derivatives Off Balance Sheet Goodwill Other Intangible Assets Minority Interests, etc. Net Required Capital Gross Required Capital (GRC): (C1) Asset Risk (C2) Insurance Risk (C3) Interest Rate/Market Risk (C4) Business Risk Covariance Adjustment Net Required Capital (NRC)* *NRC= SQRT [ (C1NonEq + C3interest)² + (C1Eq + C3market)² + (C2)² ] + C4 BCAR Ratio = Adjusted Surplus / Net Required Capital 8BCAR – The New Generation
  • 9. Reasons for Proposed Changes o More sophisticated and faster software available now • Simulations / probability curves • Economic scenario generators (ESGs) • Correlations / diversification • Company specific detail • Assets • Reinsurers • Profitability • Volatility BCAR – The New Generation 9
  • 10. Reasons for Proposed Changes o Metrics better understood and utilized by industry • Tail Value at Risk (TVaR)…aka Conditional Tail Expectation (CTE) Average loss beyond a given threshold Threshold is a percentile (ie 99%) Considers size of losses beyond threshold (Financial Strength) • Value at Risk (VAR) … aka Probability of Default Probability loss will exceed a given threshold o Consistent confidence intervals across risks • 95%, 97.5%, 99%, 99.5%, 99.9% BCAR – The New Generation 10
  • 11. Reasons for Proposed Changes o Consistent Time Horizon for risk factors • Runoff to Ultimate basis for PC UW capital factors Protects policyholders & claimants No change from current view • Some risks will need to use duration of liabilities as indicator for ultimate risk Credit risk on recoverables • Bonds – duration of bonds • Common stocks – one year BCAR – The New Generation 11
  • 12. Overview of Proposed Changes & Work to Date o Do not intend to change underlying view of the risks • Bonds – default risk • Common stock – price volatility • Reinsurance credit risk – uncollectible recoverables • Pricing risk – potential for UW loss on business written next year • Reserve risk – potential for unanticipated adverse reserve development o Do not intend to change the main structure of the model o Goal is to generate risk factors using stochastic simulations from probability curves BCAR – The New Generation 12
  • 13. o Phase 1 – Bonds • Use Economic Scenario Generator • Update bond default risk factors Reflect duration of company’s bond portfolio (SRQ) Reflect asset quality of company’s bond portfolio (SRQ) Reflect volatility in bond default assumptions (stochastic portion - tied to ESG) Can offset default with recovery on defaults (vary by rating?) TVaR metric – (currently 5 year, 5% probability of ruin) VaR metric? BCAR – The New Generation 13 Overview of Proposed Changes & Work to Date
  • 14. Bond Quality & Maturity SRQ question: BCAR – The New Generation 14 Overview of Proposed Changes & Work to Date
  • 15. o Phase 1 – Common Stock • Use Economic Scenario Generator • Update common stock risk factors Reflect type of stocks held by company (SRQ – Beta) Reflect volatility (stochastic portion – tied to ESG) Can cap simulated downside risk TVaR metric – (currently 1% EPD, 1 year) VaR metric? BCAR – The New Generation 15 Overview of Proposed Changes & Work to Date
  • 16. Common Stock Beta SRQ Question: BCAR – The New Generation 16 Overview of Proposed Changes & Work to Date
  • 17. o Phase 1 – Reinsurance • Update reinsurance credit risk factors Reflect type of recoverable (paid, unpaid, upr) Reflect rating of each reinsurer (Schedule F/S and ratings data) Reflect duration of recoverables Can reflect partial recovery when reins defaults Simulate 10,000 scenarios for each reinsurer Reflects concentration risk TVaR metric (currently based on FSR) VaR metric? BCAR – The New Generation 17 Overview of Proposed Changes & Work to Date
  • 18. o Phase 1 – PC Premium • Update PC premium risk factors Create Industry UW Loss probability curves – 21 Schedule P lines and 4 NPW size categories (VS,S,M,L) – 84 industry probability curves for premiums Use company NPW size to select industry probability curve – use company profitability to adjust curve Simulate 10,000 UW profit/loss scenarios for each line Reflect diversification across lines – use one of 4 industry correlation matrices – based on size of company’s total NPW (VS,S,M,L) Risk factors based on TVaR metric (currently 1% EPD – ultimate) VaR metric? BCAR – The New Generation 18 Overview of Proposed Changes & Work to Date
