About The “Lalgarh Railway Workshop”
• Foundation : Maharaja Ganga Singh Ji Bahadur on 18th
March,1925
• Location: Outskirt of Bikaner town known as Lalgarh
• Plant started: 1st March,1927
• Total area: 141226 meter sq.
• Machinery in plant:232
• Track inside plant:2.6 km
PERIODIC-OVERHAULING
Periodic-overhauling(POH): It is a process of 8 days during
which checking & repairing/replacement of train’s parts take
place.
Time Period Of POH:
Mail/Express train: POH after 12 months
Passenger Train : POH after 18 months
Procedures of POH
DAY 1st : Disassembly of electrical components
DAY 2nd : Lift/Lowering
DAY 3rd : Body repair
DAY 4th : Carpenter work
DAY 5th : Painting
DAY 6th : Electrical component fitting
DAY 7th : Adjustment of all parts
DAY 8th : Vacuum testing
LIST OF SHOPS
• Carriage shop
• Carpenter shop
• Corrosion shop
• Painting & Trimming shop
• Wagon shop
• Wheel shop
• Tool shop
• Mill right shop
• Bogie IOH shop
CARRIAGE SHOP
• Purpose: To repair coaches
Parts of coaches which get repaired in
carriage shop
• Dash port Spring: It act as shock absorber.
• Bdl’ster: Mounted between lower and upper shock absorber &
also called secondary shock absorber.
• Brake block: Hold the brake frame & coach beam together.
• Equalizing stray: This also hold coach beam & brake frame
together.
• Brake shoe key : Stop the brake shoe from running out.
• Bearing pieces: Component on which coaches turn.
• Pivot seat: Control running of train.
• Anchor link: Control movement of coaches.
CARPENTRY SHOP
In this shop wooden fitting of pipes on walls, floors etc are
done.
Machines available/used in the carpentry
shop of this plant:
• Circular saw machine -2
• Body band saw machine -1
• Vertical band saw machine-2
• Planer machine-1
CORROSION SHOP
• Purpose: To repair corroded parts mainly head stock,
coaching stock, sole bar and cross bar.
C-schedule in corrosion shop
DAY 1st : Cleaning with soap sol. & touch up damage
part with primer.
DAY 2nd : Spot putty.
DAY 3rd : Flat with silicon carbide & finish coat with
enamel.
DAY 4th : Apply second coat of enamel.
DAY 5th : Lettering with golden yellow color &
miscellaneous work.
PAINTING SHOP
• Painting & External maintenance is done in this shop.
• These are done in two schedule:
• A-schedule(9 days): for maintenance
• C-schedule(5 days): for final painting
Painting done in this shop:
• Side painting : Smoke grey paint
• Under frame : Bituminous Paint
• Internal painting : White enamel paint
• End panel : Black enamel paint
• Trolley : Bituminous paint
• Roof : Aluminium paint
TRIMMING SHOP
• Final stages of basic rebuilding as assembly of seats,
painting & stiching are completed.
• Seats are repaired and reassembled.
WAGON SHOP
Works done in wagon shop:
• Super structure attached to the under frame of a wagon is
called ‘WAGON BODY’.
• In this shop,the body,underframe of a Wagon are repaired.
• Proper numbers of doors, pillers etc. are attached.
• Wagon Air Brake Testing are done in this shop.
WHEEL SHOP
• New wheel undergo various operations for testing so
wheel shop has various section
• Axle passing section : Axle and tyre received from
companies and reassembled.
• Tyre section : Diameter of tyre reduced
MILL WRIGHT SHOP
• Millwright shop has three sections:
• Machine maintenance section
• Transport section
• Compressor section
• Maintenance section: All the machine parts are repaired.
• Transportation Section: Transportation of goods are taken by
some machine to reduce place and component transported
from one place to another.
• Compressor section: The screw type air compressor is a
positive displacement machine of reciprocative type.
.
BOGIE IOH SHOP
In this shop all the component of a bogie is fitted or
welded and finally railway coaches is formed.
COMPONENTS OF RAILWAY BOGIE:
• Bogie Transom
• Bogie Cylinder
• Primary Suspension Coil
• Motor Suspension Tube
• Gear Box
• Lifting Box
• Neutral section switch detector
• Secondary suspension air bag
• Shock absorber
• Axle box cover
• Bogie bolster
• Center pivot pin
Shock absorber
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ

Más contenido relacionado

La actualidad más candente

Mechanicaal workshop gorakhpur summer training report
Mechanicaal workshop gorakhpur summer training reportMechanicaal workshop gorakhpur summer training report
Mechanicaal workshop gorakhpur summer training reporthmthimanshu
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~ihaxxo24
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)anand prasad
 
