UTILITY WORK
WITHIN PUBLIC
RIGHTS-OF WAY
AND
EASEMENTS
PRESENTED BY:
Michael McCabe, P.E., CSM
Michael Steele, CPII
City of Palm Bay
107,00+ Residents Predominately SFR
100+ Sq. Miles 50% built-out
800+ Centerline Miles Predominately open
drainage
• FIRST CODE (1974)
• REVISION TO CODE TO INCLUDE PERMITTING (1993)
• DEFINITIONS
• EXEMPTIONS
• FRANCHISES
• PROHIBITED USES
• PERMIT
• WHEN REQUIRED
• NOT REQUIRED
• LIABILITY
• PERMIT PROCEDURES AND REQUIREMENTS
• DESIGN, MATERIAL, TESTING AND REPORTS
• CONSTRUCTION PROCEDURES
• EMERGENCY WORK
• PRESERVATION OF MONUMENTS
• COSTS INCURRED – PAYMENT
• INTERPRETATION OF DISCREPANCIES
• PRIMA FACIE EVIDENCE OF VIOLATION
• DUTY TO REMOVE UPON NOTICE BY CITY
• REMOVAL AND DISPOSAL BY THE CITY UPON FAILURE OF OWNER TO REMOVE;
COSTS
• REMOVAL AND DISPOSAL OF UNLAWFUL IMPROVEMENTS WITHOUT NOTICE TO
OWNER
• RESTORATION OF DAMAGED AREAS
Right of Way And Easement Use
Code
• Existing provisions of other agreements
and contracts, i.e franchises, shall prevail
over requirements of this code.
• All active franchises exempt from fees.
• Current franchise agreements
• Electric
• Gas
• Solid Waste Collection
• No franchise agreements
• Telecommunications, Broadcast, and Cable Services
(Telecommunications Act of 1996)
• Water and Wastewater
EXEMPTIONS
• Fees
• Telecommunications and Cable
• Ordinance 2001-40
• Communications Services Tax
• Increase Local Tax percentage
PERMIT FEES
• General $333
• SFR Irrigation permit $32
• Water Service Connection
• No boring required $30
• Boring required $135
• Hold Harmless recording (irrigation/docks) $15
• Street Cuts
$142
• Projects Under Section 179.096(E) (as-built)$254
EXEMPTIONS
• Prior to installing; placing; constructing; or
replacing any improvement within the right-of-
way and easements.
• Includes, but is not limited, to
• all excavations;
• jack and bores;
• all poles, regardless of its purpose;
• all above ground improvements that create an
obstruction; and,
• all below ground utilities.
WHEN A RIGHT-OF-WAY PERMIT IS
REQUIRED?
• Franchisee when work meets following:
• Will not disturb
• Paved areas.
• Any other improvement.
• Vehicular or pedestrian traffic.
• Area larger than 100 square feet.
• Exceed a depth below grade of 48 inches,
except utility poles.
• Will be restored to a condition as good or better
than existing.
• Underground service connection when trench
width less than 12 inches.
• Is not a jack-’n-bore of any kind.
WHEN A RIGHT-OF-WAY PERMIT IS
NOT REQUIRED?
• Open drainage system
CHALLENGES
• Increased activities due to competition for
communications and cable services
• PERMITEE
• PUBLIC WORKS DEPARTMENT
• CITIZEN/RESIDENT
KEY PLAYERS
COMMERICAL UTILITIES:
• Telecommunications
• Electric
• Cable
• Gas
PERMITEE
CITY UTILITIES:
• Water (Raw and Distribution Lines)
• Wastewater (Gravity, Forcemain, Reuse)
• Information Technology (Fiberoptic)
CONSTRUCTION ACTIVITIES:
• Subcontractors for utility companies
• Contractors for private development
• City staff (utility and IT)
PERMITEE (CONT)
KEY PLAYERS
Public Works Department:
• Engineering Assistant (Receives, process, routes,
issues, final approval)
• Engineering Inspector(s) (Reviews, coordinates,
inspects, approves)
• Engineer II (Supervisor)
Citizen:
• Service (Availability)
• Aesthetics (Exposed pits and soils, safety fence, vegetation)
• Hazards (Pits, cable, sidewalks, poles)
Permit active for 120 days
Acceptable Site Restoration????
Per Code, restoration of
damaged areas shall be
restored to condition prior
to damages or pay the city
the sum of money
necessary to restore.
Acceptable Site Restoration????
Flow line maintenance
Per Code, any permittee who
has previously failed to
restore damages as required
shall not be issued further
permits
Pit depth of 15”
