SlideShare una empresa de Scribd logo
1 de 5
CURRICULUM VITAE
ASHOK KUMAR TIWARI
17/212, Indra Nagar, Lucknow UP India
Cell no. 8423232388 / 8874207608  & 05224004040
E-mail:ashok_tiwari@hotmail.com, ashoktiwarieng@gmail.com
OBJECTIVE:-
To sustain in the industry and to utilize myself as all kind of challenging jobs
By upgrading my knowledge &skills from time to time.
 Skill Summary:
Total of 20 Years of Experience in Chief Engineer (technical head in facility management)
Electrical Air conditioning HT & LT PANEL. All Type DG Set.AMF.PLC. BMS System Lights & Power.CCTV. Fire
Fighting System Laundry. Boiler Hot Water Generator ALL TYPE.PANEL& ELECTROMECHANICAL SERVICE
UPS ALL TYPE. FACILITY UTILITIES SYSTEM
 Should have GOOD knowledge and understanding of PLC, VFD & relay logics (Omron, Mitsubishi& Delta), Servo
motor & servo drives, sensors , Ac drives && related instrumentation used for SPMs.
 Should be able to study existing processes, methods and identify areas of improvements to get better utilization in
energy,man power, resources used. Specially with areas relating to Electricity Conservation.
 Should be able to get junior officers to work as a team.
 Should have good Execution Capabilities proven in past job done.
 Salary is no bar for the right candidate.
 Certification and Training: License
1. License - (IET 1062 Electricity Board Mumbai 1997 No.152127)
2. Diploma in Electrical 2002
3. Air-condition Training Diploma six month 2004
Training in Complete utilitiesHT/LT & air-condition all Electrical system Tanning in Refrigeration Management
system All electro mechanical utility services
Pre opening & operational Hotel / Shopping mall Hospital Software call canter factory industrial Project &
Factory maintenance
 Technology &Utilities System:
All the technologies, Electrical, mechanical utilities system & Minor electronics systems, operations and
maintain and installation. Complete utility system and new technology .all type project & Operation
Electrical Maintenances Facility Engineer all monthly check list
Technology &Utilities System:
All the technologies,Electrical,mechanical utilities system & Minor electronics systems,operations and maintain and
installation.Complete utilitysystem
Was responsible for complete operation and maintenance all the engineering equipment and hotel facilities Like Electrical
Substation, Air conditioning, Effluent Treatment, Fire detection & Safety, Kitchen & Laundry Equipment, Boilers, Computerized
Dimmers, Swimming Pools & Water Bodies, Civil jobs incl. Painting and Polishing etc.
Also responsible for the various renovation, expansions and refurbishments in the Hotel Designed and commissioned new IBR
Boilers, Hot water generation system based on steam, New R.O. to cater to complete water supply in the hotel and many more up
gradations.
Leading a team of trained/semi trained technical staff.
Preparing various Preventive maintenance Schedules and ensuring their proper implementation.
Proactive measures for the maximum Energy Conservation without hampering the operations, guest comfort and system
operating parameters. Preparing the Budgets for energy consumption, Repairs & spares and ensure that deadlines are met.
Modifications to bring down the power consumption
overhauling of the major equipment. Implementation of various maintenance schedules for the upkeep of the property.
Present assignment: March 2008 to Till Date
Company SAROVAR PORTICO (A Sarovar Hotels) Lucknow
Company Profile:
Sarovar Hotels & Resorts
Hotels & Resorts is a privately owned hotel chain in India. It is the 4th largest hotel chain in India with 36 hotels
across India and overseas.The company is affiliated with Carlson Hospitality Worldwide. Carlson is active in
hospitality services,comprising more than 1,570 hotels, resorts restaurants,and cruis e ship operations in 81
countries. The association with Carlson Hospitality makes Sarovar Hotels the master franchisor [clarification needed] for
the Park Plaza and the Park Inn hotel brands in India. The Company has also launched the domestic brands: Sarovar
Premiere, Sarovar Portico and Hometel.
 Sarovar Premier and Park Plaza - upscale (5 star) segment
 Sarovar Portico and Park Inn - mid-market (3-4 star) segment
 Hometel - 3 star segment with cheaper rooms. Sarovar currently has 6 budget hotels.
Work Profile: I Am Working as a Chief Engineer in the company. My job included maintenance and
execution of electrical, Mechanical, plumbing STP plant, Tele-communication systems
