 Abstract
 Wind energy cost analysis
 Levelized cost of electricity
 Wind turbine present value cost analysis
Abstract
 Wind power generation capacity in India has significantly increased in recent years. As of 28 February
2018 the total installed wind power capacity was 32.96 GW,[1][2] the fourth largest installed wind
power capacity in the world. Wind power capacity is mainly spread across the South, West and North
regions.
 Wind power costs in India are decreasing rapidly. The levelised tariff of wind power reached a record
low of ₹2.43 (3.7¢ US) per kWh (without any direct or indirect subsidies) during auctions for wind
projects in December 2017.[3] In December 2017, union government announced the applicable
guidelines for tariff-based wind power auctions to bring more clarity and minimise the risk to the
developers.
WIND ENERGY COST ANALYSIS
1. Capital and Investment cost,
2. Operation and Maintenance (O&M) cost,
3. Fuel cost.
The cost of electricity in wind power generation includes the following components:
1. Economic depreciation of the capital equipment,
2. Interest paid on the borrowed capital,
3. The operation and maintenance costs,
4. Taxes paid to local and federal authorities,
5. Government incentives and tax credits,
6. Royalties paid to land owners,
7. Payment for electricity used on a standby mode,
8. Energy storage components, if used,
9. The cost of wind as fuel is zero.
LEVELIZED COST OF ELECTRICITY, LCOE
The Levelized Cost OF Electricity (LCOE) in electrical energy production can be defined as the present
value of the price of the produced electrical energy in cents / kW.hr, considering the economical life of the
plant and the costs incurred in the construction, operation and maintenance, and the fuel costs. Along this
line, we can write for the generation cost over the construction and production periods:
The fuel cost Ft is zero in wind power generation, and the wind turbine is factory- assembled and directly
delivered to the wind park site, resulting in a short construction period t in the range [-N, -1]. This results
in the following form of Eqn. 1 for wind power generation, accounting for the intermittence factor IF, the
Production Tax Credit PTCt, the depreciation credit Dt, the tax levy Tt, and the royalties or land payments
Rt:
LCOE
It
O & Mt
PTCt
Dt
= Generation Cost [cents/kW.hr]
= Investment made in year t [$]
= Operation and Maintenance in year t [$]
= Production Tax Credit [$]
Depreciation credit [$]
T = Tax levy [$]
t
where: Rt
Ft
IF
Pt
Gt
n
i
Royalties or land rents [$]
Fuel cost [$] 0
= Intermittence factor
Electrical generation capacity in year t [kW.hr]
= Electrical energy generation in year t [kW.hr],
Gt IF Pt
= Duration of the generation period [years]
= Discount rate
The Present Value Factor (PVF) is:
PVF 
1
(1i)t
DISCOUNT RATE
The discount rate (i) is chosen depending on the cost and the source of the available capital,
considering a balance between equity and debt financing and an estimate of the financial risks
entailed in the project.
It is advisable to consider the effect of inflation, and consequently using the real interest rate
instead.
NET PRESENT VALUE
The net present value of a project is the value of all payments, discounted back to the beginning
of the investment.
For its estimation, the real rate of interest “r” defined as the sum of the discount rate i and the
inflation rate s:
Real rate of interest = Discount rate + Inflation Rate
r =i +s
REAL RATE OF RETURN
The real rate of return is the real rate of interest “r” which makes the net present value of a project exactly
zero. The real rate of return is a measure of the real interest rate earned on a given investment.
ELECTRICITY COST PER UNIT ENERGY
The electricity cost per kW.hr is calculated by first estimating the sum of the total investment and the
discounted value of operation and maintenance costs in all years. The result is discounted for all future
electricity production: each year's electricity production
is divided into (1+r)ⁿ, where n is the project lifetime.
The income from electricity sales is subtracted from all non-zero amounts of payments at each year of the
project period.
DEPRECIATION COST
Depreciation is a term used in accounting, economics and finance to spread the cost of an asset over
the span of several years. In simple terms, it can be said that depreciation is the reduction in the
value of an asset or good due to usage, passage of time, wear and tear, technological outdating or
obsolescence, depletion, inadequacy, rot, rust, decay or other such factors.
STRAIGHT LINE DEPRECIATION
Straight line depreciation is the simplest and most often used method in which we can estimate the real
value of the asset at the end of the period during which it will be used to generate revenues, or its
economic life. It will expense a portion of the original cost in equal increments over the period. The real
value is an estimate of the value of the asset or good at the time it will be sold or disposed of. It may be
zero or even negative. Accordingly:
PRICE AND COST CONCEPTS
The words: “cost” and “price” are sometimes mistakenly used as synonyms. The price of a product is
determined by supply and demand for the product. Some people assume that the price of a product is
somehow a result of adding a normal or reasonable profit to a cost, which is not necessarily the case;
unless it is applied to a government controlled monopoly. Thus in general:
Price = Cost + Profit + Taxes + Installation + Fuel+ Operation and maintenance- Government incentives
