1. ANUPKUMAR DUTTA
E-100, sector-2,HEC Colony,Dhurwa,Ranchi-834004, India
Mobile:+91-9771343438/7762869464
Email:anup_kr_1@yahoo.com/anupkrdutta56@gmail.com
SeniorDeputyGeneral ManagerwithHeavyEngineeringCorporation,Ranchi
Overview
An experienced professional with 35 years of industrial experience in activities like design of
auxiliaries, maintenance and operation of equipment, planning, works contract, material
Management and Turnkey Projects.
Currently designated as Senior Deputy General Manager since April, 2005.
A keen planner & implementer with attained proficiency in meeting targets at a given specific
time, as well as on emergency basis.
Have gained expertise in undertaking various modifications with respect to spares, hydraulic
systems for enhancing shop floor productivity. Also reclamations of used spares.
Adroitat Shop-floorsupervision,budgeting,scope planningandvariousaspects of management
includingresource planning,resource hiring-training,scheduling, controlling (quality / process /
schedule and cost) & deliverable management.
Proficient in implementing and managing systems and procedures for smooth functioning of
various Operational departments with one another.
An effective communicator with demonstrated ease at managing team members; allocating
resources and guiding team members to achieve goals.
Have gained knowledge of customs, excise and sales tax procedures.
From May,2008 to 1st
week of Sept.’14,I was Project Manager of 2 projects, namely,
Augmentation of Ore handling plant project, value Rs 202 crores & New Coal Handing Plant,
value Rs492 crores under7 MT ExpansionPlanof Bhilai Steel Plant, INDIA. The new facilities of
the 1st
one & a portion of the second one have already been commissioned.
From 2nd
week of Sept.,14, presently at Dhanbad for setting up a new coal washery for
BCCL,valueRs263 crs.
Corporate memberof The Institution of Engineers(India) since June 1991 & Member of ISHRAE,
Ranchi chapter from 2008.
Expertise Domain
Strategic Planning
Conceptualizing strategic and operational plans for the manufacturing of spares and material
planning.
Process Engineering & Improvement
Designing and implementing processes and procedures to facilitate smooth functioning of
overall production operations and enhance operational efficiency.
Analyzing various processes / applications and recommending process modifications and
equipment calibrations to enhance operational efficiency.
Involving in technical discussion to maintain the process parameters & accordingly make
changes.eg. Maintaining proper water pressure in oil coolers.
Discussing technical aspects to reduce the cost of production and increase profitability &
prepare finalizations of related discussions.
Site Management/Plant Operations
Conceptualizing&implementingprojects,annual improvementplansforprocessre-engineering,
technology absorption projects for expansion and new products.
Planning&implementingthe preventive &predictivemaintenance schedules for improving the
overall reliability and safety of plant, personnel and production processes.
Steeringoperationandmaintenance of pumps,highpressure compressor,highpressure vessels,
hydraulic pressured pipelines, EOT cranes & furnaces.
Inventory/Vendor Management
Ensuringoptimuminventorylevels to achieve maximum cost savings with minimum holding of
stock; maintaining storage areas and arranging infrastructure to ensure smooth flow of
operations
Approvingdesigns,provingandtrial of the spares as well as guiding & training of the vendors if
required, for manufacturing of the same.
Overseeing initiatives for outsourcing of design and manufacture of spares.
2. Managing procuring activities of foundry forge plant. Have participated in various techno-
commercial discussions with suppliers/vendors for procurement of capital Equipment.
Ensuringtimelyprocurementof qualitymaterials/goodsatjustifiedcostsandavoiding stock-out
costs, from indigenous sources and through Imports.
Enlarging vendor base and developing quality vendors.
Issuing different work contracts for the forge shop after issuing tenders.
Development of Spares, Sealings from indigenous sources as substitutes of imported items
InterfacingwithR&Dfor necessarymodifications in component design for manufacturability of
components from internal sources.
Scheduling design of spares & ensuring their timely manufacturing.
Coordinating with R&D for approval of drawings as per specifications.
Identifying shortcomings in maximizing availability of equipment for production.
Turn Key Project
From May,2008 to 1st
week of Sept.’14,I was Project Manager of 2 projects, namely,
Augmentation of Ore handling plant project, value Rs 202 crores & New Coal Handing Plant,
value Rs492 crores under7 MT ExpansionPlanof Bhilai Steel Plant, INDIA. The new facilities of
the 1st
one & a portion of the second one have already been commissioned.
From 2nd
week of Sept.,14, presently at Dhanbad for setting up a new coal washery for
BCCL,value Rs263 crs.
Personnel Management
A strong believer in Team management
Attracting,retainingandmotivatingtalent,creatingenvironmentfordevelopmentof excellence
in various disciplines & creating a learning organization.
Allocating resources and jobs, for increased availability of equipments.
Implementing on the job training, conducting in-house training programs in order to ensure
multiskilling and development of people & optimization of resources.
Career Path
Heavy Engineering Corporation, Ranchi since March,1981
Currentlydesignatedas“SeniorDeputyGeneral Manager”
Growth Path
Executive Trainee: 23, March, 1981 to 22, March, 1982
Junior Manager: 23, March, 1982 to 30, December, 1987
Assistant Manager: 31, December, 1987 to 30, December, 1991
Deputy Manager: 31, December, 1991 to 30, December, 1995
Manager: 31, December, 1995 to 30, December, 1999
Senior Manager: 31, December, 1999 to 30, December, 2003
Senior Deputy General Manager: April, 2005 till date
Significant highlights during the tenure with Heavy Engineering Corporation include:
Managed to reduce design time period for developing import substitutes of spares of
equipments.
Developeddrawingsof imported spares of equipments for manufacture from internal sources.
Initiated development of vendors for supply of substitutes of imported seals, spares.
Drasticallyreducedconsumptionof lubricantoil per month by incorporating a drainage point in
oil cooler for settling down of water from amalgamated oil.
Modified and redesigned oil seal cover of reciprocating pump to reduce Oil leakage from
plungers.
Developeddrawingsof consumable sparesof some equipment procured from Indian suppliers.
Increased vendor base for some items by identifying vendors through internet.
Initiateddifferent In-House training programs like Computer awareness, Change Management
etc.
Performed routine checkup of Equipment before the start of each shift.
Project monitoring, Co-ordination & execution as Project Manager of 2 nos projects,
Augmentationof Ore Handling Plant project, value Rs 202 crores and New Coal Handling Plant,
value Rs492 crs at Bhilai Steel Plant, India. New facilities of the 1st
one and a portion of the
second one already commissioned.
3. PreviousWork Experience
Usha Sewing Machine Works, Kolkata April,1980-March,1981
Graduate Engineer Trainee
(Worked in machine shop area having special purpose machine tools)
Education
MBA (Industrial management) fromBirlaInstitute of Technology,Mesra,Ranchi, A Deemed
University,1986.
SWIFT Foundationcourse fromNIIT,1997.
B.Sc (Mechanical Engineering) fromBirlaInstitute of Technology,Ranchi University,1980.