and civil area of the Hotel. My Job Includes Execution of Project and operational works of
hotel. I was handling team of technicians and other technical people of different
contractors. I My Job also included planning and management of work force for
completions of jobs within the time
Past Assignment: May.2005 to March 2008
Company Profile:
Jones Lang LaSalle
SaharaganjMall
Lucknow went through a transformation in its lifestyle with Sahara
Infrastructure & Housing generating ample avenues. Be it residential
or commercial Sahara Ganj, opened in November 2005 to provide the
city with the best entertainment arena. A brand Super Mall, it is self
sufficient in its offerings & specifications of the highest order. The
built up area of approx 525 Thousand sq. ft. matching international
standards & having the best value additions.
Work profile : I was designated as Shift Engineer in the company.
My job included maintenance and execution of Electrical, Mechanical,
plumbing swimming pool, STP plant, Tele-communication systems and civil
area of the Hotel. My Job Includes Execution of Project and operational works of hotel. I was handling team of
technicians and other technical people of different contractors. I used to work in Shifts and open for pressure
environment. My Job also included planning and management of work force for completions of jobs within the time
frame given by superiors I was designated as Shift Engineer
Past Assignment: ( Facility Engineer )
Company Birla Soft
Company Profile:
Founded in 1995, Birla soft is an IT Services provider,with a global workforce of over 6000 employees and has a
footprint in 5 continents & delivery centers in China & India. Birla soft sells its stuff to the Banking,Financial ices,
Insurance and Manufacturing industries.Starting out as Birla Horizons International,the company was rejuvenated
and renamed as Birla soft Inc in 1998, when GE Capital joined the company as a strategic investor. The company
now has several offices across multiple global locations with dedicated software centers,
Work Profile: I was designated as As whole sole In charge in the company. My job includes maintenance and
execution of electrical, Mechanical, plumbing, civil, in company. I was handling team of technicians
and other technical people of different contractors I was reporting to Chief Engineer of company.
Past assignment: ( Shift Engineer ).
Company : mansingh Hotels & Resorts
CompanyProfile: Keepingthe age-oldtraditionsalive, theMansingh at Agra,Ajmer and Jaipur provides a glorious example of
hotels. The group'shotel businessstarted in 1980, when IndoContinental Hotels& Resorts Ltd. was taken over by the family. The first Hotel
of the group, `Mansingh', Jaipur gave the hotel group its present name - The Mansingh Group
Work profile : I was designated as Shift Engineer in the company. My job included maintenance and
execution of Electrical, Mechanical, plumbing swimming pool, STP plant, Tele-communication systems and civil area
of the Hotel. My Job Includes Execution of Project and operational works of hotel. I was handling team of
technicians and other technical people of different contractors. I used to work in Shifts and open for pressure
environment. My Job also included planning and management of work force for completions of jobs within the time
frame given by superiors I was designated as Shift Engineer
Past Assignment: Facility Engineer (From Jan 97 to Jan 2002 )
Company HST Enterprises, Gautam Nagar New-Delhi
Company Profile: For handling All types of Electro-Mechanical Services for various Telephonic
Exchanges at T.E Yamuna Nagar T.E Ambala and T.E Hisser .all A/C, L/T, H/T ,POWERPLANT Rapier
all type electro maniacal All haryana India check and execute all activities of his department to ensure guest
safety and comfort. These activities include ensuring smooth and appropriate functioning of air
conditioning/heating systems, water supply, heat, light and power and all equipment in the hotel, while
keeping a control on energy
Work Profile:I was designated Supervisor in the company. My job includes maintenanceand execution of
electrical,Mechanical,plumbing,civil, in company.I was handlingteam of technicians and other technical people
of different contractors I was reportingto Chief Engineer of company
Past Assignment: Asst. Engineer (From Jun 1994 to July 1997)
Company M/S DELIP VIDYUT BOMBAY (GOVT. Contractor ) Mumbai
Company Profile: Maintaining all types of Controls & Consoles of panel Boards and DG sets D C Motor Panel
