The Impact of the Internet of Things on our Lives.
The Challenge of Legacy Assets
Richard Lucas, BSc(Eng) MBA
MD of ASH Wireless
ASH Wireless is an electronics design consultancy
Specialising in wireless and sensors
2
An Ofgem funded Network
Innovation Competition project
3
The problem
Assets have
nominal thermal
rating
Ratings = OC
Ratings K amps
Diverse range of
environments
Small changes in
environmental
factors can result
in very different
actual ratings
HV network
LV network
Assumed thermal
ratings can lead to
capacity being
under-utilised
or
unnecessary risk
Objective is to
maximise power
through
transformer
4
Celsius as part of the smart future
Celsius
monitoring
Smart meter
data
Thermal Ratings Tool
Reinforce
Retrofit
cooling
Extra capacity
Lower bills for customers
5
Step 1: Fit thermal monitoring
Internal
temperature
Asset
Environmental
factors
External
temperature
Thermal
coefficient
Learning
Thermal
Ratings
Tool
Deliverable
More
capacity
Benefit
6
Step 2: Retrofit cooling
Retrofit
cooling
Internal
temperature
Asset
Environmental
factors
External
temperature
Full
capacity
Benefit
Enhanced
Thermal
Ratings
Tool
Deliverable
Retrofit cooling
specifications,
installation
methodologies
and buy order
Learning
7
Partners and roles on project
Facilitate customer
focus groups
Develop customer
communication
materials
Lead the customer
survey engagement
Analyse trial data
Develop
methodologies to
understand
relationship between
asset temperature,
load characteristics
and surrounding
environment
Determine impact of
cooling technologies
Develop tool and
spec for low cost
temperature sensor
Recommendations
for BAU rollout
Supply complete
retrofit monitoring
solution
Provide ongoing
support throughout
installation,
commissioning and
operation of the
retrofit thermal
monitoring
workstream
Peer review of the
analysis
methodology of the
retrofit temperature
sensor part of the
project
An investigative
study on the impact
of Celsius on the
lifetime health of
network assets
Work with ASH,
Ricardo-AEA and
Electricity North
West to develop
retrofit thermal
monitoring solution
Participate in
evaluation and
selection of retrofit
cooling techniques
8
Monitoring site selection and timescales
To enable trials to
take place during
all seasons and to
trial all cooling
techniques
Four year project
Subset of 520
substations –
enough sites to
adequately trial all
techniques
100 cooling
technique sites
Enough
substations to
represent 80% of
GB substation
population
520 substations
9
Celsius
£5.5
million
Investment
Up to £583m
across GB by
2050 Financial
benefits
Awarded: 9th December 2015
Go live
Monitoring
installation
Mar 2017
Monitoring
trial
Mar 2018
Thermal
ratings
tool stage
1
Oct 2018
Retrofit
cooling
installation
Jun 2018
Cooling
trial
Jun 2019
Thermal
ratings
tool stage
2
Jan 2020
Closedown
Mar 2020
So the answer’s simple
1. Gather data on the power throughput &
characteristics, asset temperature,
2. Work out the relationships, and how you can change
these with retrofitted cooling technology
3. Decide how long you can postpone reinforcing or
replacing assets,
4. Save lots of money
But there are some practical problems…………..
11
Legacy Assets
 A significant percentage of
electrical substations are
more than half a century old
 Most are not installed with
measurement equipment for
voltage, current, power,
power quality, temperature
of key assets
 Critical infrastructure – any
work must not intrude on