and tax credits+ f(scarcity)
A factor that is a function of the scarcity of wind resources at a given location, as well as the taxes paid
WIND TURBINES PRICES
Wind turbine prices may vary due to transportation costs, different tower heights, different rotor
diameters, different generators sizes and the grid connection costs.
To determine the prices of wind turbines, it is erroneous to divide the turnover in dollars by the volume or
sales or MW to obtain the price of a turbine in $/MW:
Price =Turnover [$]/Volume(MW)
PRODUCTIVITY AND COSTS
A unique aspect of wind energy production is that its productivity and costs depend on the price of
electricity, and not vice versa as in other energy systems.
Cost = f(price of electricity)
Price of electricity≠ Cost
INSTALLATION COSTS
Another unique feature of wind energy is that a high cost of generating electricity is not necessarily a
result of high installation cost. One incurs a high installation cost whenever a good wind resource is
available and hence cheap generating costs are available in a remote area.
OPERATION AND MAINTENANCE
The operation and maintenance cost can be estimated as either a fixed amount per year or a percentage of
the cost of the turbine.
INTERMITTENCE FACTOR
The Intermittence Factor (IF) or Capacity Factor for an energy generating technology is equal to the ratio
of the annual energy production to the theoretical maximum energy production, if the generator were
running at its rated electrical power all year.
Intermittence Factor IF =Annual energy production/ Rated maximum energy production
PROJECT LIFETIMES
The figure used for the design lifetime of a typical wind turbine is 20 years. With the low turbulence of
offshore wind conditions leading to lower vibrations and fatigue stresses, it is likely that the turbines
can last longer, from 25-30 years, provided that corrosion from salty conditions can be controlled.
Offshore foundations for oil installations are designed to last 50 years, and it may be possible to
consider two generations of turbines to be built on the same foundations, with an overhaul repair at
the midlife point after 25 years.
WIND TURBINE PRESENT VALUE COST ANALYSIS(example)
An attempt is made at the estimation of a present value cost analysis for the cost of electricity over a 20
years turbine project duration. A benchmark problem is first presented to later accommodate sensitivity
studies of the effects of other factors, such as the Production Tax Credit, depreciation and taxes.
Investment
Expected lifetime = 20 years Turbine rated power: 600 kW Turbine cost: $450,000
Installation costs: 30 percent of turbine price = $450,000 x 0.30 = $135,000
Total turbine cost = Turbine cost + Installation cost
= $450,000 + $135,000
= $585,000
Payments
The payments, including the initial payment, are used to calculate the net present value and the real rate
of return over a 20 years project lifetime
Operation and Maintenance: 1.5 percent of turbine price = 0.015 x 450,000 = 6,750 $/year.
Total expenditure = Total turbine cost + Operation and maintenance cost over expected lifetime
= $585,000 + $6,750 / year x 20 year
= $585,000 + $135,000
= $720,000
Conti……
Current income and expenditures per year
Capacity factor: 28.54 percent = 0.2854.
Energy produced in a year: 600 x 365 x 24 x 0.2854 = 1,500,000 kWhr / year. Price of electricity =$0.05 / kW.hr
Gross yearly income from electricity sale: 1,500,000 kWhr / yr at $0.05/kWhr = 1,500,000 x 0.05 = $75,000 / yr.
Net income stream per year: $75,000 – $6,750 = $68,250 /yr.
Table-present value calculation for a 0.6 MW rated power wind turbine
Year n Expenditures
$
Gross Income
Stream
$
Net Income Stream
$
Present value factor 1/(1+r)n
r = 0.05
Net present value of income
stream
$
0 -585,000 - - - -
1 -6,750 75,000 68,250 0.9524 65,000
2 -6,750 75,000 68,250 0.9070 61,903
3 -6,750 75,000 68,250 0.8638 58,957
4 -6,750 75,000 68,250 0.8227 56,149
5 -6,750 75,000 68,250 0.7835 53,475
6 -6,750 75,000 68,250 0.7462 50,929
7 -6,750 75,000 68,250 0.7107 48,504
8 -6,750 75,000 68,250 0.6768 46,194
9 -6,750 75,000 68,250 0.6446 43,995
10 -6,750 75,000 68,250 0.6139 41,899
11 -6,750 75,000 68,250 0.5847 39,904
12 -6,750 75,000 68,250 0.5568 38,004
Cont…
Cont….
Year n Expenditures
$
Gross Income
Stream
$
Net Income
Stream
$
Present value factor
1/(1+r)n r = 0.05
Net present value of income
stream
$
13 -6,750 75,000 68,250 0.5303 36,194
14 -6,750 75,000 68,250 0.5051 34,471
15 -6,750 75,000 68,250 0.4810 32,829
16 -6,750 75,000 68,250 0.4581 31,266
17 -6,750 75,000 68,250 0.4363 29,777
18 -6,750 75,000 68,250 0.4155 28,359
19 -6,750 75,000 68,250 0.3957 27,009
20 -6,750 75,000 68,250 0.3769 25,723
Total -720,000 1,500,000 1,365,000 - 850,531.5
Cont….
Net present value of income stream at r = 5 percent/yr real rate of interest: $850,531.5.
Yearly net real rate of return = Net present value of income stream./(Total turbine cost)*(Project lifetime)
= ($850,531.5 / $585,000) / 20 years
= 0.072695
= 7.269 percent/year.
Present value of electricity per kW.hr =Net present value of income stream/(Yearly energy production)*(Project lifetime)
=$850,531.5 /(1,500,000 kWhr x 20 years year)
= $0.02835105 / kWhr
= 2.84 cents / kWhr
References
1. http://www.indianwindpower.com/news_views.php#tab1
2. http://gwec.net/wp-content/uploads/vip/GWEC_PRstats2017_EN-
003_FINAL.pdf
3. "Wind power tariffs in Gujarat auctions fall to Rs 2.43 per unit". The
Economic Times. Retrieved 22 December 2017
4. http://www.ewea.org/fileadmin/files/library/publications/reports/Eco
nomics_of_Wind_Energy.pdf

