SlideShare una empresa de Scribd logo
1 de 8
Abdelrazek Kamal Ali Mohamed
Mobile: +2 0100 345 273 2 Home: +2 01158954686
E-mail: abdelrazek2003@gmail.com
JOB SUMMARY
- I am having an experience in the field of Transformer installation and
commission up to 220KV voltage,175MVA and distribution transformer
as well 33KVA transformer, and dry type, cast resin transformer in
different countries Egypt, Zambia, Camron; Ghana and Syria, and I
having knowledge of Quality assurance ISO 9000-14000 Series,
- I have installed two transformers plants in different countries in Egypt
and Zambia, For all electro mechincal works, foundation and start up
- Solid Experience in Electrical Engineering within extensive process
automation projects, perform hardware engineering (with regard to
electrical installation and commission including control cabinets, field
components, PLC and measuring and control equipment).
- Transformer instaltion and commission
KEY STRENGTHS
-Order Hardware (after approval by the project coordinator hardware).
-Administer electrical drawings and other electrical engineering
documents during the current project.
-Offer support at electrical malfunctions project hand over to service in
the sphere of electrical installation
EDUCATION
•
Academic Degree : Graduate Diploma in Global Business
University : Eslsca Business school 2016
Academic Degree : Bachelor Of Electrical Engineering
Year of Graduation : May, 2003.
University : Zagazig
Major : Elecrical Power and Machines.
Overall Grade : Very Good.
General Rank : The 3rd.
Graduation Project : Load Flow.
Project Grade : Excellent.
LANGUAGE SKILLS
Arabic : Mother Tongue.
English : Very Good
COMPUTER SKILLS
Operating System : WindowsXP, Vista, 7.
Fluent use of : MS Office XP (Excel, Word, Power point).
Fluent use of : AutoCAD (2D).
2
TRAINING
MBA : I am studing MBA now
PLC :Siemens (Basic) step 7(300&400) from Auto Tack Company.
PLC: Siemens (Advanced) step 7(300&400) from Auto Tack Company.
PLC : Fatack & SCADA system from Industrial System Company.
Automatic control : From Industrial System Company.
CAREER HISTORY
`
(1) Elsewedy Cables Group
A :- Elsewedy Transformer Egypt
• Company : Elsewedy Transformers. (Egypt)
• From-To : Dec 20011 – up to now
• Field : Transformers
• Title : Installation manager
• Summary of Work Done :-
a) I responsed and commissing for more than 30 transfomers 125MVA , 220KV
b) I responsed and commissing for more than 100 transfomers 40MVA , 66/11 KV 
In different countiers (Egypt, UAE, Zambia, Cameron and Ghana)
c) Response for all installation of transformers (Power Transformer, Distribution
transformer Dry and oil)
b) Response for commissioning of transformer
3
c)Prepare ISO documents for after sales department.
d) Ensures that After sales technicians are adequately trained, so that the after
sales program can be accomplished in a safe, timely and cost-effective manner.
B :- Elsewedy Zambia
• Company : Elsewedy Electic Zambia LTD. (Zambia)
• From-To : January 2009- Dec 2011
• Field : Transformers and Energy Meters Factory
• Title : Maintenance and After Sales Services Manager
• Summary of Work Done :-
I have established whole plant (Transformer and Energy meters Factories)
d) Plant installation and commissioning
e) Prepare the action plane for Electromechanical work
f) Response for all Electromechanical works such as Electrical installation, Air
network, fire fight network, machines foundations, Cranes installation and
Earthing system.
g) Prepare the plant maintenance program based on best practices on
planning/scheduling and preventive /predictive maintenance (production
machinery, power generating equipment, utilities equipment, moving
equipment, building maintenance including electrical wiring and controls,
painting, heating/cooling and ventilation….).
h) Analyzes data and makes recommendations for improving plan operations
and solving maintenance-related problems (Troubleshooting maintenance)
i) Monitors operation of plant equipment & systems and modification of machinery
equipments.
j) Establishes and maintains a computerized maintenance management (Excel) for
tracking work orders, spare parts, and maintenance history of plant equipment.
4
k) Monitors the use and inventories of spare parts, maintenance supplies and
equipment, and initiates reordering when necessary.
l) Coordinates with the Administrative Department on request and reception of
spare parts and supplies
m) Maintains and updates operating and training manuals and technical catalogues
of all the plant equipment for the maintenance department.
n) Ensures that maintenance technicians are adequately trained, equipped and
motivated so that the maintenance program can be accomplished in a safe, timely
and cost-effective manner.
o) Ensures that all maintenance technicians are trained on the most updated
version of the operating procedures
p) Communicates regularly with all maintenance technicians, both individually and in
group, to ensure good two-way communication concerning maintenance issues.
q) Supervises plant maintenance personnel and inspects regularly their work.
r) Response for all installation and maintenance of transformers (Power
Transformer, Distribution transformer Dry and oil)
s) Prepare ISO documents for Maintance and after sales department.
C :- Elsewedy Egypt
• Company : Elsewedy Transformers. (Egypt)
• From-To : January 2008 - January 2009
• Field : Transformers
• Title : Electrical maintenance head section
• Summary of Work Done :-
a) Attend the primary installation works and machines commissioning
5
b) Response for all Electrical works such as install Medium voltage, low
voltage panels, lighting system, cable try and running cables.
c) Prepare the action plane for Electric work
d) Prepare the plant maintenance program (Electric Preventive maintenance)
e) Troubleshooting maintenance
f) Order Electric spare parts
(2) Oriental weavers Group
• Company : International Factory (Egypt)
• From-To : January 2007- January 2008
• Field : Carpets
• Title : Maintenance Head shift Engineer
• Summary of Work Done :-
a) Troubleshooting maintenance
b) Electrical installation work
c) Carrying out protective maintenance
(3) El Eslamya For Plastic
• Company : El Eslamya Factory (Egypt)
• From-To : January 2006- January 2007
6
• Field : Injection and Blowing Machines
• Title : Shift maintenance and operation Engineer
• Summary of Work Done :-
a) Troubleshooting maintenance
b) Electrical installation work
c) Carrying out protective maintenance
d) The operation of the machines
(4) ElSadak For Construction
• Company : ElSadak Company (Egypt)
• From-To : June 2004- January 2006
• Field : Construction
• Title : Electrical site Engineer
• Summary of Work Done :-
Response for all Electrical works such as install Medium voltage, low
Voltage panels, lighting system and running cables.
WORK EXPERIENCE
a) Familiar with motors information AC/DC
b) (AC& DC) Drives
c) PLC programming and troubleshooting (Siemens, LG, Mitsubishi and Omron)
7
d) Integrate the medium voltage and low voltage panels with the system
e) Design and repair the control circuits
f) Planning Schedule Maintenance
g) Creative thinking and problem solving
h) Design and modification of machinery equipments
i) Preparing ISO documents of maintenance and after sales departments
j) Maintenance power transformers
k) Maintenance oil transformers
l) Maintenance Dry transformers
PERSONAL DATA
Date of Birth : 27th of April, 1981.
Current Address : 10th of Ramadan City - Elsharkia - Egypt
Marital Status : Married. Military Status : Done.
Nationality : Egyption. Sex : Male.
Religion : Muslium. Passport no. : A14805515
Driving license : 4 wheel light vehicle Egypt .
8