continued operation.
 Access to the sites is
restricted for safety reasons
12
?How to fit monitoring sensors when…
 No internet connection
available
 No mains power available
 Can’t install wiring, mount
equipment, etc without
intruding on critical
operations
 Challenging RF environment
for radio connections,,
multipath, multiple
monitoring points needed
KeLVN
- Design Requirements
 Monitoring system can be installed
non-invasively;
 All equipment magnetic or cable-tie
mounting;
 All equipment battery powered for
duration of data gathering project
(3.5 years).
 All equipment wireless, only leads are
those required to actually take
measurements.
 Daily reports to back end. 30 minute
measurements of V, I, P, Q, THD,
Temperature
Backhaul Choices
• Clusters of sensors over a
small area
• Spread over a large part of
the country
• Mobile network is clear winner
• LPWAN
• Possible, but patchy network
support
• 2.5G GPRS chosen
• Coverage, component cost
Local Wireless Sensor Network
• Requirement for large substations (30m x 15m), sensors
may be in cabinets
• Path loss at 2.4GHz expected less than 90dB
• Avoid stationary nulls by using antenna diversity
• Energy-efficient 802.15.4 transceivers used, no front-
end-modules
• Operation needs to allow for more than one hub
• Large coverage
• Check installation from outside the substation
Local Wireless Sensor Network
• Simple, non-paired network access, minimised energy
• Sensors transmit the last 6 hours of measurements
(1 packet) every 30s
• Time-jittered to avoid multiple collisions from time-
aligned sensors
• A hub listens for 60s for reports every 6 hours
• Hub transmits a daily report to a back-end database
• Hub operates for 3.5 years on a Lithium D-cell
• Other sensors use AA or D cells for >3.5 year life
TT T
T
Voltage Sensor
Temperature Sensor
GPRS
Backhaul
Mobile
data link
Hub 1
Hub 2
(optional)
Hex 1
PMU
Hex 2
Ind.
V,I,T
Low Power
Radio
Network
Single
Temperature
Sensors
Back
End
KeLVN
- Substation Monitoring
Battery Life
• The Hub is an interesting challenge:
• Lithium D-cell, 10AH
• Over 3.5 years life
• Distribution of where the capacity is used:
KeLVN Hub battery usage
Daily GPRS data transfer
Sensor receiver window
Quiescent: ‘off’
Key learning points
• The installation and environment defines
• Equipment design (e.g. magnetic mounting)
• Protocol (e.g. multiple hubs allowed)
• installation procedure (fast, non-invasive)
• GPRS modem auto-connect modes are not reliable,
process needs detailed design
• Alarms
• Not required in Celsius
• Low latency for alarms is managed with a hub
software extension, and external power to the hub
Example of how legacy assets can
be made to yield valuable data
Retrofitting monitoring equipment to legacy assets:
• Ease of installation is primary consideration
• Use of a local wireless sensor network eases installation
• Optimise air interface to manage trade off between
latency, data rate, battery life
Additional material
22
Site selection map
23
Celsius technology
Hub Wireless sensor
24
Celsius technology – trial fit
LV board with three sensors
25
Celsius technology – trial fit
Transformer
26
Trial site data
-5
0
5
10
15
20
25
30
35
-20
0
20
40
60
80
100
120
140
30/09/2016 00:00 30/09/2016 12:00 01/10/2016 00:00 01/10/2016 12:00 02/10/2016 00:00 02/10/2016 12:00
TemperatureDegreesC
RealPowerkWperPhase
Magda Rd 750kVA Transformer Load and Temperatures
P1 kW P2 kW P3 kW Top Oil oC Inlet oC Outlet oC Bottom Oil oC