Training report on nwr carriage workshop, jodhpur
Training report on nwr carriage workshop, jodhpurTraining report on nwr carriage workshop, jodhpur
Training report on nwr carriage workshop, jodhpursachin deora
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)Neha Gethe
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training ReportVishal Singh
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPTSahil arora
 
WAGON TEST EQUIPMENTS.pdf
WAGON TEST EQUIPMENTS.pdfWAGON TEST EQUIPMENTS.pdf
WAGON TEST EQUIPMENTS.pdfTCCW1
 
POH seminar ppt bhusawal
POH seminar ppt bhusawalPOH seminar ppt bhusawal
POH seminar ppt bhusawalDhiraj Mahajan
 
Ne railway gorakhpur summer training report
Ne railway gorakhpur summer training reportNe railway gorakhpur summer training report
Ne railway gorakhpur summer training reportKrishna Yadav
 
Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)
Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)
Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)Shikhar Gupta
 
Indian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportIndian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportaman1312
 
indian railway training report
indian railway training reportindian railway training report
indian railway training reportravi kant
 
locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.Mukesh Maurya
 
Rake maintenance (C&W Depot AGC ) Indian Railways
Rake maintenance (C&W Depot AGC )  Indian RailwaysRake maintenance (C&W Depot AGC )  Indian Railways
Rake maintenance (C&W Depot AGC ) Indian RailwaysDeewan singh
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...haxxo24
 

La actualidad más candente (20)

Mechanicaal workshop gorakhpur summer training report
Mechanicaal workshop gorakhpur summer training reportMechanicaal workshop gorakhpur summer training report
Mechanicaal workshop gorakhpur summer training report
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~i
 
railway_plant_layout
railway_plant_layoutrailway_plant_layout
railway_plant_layout
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 
Training report on nwr carriage workshop, jodhpur
Training report on nwr carriage workshop, jodhpurTraining report on nwr carriage workshop, jodhpur
Training report on nwr carriage workshop, jodhpur
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPT
 
Bogie
BogieBogie
Bogie
 
WAGON TEST EQUIPMENTS.pdf
WAGON TEST EQUIPMENTS.pdfWAGON TEST EQUIPMENTS.pdf
WAGON TEST EQUIPMENTS.pdf
 
POH seminar ppt bhusawal
POH seminar ppt bhusawalPOH seminar ppt bhusawal
POH seminar ppt bhusawal
 
Ne railway gorakhpur summer training report
Ne railway gorakhpur summer training reportNe railway gorakhpur summer training report
Ne railway gorakhpur summer training report
 
L.H.B. Coaches
L.H.B. CoachesL.H.B. Coaches
L.H.B. Coaches
 
Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)
Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)
Study of Shell Manufacturing Process @ Modern Coach Factory (Raebareli)
 
Indian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportIndian Railway Diesel shed Training report
Indian Railway Diesel shed Training report
 
indian railway training report
indian railway training reportindian railway training report
indian railway training report
 
liluahworkshop
liluahworkshopliluahworkshop
liluahworkshop
 
locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.
 
Rake maintenance (C&W Depot AGC ) Indian Railways
Rake maintenance (C&W Depot AGC )  Indian RailwaysRake maintenance (C&W Depot AGC )  Indian Railways
Rake maintenance (C&W Depot AGC ) Indian Railways
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 

Similar a Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ

Suzuki
SuzukiSuzuki
SuzukiHome
 
Industrial training report with Mechnaical Engineering department Kashmir
Industrial training report with Mechnaical Engineering department KashmirIndustrial training report with Mechnaical Engineering department Kashmir
Industrial training report with Mechnaical Engineering department KashmirNauman Wani
 
Ppt on Gorakhpur railway station
Ppt on Gorakhpur railway stationPpt on Gorakhpur railway station
Ppt on Gorakhpur railway stationdurgesh pathak
 
railway internship presentation
railway internship presentationrailway internship presentation
railway internship presentationahmedalvi01
 
bottle neck operation through critical path method
bottle neck operation through critical path methodbottle neck operation through critical path method
bottle neck operation through critical path methodSaurav Kumar
 
Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...
Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...
Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...Toukir Ahmed Chowdhury
 
Ksrtc central works INDUSTRIAL VISIT REPORT
Ksrtc central works INDUSTRIAL VISIT REPORTKsrtc central works INDUSTRIAL VISIT REPORT
Ksrtc central works INDUSTRIAL VISIT REPORTGeorge Jose
 