Más contenido relacionado

La actualidad más candente (20)

Saw Qualification1
Saw Qualification1Saw Qualification1
Saw Qualification1
 
MOHAMED SALEM C.V
MOHAMED  SALEM  C.VMOHAMED  SALEM  C.V
MOHAMED SALEM C.V
 
CV 2016 .
CV 2016 .CV 2016 .
CV 2016 .
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CV
 
Sultan Alarimi
Sultan AlarimiSultan Alarimi
Sultan Alarimi
 
Resume
ResumeResume
Resume
 
Mr johann van der westhuizen full cv.docx
Mr johann van der westhuizen full cv.docxMr johann van der westhuizen full cv.docx
Mr johann van der westhuizen full cv.docx
 
PERSONAL INFORMATION
PERSONAL INFORMATIONPERSONAL INFORMATION
PERSONAL INFORMATION
 
ahmed amer
ahmed amerahmed amer
ahmed amer
 
V.Prado.Jr_CV
V.Prado.Jr_CVV.Prado.Jr_CV
V.Prado.Jr_CV
 
Mohamed Saad Resume
Mohamed Saad ResumeMohamed Saad Resume
Mohamed Saad Resume
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 
Abdelrhman CV
Abdelrhman CVAbdelrhman CV
Abdelrhman CV
 
Electronics & electrical communication engineer (1)
Electronics & electrical communication engineer (1)Electronics & electrical communication engineer (1)
Electronics & electrical communication engineer (1)
 
Ww CV 2016
Ww CV 2016Ww CV 2016
Ww CV 2016
 
The last Curriculum Vitae CV
The last Curriculum Vitae CVThe last Curriculum Vitae CV
The last Curriculum Vitae CV
 
Ww cv 2016
Ww cv 2016Ww cv 2016
Ww cv 2016
 
Adam_Smith_CV13042016 (1)
Adam_Smith_CV13042016 (1)Adam_Smith_CV13042016 (1)
Adam_Smith_CV13042016 (1)
 