cable mcb mccb acb& ocb installation work
Work Profile:I was designated Supervisor in the company. My job includes maintenanceand execution of
electrical,Mechanical,plumbing,civil, in company.I was handlingteam of technicians and other technical people
of different contractors I was reportingto Chief Engineer of company
Past Assignment: Asst. Technical Service (from Jan 1993 to Nov 1995)
Company M/S Western Engineering Company, New Delhi
Company Profile:
Maintaining all types of Controls & Consoles of panel Boards and DG sets D C Motor Panel
cable mcb mccb acb& ocb installation work Panel manufacturing
Work Profile. As Electrical Asst. for H.V.A.C Project handling all types of Electro-Mechanical Services all A/C,
L/T, H/T, Power plant Rapier all type Electro, mechanical jobs
Past Assignment: Air-condition & Electrical Engineer ( C.N. Center) (From July 1997 to Jan 1999)
Company
All India Institute of Medical Sciences
Company Profile: AIIMS was inaugurated in 1956, and was built with a grant from the Government of New
Zealand under the Colombo Plan. AIIMS was established in New Delhi after former Indian prime minister
Jawaharlal Nehru's initial proposalto set up the institute in Calcutta was turned down by the then Chief Minister of
West Bengal Bidhan Chandra Roy.[8] It was the vision of Rajkumari Amrit Kaur, the first Health Minister of India,
to establish an institute of such nature in India.
Work Profile:As whole solein charge CN Center for AC Plantfor 5+120 tan Voltas capacity 600 tan ahu stardalta
starter total capacity 2000 amp.Includingall electrical & maintenanceAll CN canter AIIMS new Delhi Voltas C.N
Center in AllMS New Delhi. check and executeall activities of his departmentto ensure guestsafety and comfort.These
activities includeensuring smooth andappropriatefunctioningof airconditioning/heatingsystems,watersupply,heat,
lightand powerand all equipmentin thehotel,whilekeeping a control on energy costs
Professional Knowledge: - :
Energy Saving Cost Below In all Departments in 20 % joins the company
H.T supply :ACB O.C.B & V.C.B & G/O Sw itches & AllTypes HT Sw itch Repair & Maintenance .Control & Console System, HT
Cable testing ,Earth testing w ith Attach transformer HT ,High Voltage AVR
LT Supply: LT Panel Manual System, LT Panel w ith Auto System& Equipment Know ledge, AMFpanel UPS system
PLC .AMF& BMS attached Synchronizing Panel w ith DC Control Panel System(24V) & DG Panel Selection Manually & Auto
Change Over Type. All types Motors AC & DC
HVAC :*("heating, ventilating, and air conditioning.")
Like centralized plant. Window AC Split. Tower centrifugal plant VRF & VRV Systems
Water (WTP.RO.Softner Plant)
Aggressively managing a hotel's water consumption is very cost-effective because it pays three ways. Conserving
water:
1. Reduces the number of gallons of water purchased
2. Reduces the amount the hotel will pay for sewage (water disposal)
3. In the case of hot water, reduces water-hearing costs because less hot water must be produced
Waste water treatment
STP WTP
PM (Preventative Maintenance) Program: A specific inspection and activities schedule designed to
minimize maintenance-related costs and to prolong the life of equipment by preventing small problems
before they become larger ones.
 Checking the bills of electrical, Low current & HVAC contractors
 Checking the bills of electrical, Low current fire detection and fire fighting systems
 Checking the specifications and contact of Electrical, (HT & LT). H.V.A.C.fire fighting. IBMS. Security,
fire detection & Alarm, P.A.lift & Escalator, ETP etc
 Negotiations & Finalization of tenders with different contractors
 Installation Testing &Commissioning of E.T.P.
 Installation Testing &Commissioning of water Softener Plant
 Installation testing & commissioning of Elevators & Escalators
Software Known : Dos 6.22 Window95, 98xp window8 andNTMS office, Internet Explorer
Hardware : Hardware Assembling. Maintenance & Troubleshooting.
Installation of Modem.Multimedia & various software.
Academic Qualification : 10+2th Passed. 1993
Tec. Qualification... Diploma in electrical 2002
Air-condition six month training diploma
Electrical licance in Bombay HT & LT 1997 IER 1062
Permanent Address : Village .Tiwaripur, P.O. Khajurgawa. Campierganj
Distt. Gorakhpur (U.P) India PIN.273158
Res. mo.no. 09336450047
Personal Details:
Father’s Name : Shri Sant Kumar Tiwari
Date of Birth 05/01/1975
Nationality : Indian
Language : Hindi & English
Date:
Place: (Ashok Kumar Tiwari)
Notice Period one month