Pit depth of 12”
Utility Pole Removal
Good work?
PERMITTING PROCESS
- Specific zones- Zone 1, Aerial Transmissions- Zone 2, Underground Improvements- Zone 3, Water, Sewer, Gas lines
PERMITTING PROCESS
- Specific depths
• Current Flow Chart
• Proposed Flow Chart
Improvements
PERMITTING PROCESS
STAR
T
APPLICATION
SUBMITTAL
PLANS & SPECS
PLAN REVIEW
PERMIT
REQ’D
REVISION
REQ’D
PROCEED
FILE
ASSIGN INSPECTOR
A B
NO
YES
NO
YES
END
Permitting Process
Flow Chart
NOTIFY
SUBCONTRACTOR
DOCUMENT
A
INSPECTION
CONSTRUCTION
ISSUES
DOCUMENT
ISSUES
RESOLVED
NOTIFY
ENGINEERING
ASST./ENGINEER
ISSUES
RESOLVED
IS WORK
COMPLIANT DOCUMENT
DOCUMENT
WORK
DELAY
CONTACT
PERMITEE
DOCUMENT
B
DOCUMENT
COMPLIANCE
NO
YES
YES
YES
YES
NO
YES
C
NO
INSPECTION
HAS
WORK
STARTED
NO
YES
NO
C D
DOES
WORK
CONTINUE
NO
YES
24 HR
NTP
90 DAY
BENCHMARK
DOCUMENT/NOTIFY PERMITEE
PLAN REVISION
C
INSTALLATIO
N
COMPLETE
SUBMIT
COMPLETION
&
RESTORATION
IS
RESTORATION
COMPLETE
NO
DOCUMENT
(NON-
COMPLIANCE)
D
PERMIT
COMPLETE
YES
SIGN-OFF
PERMIT
CONTACT
ROW
COORDINATOR
ARCHIVE
END
NOTIFY
SUBCONTRACTOR
DOCUMENT
A
INSPECTION
CONSTRUCTION
ISSUES
DOCUMENT
ISSUES
RESOLVED
NOTIFY
ENGINEERING
ASST./ENGINEER
ISSUES
RESOLVED
IS WORK
COMPLIANT DOCUMENT
DOCUMENT
WORK
DELAY
CONTACT
PERMITEE
DOCUMENT
B
DOCUMENT
COMPLIANCE
NO
YES
YES
YES
YES
NO
YES
C
NO
INSPECTION
HAS
WORK
STARTED
NO
YES
NO
C D
DOES
WORK
CONTINUE
NO
YES
24 HR
NTP
90 DAY
BENCHMARK
DOCUMENT/NOTIFY PERMITEE
PLAN REVISION
Process Flow
Chart
Improvements
NOTIFY
SUBCONTRACTOR
DOCUMENT
A
INSPECTION
CONSTRUCTION
ISSUES
DOCUMENT
ISSUES
RESOLVED
NOTIFY
ENGINEERING
ASST./ENGINEER
ISSUES
RESOLVED
IS WORK
COMPLIANT DOCUMENT
DOCUMENT
WORK
DELAY
CONTACT
PERMITEE
DOCUMENT
B
DOCUMENT
COMPLIANCE
NO
YES
YES
YES
YES
NO
YES
C
NO NOTIFY
PERMITEE
HAS
WORK
STARTED
NO
YES
NO
C D
DOES
WORK
CONTINUE
NO
YES
24 HR
NTP
90 DAY
BENCHMARK
VOID PERMIT
PLAN REVISION
END
YES
NO
Process Flow
Chart
Improvements
PERMITTING
PROCESSPermitting Plans and Specifications
Cover Sheet
Cover Sheet
Standard Detail (City’s)
Plan and Cross-Sections
Plan and Cross-Sections
Plan and Cross-Sections
Plan and Details
Plan (aerial view)
Plan (street view)
Plan (color code other utilities)
Traffic Control Plan
General Notes
PERMITTING PROCESS
CHALLENGES
- Number of Open Permits (312)
• 1 utility company has 72 open permits
Permitted
splice pits
Permitted
splice pits in
one
neighborhood
INSPECTION OF WORK
EXISTING
UTILITIES
SWALE
PROPOSED BORE
INSPECTION OF WORK
EXISTING
UTILITIES
SWALE
PROPOSED BORE
EXISTING
UTILITIES???
INSPECTION CONSTRAINTS
Manpower
• 6 Inspectors
Inspector Responsibilities
Permits per Inspector
- Training
- Meetings
- Work Reports
- Plan Reviews
- Construction Inspections
- Capital Improvement Projects
- Commercial Projects
INSPECTION CONSTRAINTS
- Infrastructure Inventory
• Failed Culvert Pipes (+/- 1400)
• Sidewalk Inspections (Annually)
• Guardrail & Handrail (2 year
Inspections)
• Roadway Inspections (5 year
Inspections)
INSPECTION CONSTRAINTS
- Citizen Requests
• (245 Last Quarter)
- ROW Permits Inspections
- NPDES Permit Requirements (MS4)
• Illicit discharge investigations
• Dry weather outfall monitoring
• Storm event inspections
INSPECTION CONSTRAINTS
INSPECTOR DUTIES
PERMITTING PROCESS
SUMMARY
OF CHALLENGES
• Number of open permits
• Lack of required start-up notification
• Timeliness of completion (335 Days)
• Infrastructure maintenance after
installation
• Manpower
• Time management
POSSIBLE
IMPROVEMENTS• Streamline the flow chart
• Restrict open permits to 20-30
• 10 working day stop work delay
• GPS conflicts to import to GIS
• Additional inspection staff or dedicate
one inspector for permits
• Communication
• Quarterly meetings with utilities
• Monthly meetings with Inspectors
• Monthly meetings with staff
QUESTIONS
? ?
?
?

