ANUPKUMAR DUTTA
E-100, sector-2,HEC Colony,Dhurwa,Ranchi-834004, India
Mobile:+91-9771343438/7762869464
Email:anup_kr_1@yahoo.com/anupkrdutta56@gmail.com
SeniorDeputyGeneral ManagerwithHeavyEngineeringCorporation,Ranchi
Overview
 An experienced professional with 35 years of industrial experience in activities like design of
auxiliaries, maintenance and operation of equipment, planning, works contract, material
Management and Turnkey Projects.
 Currently designated as Senior Deputy General Manager since April, 2005.
 A keen planner & implementer with attained proficiency in meeting targets at a given specific
time, as well as on emergency basis.
 Have gained expertise in undertaking various modifications with respect to spares, hydraulic
systems for enhancing shop floor productivity. Also reclamations of used spares.
 Adroitat Shop-floorsupervision,budgeting,scope planningandvariousaspects of management
includingresource planning,resource hiring-training,scheduling, controlling (quality / process /
schedule and cost) & deliverable management.
 Proficient in implementing and managing systems and procedures for smooth functioning of
various Operational departments with one another.
 An effective communicator with demonstrated ease at managing team members; allocating
resources and guiding team members to achieve goals.
 Have gained knowledge of customs, excise and sales tax procedures.
 From May,2008 to 1st
week of Sept.’14,I was Project Manager of 2 projects, namely,
Augmentation of Ore handling plant project, value Rs 202 crores & New Coal Handing Plant,
value Rs492 crores under7 MT ExpansionPlanof Bhilai Steel Plant, INDIA. The new facilities of
the 1st
one & a portion of the second one have already been commissioned.
 From 2nd
week of Sept.,14, presently at Dhanbad for setting up a new coal washery for
BCCL,valueRs263 crs.
 Corporate memberof The Institution of Engineers(India) since June 1991 & Member of ISHRAE,
Ranchi chapter from 2008.
Expertise Domain
 Strategic Planning
 Conceptualizing strategic and operational plans for the manufacturing of spares and material
planning.
 Process Engineering & Improvement
 Designing and implementing processes and procedures to facilitate smooth functioning of
overall production operations and enhance operational efficiency.
 Analyzing various processes / applications and recommending process modifications and
equipment calibrations to enhance operational efficiency.
 Involving in technical discussion to maintain the process parameters & accordingly make
changes.eg. Maintaining proper water pressure in oil coolers.
 Discussing technical aspects to reduce the cost of production and increase profitability &
prepare finalizations of related discussions.
 Site Management/Plant Operations
 Conceptualizing&implementingprojects,annual improvementplansforprocessre-engineering,
technology absorption projects for expansion and new products.
 Planning&implementingthe preventive &predictivemaintenance schedules for improving the
overall reliability and safety of plant, personnel and production processes.
 Steeringoperationandmaintenance of pumps,highpressure compressor,highpressure vessels,
hydraulic pressured pipelines, EOT cranes & furnaces.
 Inventory/Vendor Management
 Ensuringoptimuminventorylevels to achieve maximum cost savings with minimum holding of
stock; maintaining storage areas and arranging infrastructure to ensure smooth flow of
operations
 Approvingdesigns,provingandtrial of the spares as well as guiding & training of the vendors if
required, for manufacturing of the same.
 Overseeing initiatives for outsourcing of design and manufacture of spares.
 Managing procuring activities of foundry forge plant. Have participated in various techno-
commercial discussions with suppliers/vendors for procurement of capital Equipment.
 Ensuringtimelyprocurementof qualitymaterials/goodsatjustifiedcostsandavoiding stock-out
costs, from indigenous sources and through Imports.
 Enlarging vendor base and developing quality vendors.
 Issuing different work contracts for the forge shop after issuing tenders.
 Development of Spares, Sealings from indigenous sources as substitutes of imported items
 InterfacingwithR&Dfor necessarymodifications in component design for manufacturability of
components from internal sources.
 Scheduling design of spares & ensuring their timely manufacturing.
 Coordinating with R&D for approval of drawings as per specifications.
 Identifying shortcomings in maximizing availability of equipment for production.
 Turn Key Project
From May,2008 to 1st
week of Sept.’14,I was Project Manager of 2 projects, namely,
Augmentation of Ore handling plant project, value Rs 202 crores & New Coal Handing Plant,
value Rs492 crores under7 MT ExpansionPlanof Bhilai Steel Plant, INDIA. The new facilities of
the 1st
one & a portion of the second one have already been commissioned.
 From 2nd
week of Sept.,14, presently at Dhanbad for setting up a new coal washery for
BCCL,value Rs263 crs.
 Personnel Management
A strong believer in Team management
 Attracting,retainingandmotivatingtalent,creatingenvironmentfordevelopmentof excellence
in various disciplines & creating a learning organization.
 Allocating resources and jobs, for increased availability of equipments.
 Implementing on the job training, conducting in-house training programs in order to ensure
multiskilling and development of people & optimization of resources.
Career Path
Heavy Engineering Corporation, Ranchi since March,1981
Currentlydesignatedas“SeniorDeputyGeneral Manager”
Growth Path
Executive Trainee: 23, March, 1981 to 22, March, 1982
Junior Manager: 23, March, 1982 to 30, December, 1987
Assistant Manager: 31, December, 1987 to 30, December, 1991
Deputy Manager: 31, December, 1991 to 30, December, 1995
Manager: 31, December, 1995 to 30, December, 1999
Senior Manager: 31, December, 1999 to 30, December, 2003
Senior Deputy General Manager: April, 2005 till date
Significant highlights during the tenure with Heavy Engineering Corporation include:
 Managed to reduce design time period for developing import substitutes of spares of
equipments.
 Developeddrawingsof imported spares of equipments for manufacture from internal sources.
 Initiated development of vendors for supply of substitutes of imported seals, spares.
 Drasticallyreducedconsumptionof lubricantoil per month by incorporating a drainage point in
oil cooler for settling down of water from amalgamated oil.
 Modified and redesigned oil seal cover of reciprocating pump to reduce Oil leakage from
plungers.
 Developeddrawingsof consumable sparesof some equipment procured from Indian suppliers.
 Increased vendor base for some items by identifying vendors through internet.
 Initiateddifferent In-House training programs like Computer awareness, Change Management
etc.
 Performed routine checkup of Equipment before the start of each shift.
 Project monitoring, Co-ordination & execution as Project Manager of 2 nos projects,
Augmentationof Ore Handling Plant project, value Rs 202 crores and New Coal Handling Plant,
value Rs492 crs at Bhilai Steel Plant, India. New facilities of the 1st
one and a portion of the
second one already commissioned.
PreviousWork Experience
Usha Sewing Machine Works, Kolkata April,1980-March,1981
Graduate Engineer Trainee
(Worked in machine shop area having special purpose machine tools)
Education
 MBA (Industrial management) fromBirlaInstitute of Technology,Mesra,Ranchi, A Deemed
University,1986.
 SWIFT Foundationcourse fromNIIT,1997.
 B.Sc (Mechanical Engineering) fromBirlaInstitute of Technology,Ranchi University,1980.