Más contenido relacionado

La actualidad más candente

MEC Engineers Company Profiles f
MEC Engineers Company Profiles fMEC Engineers Company Profiles f
MEC Engineers Company Profiles f
RAVICHANDER
 
chetan patel_update
chetan patel_updatechetan patel_update
chetan patel_update
patel chetan
 
Sally CV 15 Aprl2012(Docx) Brief
Sally CV 15 Aprl2012(Docx)   BriefSally CV 15 Aprl2012(Docx)   Brief
Sally CV 15 Aprl2012(Docx) Brief
Sally Al-Gazzar
 
Resume - Farhan Ahmed Memon - June 20, 2015
Resume - Farhan Ahmed Memon - June 20, 2015Resume - Farhan Ahmed Memon - June 20, 2015
Resume - Farhan Ahmed Memon - June 20, 2015
Engr. Farhan Ahmed Memon
 
RABINDRA KUMAR PANDEY-PUNE
RABINDRA KUMAR PANDEY-PUNERABINDRA KUMAR PANDEY-PUNE
RABINDRA KUMAR PANDEY-PUNE
R.K. Pandey
 

La actualidad más candente (20)

CV RESUME -20.11.2016.docx AGM
CV  RESUME -20.11.2016.docx  AGM  CV  RESUME -20.11.2016.docx  AGM
CV RESUME -20.11.2016.docx AGM
 
CV-ASIF - 0dtl - PDF
CV-ASIF - 0dtl - PDFCV-ASIF - 0dtl - PDF
CV-ASIF - 0dtl - PDF
 
JOJI GEORGE new
JOJI GEORGE newJOJI GEORGE new
JOJI GEORGE new
 
MMS
MMSMMS
MMS
 
AK CV
AK CVAK CV
AK CV
 
MEC Engineers Company Profiles f
MEC Engineers Company Profiles fMEC Engineers Company Profiles f
MEC Engineers Company Profiles f
 
chetan patel_update
chetan patel_updatechetan patel_update
chetan patel_update
 
Resume of satya
Resume of satyaResume of satya
Resume of satya
 
Sally CV 15 Aprl2012(Docx) Brief
Sally CV 15 Aprl2012(Docx)   BriefSally CV 15 Aprl2012(Docx)   Brief
Sally CV 15 Aprl2012(Docx) Brief
 
Resume - Farhan Ahmed Memon - June 20, 2015
Resume - Farhan Ahmed Memon - June 20, 2015Resume - Farhan Ahmed Memon - June 20, 2015
Resume - Farhan Ahmed Memon - June 20, 2015
 
Sharudin Hamid
Sharudin HamidSharudin Hamid
Sharudin Hamid
 
Paul Jacob
Paul JacobPaul Jacob
Paul Jacob
 
Simab CV sup.
Simab CV sup.Simab CV sup.
Simab CV sup.
 
Elangovan_Selvam (1)
Elangovan_Selvam (1)Elangovan_Selvam (1)
Elangovan_Selvam (1)
 
Company Profile
Company ProfileCompany Profile
Company Profile
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
 
RABINDRA KUMAR PANDEY-PUNE
RABINDRA KUMAR PANDEY-PUNERABINDRA KUMAR PANDEY-PUNE
RABINDRA KUMAR PANDEY-PUNE
 
sameer CV (22-1-2016)
sameer CV (22-1-2016)sameer CV (22-1-2016)
sameer CV (22-1-2016)
 
Profile final 234567890@
Profile  final 234567890@Profile  final 234567890@
Profile final 234567890@
 
karthi
karthikarthi
karthi
 

Destacado (17)

Arun Singh Resume
Arun Singh ResumeArun Singh Resume
Arun Singh Resume
 
army resume
army resumearmy resume
army resume
 
Arlyne Gonzalez resumeeees
Arlyne Gonzalez resumeeeesArlyne Gonzalez resumeeees
Arlyne Gonzalez resumeeees
 