HMT TRACTORS LIMITED
HMT TRACTORS LIMITEDHMT TRACTORS LIMITED
HMT TRACTORS LIMITEDDeepak kango
 
Amresh kumar ppt.(2017) (1)
Amresh kumar ppt.(2017) (1)Amresh kumar ppt.(2017) (1)
Amresh kumar ppt.(2017) (1)Amresh0024
 
PRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODY
PRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODYPRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODY
PRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODYSyedYahya4
 
Design & Manufacturing of Metro Car Body.pdf
Design & Manufacturing of Metro Car Body.pdfDesign & Manufacturing of Metro Car Body.pdf
Design & Manufacturing of Metro Car Body.pdfravibhaknp
 
N.E RAILWAY GORAKHPUR, PPT
N.E RAILWAY GORAKHPUR, PPTN.E RAILWAY GORAKHPUR, PPT
N.E RAILWAY GORAKHPUR, PPTANAND kumar
 
Internship at Pakistan Railways
Internship at Pakistan RailwaysInternship at Pakistan Railways
Internship at Pakistan RailwaysMuhammad Usman
 
Nw railway by suresh bose
Nw railway  by suresh boseNw railway  by suresh bose
Nw railway by suresh boseSuresh Bose
 
Automotive Manufacturing Process Overview
Automotive Manufacturing Process OverviewAutomotive Manufacturing Process Overview
Automotive Manufacturing Process OverviewTal Vagman
 
A presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayA presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayGALGOTIAS UNIVERSITY
 

Similar a Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ (20)

Suzuki
SuzukiSuzuki
Suzuki
 
Industrial training report with Mechnaical Engineering department Kashmir
Industrial training report with Mechnaical Engineering department KashmirIndustrial training report with Mechnaical Engineering department Kashmir
Industrial training report with Mechnaical Engineering department Kashmir
 
Bwel presentation
Bwel presentationBwel presentation
Bwel presentation
 
Ppt on Gorakhpur railway station
Ppt on Gorakhpur railway stationPpt on Gorakhpur railway station
Ppt on Gorakhpur railway station
 
railway internship presentation
railway internship presentationrailway internship presentation
railway internship presentation
 
bottle neck operation through critical path method
bottle neck operation through critical path methodbottle neck operation through critical path method
bottle neck operation through critical path method
 
Prince ppt
Prince pptPrince ppt
Prince ppt
 
Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...
Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...
Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...
 
Ksrtc central works INDUSTRIAL VISIT REPORT
Ksrtc central works INDUSTRIAL VISIT REPORTKsrtc central works INDUSTRIAL VISIT REPORT
Ksrtc central works INDUSTRIAL VISIT REPORT
 
HMT TRACTORS LIMITED
HMT TRACTORS LIMITEDHMT TRACTORS LIMITED
HMT TRACTORS LIMITED
 
Amresh kumar ppt.(2017) (1)
Amresh kumar ppt.(2017) (1)Amresh kumar ppt.(2017) (1)
Amresh kumar ppt.(2017) (1)
 
RAILWAY PPT
RAILWAY PPTRAILWAY PPT
RAILWAY PPT
 
PRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODY
PRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODYPRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODY
PRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODY
 
Design & Manufacturing of Metro Car Body.pdf
Design & Manufacturing of Metro Car Body.pdfDesign & Manufacturing of Metro Car Body.pdf
Design & Manufacturing of Metro Car Body.pdf
 
N.E RAILWAY GORAKHPUR, PPT
N.E RAILWAY GORAKHPUR, PPTN.E RAILWAY GORAKHPUR, PPT
N.E RAILWAY GORAKHPUR, PPT
 
automotivemanufacturingprocessesoverviewtvjan2016updated-160106163635 (1).pdf
automotivemanufacturingprocessesoverviewtvjan2016updated-160106163635 (1).pdfautomotivemanufacturingprocessesoverviewtvjan2016updated-160106163635 (1).pdf
automotivemanufacturingprocessesoverviewtvjan2016updated-160106163635 (1).pdf
 
Internship at Pakistan Railways
Internship at Pakistan RailwaysInternship at Pakistan Railways
Internship at Pakistan Railways
 
Nw railway by suresh bose
Nw railway  by suresh boseNw railway  by suresh bose
Nw railway by suresh bose
 
Automotive Manufacturing Process Overview
Automotive Manufacturing Process OverviewAutomotive Manufacturing Process Overview
Automotive Manufacturing Process Overview
 
A presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayA presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railway
 

Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ

  • 1. SUBMITTED TO ASTT. PROF. ANITA KURADIYA MECHANICAL DEPARTMENT (COLLEGE OF ENGINEERING & TECHNOLOGY BIKANER) SUBMITTED BY AMITRAJ 13ECTME007
  • 2. About The “Lalgarh Railway Workshop” • Foundation : Maharaja Ganga Singh Ji Bahadur on 18th March,1925 • Location: Outskirt of Bikaner town known as Lalgarh • Plant started: 1st March,1927 • Total area: 141226 meter sq. • Machinery in plant:232 • Track inside plant:2.6 km
  • 3. PERIODIC-OVERHAULING Periodic-overhauling(POH): It is a process of 8 days during which checking & repairing/replacement of train’s parts take place. Time Period Of POH: Mail/Express train: POH after 12 months Passenger Train : POH after 18 months
  • 4. Procedures of POH DAY 1st : Disassembly of electrical components DAY 2nd : Lift/Lowering DAY 3rd : Body repair DAY 4th : Carpenter work DAY 5th : Painting DAY 6th : Electrical component fitting DAY 7th : Adjustment of all parts DAY 8th : Vacuum testing
  • 5. LIST OF SHOPS • Carriage shop • Carpenter shop • Corrosion shop • Painting & Trimming shop • Wagon shop • Wheel shop • Tool shop • Mill right shop • Bogie IOH shop
  • 6. CARRIAGE SHOP • Purpose: To repair coaches
  • 7. Parts of coaches which get repaired in carriage shop • Dash port Spring: It act as shock absorber. • Bdl’ster: Mounted between lower and upper shock absorber & also called secondary shock absorber. • Brake block: Hold the brake frame & coach beam together. • Equalizing stray: This also hold coach beam & brake frame together.
  • 8. • Brake shoe key : Stop the brake shoe from running out. • Bearing pieces: Component on which coaches turn. • Pivot seat: Control running of train. • Anchor link: Control movement of coaches.
  • 9. CARPENTRY SHOP In this shop wooden fitting of pipes on walls, floors etc are done.
  • 10. Machines available/used in the carpentry shop of this plant: • Circular saw machine -2 • Body band saw machine -1 • Vertical band saw machine-2 • Planer machine-1
  • 11. CORROSION SHOP • Purpose: To repair corroded parts mainly head stock, coaching stock, sole bar and cross bar.
  • 12. C-schedule in corrosion shop DAY 1st : Cleaning with soap sol. & touch up damage part with primer. DAY 2nd : Spot putty. DAY 3rd : Flat with silicon carbide & finish coat with enamel. DAY 4th : Apply second coat of enamel. DAY 5th : Lettering with golden yellow color & miscellaneous work.
  • 13. PAINTING SHOP • Painting & External maintenance is done in this shop. • These are done in two schedule: • A-schedule(9 days): for maintenance • C-schedule(5 days): for final painting
  • 14. Painting done in this shop: • Side painting : Smoke grey paint • Under frame : Bituminous Paint • Internal painting : White enamel paint • End panel : Black enamel paint • Trolley : Bituminous paint • Roof : Aluminium paint
  • 15. TRIMMING SHOP • Final stages of basic rebuilding as assembly of seats, painting & stiching are completed. • Seats are repaired and reassembled.
  • 17. Works done in wagon shop: • Super structure attached to the under frame of a wagon is called ‘WAGON BODY’. • In this shop,the body,underframe of a Wagon are repaired. • Proper numbers of doors, pillers etc. are attached. • Wagon Air Brake Testing are done in this shop.
  • 18. WHEEL SHOP • New wheel undergo various operations for testing so wheel shop has various section • Axle passing section : Axle and tyre received from companies and reassembled. • Tyre section : Diameter of tyre reduced
  • 19. MILL WRIGHT SHOP • Millwright shop has three sections: • Machine maintenance section • Transport section • Compressor section
  • 20. • Maintenance section: All the machine parts are repaired.
  • 21. • Transportation Section: Transportation of goods are taken by some machine to reduce place and component transported from one place to another. • Compressor section: The screw type air compressor is a positive displacement machine of reciprocative type. .
  • 22. BOGIE IOH SHOP In this shop all the component of a bogie is fitted or welded and finally railway coaches is formed.
  • 23. COMPONENTS OF RAILWAY BOGIE: • Bogie Transom • Bogie Cylinder • Primary Suspension Coil • Motor Suspension Tube • Gear Box • Lifting Box
  • 24. • Neutral section switch detector • Secondary suspension air bag • Shock absorber • Axle box cover • Bogie bolster • Center pivot pin Shock absorber