Más contenido relacionado

La actualidad más candente

La actualidad más candente (19)

@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@
 
Gauravcv
GauravcvGauravcv
Gauravcv
 
SRCV
SRCVSRCV
SRCV
 
Mali(Cv)
Mali(Cv)Mali(Cv)
Mali(Cv)
 
CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23
 
Roger Banks: My Professional Resume
Roger Banks: My Professional ResumeRoger Banks: My Professional Resume
Roger Banks: My Professional Resume
 
MY RESUME_TD.NATHWANI.
MY RESUME_TD.NATHWANI.MY RESUME_TD.NATHWANI.
MY RESUME_TD.NATHWANI.
 
Production and service operations planning
Production and service operations planningProduction and service operations planning
Production and service operations planning
 
Plant location and lay out planning
Plant location and lay out planningPlant location and lay out planning
Plant location and lay out planning
 
Mahendiran Resume 07.08.15
Mahendiran Resume 07.08.15Mahendiran Resume 07.08.15
Mahendiran Resume 07.08.15
 
IRJET- Production Plan and Control
IRJET- Production Plan and ControlIRJET- Production Plan and Control
IRJET- Production Plan and Control
 
Vinay 2016
Vinay  2016Vinay  2016
Vinay 2016
 
Gauravcv
GauravcvGauravcv
Gauravcv
 
BiodataTps15
BiodataTps15BiodataTps15
BiodataTps15
 
Chapter 9
Chapter 9Chapter 9
Chapter 9
 
CV RAJESH LONKAR
CV RAJESH LONKARCV RAJESH LONKAR
CV RAJESH LONKAR
 
Subhash_21_years___DVS__
Subhash_21_years___DVS__Subhash_21_years___DVS__
Subhash_21_years___DVS__
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
updated Resume
updated Resumeupdated Resume
updated Resume
 

Destacado (12)

смысл жизни
смысл жизнисмысл жизни
смысл жизни
 
M.N.Nanda kishore Profile
M.N.Nanda kishore ProfileM.N.Nanda kishore Profile
M.N.Nanda kishore Profile
 
Co-operator farming history part 1
Co-operator farming history part 1Co-operator farming history part 1
Co-operator farming history part 1
 
fosdem-2015
fosdem-2015fosdem-2015
fosdem-2015
 
насилля
насиллянасилля
насилля
 
Pril
PrilPril
Pril
 
насилля
насиллянасилля
насилля
 
Sutures and suturing
Sutures and suturingSutures and suturing
Sutures and suturing
 