Aries Gdim Business Resume
Aries Gdim Business ResumeAries Gdim Business Resume
Aries Gdim Business Resume
 
Arslan Ahmad Resume
Arslan Ahmad ResumeArslan Ahmad Resume
Arslan Ahmad Resume
 
Ashliegh Jarzenski Hospitality Resume
Ashliegh Jarzenski Hospitality Resume Ashliegh Jarzenski Hospitality Resume
Ashliegh Jarzenski Hospitality Resume
 
Ashley Faciane Resume 2016 IT (No Photo)
Ashley Faciane Resume 2016 IT (No Photo)Ashley Faciane Resume 2016 IT (No Photo)
Ashley Faciane Resume 2016 IT (No Photo)
 
Ash1_Entry Level Resume – 01
Ash1_Entry Level Resume – 01Ash1_Entry Level Resume – 01
Ash1_Entry Level Resume – 01
 
Ash.Helm.resume
Ash.Helm.resumeAsh.Helm.resume
Ash.Helm.resume
 
Arnab-Roy-Resume'16
Arnab-Roy-Resume'16Arnab-Roy-Resume'16
Arnab-Roy-Resume'16
 
Arun_Resume (1)
Arun_Resume (1)Arun_Resume (1)
Arun_Resume (1)
 
Aron Morgulis resume
Aron Morgulis resumeAron Morgulis resume
Aron Morgulis resume
 
Arjun Thomas Photography Resume
Arjun Thomas Photography ResumeArjun Thomas Photography Resume
Arjun Thomas Photography Resume
 
Ash_Resume USA JOBS
Ash_Resume USA JOBSAsh_Resume USA JOBS
Ash_Resume USA JOBS
 
ARUN RESUME 2015
ARUN RESUME 2015ARUN RESUME 2015
ARUN RESUME 2015
 
Arjun Sandhu Resume 5.19.15
Arjun Sandhu Resume 5.19.15Arjun Sandhu Resume 5.19.15
Arjun Sandhu Resume 5.19.15
 
Ashley Emert Resume
Ashley Emert ResumeAshley Emert Resume
Ashley Emert Resume
 

Similar a ashok kumar tiwari resume

My Resume
My Resume My Resume
PURUSHOTHAMAN.M_-_RESUME.
PURUSHOTHAMAN.M_-_RESUME.PURUSHOTHAMAN.M_-_RESUME.
PURUSHOTHAMAN.M_-_RESUME.
Purushoth M
 

Similar a ashok kumar tiwari resume (20)

Rajnish_1971
Rajnish_1971Rajnish_1971
Rajnish_1971
 
Shashikant Resume
Shashikant ResumeShashikant Resume
Shashikant Resume
 
CHAYARAVI_1 (4)
CHAYARAVI_1 (4)CHAYARAVI_1 (4)
CHAYARAVI_1 (4)
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
 
CV
CVCV
CV
 
My Resume
My Resume My Resume
My Resume
 
hari shankar4
hari shankar4hari shankar4
hari shankar4
 
MJ FM hvac
MJ FM hvacMJ FM hvac
MJ FM hvac
 
CV of Ashok Kumar.K
CV of Ashok Kumar.KCV of Ashok Kumar.K
CV of Ashok Kumar.K
 
Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
 
Rajiv cv
Rajiv cv Rajiv cv
Rajiv cv
 
CV Dewaharbabu
CV DewaharbabuCV Dewaharbabu
CV Dewaharbabu
 
rajiv cv
rajiv cv rajiv cv
rajiv cv
 
PURUSHOTHAMAN.M_-_RESUME.
PURUSHOTHAMAN.M_-_RESUME.PURUSHOTHAMAN.M_-_RESUME.
PURUSHOTHAMAN.M_-_RESUME.
 