  • 19. o Phase 1 – PC Reserves • Update PC reserve risk Factors  Create industry unanticipated adverse development probability curves – 21 Schedule P lines and 4 reserve size categories (VS,S,M,L) – 84 industry probability curves for reserves  Use company Reserve size to select industry probability curve – use company volatility to adjust curve  Simulate 10,000 reserve development scenarios for each line  Reflect diversification across lines – use one of 4 industry correlation matrices – based on size of company’s total net reserves (VS,S,M,L)  Risk factors based on TVaR metric (currently 1% EPD – ultimate)  VaR metric? BCAR – The New Generation 19 Overview of Proposed Changes & Work to Date
  • 20. o Phase 1 – Natural Catastrophe • Update natural catastrophe approach Var or TVaR metric? Occurrence vs. aggregate season? Total all perils? Currently different VaRs for EQ and Wind Straight charge to PHS or add to NRC? Confidence level? Continue stress test approach? BCAR – The New Generation 20 Overview of Proposed Changes & Work to Date
  • 21. Potential Structure – PC BCAR Adjusted Surplus (APHS) Reported Surplus (PHS) Equity Adjustments: Unearned Premiums (DAC) Equalization/Contingency Reserves Loss Reserves Assets Debt Adjustments: Surplus Notes Debt Service Requirements Other Adjustments: Future Operating Losses Potential Loss Future Dividends Goodwill Other Intangible Assets Minority Interests, etc. 21 Net Required Capital Gross Required Capital (GRC): (B1) Fixed Income Securities (B2) Equity Securities (B3) Interest Rate (B4) Credit (B5) Loss and LAE Reserves (B6) Net Premiums Written (B7) Off-Balance Sheet (B8) Catastrophe Exposure Covariance Adjustment Net Required Capital (NRC)* BCAR Ratio = Adjusted Surplus / Net Required Capital *NRC= SQRT [ (B1)²+(B2)²+(B3)²+(0.5*B4)² +[(0.5*B4)+B5)]²+(B6)² ] + B7 + B8 BCAR – The New Generation
  • 22. Example of Impact to PC Model 22 Current Calculation APHS (ex Potential Cat Losses) = $150M Potential cat Losses = $30M NRC = $80M BCAR = (150-30) = 120 = 15080 80 Potential Calculation APHS (ex Potential Cat Losses) = $150M Potential cat Losses = $30M NRC = $80M BCAR = 150 = 150 = 136(80+30) 110 BCAR – The New Generation
  • 23. Overview of Proposed Changes o Phase 2 • Remaining asset classes • Life and annuity risks Mortality Longevity Disintermediation Product Guarantees Long Term Care/Disability • Change net required capital formula to correlation matrix approach (instead of the square root rule) BCAR – The New Generation 23
  • 24. Observations o Investments • Greater risk than previous considered • Particularly in equities o Reinsurance • Initial charges came out high and this is being reviewed o PC Underwriting (Reserves and Premium) • Auto is coming out lower – not surprised by this • Made sure we are not double counting catastrophe charge • TVaR very high at high confidence levels • More differentiation between lines of business • By line correlation matrices – no real surprises o BCAR Guidelines • May need to change BCAR – The New Generation 24
  • 25. Observations o Next generation BCAR as an indication of current balance sheet strength…what do scores say about relative financial strength? 95% 98% 99% Company A 178 (A++) 111 83 Company B 178 (A++) 126 103 Company C 152 (A) 128 116 BCAR – The New Generation 25
  • 26. Observations o Next generation BCAR as an indication of current balance sheet strength…what do scores say about relative financial strength? 95% 98% 99% Company A 178 (A++) 111 83 Company B 178 (A++) 126 103 Company C 152 (A) 128 116 BCAR – The New Generation 26
  • 27. Observations o Next generation BCAR as an indication of current balance sheet strength…what do scores say about relative financial strength? 95% 98% 99% Company A 178 (A++) 111 83 Company B 178 (A++) 126 103 Company C 152 (A) 128 116 BCAR – The New Generation 27
  • 28. Observations & Next Steps o TVaR • Issues with catastrophe losses and the impact of extreme tail events • May go beyond what is needed from BCAR o Further review needed • Does VaR provide sufficient information? o Next Steps • Continue to evaluate TVaR based output (Life and Universal models) • Also evaluate VaR based output • Additional discussions with key industry constituents • Begin to develop Draft Criteria BCAR – The New Generation 28
  • 29. Expected Timeline o Model being developed in phases • Phase 1 built – testing internally with 2013 YE data Initial Parameters completed Run parallel BCARs (PC; LH; Universal) internally with 2014 YE data Draft criteria expected to be released this summer for comment We do anticipate sharing 2014 YE output with companies as draft criteria are released Time frames for final criteria release will be impacted by comments received on criteria, changes based on comments, & LH impact study • Phase 2 – 1 year after Phase 1 finalized BCAR – The New Generation 29