Más contenido relacionado

La actualidad más candente

Wind energy
Wind energyWind energy
Wind energysstms1
 
PV Wind Hybrid Systems
PV Wind Hybrid SystemsPV Wind Hybrid Systems
PV Wind Hybrid SystemsSeminar Links
 
Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018AshwaniSinha11
 
Energy Scenario in India
Energy Scenario in IndiaEnergy Scenario in India
Energy Scenario in IndiaRavijesh Kumar
 
Economic and Environmental Analysis of Renewable Energy Systems
Economic and Environmental Analysis of Renewable Energy SystemsEconomic and Environmental Analysis of Renewable Energy Systems
Economic and Environmental Analysis of Renewable Energy Systemslenses
 
Applications of solar energy
Applications of solar energyApplications of solar energy
Applications of solar energyAnkit Namdev
 
Wind Power Plant Presentation (Seminar PPT)
Wind Power Plant Presentation (Seminar PPT) Wind Power Plant Presentation (Seminar PPT)
Wind Power Plant Presentation (Seminar PPT) Jay Sonar
 
Non conventional source of energy
Non conventional source of energyNon conventional source of energy
Non conventional source of energysreegillal
 
Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyMalik Sameeullah
 
Role of energy in sustainable development
Role of energy in sustainable developmentRole of energy in sustainable development
Role of energy in sustainable developmentMukul Saini
 
Environmental impacts of renewable energy technologies
Environmental impacts of renewable energy technologiesEnvironmental impacts of renewable energy technologies
Environmental impacts of renewable energy technologiesRamaraj90033
 
Control Scheme for a Stand-Alone Wind Energy Conversion System
Control Scheme for a Stand-Alone Wind Energy Conversion SystemControl Scheme for a Stand-Alone Wind Energy Conversion System
Control Scheme for a Stand-Alone Wind Energy Conversion SystemRoja Rani
 
Wind resource assessment.
Wind resource assessment.Wind resource assessment.
Wind resource assessment.RCREEE
 