Anup updated
Anup updatedAnup updated
Anup updated
 
Resume 25.09.15
Resume 25.09.15Resume 25.09.15
Resume 25.09.15
 
Resume0516
Resume0516Resume0516
Resume0516
 
Resume0516
Resume0516Resume0516
Resume0516
 
Mark O
Mark OMark O
Mark O
 
Sanjay Mondal Presentation
Sanjay Mondal PresentationSanjay Mondal Presentation
Sanjay Mondal Presentation
 

ashok kumar tiwari resume

  • 1. CURRICULUM VITAE ASHOK KUMAR TIWARI 17/212, Indra Nagar, Lucknow UP India Cell no. 8423232388 / 8874207608 & 05224004040 E-mail:ashok_tiwari@hotmail.com, ashoktiwarieng@gmail.com OBJECTIVE:- To sustain in the industry and to utilize myself as all kind of challenging jobs By upgrading my knowledge &skills from time to time.  Skill Summary: Total of 20 Years of Experience in Chief Engineer (technical head in facility management) Electrical Air conditioning HT & LT PANEL. All Type DG Set.AMF.PLC. BMS System Lights & Power.CCTV. Fire Fighting System Laundry. Boiler Hot Water Generator ALL TYPE.PANEL& ELECTROMECHANICAL SERVICE UPS ALL TYPE. FACILITY UTILITIES SYSTEM  Should have GOOD knowledge and understanding of PLC, VFD & relay logics (Omron, Mitsubishi& Delta), Servo motor & servo drives, sensors , Ac drives && related instrumentation used for SPMs.  Should be able to study existing processes, methods and identify areas of improvements to get better utilization in energy,man power, resources used. Specially with areas relating to Electricity Conservation.  Should be able to get junior officers to work as a team.  Should have good Execution Capabilities proven in past job done.  Salary is no bar for the right candidate.  Certification and Training: License 1. License - (IET 1062 Electricity Board Mumbai 1997 No.152127) 2. Diploma in Electrical 2002 3. Air-condition Training Diploma six month 2004 Training in Complete utilitiesHT/LT & air-condition all Electrical system Tanning in Refrigeration Management system All electro mechanical utility services Pre opening & operational Hotel / Shopping mall Hospital Software call canter factory industrial Project & Factory maintenance  Technology &Utilities System: All the technologies, Electrical, mechanical utilities system & Minor electronics systems, operations and maintain and installation. Complete utility system and new technology .all type project & Operation Electrical Maintenances Facility Engineer all monthly check list Technology &Utilities System: All the technologies,Electrical,mechanical utilities system & Minor electronics systems,operations and maintain and installation.Complete utilitysystem Was responsible for complete operation and maintenance all the engineering equipment and hotel facilities Like Electrical Substation, Air conditioning, Effluent Treatment, Fire detection & Safety, Kitchen & Laundry Equipment, Boilers, Computerized Dimmers, Swimming Pools & Water Bodies, Civil jobs incl. Painting and Polishing etc. Also responsible for the various renovation, expansions and refurbishments in the Hotel Designed and commissioned new IBR Boilers, Hot water generation system based on steam, New R.O. to cater to complete water supply in the hotel and many more up gradations. Leading a team of trained/semi trained technical staff. Preparing various Preventive maintenance Schedules and ensuring their proper implementation. Proactive measures for the maximum Energy Conservation without hampering the operations, guest comfort and system operating parameters. Preparing the Budgets for energy consumption, Repairs & spares and ensure that deadlines are met.
  • 2. Modifications to bring down the power consumption overhauling of the major equipment. Implementation of various maintenance schedules for the upkeep of the property. Present assignment: March 2008 to Till Date Company SAROVAR PORTICO (A Sarovar Hotels) Lucknow Company Profile: Sarovar Hotels & Resorts Hotels & Resorts is a privately owned hotel chain in India. It is the 4th largest hotel chain in India with 36 hotels across India and overseas.The company is affiliated with Carlson Hospitality Worldwide. Carlson is active in hospitality services,comprising more than 1,570 hotels, resorts restaurants,and cruis e ship operations in 81 countries. The association with Carlson Hospitality makes Sarovar Hotels the master franchisor [clarification needed] for the Park Plaza and the Park Inn hotel brands in India. The Company has also launched the domestic brands: Sarovar Premiere, Sarovar Portico and Hometel.  