Instruments & implants
Instruments  &  implantsInstruments  &  implants
Instruments & implants
 
Resume John Hsieh Scientist Enzymologist
Resume John Hsieh Scientist EnzymologistResume John Hsieh Scientist Enzymologist
Resume John Hsieh Scientist Enzymologist
 
Polish pottery samples 2015
Polish pottery samples 2015Polish pottery samples 2015
Polish pottery samples 2015
 
Uno Alla Volta Polish Pottery for VIP Customers
Uno Alla Volta Polish Pottery for VIP CustomersUno Alla Volta Polish Pottery for VIP Customers
Uno Alla Volta Polish Pottery for VIP Customers
 

Similar a CVanup kumar dutta2 (20)

Rev Bio Times
Rev Bio TimesRev Bio Times
Rev Bio Times
 
Resume - Sumit Jindal
Resume - Sumit JindalResume - Sumit Jindal
Resume - Sumit Jindal
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
 
resume
resumeresume
resume
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
 
Girish kumar yadav
Girish kumar yadavGirish kumar yadav
Girish kumar yadav
 
Rohit Resume
Rohit ResumeRohit Resume
Rohit Resume
 
Ganesh B Gawali
Ganesh B GawaliGanesh B Gawali
Ganesh B Gawali
 
Resume of Srinivas
Resume of SrinivasResume of Srinivas
Resume of Srinivas
 
CV_Vijay
CV_VijayCV_Vijay
CV_Vijay
 
Resume - Premal J Vashi
Resume - Premal J VashiResume - Premal J Vashi
Resume - Premal J Vashi
 
Resume
ResumeResume
Resume
 
Utpal bose resume
Utpal bose resumeUtpal bose resume
Utpal bose resume
 
Anuraj Panicker
Anuraj PanickerAnuraj Panicker
Anuraj Panicker
 
Anuraj panicker
Anuraj panickerAnuraj panicker
Anuraj panicker
 
Resume - Kishor Kumar Jalori new
Resume - Kishor Kumar Jalori newResume - Kishor Kumar Jalori new
Resume - Kishor Kumar Jalori new
 
dipankar bandyopadhyay_6787_GR_A
dipankar bandyopadhyay_6787_GR_Adipankar bandyopadhyay_6787_GR_A
dipankar bandyopadhyay_6787_GR_A
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 