La actualidad más candente (20)

Wind energy
Wind energyWind energy
Wind energy
 
PV Wind Hybrid Systems
PV Wind Hybrid SystemsPV Wind Hybrid Systems
PV Wind Hybrid Systems
 
Energy scenario in India
Energy scenario in IndiaEnergy scenario in India
Energy scenario in India
 
Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018
 
Energy Scenario in India
Energy Scenario in IndiaEnergy Scenario in India
Energy Scenario in India
 
Economic and Environmental Analysis of Renewable Energy Systems
Economic and Environmental Analysis of Renewable Energy SystemsEconomic and Environmental Analysis of Renewable Energy Systems
Economic and Environmental Analysis of Renewable Energy Systems
 
Applications of solar energy
Applications of solar energyApplications of solar energy
Applications of solar energy
 
Renewable energy economics
Renewable energy economicsRenewable energy economics
Renewable energy economics
 
Hydrogen energy
Hydrogen energyHydrogen energy
Hydrogen energy
 
Wind Power Plant Presentation (Seminar PPT)
Wind Power Plant Presentation (Seminar PPT) Wind Power Plant Presentation (Seminar PPT)
Wind Power Plant Presentation (Seminar PPT)
 
Non conventional source of energy
Non conventional source of energyNon conventional source of energy
Non conventional source of energy
 
Solar Thermal Power
Solar Thermal PowerSolar Thermal Power
Solar Thermal Power
 
PPT ON NON-CONVENTIONAL ENERGY SOURCES (Renewable energy resources)
PPT ON NON-CONVENTIONAL ENERGY SOURCES (Renewable energy resources)PPT ON NON-CONVENTIONAL ENERGY SOURCES (Renewable energy resources)
PPT ON NON-CONVENTIONAL ENERGY SOURCES (Renewable energy resources)
 
Compressed Air Energy Storage CAES
Compressed Air Energy Storage CAESCompressed Air Energy Storage CAES
Compressed Air Energy Storage CAES
 
Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and Policy
 
Role of energy in sustainable development
Role of energy in sustainable developmentRole of energy in sustainable development
Role of energy in sustainable development
 
Environmental impacts of renewable energy technologies
Environmental impacts of renewable energy technologiesEnvironmental impacts of renewable energy technologies
Environmental impacts of renewable energy technologies
 
Control Scheme for a Stand-Alone Wind Energy Conversion System
Control Scheme for a Stand-Alone Wind Energy Conversion SystemControl Scheme for a Stand-Alone Wind Energy Conversion System
Control Scheme for a Stand-Alone Wind Energy Conversion System
 
Cogeneration
CogenerationCogeneration
Cogeneration
 
Wind resource assessment.
Wind resource assessment.Wind resource assessment.
Wind resource assessment.
 

Similar a Economics of wind energy

Cost of electricity by source
Cost of electricity by sourceCost of electricity by source
Cost of electricity by sourcerohitjain21120
 
Power plant economics
Power plant economicsPower plant economics
Power plant economicsTarek Erin
 
economics of power generation
economics of power generationeconomics of power generation
economics of power generationjagniyant
 
Principles of Power Systems V.K Mehta Complete Book - Chapter 4
Principles of Power Systems V.K Mehta Complete Book - Chapter 4Principles of Power Systems V.K Mehta Complete Book - Chapter 4
Principles of Power Systems V.K Mehta Complete Book - Chapter 4Power System Operation
 
Economics of Power Generation(4) h.pdf
Economics of Power Generation(4)       h.pdfEconomics of Power Generation(4)       h.pdf
Economics of Power Generation(4) h.pdfMahamad Jawhar
 
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
POWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNISTPOWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNIST
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNISTS.Vijaya Bhaskar
 
Economics of power plant h.pptx
Economics of power plant   h.pptxEconomics of power plant   h.pptx
Economics of power plant h.pptxMahamad Jawhar
 
Economics of power generation
Economics of power generationEconomics of power generation
Economics of power generationMaharishi Tiwari
 
Unit-V-Power Plant Economics and Environment.pptx
Unit-V-Power Plant Economics and Environment.pptxUnit-V-Power Plant Economics and Environment.pptx
Unit-V-Power Plant Economics and Environment.pptxprakash0712
 
Cost development of renewable energy technologies
Cost development of renewable energy technologiesCost development of renewable energy technologies
Cost development of renewable energy technologiesLeonardo ENERGY
 