Más contenido relacionado

La actualidad más candente

Data Acquisition System and Data loggers
Data Acquisition System and Data loggersData Acquisition System and Data loggers
Data Acquisition System and Data loggers
Swara Dave
 
Lectute instrumentation and process control data acquisition
Lectute instrumentation and process control data acquisitionLectute instrumentation and process control data acquisition
Lectute instrumentation and process control data acquisition
rama52
 
[Oil & Gas White Paper] Liquids Pipeline Leak Detection and Simulation Training
[Oil & Gas White Paper] Liquids Pipeline Leak Detection and Simulation Training[Oil & Gas White Paper] Liquids Pipeline Leak Detection and Simulation Training
[Oil & Gas White Paper] Liquids Pipeline Leak Detection and Simulation Training
Schneider Electric
 
Interrupt latency and its measurements methods
Interrupt latency and its measurements methodsInterrupt latency and its measurements methods
Interrupt latency and its measurements methods
s60030
 
Cyber Security in Substation Automation (IEC 61850)
Cyber Security in Substation Automation (IEC 61850)Cyber Security in Substation Automation (IEC 61850)
Cyber Security in Substation Automation (IEC 61850)
Nikandrov Maxim
 
RT-Link 2005
RT-Link 2005RT-Link 2005
RT-Link 2005
rahulm
 
Reading Flow Meters With Revenue-Grade Accuracy Through Your SCADA, Telemetry...
Reading Flow Meters With Revenue-Grade Accuracy Through Your SCADA, Telemetry...Reading Flow Meters With Revenue-Grade Accuracy Through Your SCADA, Telemetry...
Reading Flow Meters With Revenue-Grade Accuracy Through Your SCADA, Telemetry...
SCADAmetrics
 
Rwh control system poster
Rwh control system posterRwh control system poster
Rwh control system poster
Deval Dixit
 

La actualidad más candente (20)

Further improvements
Further improvementsFurther improvements
Further improvements
 
The Challenges and Solutions to Integrate Multi-Facility/Buildings Disparate ...
The Challenges and Solutions to Integrate Multi-Facility/Buildings Disparate ...The Challenges and Solutions to Integrate Multi-Facility/Buildings Disparate ...
The Challenges and Solutions to Integrate Multi-Facility/Buildings Disparate ...
 
Data Acquisition System
Data Acquisition SystemData Acquisition System
Data Acquisition System
 
Data Acquisition System and Data loggers
Data Acquisition System and Data loggersData Acquisition System and Data loggers
Data Acquisition System and Data loggers
 
Data Acquisition System
Data Acquisition SystemData Acquisition System
Data Acquisition System
 
Lectute instrumentation and process control data acquisition
Lectute instrumentation and process control data acquisitionLectute instrumentation and process control data acquisition
Lectute instrumentation and process control data acquisition
 
LEACH Protocol
LEACH ProtocolLEACH Protocol
LEACH Protocol
 
[Oil & Gas White Paper] Liquids Pipeline Leak Detection and Simulation Training
[Oil & Gas White Paper] Liquids Pipeline Leak Detection and Simulation Training[Oil & Gas White Paper] Liquids Pipeline Leak Detection and Simulation Training
[Oil & Gas White Paper] Liquids Pipeline Leak Detection and Simulation Training
 
Interrupt latency and its measurements methods
Interrupt latency and its measurements methodsInterrupt latency and its measurements methods
Interrupt latency and its measurements methods
 
Data acquisition & system control basic information
Data acquisition & system control basic information Data acquisition & system control basic information
Data acquisition & system control basic information
 
Cyber Security in Substation Automation (IEC 61850)
Cyber Security in Substation Automation (IEC 61850)Cyber Security in Substation Automation (IEC 61850)
Cyber Security in Substation Automation (IEC 61850)
 
ClearWater Sensors - Easy Setup Water Chemisty Monitoring
ClearWater Sensors - Easy Setup Water Chemisty MonitoringClearWater Sensors - Easy Setup Water Chemisty Monitoring
ClearWater Sensors - Easy Setup Water Chemisty Monitoring
 
Data Acquisition Systems presentation
Data Acquisition  Systems presentationData Acquisition  Systems presentation
Data Acquisition Systems presentation
 
Data acquisition system
Data acquisition systemData acquisition system
Data acquisition system
 
RT-Link 2005
RT-Link 2005RT-Link 2005
RT-Link 2005
 
Data Acquisition System & Data Logger
Data Acquisition System & Data LoggerData Acquisition System & Data Logger
Data Acquisition System & Data Logger
 
Reading Flow Meters With Revenue-Grade Accuracy Through Your SCADA, Telemetry...
Reading Flow Meters With Revenue-Grade Accuracy Through Your SCADA, Telemetry...Reading Flow Meters With Revenue-Grade Accuracy Through Your SCADA, Telemetry...
Reading Flow Meters With Revenue-Grade Accuracy Through Your SCADA, Telemetry...
 