Destacado

Seguridad informática
Seguridad informáticaSeguridad informática
Seguridad informáticaAndrea Gamarra
 
Curriculum vitae 12 16 pdf
Curriculum vitae 12 16  pdfCurriculum vitae 12 16  pdf
Curriculum vitae 12 16 pdfJan deVries
 
2017 transition mtg
2017 transition mtg 2017 transition mtg
2017 transition mtg Brian Ross
 
2016 senior slide show
2016 senior slide show2016 senior slide show
2016 senior slide showBrian Ross
 
Q4 media evaluation
Q4 media evaluation Q4 media evaluation
Q4 media evaluation Ibzie
 
нанесення розмірів на кресленні
нанесення розмірів на кресленнінанесення розмірів на кресленні
нанесення розмірів на кресленніtank1975
 
2017. január - A Hónap Webáruháza: Aranyshop.hu
2017. január - A Hónap Webáruháza: Aranyshop.hu2017. január - A Hónap Webáruháza: Aranyshop.hu
2017. január - A Hónap Webáruháza: Aranyshop.huShopRenter
 
Q4 media evaluation
Q4 media evaluation Q4 media evaluation
Q4 media evaluation Ibzie
 
Evaluation question 1
Evaluation question 1Evaluation question 1
Evaluation question 1Ibzie
 
Question 1 evaluation conventions
Question 1 evaluation conventionsQuestion 1 evaluation conventions
Question 1 evaluation conventionsCLEKmedia
 
Solar furnaces presentation
Solar furnaces presentationSolar furnaces presentation
Solar furnaces presentationCooper Lackay
 
Recovery: Job Growth and Education Requirements Through 2020
Recovery: Job Growth and Education Requirements Through 2020Recovery: Job Growth and Education Requirements Through 2020
Recovery: Job Growth and Education Requirements Through 2020CEW Georgetown
 
Beyond the Gig Economy
Beyond the Gig EconomyBeyond the Gig Economy
Beyond the Gig EconomyJon Lieber
 
African Americans: College Majors and Earnings
African Americans: College Majors and Earnings African Americans: College Majors and Earnings
African Americans: College Majors and Earnings CEW Georgetown
 
Creative Traction Methodology - For Early Stage Startups
Creative Traction Methodology - For Early Stage StartupsCreative Traction Methodology - For Early Stage Startups
Creative Traction Methodology - For Early Stage StartupsTommaso Di Bartolo
 
The Online College Labor Market
The Online College Labor MarketThe Online College Labor Market
The Online College Labor MarketCEW Georgetown
 
3 hard facts shaping higher education thinking and behavior
3 hard facts shaping higher education thinking and behavior3 hard facts shaping higher education thinking and behavior
3 hard facts shaping higher education thinking and behaviorGrant Thornton LLP
 

Destacado (20)

VinitaCVR
VinitaCVRVinitaCVR
VinitaCVR
 
Seguridad informática
Seguridad informáticaSeguridad informática
Seguridad informática
 
Curriculum vitae 12 16 pdf
Curriculum vitae 12 16  pdfCurriculum vitae 12 16  pdf
Curriculum vitae 12 16 pdf
 
2017 transition mtg
2017 transition mtg 2017 transition mtg
2017 transition mtg
 
2016 senior slide show
2016 senior slide show2016 senior slide show
2016 senior slide show
 
Q4 media evaluation
Q4 media evaluation Q4 media evaluation
Q4 media evaluation
 
нанесення розмірів на кресленні
нанесення розмірів на кресленнінанесення розмірів на кресленні
нанесення розмірів на кресленні
 
2017. január - A Hónap Webáruháza: Aranyshop.hu
2017. január - A Hónap Webáruháza: Aranyshop.hu2017. január - A Hónap Webáruháza: Aranyshop.hu
2017. január - A Hónap Webáruháza: Aranyshop.hu
 
Q4 media evaluation
Q4 media evaluation Q4 media evaluation
Q4 media evaluation
 
Evaluation question 1
Evaluation question 1Evaluation question 1
Evaluation question 1
 
Question 1 evaluation conventions
Question 1 evaluation conventionsQuestion 1 evaluation conventions
Question 1 evaluation conventions
 
Question 2
Question 2Question 2
Question 2
 
Solar furnaces presentation
Solar furnaces presentationSolar furnaces presentation
Solar furnaces presentation
 