Sarovar Premier and Park Plaza - upscale (5 star) segment  Sarovar Portico and Park Inn - mid-market (3-4 star) segment  Hometel - 3 star segment with cheaper rooms. Sarovar currently has 6 budget hotels. Work Profile: I Am Working as a Chief Engineer in the company. My job included maintenance and execution of electrical, Mechanical, plumbing STP plant, Tele-communication systems and civil area of the Hotel. My Job Includes Execution of Project and operational works of hotel. I was handling team of technicians and other technical people of different contractors. I My Job also included planning and management of work force for completions of jobs within the time Past Assignment: May.2005 to March 2008 Company Profile: Jones Lang LaSalle SaharaganjMall Lucknow went through a transformation in its lifestyle with Sahara Infrastructure & Housing generating ample avenues. Be it residential or commercial Sahara Ganj, opened in November 2005 to provide the city with the best entertainment arena. A brand Super Mall, it is self sufficient in its offerings & specifications of the highest order. The built up area of approx 525 Thousand sq. ft. matching international standards & having the best value additions. Work profile : I was designated as Shift Engineer in the company. My job included maintenance and execution of Electrical, Mechanical, plumbing swimming pool, STP plant, Tele-communication systems and civil area of the Hotel. My Job Includes Execution of Project and operational works of hotel. I was handling team of technicians and other technical people of different contractors. I used to work in Shifts and open for pressure environment. My Job also included planning and management of work force for completions of jobs within the time frame given by superiors I was designated as Shift Engineer
  • 3. Past Assignment: ( Facility Engineer ) Company Birla Soft Company Profile: Founded in 1995, Birla soft is an IT Services provider,with a global workforce of over 6000 employees and has a footprint in 5 continents & delivery centers in China & India. Birla soft sells its stuff to the Banking,Financial ices, Insurance and Manufacturing industries.Starting out as Birla Horizons International,the company was rejuvenated and renamed as Birla soft Inc in 1998, when GE Capital joined the company as a strategic investor. The company now has several offices across multiple global locations with dedicated software centers, Work Profile: I was designated as As whole sole In charge in the company. My job includes maintenance and execution of electrical, Mechanical, plumbing, civil, in company. I was handling team of technicians and other technical people of different contractors I was reporting to Chief Engineer of company. Past assignment: ( Shift Engineer ). Company : mansingh Hotels & Resorts CompanyProfile: Keepingthe age-oldtraditionsalive, theMansingh at Agra,Ajmer and Jaipur provides a glorious example of hotels. The group'shotel businessstarted in 1980, when IndoContinental Hotels& Resorts Ltd. was taken over by the family. The first Hotel of the group, `Mansingh', Jaipur gave the hotel group its present name - The Mansingh Group Work profile : I was designated as Shift Engineer in the company. My job included maintenance and execution of Electrical, Mechanical, plumbing swimming pool, STP plant, Tele-communication systems and civil area of the Hotel. My Job Includes Execution of Project and operational works of hotel. I was handling team of technicians and other technical people of different contractors. I used to work in Shifts and open for pressure environment. My Job also included planning and management of work force for completions of jobs within the time frame given by superiors I was designated as Shift Engineer Past Assignment: Facility Engineer (From Jan 97 to Jan 2002 ) Company HST Enterprises, Gautam Nagar New-Delhi Company Profile: For handling All types of Electro-Mechanical Services for various Telephonic Exchanges at T.E Yamuna Nagar T.E Ambala and T.E Hisser .all A/C, L/T, H/T ,POWERPLANT Rapier all type electro maniacal All haryana India check and execute all activities of his department to ensure guest safety and comfort. These activities include ensuring smooth and appropriate functioning of air conditioning/heating systems, water supply, heat, light and power and all equipment in the hotel, while keeping a control on energy Work Profile:I was designated Supervisor in the company. My job includes maintenanceand execution of electrical,Mechanical,plumbing,civil, in company.I was handlingteam of technicians and other technical people of different contractors I was reportingto Chief Engineer of company