Wind farm optimal_design_including_risk
Wind farm optimal_design_including_riskWind farm optimal_design_including_risk
Wind farm optimal_design_including_riskTomás Espejel Morales
 
IRJET- Implementing Zero Energy Efficiency in Residential Building
IRJET-  	  Implementing Zero Energy Efficiency in Residential BuildingIRJET-  	  Implementing Zero Energy Efficiency in Residential Building
IRJET- Implementing Zero Energy Efficiency in Residential BuildingIRJET Journal
 
Natural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & EconomicsNatural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & EconomicsVijay Sarathy
 
Estimating Quadratic Cost Curve Coefficients of Thermal Power Plant Without U...
Estimating Quadratic Cost Curve Coefficients of Thermal Power Plant Without U...Estimating Quadratic Cost Curve Coefficients of Thermal Power Plant Without U...
Estimating Quadratic Cost Curve Coefficients of Thermal Power Plant Without U...IRJET Journal
 
Cost analysis of greenhouse production
Cost analysis of greenhouse productionCost analysis of greenhouse production
Cost analysis of greenhouse productionAjay Singh Lodhi
 
Modification of Cost Equation for Optimization of Cutting Parameters in Turni...
Modification of Cost Equation for Optimization of Cutting Parameters in Turni...Modification of Cost Equation for Optimization of Cutting Parameters in Turni...
Modification of Cost Equation for Optimization of Cutting Parameters in Turni...IJLT EMAS
 
Implementation effects of economics and market operations based model for tra...
Implementation effects of economics and market operations based model for tra...Implementation effects of economics and market operations based model for tra...
Implementation effects of economics and market operations based model for tra...nooriasukmaningtyas
 

Similar a Economics of wind energy (20)

Cost of electricity by source
Cost of electricity by sourceCost of electricity by source
Cost of electricity by source
 
Power plant economics
Power plant economicsPower plant economics
Power plant economics
 
economics of power generation
economics of power generationeconomics of power generation
economics of power generation
 
Principles of Power Systems V.K Mehta Complete Book - Chapter 4
Principles of Power Systems V.K Mehta Complete Book - Chapter 4Principles of Power Systems V.K Mehta Complete Book - Chapter 4
Principles of Power Systems V.K Mehta Complete Book - Chapter 4
 
Economics of Power Generation(4) h.pdf
Economics of Power Generation(4)       h.pdfEconomics of Power Generation(4)       h.pdf
Economics of Power Generation(4) h.pdf
 
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
POWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNISTPOWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNIST
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
 
Economics of power plant h.pptx
Economics of power plant   h.pptxEconomics of power plant   h.pptx
Economics of power plant h.pptx
 
Economics of power generation
Economics of power generationEconomics of power generation
Economics of power generation
 
Unit-V-Power Plant Economics and Environment.pptx
Unit-V-Power Plant Economics and Environment.pptxUnit-V-Power Plant Economics and Environment.pptx
Unit-V-Power Plant Economics and Environment.pptx
 
Cost theories mm-aagac
Cost theories mm-aagacCost theories mm-aagac
Cost theories mm-aagac
 
Cost development of renewable energy technologies
Cost development of renewable energy technologiesCost development of renewable energy technologies
Cost development of renewable energy technologies
 
Wind farm optimal_design_including_risk
Wind farm optimal_design_including_riskWind farm optimal_design_including_risk
Wind farm optimal_design_including_risk
 
IRJET- Implementing Zero Energy Efficiency in Residential Building
IRJET-  	  Implementing Zero Energy Efficiency in Residential BuildingIRJET-  	  Implementing Zero Energy Efficiency in Residential Building
IRJET- Implementing Zero Energy Efficiency in Residential Building
 
Natural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & EconomicsNatural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & Economics
 
Estimating Quadratic Cost Curve Coefficients of Thermal Power Plant Without U...
Estimating Quadratic Cost Curve Coefficients of Thermal Power Plant Without U...Estimating Quadratic Cost Curve Coefficients of Thermal Power Plant Without U...
Estimating Quadratic Cost Curve Coefficients of Thermal Power Plant Without U...
 