Infrared Technology presented at Entelec
Infrared Technology presented at EntelecInfrared Technology presented at Entelec
Infrared Technology presented at Entelec
 
Rwh control system poster
Rwh control system posterRwh control system poster
Rwh control system poster
 
Cooperative Meter Sharing Between the Water Utility and Commercial Water Cust...
Cooperative Meter Sharing Between the Water Utility and Commercial Water Cust...Cooperative Meter Sharing Between the Water Utility and Commercial Water Cust...
Cooperative Meter Sharing Between the Water Utility and Commercial Water Cust...
 

Similar a The Challenge of Legacy Assets

Select-Info Packet Power presentation
Select-Info Packet Power presentationSelect-Info Packet Power presentation
Select-Info Packet Power presentation
Kamel Abou-Faraj
 
Numerex-Slides-12.10.15
Numerex-Slides-12.10.15Numerex-Slides-12.10.15
Numerex-Slides-12.10.15
Rod Montrose
 
IT and the smart grid, Peter Will,Information Sciences Institute, USC'
IT and the smart grid, Peter Will,Information Sciences Institute, USC'IT and the smart grid, Peter Will,Information Sciences Institute, USC'
IT and the smart grid, Peter Will,Information Sciences Institute, USC'
University of Southern California
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdf
SmritiGarg21
 
Wireless Water Monitoring System
Wireless Water Monitoring SystemWireless Water Monitoring System
Wireless Water Monitoring System
Praveen Sharma
 

Similar a The Challenge of Legacy Assets (20)

Design drivers for monitoring critical infrastructure
Design drivers for monitoring critical infrastructureDesign drivers for monitoring critical infrastructure
Design drivers for monitoring critical infrastructure
 
Select-Info Packet Power presentation
Select-Info Packet Power presentationSelect-Info Packet Power presentation
Select-Info Packet Power presentation
 
Tutorials - History Evolution and Future of SCADA.pdf
Tutorials - History Evolution and Future of SCADA.pdfTutorials - History Evolution and Future of SCADA.pdf
Tutorials - History Evolution and Future of SCADA.pdf
 
Numerex-Slides-12.10.15
Numerex-Slides-12.10.15Numerex-Slides-12.10.15
Numerex-Slides-12.10.15
 
Design of wireless sensor network for building management systems
Design of wireless sensor network for building management systemsDesign of wireless sensor network for building management systems
Design of wireless sensor network for building management systems
 
Vanjen Group IntelliSAW Overview 2018
Vanjen Group IntelliSAW Overview 2018Vanjen Group IntelliSAW Overview 2018
Vanjen Group IntelliSAW Overview 2018
 
Wireless presentation
Wireless presentationWireless presentation
Wireless presentation
 
IT and the smart grid, Peter Will,Information Sciences Institute, USC'
IT and the smart grid, Peter Will,Information Sciences Institute, USC'IT and the smart grid, Peter Will,Information Sciences Institute, USC'
IT and the smart grid, Peter Will,Information Sciences Institute, USC'
 
Lecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxLecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptx
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdf
 
Wireless Water Monitoring System
Wireless Water Monitoring SystemWireless Water Monitoring System
Wireless Water Monitoring System
 
IEEE_2030_5_Seoul_Simpson_20150424.pdf
IEEE_2030_5_Seoul_Simpson_20150424.pdfIEEE_2030_5_Seoul_Simpson_20150424.pdf
IEEE_2030_5_Seoul_Simpson_20150424.pdf
 
Automated Thermal Imaging for Remote Substation Monitoring
Automated Thermal Imaging for Remote Substation MonitoringAutomated Thermal Imaging for Remote Substation Monitoring
Automated Thermal Imaging for Remote Substation Monitoring
 
Dynamic Line Rating: Principles - Applications - Benefits
Dynamic Line Rating: Principles - Applications - BenefitsDynamic Line Rating: Principles - Applications - Benefits
Dynamic Line Rating: Principles - Applications - Benefits
 
5 Reasons You Need the Latest Generation of iPDU
5 Reasons You Need the Latest Generation of iPDU5 Reasons You Need the Latest Generation of iPDU
5 Reasons You Need the Latest Generation of iPDU
 
Sensor Networks – Introduction & Architectures by Mr.Darwin Nesakumar, AP/EC...
Sensor  Networks – Introduction & Architectures by Mr.Darwin Nesakumar, AP/EC...Sensor  Networks – Introduction & Architectures by Mr.Darwin Nesakumar, AP/EC...
Sensor Networks – Introduction & Architectures by Mr.Darwin Nesakumar, AP/EC...
 