  • 4. Past Assignment: Asst. Engineer (From Jun 1994 to July 1997) Company M/S DELIP VIDYUT BOMBAY (GOVT. Contractor ) Mumbai Company Profile: Maintaining all types of Controls & Consoles of panel Boards and DG sets D C Motor Panel cable mcb mccb acb& ocb installation work Work Profile:I was designated Supervisor in the company. My job includes maintenanceand execution of electrical,Mechanical,plumbing,civil, in company.I was handlingteam of technicians and other technical people of different contractors I was reportingto Chief Engineer of company Past Assignment: Asst. Technical Service (from Jan 1993 to Nov 1995) Company M/S Western Engineering Company, New Delhi Company Profile: Maintaining all types of Controls & Consoles of panel Boards and DG sets D C Motor Panel cable mcb mccb acb& ocb installation work Panel manufacturing Work Profile. As Electrical Asst. for H.V.A.C Project handling all types of Electro-Mechanical Services all A/C, L/T, H/T, Power plant Rapier all type Electro, mechanical jobs Past Assignment: Air-condition & Electrical Engineer ( C.N. Center) (From July 1997 to Jan 1999) Company All India Institute of Medical Sciences Company Profile: AIIMS was inaugurated in 1956, and was built with a grant from the Government of New Zealand under the Colombo Plan. AIIMS was established in New Delhi after former Indian prime minister Jawaharlal Nehru's initial proposalto set up the institute in Calcutta was turned down by the then Chief Minister of West Bengal Bidhan Chandra Roy.[8] It was the vision of Rajkumari Amrit Kaur, the first Health Minister of India, to establish an institute of such nature in India. Work Profile:As whole solein charge CN Center for AC Plantfor 5+120 tan Voltas capacity 600 tan ahu stardalta starter total capacity 2000 amp.Includingall electrical & maintenanceAll CN canter AIIMS new Delhi Voltas C.N Center in AllMS New Delhi. check and executeall activities of his departmentto ensure guestsafety and comfort.These activities includeensuring smooth andappropriatefunctioningof airconditioning/heatingsystems,watersupply,heat, lightand powerand all equipmentin thehotel,whilekeeping a control on energy costs Professional Knowledge: - : Energy Saving Cost Below In all Departments in 20 % joins the company H.T supply :ACB O.C.B & V.C.B & G/O Sw itches & AllTypes HT Sw itch Repair & Maintenance .Control & Console System, HT Cable testing ,Earth testing w ith Attach transformer HT ,High Voltage AVR LT Supply: LT Panel Manual System, LT Panel w ith Auto System& Equipment Know ledge, AMFpanel UPS system PLC .AMF& BMS attached Synchronizing Panel w ith DC Control Panel System(24V) & DG Panel Selection Manually & Auto Change Over Type. All types Motors AC & DC
  • 5. HVAC :*("heating, ventilating, and air conditioning.") Like centralized plant. Window AC Split. Tower centrifugal plant VRF & VRV Systems Water (WTP.RO.Softner Plant) Aggressively managing a hotel's water consumption is very cost-effective because it pays three ways. Conserving water: 1. Reduces the number of gallons of water purchased 2. Reduces the amount the hotel will pay for sewage (water disposal) 3. In the case of hot water, reduces water-hearing costs because less hot water must be produced Waste water treatment STP WTP PM (Preventative Maintenance) Program: A specific inspection and activities schedule designed to minimize maintenance-related costs and to prolong the life of equipment by preventing small problems before they become larger ones.  Checking the bills of electrical, Low current & HVAC contractors  Checking the bills of electrical, Low current fire detection and fire fighting systems  Checking the specifications and contact of Electrical, (HT & LT). H.V.A.C.fire fighting. IBMS. Security, fire detection & Alarm, P.A.lift & Escalator, ETP etc  Negotiations & Finalization of tenders with different contractors  Installation Testing &Commissioning of E.T.P.  Installation Testing &Commissioning of water Softener Plant  Installation testing & commissioning of Elevators & Escalators Software Known : Dos 6.22 Window95, 98xp window8 andNTMS office, Internet Explorer Hardware : Hardware Assembling. Maintenance & Troubleshooting. Installation of Modem.Multimedia & various software. Academic Qualification : 10+2th Passed. 1993 Tec. Qualification... Diploma in electrical 2002 Air-condition six month training diploma Electrical licance in Bombay HT & LT 1997 IER 1062 Permanent Address : Village .Tiwaripur, P.O. Khajurgawa. Campierganj Distt. Gorakhpur (U.P) India PIN.273158 Res. mo.no. 09336450047 Personal Details: Father’s Name : Shri Sant Kumar Tiwari Date of Birth 05/01/1975 Nationality : Indian Language : Hindi & English Date: Place: (Ashok Kumar Tiwari) Notice Period one month