Cost analysis of greenhouse production
Cost analysis of greenhouse productionCost analysis of greenhouse production
Cost analysis of greenhouse production
 
Modification of Cost Equation for Optimization of Cutting Parameters in Turni...
Modification of Cost Equation for Optimization of Cutting Parameters in Turni...Modification of Cost Equation for Optimization of Cutting Parameters in Turni...
Modification of Cost Equation for Optimization of Cutting Parameters in Turni...
 
Implementation effects of economics and market operations based model for tra...
Implementation effects of economics and market operations based model for tra...Implementation effects of economics and market operations based model for tra...
Implementation effects of economics and market operations based model for tra...
 
Ise 307- chapter 9
Ise 307- chapter 9 Ise 307- chapter 9
Ise 307- chapter 9
 
Rate analysis brief
Rate analysis briefRate analysis brief
Rate analysis brief
 

Más de ASHWANI BHARATI

Social and environmental effect of large hydro power
Social and environmental effect of large hydro powerSocial and environmental effect of large hydro power
Social and environmental effect of large hydro powerASHWANI BHARATI
 
European union policy for renewable sourse
European union policy for renewable sourseEuropean union policy for renewable sourse
European union policy for renewable sourseASHWANI BHARATI
 
Biomass power and cogeneration programme by mnre
Biomass power and cogeneration programme by mnreBiomass power and cogeneration programme by mnre
Biomass power and cogeneration programme by mnreASHWANI BHARATI
 

Más de ASHWANI BHARATI (7)

Social and environmental effect of large hydro power
Social and environmental effect of large hydro powerSocial and environmental effect of large hydro power
Social and environmental effect of large hydro power
 
History of wind power
History of wind powerHistory of wind power
History of wind power
 
Improved watermill
Improved watermillImproved watermill
Improved watermill
 
Pump and pumping system
Pump and pumping systemPump and pumping system
Pump and pumping system
 
European union policy for renewable sourse
European union policy for renewable sourseEuropean union policy for renewable sourse
European union policy for renewable sourse
 
Biomass power and cogeneration programme by mnre
Biomass power and cogeneration programme by mnreBiomass power and cogeneration programme by mnre
Biomass power and cogeneration programme by mnre
 
Status of fossil fuel
Status of fossil fuelStatus of fossil fuel
Status of fossil fuel
 

Último

How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 

Último (20)