Más contenido relacionado

La actualidad más candente

Peace, Property and Privacy: Objections to BSA 315-12-BZ
Peace, Property and Privacy: Objections to BSA 315-12-BZ  Peace, Property and Privacy: Objections to BSA 315-12-BZ
Peace, Property and Privacy: Objections to BSA 315-12-BZ nsutaria
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 
Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Fairfax County
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12Jerry Williams
 
Meeting of the Verdun / Le Sud-Ouest - Good Neighbourly Relations Committee
Meeting of the Verdun / Le Sud-Ouest - Good Neighbourly Relations CommitteeMeeting of the Verdun / Le Sud-Ouest - Good Neighbourly Relations Committee
Meeting of the Verdun / Le Sud-Ouest - Good Neighbourly Relations CommitteePont Samuel-De Champlain Bridge
 
Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14James M. Bright, P.E.
 
Compliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit RequirementsCompliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit RequirementsLoren Larson, CHMM, CPEA
 
New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207Safe Rise
 
Details of anti noise walls - june 15 2016 - nouveau pont champlain
Details of anti noise walls - june 15 2016 - nouveau pont champlainDetails of anti noise walls - june 15 2016 - nouveau pont champlain
Details of anti noise walls - june 15 2016 - nouveau pont champlainPont Samuel-De Champlain Bridge
 
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017Fairfax County
 
Optimisation of dewatering systems
Optimisation of dewatering systemsOptimisation of dewatering systems
Optimisation of dewatering systemsMartin Preene
 

La actualidad más candente (13)

Peace, Property and Privacy: Objections to BSA 315-12-BZ
Peace, Property and Privacy: Objections to BSA 315-12-BZ  Peace, Property and Privacy: Objections to BSA 315-12-BZ
Peace, Property and Privacy: Objections to BSA 315-12-BZ
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
E1 estudio topografico 1
E1 estudio topografico 1E1 estudio topografico 1
E1 estudio topografico 1
 
Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12
 
Public Information Meeting - Verdu - May 25, 2016
Public Information Meeting - Verdu - May 25, 2016Public Information Meeting - Verdu - May 25, 2016
Public Information Meeting - Verdu - May 25, 2016
 
Meeting of the Verdun / Le Sud-Ouest - Good Neighbourly Relations Committee
Meeting of the Verdun / Le Sud-Ouest - Good Neighbourly Relations CommitteeMeeting of the Verdun / Le Sud-Ouest - Good Neighbourly Relations Committee
Meeting of the Verdun / Le Sud-Ouest - Good Neighbourly Relations Committee
 
Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14
 
Compliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit RequirementsCompliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit Requirements
 
New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207
 
Details of anti noise walls - june 15 2016 - nouveau pont champlain
Details of anti noise walls - june 15 2016 - nouveau pont champlainDetails of anti noise walls - june 15 2016 - nouveau pont champlain
Details of anti noise walls - june 15 2016 - nouveau pont champlain
 
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
 
Optimisation of dewatering systems
Optimisation of dewatering systemsOptimisation of dewatering systems
Optimisation of dewatering systems
 

Similar a Utility Work within Public Right of Way

Construction Observation Tips
Construction Observation TipsConstruction Observation Tips
Construction Observation Tipsncengineer
 
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...California Asphalt Pavement Association
 
Supplier Hoist Cranes Jakarta | stahlindo
Supplier Hoist Cranes Jakarta | stahlindoSupplier Hoist Cranes Jakarta | stahlindo
Supplier Hoist Cranes Jakarta | stahlindoStahlindo Indonesia
 
GISImplementationInDesignWorkflows
GISImplementationInDesignWorkflowsGISImplementationInDesignWorkflows
GISImplementationInDesignWorkflowsZeev Somer
 
Dallas madson resume2
Dallas madson resume2Dallas madson resume2
Dallas madson resume2Dallas Madson
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessEMRoundtable
 
Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Obi-Ugbo Alex
 
Land Subdivisions University Course
Land Subdivisions University CourseLand Subdivisions University Course
Land Subdivisions University CourseNettlemanU
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
PACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHUREPACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHURERichard Carroll
 
PACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHUREPACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHURENelson Larios
 
PACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHUREPACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHURERick Huerta
 
PACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHUREPACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHUREDon Greenman
 

Similar a Utility Work within Public Right of Way (20)

Quick trench program
Quick trench programQuick trench program
Quick trench program
 
Area 21 & 23 Pic1 display panels
Area 21 & 23 Pic1 display panelsArea 21 & 23 Pic1 display panels
Area 21 & 23 Pic1 display panels
 
RiverArch Investor Summary - Sponsor.pdf
RiverArch Investor Summary - Sponsor.pdfRiverArch Investor Summary - Sponsor.pdf
RiverArch Investor Summary - Sponsor.pdf
 
Construction Observation Tips
Construction Observation TipsConstruction Observation Tips
Construction Observation Tips
 
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
 
Supplier Hoist Cranes Jakarta | stahlindo
Supplier Hoist Cranes Jakarta | stahlindoSupplier Hoist Cranes Jakarta | stahlindo
Supplier Hoist Cranes Jakarta | stahlindo
 
GISImplementationInDesignWorkflows
GISImplementationInDesignWorkflowsGISImplementationInDesignWorkflows
GISImplementationInDesignWorkflows
 
Dallas madson resume2
Dallas madson resume2Dallas madson resume2
Dallas madson resume2
 
Cost-Effective Duct Retrofit & Leakage Reduction
Cost-Effective Duct Retrofit & Leakage ReductionCost-Effective Duct Retrofit & Leakage Reduction
Cost-Effective Duct Retrofit & Leakage Reduction
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site Readiness
 
Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)
 
Land Subdivisions University Course
Land Subdivisions University CourseLand Subdivisions University Course
Land Subdivisions University Course
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Area36 final pic1 boards
Area36 final pic1 boardsArea36 final pic1 boards
Area36 final pic1 boards
 
PACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHUREPACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHURE
 
PACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHUREPACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHURE
 
PACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHUREPACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHURE
 
PACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHUREPACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHURE
 
PACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHUREPACIFIC COAST LOCATORS BROCHURE
PACIFIC COAST LOCATORS BROCHURE
 
Resume lois 12-2015
Resume lois 12-2015Resume lois 12-2015
Resume lois 12-2015
 

Más de 2014 Florida Public Works Expo

Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 0707142014 Florida Public Works Expo
 
Closing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building OperationsClosing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building Operations2014 Florida Public Works Expo
 
What Every City Manager wants in a Public Works Director
What Every City Manager wants in a Public Works Director What Every City Manager wants in a Public Works Director
What Every City Manager wants in a Public Works Director 2014 Florida Public Works Expo
 