Well_Monitoring_System_DataComm_Technology.pdf
Well_Monitoring_System_DataComm_Technology.pdfWell_Monitoring_System_DataComm_Technology.pdf
Well_Monitoring_System_DataComm_Technology.pdf
 
Distribution System Automation
 Distribution System Automation  Distribution System Automation
Distribution System Automation
 
Monitoring of Transmission and Distribution Grids using PMUs
Monitoring of Transmission and Distribution Grids using PMUsMonitoring of Transmission and Distribution Grids using PMUs
Monitoring of Transmission and Distribution Grids using PMUs
 
Tollgrade LightHouse Asset Management Techniques Using Smart Grid Sensors
Tollgrade LightHouse Asset Management Techniques Using Smart Grid SensorsTollgrade LightHouse Asset Management Techniques Using Smart Grid Sensors
Tollgrade LightHouse Asset Management Techniques Using Smart Grid Sensors
 

Último

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 

The Challenge of Legacy Assets

  • 1. The Impact of the Internet of Things on our Lives. The Challenge of Legacy Assets Richard Lucas, BSc(Eng) MBA MD of ASH Wireless ASH Wireless is an electronics design consultancy Specialising in wireless and sensors
  • 2. 2 An Ofgem funded Network Innovation Competition project
  • 3. 3 The problem Assets have nominal thermal rating Ratings = OC Ratings K amps Diverse range of environments Small changes in environmental factors can result in very different actual ratings HV network LV network Assumed thermal ratings can lead to capacity being under-utilised or unnecessary risk Objective is to maximise power through transformer
  • 4. 4 Celsius as part of the smart future Celsius monitoring Smart meter data Thermal Ratings Tool Reinforce Retrofit cooling Extra capacity Lower bills for customers
  • 5. 5 Step 1: Fit thermal monitoring Internal temperature Asset Environmental factors External temperature Thermal coefficient Learning Thermal Ratings Tool Deliverable More capacity Benefit
  • 6. 6 Step 2: Retrofit cooling Retrofit cooling Internal temperature Asset Environmental factors External temperature Full capacity Benefit Enhanced Thermal Ratings Tool Deliverable Retrofit cooling specifications, installation methodologies and buy order Learning
  • 7. 7 Partners and roles on project Facilitate customer focus groups Develop customer communication materials Lead the customer survey engagement Analyse trial data Develop methodologies to understand relationship between asset temperature, load characteristics and surrounding environment Determine impact of cooling technologies Develop tool and spec for low cost temperature sensor Recommendations for BAU rollout Supply complete retrofit monitoring solution Provide ongoing support throughout installation, commissioning and operation of the retrofit thermal monitoring workstream Peer review of the analysis methodology of the retrofit temperature sensor part of the project An investigative study on the impact of Celsius on the lifetime health of network assets Work with ASH, Ricardo-AEA and Electricity North West to develop retrofit thermal monitoring solution Participate in evaluation and selection of retrofit cooling techniques
  • 8. 8 Monitoring site selection and timescales To enable trials to take place during all seasons and to trial all cooling techniques Four year project Subset of 520 substations – enough sites to adequately trial all techniques 100 cooling technique sites Enough substations to represent 80% of GB substation population 520 substations
  • 9. 9 Celsius £5.5 million Investment Up to £583m across GB by 2050 Financial benefits Awarded: 9th December 2015 Go live Monitoring installation Mar 2017 Monitoring trial Mar 2018 Thermal ratings tool stage 1 Oct 2018 Retrofit cooling installation Jun 2018 Cooling trial Jun 2019 Thermal ratings tool stage 2 Jan 2020 Closedown Mar 2020
  • 10. So the answer’s simple 1. Gather data on the power throughput & characteristics, asset temperature, 2. Work out the relationships, and how you can change these with retrofitted cooling technology 3. Decide how long you can postpone reinforcing or replacing assets, 4. Save lots of money But there are some practical problems…………..