How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 

Economics of wind energy

  • 2. Content  Abstract  Wind energy cost analysis  Levelized cost of electricity  Wind turbine present value cost analysis
  • 3. Abstract  Wind power generation capacity in India has significantly increased in recent years. As of 28 February 2018 the total installed wind power capacity was 32.96 GW,[1][2] the fourth largest installed wind power capacity in the world. Wind power capacity is mainly spread across the South, West and North regions.  Wind power costs in India are decreasing rapidly. The levelised tariff of wind power reached a record low of ₹2.43 (3.7¢ US) per kWh (without any direct or indirect subsidies) during auctions for wind projects in December 2017.[3] In December 2017, union government announced the applicable guidelines for tariff-based wind power auctions to bring more clarity and minimise the risk to the developers.
  • 4. WIND ENERGY COST ANALYSIS 1. Capital and Investment cost, 2. Operation and Maintenance (O&M) cost, 3. Fuel cost. The cost of electricity in wind power generation includes the following components: 1. Economic depreciation of the capital equipment, 2. Interest paid on the borrowed capital, 3. The operation and maintenance costs, 4. Taxes paid to local and federal authorities, 5. Government incentives and tax credits, 6. Royalties paid to land owners, 7. Payment for electricity used on a standby mode, 8. Energy storage components, if used, 9. The cost of wind as fuel is zero.
  • 5. LEVELIZED COST OF ELECTRICITY, LCOE The Levelized Cost OF Electricity (LCOE) in electrical energy production can be defined as the present value of the price of the produced electrical energy in cents / kW.hr, considering the economical life of the plant and the costs incurred in the construction, operation and maintenance, and the fuel costs. Along this line, we can write for the generation cost over the construction and production periods:
  • 6. The fuel cost Ft is zero in wind power generation, and the wind turbine is factory- assembled and directly delivered to the wind park site, resulting in a short construction period t in the range [-N, -1]. This results in the following form of Eqn. 1 for wind power generation, accounting for the intermittence factor IF, the Production Tax Credit PTCt, the depreciation credit Dt, the tax levy Tt, and the royalties or land payments Rt: LCOE It O & Mt PTCt Dt = Generation Cost [cents/kW.hr] = Investment made in year t [$] = Operation and Maintenance in year t [$] = Production Tax Credit [$] Depreciation credit [$] T = Tax levy [$] t where: Rt Ft IF Pt Gt n i Royalties or land rents [$] Fuel cost [$] 0 = Intermittence factor Electrical generation capacity in year t [kW.hr] = Electrical energy generation in year t [kW.hr], Gt IF Pt = Duration of the generation period [years] = Discount rate The Present Value Factor (PVF) is: PVF  1 (1i)t
  • 7. DISCOUNT RATE The discount rate (i) is chosen depending on the cost and the source of the available capital, considering a balance between equity and debt financing and an estimate of the financial risks entailed in the project. It is advisable to consider the effect of inflation, and consequently using the real interest rate instead. NET PRESENT VALUE The net present value of a project is the value of all payments, discounted back to the beginning of the investment. For its estimation, the real rate of interest “r” defined as the sum of the discount rate i and the inflation rate s: Real rate of interest = Discount rate + Inflation Rate r =i +s
  • 8. REAL RATE OF RETURN The real rate of return is the real rate of interest “r” which makes the net present value of a project exactly zero. The real rate of return is a measure of the real interest rate earned on a given investment. ELECTRICITY COST PER UNIT ENERGY The electricity cost per kW.hr is calculated by first estimating the sum of the total investment and the discounted value of operation and maintenance costs in all years. The result is discounted for all future electricity production: each year's electricity production is divided into (1+r)ⁿ, where n is the project lifetime. The income from electricity sales is subtracted from all non-zero amounts of payments at each year of the project period. DEPRECIATION COST Depreciation is a term used in accounting, economics and finance to spread the cost of an asset over the span of several years. In simple terms, it can be said that depreciation is the reduction in the value of an asset or good due to usage, passage of time, wear and tear, technological outdating or obsolescence, depletion, inadequacy, rot, rust, decay or other such factors.
  • 9. STRAIGHT LINE DEPRECIATION Straight line depreciation is the simplest and most often used method in which we can estimate the real value of the asset at the end of the period during which it will be used to generate revenues, or its economic life. It will expense a portion of the original cost in equal increments over the period. The real value is an estimate of the value of the asset or good at the time it will be sold or disposed of. It may be zero or even negative. Accordingly: PRICE AND COST CONCEPTS The words: “cost” and “price” are sometimes mistakenly used as synonyms. The price of a product is determined by supply and demand for the product. Some people assume that the price of a product is somehow a result of adding a normal or reasonable profit to a cost, which is not necessarily the case; unless it is applied to a government controlled monopoly. Thus in general: Price = Cost + Profit + Taxes + Installation + Fuel+ Operation and maintenance- Government incentives and tax credits+ f(scarcity) A factor that is a function of the scarcity of wind resources at a given location, as well as the taxes paid