Más de 2014 Florida Public Works Expo (18)

Wausau Paper Presentation
Wausau Paper PresentationWausau Paper Presentation
Wausau Paper Presentation
 
Public Works Advocacy - The Australian Way
Public Works Advocacy - The Australian WayPublic Works Advocacy - The Australian Way
Public Works Advocacy - The Australian Way
 
Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714
 
City of Edgewater CNG Presentation
City of Edgewater CNG PresentationCity of Edgewater CNG Presentation
City of Edgewater CNG Presentation
 
Closing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building OperationsClosing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building Operations
 
Pathway to Sustainable Waste Management
Pathway to Sustainable Waste ManagementPathway to Sustainable Waste Management
Pathway to Sustainable Waste Management
 
What Every City Manager wants in a Public Works Director
What Every City Manager wants in a Public Works Director What Every City Manager wants in a Public Works Director
What Every City Manager wants in a Public Works Director
 
Permanent Backup Lift Station Pumps
Permanent Backup Lift Station PumpsPermanent Backup Lift Station Pumps
Permanent Backup Lift Station Pumps
 
Old Cutler Road Improvements
Old Cutler Road ImprovementsOld Cutler Road Improvements
Old Cutler Road Improvements
 
Does Size Matter?
Does Size Matter?Does Size Matter?
Does Size Matter?
 
Pipe Bursting
Pipe BurstingPipe Bursting
Pipe Bursting
 
The Pompano Canal Story
The Pompano Canal StoryThe Pompano Canal Story
The Pompano Canal Story
 
Nbc cso apwa expo july 8 t12
Nbc cso apwa expo july 8 t12Nbc cso apwa expo july 8 t12
Nbc cso apwa expo july 8 t12
 
Tools for Pavement Preservation
Tools for Pavement PreservationTools for Pavement Preservation
Tools for Pavement Preservation
 
Sustainability
SustainabilitySustainability
Sustainability
 
Emergency Watershed Protection Program
Emergency Watershed Protection ProgramEmergency Watershed Protection Program
Emergency Watershed Protection Program
 
APWA Cool Roofing Made Simple
APWA Cool Roofing Made SimpleAPWA Cool Roofing Made Simple
APWA Cool Roofing Made Simple
 
Networking for Introverts
Networking for IntrovertsNetworking for Introverts
Networking for Introverts
 

Último

Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s educationSERUDS INDIA
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfSamirsinh Parmar
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisChristina Parmionova
 
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiVasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiPriya Reddy
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsPakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsMonica Sydney
 
unang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionunang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionGLADYSNUEVO1
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32JSchaus & Associates
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Partito democratico
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learningNAP Global Network
 
sponsor for poor old age person food.pdf
sponsor for poor old age person food.pdfsponsor for poor old age person food.pdf
sponsor for poor old age person food.pdfSERUDS INDIA
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCNAP Global Network
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.Christina Parmionova
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...HyderabadDolls
 
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...Namrata Singh
 
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7Delhi Call girls
 

Último (20)

Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiVasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsPakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
 
unang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionunang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog version
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
sponsor for poor old age person food.pdf
sponsor for poor old age person food.pdfsponsor for poor old age person food.pdf
sponsor for poor old age person food.pdf
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
 
31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.
 
Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
 

Utility Work within Public Right of Way

Notas del editor

  1. Only when the proposed improvement within the City right-of-way meets all the following conditions: (1) Will not disturb any paved areas. (2) Will not disturb any other improvements/infrastructure in the area. (3) Will not disturb vehicular or pedestrian traffic to any degree. (4) Will not disturb an area larger than 100 square feet in any shape. (5) Will not exceed a depth below grade of 48 inches. (6) Will be restored to a condition as good as or better than existed before the effort. The disturbed soil will be stabilized with like sod in front of developed areas or seed and mulch in front of undeveloped areas, except sod shall be used on all disturbed areas with a slope angle of 3 to 1 or greater. (7) Underground service connection, when the trench width is twelve inches (12") or less. (8} Is not a jack-and-bore of any kind, regardless of intended method of underground piercing to be used.
  2. Only when the proposed improvement within the City right-of-way meets all the following conditions: (1) Will not disturb any paved areas. (2) Will not disturb any other improvements/infrastructure in the area. (3) Will not disturb vehicular or pedestrian traffic to any degree. (4) Will not disturb an area larger than 100 square feet in any shape. (5) Will not exceed a depth below grade of 48 inches. (6) Will be restored to a condition as good as or better than existed before the effort. The disturbed soil will be stabilized with like sod in front of developed areas or seed and mulch in front of undeveloped areas, except sod shall be used on all disturbed areas with a slope angle of 3 to 1 or greater. (7) Underground service connection, when the trench width is twelve inches (12") or less. (8} Is not a jack-and-bore of any kind, regardless of intended method of underground piercing to be used.
  3. Only when the proposed improvement within the City right-of-way meets all the following conditions: (1) Will not disturb any paved areas. (2) Will not disturb any other improvements/infrastructure in the area. (3) Will not disturb vehicular or pedestrian traffic to any degree. (4) Will not disturb an area larger than 100 square feet in any shape. (5) Will not exceed a depth below grade of 48 inches. (6) Will be restored to a condition as good as or better than existed before the effort. The disturbed soil will be stabilized with like sod in front of developed areas or seed and mulch in front of undeveloped areas, except sod shall be used on all disturbed areas with a slope angle of 3 to 1 or greater. (7) Underground service connection, when the trench width is twelve inches (12") or less. (8} Is not a jack-and-bore of any kind, regardless of intended method of underground piercing to be used.
  4. Only when the proposed improvement within the City right-of-way meets all the following conditions: (1) Will not disturb any paved areas. (2) Will not disturb any other improvements/infrastructure in the area. (3) Will not disturb vehicular or pedestrian traffic to any degree. (4) Will not disturb an area larger than 100 square feet in any shape. (5) Will not exceed a depth below grade of 48 inches. (6) Will be restored to a condition as good as or better than existed before the effort. The disturbed soil will be stabilized with like sod in front of developed areas or seed and mulch in front of undeveloped areas, except sod shall be used on all disturbed areas with a slope angle of 3 to 1 or greater. (7) Underground service connection, when the trench width is twelve inches (12") or less. (8} Is not a jack-and-bore of any kind, regardless of intended method of underground piercing to be used.
  5. Only when the proposed improvement within the City right-of-way meets all the following conditions: (1) Will not disturb any paved areas. (2) Will not disturb any other improvements/infrastructure in the area. (3) Will not disturb vehicular or pedestrian traffic to any degree. (4) Will not disturb an area larger than 100 square feet in any shape. (5) Will not exceed a depth below grade of 48 inches. (6) Will be restored to a condition as good as or better than existed before the effort. The disturbed soil will be stabilized with like sod in front of developed areas or seed and mulch in front of undeveloped areas, except sod shall be used on all disturbed areas with a slope angle of 3 to 1 or greater. (7) Underground service connection, when the trench width is twelve inches (12") or less. (8} Is not a jack-and-bore of any kind, regardless of intended method of underground piercing to be used.
  6. Only when the proposed improvement within the City right-of-way meets all the following conditions: (1) Will not disturb any paved areas. (2) Will not disturb any other improvements/infrastructure in the area. (3) Will not disturb vehicular or pedestrian traffic to any degree. (4) Will not disturb an area larger than 100 square feet in any shape. (5) Will not exceed a depth below grade of 48 inches. (6) Will be restored to a condition as good as or better than existed before the effort. The disturbed soil will be stabilized with like sod in front of developed areas or seed and mulch in front of undeveloped areas, except sod shall be used on all disturbed areas with a slope angle of 3 to 1 or greater. (7) Underground service connection, when the trench width is twelve inches (12") or less. (8} Is not a jack-and-bore of any kind, regardless of intended method of underground piercing to be used.
  7. Commercial Utilities 1. Revenue/Profits 2. New Facilities 3. Upgraded Used Facilities and Maintenance 4. Demand for Service
  8. CITIZENS REQUIRED FOR DRIVEWAY IMPROVEMENTS AND/OR ADDITIONS
  9. SAFETY FENCE SILT FENCE CROSS DRAIN PIPE
  10. In-line with the swale.
  11. 30” below grade
  12. Sidewalk Closed
  13. Good work MOT Filter fabric for excavated material Amount of trenching backfilled at the end of the day