  • 11. 11 Legacy Assets  A significant percentage of electrical substations are more than half a century old  Most are not installed with measurement equipment for voltage, current, power, power quality, temperature of key assets  Critical infrastructure – any work must not intrude on continued operation.  Access to the sites is restricted for safety reasons
  • 12. 12 ?How to fit monitoring sensors when…  No internet connection available  No mains power available  Can’t install wiring, mount equipment, etc without intruding on critical operations  Challenging RF environment for radio connections,, multipath, multiple monitoring points needed
  • 13. KeLVN - Design Requirements  Monitoring system can be installed non-invasively;  All equipment magnetic or cable-tie mounting;  All equipment battery powered for duration of data gathering project (3.5 years).  All equipment wireless, only leads are those required to actually take measurements.  Daily reports to back end. 30 minute measurements of V, I, P, Q, THD, Temperature
  • 14. Backhaul Choices • Clusters of sensors over a small area • Spread over a large part of the country • Mobile network is clear winner • LPWAN • Possible, but patchy network support • 2.5G GPRS chosen • Coverage, component cost
  • 15. Local Wireless Sensor Network • Requirement for large substations (30m x 15m), sensors may be in cabinets • Path loss at 2.4GHz expected less than 90dB • Avoid stationary nulls by using antenna diversity • Energy-efficient 802.15.4 transceivers used, no front- end-modules • Operation needs to allow for more than one hub • Large coverage • Check installation from outside the substation
  • 16. Local Wireless Sensor Network • Simple, non-paired network access, minimised energy • Sensors transmit the last 6 hours of measurements (1 packet) every 30s • Time-jittered to avoid multiple collisions from time- aligned sensors • A hub listens for 60s for reports every 6 hours • Hub transmits a daily report to a back-end database • Hub operates for 3.5 years on a Lithium D-cell • Other sensors use AA or D cells for >3.5 year life
  • 17. TT T T Voltage Sensor Temperature Sensor GPRS Backhaul Mobile data link Hub 1 Hub 2 (optional) Hex 1 PMU Hex 2 Ind. V,I,T Low Power Radio Network Single Temperature Sensors Back End KeLVN - Substation Monitoring
  • 18. Battery Life • The Hub is an interesting challenge: • Lithium D-cell, 10AH • Over 3.5 years life • Distribution of where the capacity is used: KeLVN Hub battery usage Daily GPRS data transfer Sensor receiver window Quiescent: ‘off’
  • 19. Key learning points • The installation and environment defines • Equipment design (e.g. magnetic mounting) • Protocol (e.g. multiple hubs allowed) • installation procedure (fast, non-invasive) • GPRS modem auto-connect modes are not reliable, process needs detailed design • Alarms • Not required in Celsius • Low latency for alarms is managed with a hub software extension, and external power to the hub
  • 20. Example of how legacy assets can be made to yield valuable data Retrofitting monitoring equipment to legacy assets: • Ease of installation is primary consideration • Use of a local wireless sensor network eases installation • Optimise air interface to manage trade off between latency, data rate, battery life
  • 24. 24 Celsius technology – trial fit LV board with three sensors
  • 25. 25 Celsius technology – trial fit Transformer
  • 26. 26 Trial site data -5 0 5 10 15 20 25 30 35 -20 0 20 40 60 80 100 120 140 30/09/2016 00:00 30/09/2016 12:00 01/10/2016 00:00 01/10/2016 12:00 02/10/2016 00:00 02/10/2016 12:00 TemperatureDegreesC RealPowerkWperPhase Magda Rd 750kVA Transformer Load and Temperatures P1 kW P2 kW P3 kW Top Oil oC Inlet oC Outlet oC Bottom Oil oC

Notas del editor

  1. 2 Installation Elements, each followed by an analysis of data. The first being an Installation of retrofit monitoring followed by analysis of data and design of a Thermal ratings tool The second trial will be installation of various different cooling techniques, followed by analysis of benefits and this will feed into developing and refining the thermal ratings tool