  • 10. WIND TURBINES PRICES Wind turbine prices may vary due to transportation costs, different tower heights, different rotor diameters, different generators sizes and the grid connection costs. To determine the prices of wind turbines, it is erroneous to divide the turnover in dollars by the volume or sales or MW to obtain the price of a turbine in $/MW: Price =Turnover [$]/Volume(MW) PRODUCTIVITY AND COSTS A unique aspect of wind energy production is that its productivity and costs depend on the price of electricity, and not vice versa as in other energy systems. Cost = f(price of electricity) Price of electricity≠ Cost INSTALLATION COSTS Another unique feature of wind energy is that a high cost of generating electricity is not necessarily a result of high installation cost. One incurs a high installation cost whenever a good wind resource is available and hence cheap generating costs are available in a remote area.
  • 11. OPERATION AND MAINTENANCE The operation and maintenance cost can be estimated as either a fixed amount per year or a percentage of the cost of the turbine. INTERMITTENCE FACTOR The Intermittence Factor (IF) or Capacity Factor for an energy generating technology is equal to the ratio of the annual energy production to the theoretical maximum energy production, if the generator were running at its rated electrical power all year. Intermittence Factor IF =Annual energy production/ Rated maximum energy production PROJECT LIFETIMES The figure used for the design lifetime of a typical wind turbine is 20 years. With the low turbulence of offshore wind conditions leading to lower vibrations and fatigue stresses, it is likely that the turbines can last longer, from 25-30 years, provided that corrosion from salty conditions can be controlled. Offshore foundations for oil installations are designed to last 50 years, and it may be possible to consider two generations of turbines to be built on the same foundations, with an overhaul repair at the midlife point after 25 years.
  • 12. WIND TURBINE PRESENT VALUE COST ANALYSIS(example) An attempt is made at the estimation of a present value cost analysis for the cost of electricity over a 20 years turbine project duration. A benchmark problem is first presented to later accommodate sensitivity studies of the effects of other factors, such as the Production Tax Credit, depreciation and taxes. Investment Expected lifetime = 20 years Turbine rated power: 600 kW Turbine cost: $450,000 Installation costs: 30 percent of turbine price = $450,000 x 0.30 = $135,000 Total turbine cost = Turbine cost + Installation cost = $450,000 + $135,000 = $585,000 Payments The payments, including the initial payment, are used to calculate the net present value and the real rate of return over a 20 years project lifetime Operation and Maintenance: 1.5 percent of turbine price = 0.015 x 450,000 = 6,750 $/year. Total expenditure = Total turbine cost + Operation and maintenance cost over expected lifetime = $585,000 + $6,750 / year x 20 year = $585,000 + $135,000 = $720,000
  • 13. Conti…… Current income and expenditures per year Capacity factor: 28.54 percent = 0.2854. Energy produced in a year: 600 x 365 x 24 x 0.2854 = 1,500,000 kWhr / year. Price of electricity =$0.05 / kW.hr Gross yearly income from electricity sale: 1,500,000 kWhr / yr at $0.05/kWhr = 1,500,000 x 0.05 = $75,000 / yr. Net income stream per year: $75,000 – $6,750 = $68,250 /yr.
  • 14. Table-present value calculation for a 0.6 MW rated power wind turbine Year n Expenditures $ Gross Income Stream $ Net Income Stream $ Present value factor 1/(1+r)n r = 0.05 Net present value of income stream $ 0 -585,000 - - - - 1 -6,750 75,000 68,250 0.9524 65,000 2 -6,750 75,000 68,250 0.9070 61,903 3 -6,750 75,000 68,250 0.8638 58,957 4 -6,750 75,000 68,250 0.8227 56,149 5 -6,750 75,000 68,250 0.7835 53,475 6 -6,750 75,000 68,250 0.7462 50,929 7 -6,750 75,000 68,250 0.7107 48,504 8 -6,750 75,000 68,250 0.6768 46,194 9 -6,750 75,000 68,250 0.6446 43,995 10 -6,750 75,000 68,250 0.6139 41,899 11 -6,750 75,000 68,250 0.5847 39,904 12 -6,750 75,000 68,250 0.5568 38,004 Cont…
  • 15. Cont…. Year n Expenditures $ Gross Income Stream $ Net Income Stream $ Present value factor 1/(1+r)n r = 0.05 Net present value of income stream $ 13 -6,750 75,000 68,250 0.5303 36,194 14 -6,750 75,000 68,250 0.5051 34,471 15 -6,750 75,000 68,250 0.4810 32,829 16 -6,750 75,000 68,250 0.4581 31,266 17 -6,750 75,000 68,250 0.4363 29,777 18 -6,750 75,000 68,250 0.4155 28,359 19 -6,750 75,000 68,250 0.3957 27,009 20 -6,750 75,000 68,250 0.3769 25,723 Total -720,000 1,500,000 1,365,000 - 850,531.5
  • 16. Cont…. Net present value of income stream at r = 5 percent/yr real rate of interest: $850,531.5. Yearly net real rate of return = Net present value of income stream./(Total turbine cost)*(Project lifetime) = ($850,531.5 / $585,000) / 20 years = 0.072695 = 7.269 percent/year. Present value of electricity per kW.hr =Net present value of income stream/(Yearly energy production)*(Project lifetime) =$850,531.5 /(1,500,000 kWhr x 20 years year) = $0.02835105 / kWhr = 2.84 cents / kWhr
  • 17. References 1. http://www.indianwindpower.com/news_views.php#tab1 2. http://gwec.net/wp-content/uploads/vip/GWEC_PRstats2017_EN- 003_FINAL.pdf 3. "Wind power tariffs in Gujarat auctions fall to Rs 2.43 per unit". The Economic Times. Retrieved 22 December 2017 4. http://www.ewea.org/fileadmin/files/library/publications/reports/Eco nomics_of_Wind_Energy.pdf