CVanup kumar dutta2

  • 1. ANUPKUMAR DUTTA E-100, sector-2,HEC Colony,Dhurwa,Ranchi-834004, India Mobile:+91-9771343438/7762869464 Email:anup_kr_1@yahoo.com/anupkrdutta56@gmail.com SeniorDeputyGeneral ManagerwithHeavyEngineeringCorporation,Ranchi Overview  An experienced professional with 35 years of industrial experience in activities like design of auxiliaries, maintenance and operation of equipment, planning, works contract, material Management and Turnkey Projects.  Currently designated as Senior Deputy General Manager since April, 2005.  A keen planner & implementer with attained proficiency in meeting targets at a given specific time, as well as on emergency basis.  Have gained expertise in undertaking various modifications with respect to spares, hydraulic systems for enhancing shop floor productivity. Also reclamations of used spares.  Adroitat Shop-floorsupervision,budgeting,scope planningandvariousaspects of management includingresource planning,resource hiring-training,scheduling, controlling (quality / process / schedule and cost) & deliverable management.  Proficient in implementing and managing systems and procedures for smooth functioning of various Operational departments with one another.  An effective communicator with demonstrated ease at managing team members; allocating resources and guiding team members to achieve goals.  Have gained knowledge of customs, excise and sales tax procedures.  From May,2008 to 1st week of Sept.’14,I was Project Manager of 2 projects, namely, Augmentation of Ore handling plant project, value Rs 202 crores & New Coal Handing Plant, value Rs492 crores under7 MT ExpansionPlanof Bhilai Steel Plant, INDIA. The new facilities of the 1st one & a portion of the second one have already been commissioned.  From 2nd week of Sept.,14, presently at Dhanbad for setting up a new coal washery for BCCL,valueRs263 crs.  Corporate memberof The Institution of Engineers(India) since June 1991 & Member of ISHRAE, Ranchi chapter from 2008. Expertise Domain  Strategic Planning  Conceptualizing strategic and operational plans for the manufacturing of spares and material planning.  Process Engineering & Improvement  Designing and implementing processes and procedures to facilitate smooth functioning of overall production operations and enhance operational efficiency.  Analyzing various processes / applications and recommending process modifications and equipment calibrations to enhance operational efficiency.  Involving in technical discussion to maintain the process parameters & accordingly make changes.eg. Maintaining proper water pressure in oil coolers.  Discussing technical aspects to reduce the cost of production and increase profitability & prepare finalizations of related discussions.  Site Management/Plant Operations  Conceptualizing&implementingprojects,annual improvementplansforprocessre-engineering, technology absorption projects for expansion and new products.  Planning&implementingthe preventive &predictivemaintenance schedules for improving the overall reliability and safety of plant, personnel and production processes.  Steeringoperationandmaintenance of pumps,highpressure compressor,highpressure vessels, hydraulic pressured pipelines, EOT cranes & furnaces.  Inventory/Vendor Management  Ensuringoptimuminventorylevels to achieve maximum cost savings with minimum holding of stock; maintaining storage areas and arranging infrastructure to ensure smooth flow of operations  Approvingdesigns,provingandtrial of the spares as well as guiding & training of the vendors if required, for manufacturing of the same.  Overseeing initiatives for outsourcing of design and manufacture of spares.
  • 2.  Managing procuring activities of foundry forge plant. Have participated in various techno- commercial discussions with suppliers/vendors for procurement of capital Equipment.  Ensuringtimelyprocurementof qualitymaterials/goodsatjustifiedcostsandavoiding stock-out costs, from indigenous sources and through Imports.  Enlarging vendor base and developing quality vendors.  Issuing different work contracts for the forge shop after issuing tenders.  Development of Spares, Sealings from indigenous sources as substitutes of imported items  InterfacingwithR&Dfor necessarymodifications in component design for manufacturability of components from internal sources.  Scheduling design of spares & ensuring their timely manufacturing.  Coordinating with R&D for approval of drawings as per specifications.  Identifying shortcomings in maximizing availability of equipment for production.  Turn Key Project From May,2008 to 1st week of Sept.’14,I was Project Manager of 2 projects, namely, Augmentation of Ore handling plant project, value Rs 202 crores & New Coal Handing Plant, value Rs492 crores under7 MT ExpansionPlanof Bhilai Steel Plant, INDIA. The new facilities of the 1st one & a portion of the second one have already been commissioned.  From 2nd week of Sept.,14, presently at Dhanbad for setting up a new coal washery for BCCL,value Rs263 crs.  Personnel Management A strong believer in Team management  Attracting,retainingandmotivatingtalent,creatingenvironmentfordevelopmentof excellence in various disciplines & creating a learning organization.  Allocating resources and jobs, for increased availability of equipments.  Implementing on the job training, conducting in-house training programs in order to ensure multiskilling and development of people & optimization of resources. Career Path Heavy Engineering Corporation, Ranchi since March,1981 Currentlydesignatedas“SeniorDeputyGeneral Manager” Growth Path Executive Trainee: 23, March, 1981 to 22, March, 1982 Junior Manager: 23, March, 1982 to 30, December, 1987 Assistant Manager: 31, December, 1987 to 30, December, 1991 Deputy Manager: 31, December, 1991 to 30, December, 1995 Manager: 31, December, 1995 to 30, December, 1999 Senior Manager: 31, December, 1999 to 30, December, 2003 Senior Deputy General Manager: April, 2005 till date Significant highlights during the tenure with Heavy Engineering Corporation include:  Managed to reduce design time period for developing import substitutes of spares of equipments.  Developeddrawingsof imported spares of equipments for manufacture from internal sources.  Initiated development of vendors for supply of substitutes of imported seals, spares.  Drasticallyreducedconsumptionof lubricantoil per month by incorporating a drainage point in oil cooler for settling down of water from amalgamated oil.  Modified and redesigned oil seal cover of reciprocating pump to reduce Oil leakage from plungers.  Developeddrawingsof consumable sparesof some equipment procured from Indian suppliers.  Increased vendor base for some items by identifying vendors through internet.  Initiateddifferent In-House training programs like Computer awareness, Change Management etc.  Performed routine checkup of Equipment before the start of each shift.  Project monitoring, Co-ordination & execution as Project Manager of 2 nos projects, Augmentationof Ore Handling Plant project, value Rs 202 crores and New Coal Handling Plant, value Rs492 crs at Bhilai Steel Plant, India. New facilities of the 1st one and a portion of the second one already commissioned.
  • 3. PreviousWork Experience Usha Sewing Machine Works, Kolkata April,1980-March,1981 Graduate Engineer Trainee (Worked in machine shop area having special purpose machine tools) Education  MBA (Industrial management) fromBirlaInstitute of Technology,Mesra,Ranchi, A Deemed University,1986.  SWIFT Foundationcourse fromNIIT,1997.  B.Sc (Mechanical Engineering) fromBirlaInstitute of Technology,Ranchi University,1980.