Projeto gelo
Projeto geloProjeto gelo
Projeto gelo
 
Recovery: Job Growth and Education Requirements Through 2020
Recovery: Job Growth and Education Requirements Through 2020Recovery: Job Growth and Education Requirements Through 2020
Recovery: Job Growth and Education Requirements Through 2020
 
Beyond the Gig Economy
Beyond the Gig EconomyBeyond the Gig Economy
Beyond the Gig Economy
 
African Americans: College Majors and Earnings
African Americans: College Majors and Earnings African Americans: College Majors and Earnings
African Americans: College Majors and Earnings
 
Creative Traction Methodology - For Early Stage Startups
Creative Traction Methodology - For Early Stage StartupsCreative Traction Methodology - For Early Stage Startups
Creative Traction Methodology - For Early Stage Startups
 
The Online College Labor Market
The Online College Labor MarketThe Online College Labor Market
The Online College Labor Market
 
3 hard facts shaping higher education thinking and behavior
3 hard facts shaping higher education thinking and behavior3 hard facts shaping higher education thinking and behavior
3 hard facts shaping higher education thinking and behavior
 

Similar a abdelrazek Kamal C.V

bishoy-nabil-adly-aziz_(1)[1]
bishoy-nabil-adly-aziz_(1)[1]bishoy-nabil-adly-aziz_(1)[1]
bishoy-nabil-adly-aziz_(1)[1]Bishoy nabil
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016Mohamed Fawzy
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016Mohamed Fawzy
 
Efoghe Oscar - Genset Electrical & Maint CV
Efoghe Oscar - Genset Electrical & Maint CVEfoghe Oscar - Genset Electrical & Maint CV
Efoghe Oscar - Genset Electrical & Maint CVOSCAR EFOGHE
 
mohamed moustafa resume
mohamed moustafa resumemohamed moustafa resume
mohamed moustafa resumemohamed ahmed
 
wsel wasfy cv ramadan
wsel wasfy cv ramadanwsel wasfy cv ramadan
wsel wasfy cv ramadanWael Wasfy
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CValaa ibrahim
 
CVJ_29466149_20150624093911
CVJ_29466149_20150624093911CVJ_29466149_20150624093911
CVJ_29466149_20150624093911Ahmed Atallah
 
ahmed mohamed diaa_original
ahmed mohamed diaa_originalahmed mohamed diaa_original
ahmed mohamed diaa_originalAHMED DIAA
 

Similar a abdelrazek Kamal C.V (20)

Hamada's cv
Hamada's cvHamada's cv
Hamada's cv
 
bishoy-nabil-adly-aziz_(1)[1]
bishoy-nabil-adly-aziz_(1)[1]bishoy-nabil-adly-aziz_(1)[1]
bishoy-nabil-adly-aziz_(1)[1]
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
 
Efoghe Oscar - Genset Electrical & Maint CV
Efoghe Oscar - Genset Electrical & Maint CVEfoghe Oscar - Genset Electrical & Maint CV
Efoghe Oscar - Genset Electrical & Maint CV
 
Ahmed Hussein
Ahmed HusseinAhmed Hussein
Ahmed Hussein
 
mohamed moustafa resume
mohamed moustafa resumemohamed moustafa resume
mohamed moustafa resume
 
Hussein CV 2015
Hussein CV 2015Hussein CV 2015
Hussein CV 2015
 
wsel wasfy cv ramadan
wsel wasfy cv ramadanwsel wasfy cv ramadan
wsel wasfy cv ramadan
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
Mpe. muhammad elkhatib
Mpe. muhammad elkhatibMpe. muhammad elkhatib
Mpe. muhammad elkhatib
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
khaled cv
khaled cvkhaled cv
khaled cv
 
CV 2015
CV 2015CV 2015
CV 2015
 
ansary-cv
ansary-cvansary-cv
ansary-cv
 
CVJ_29466149_20150624093911
CVJ_29466149_20150624093911CVJ_29466149_20150624093911
CVJ_29466149_20150624093911
 
CV 2016 new
CV 2016 newCV 2016 new
CV 2016 new
 
ahmed mohamed diaa_original
ahmed mohamed diaa_originalahmed mohamed diaa_original
ahmed mohamed diaa_original
 
M.ElGamal CV
M.ElGamal CVM.ElGamal CV
M.ElGamal CV
 
Yasser Elghoul C.V
Yasser Elghoul C.VYasser Elghoul C.V
Yasser Elghoul C.V
 

abdelrazek Kamal C.V

  • 1. Abdelrazek Kamal Ali Mohamed Mobile: +2 0100 345 273 2 Home: +2 01158954686 E-mail: abdelrazek2003@gmail.com JOB SUMMARY - I am having an experience in the field of Transformer installation and commission up to 220KV voltage,175MVA and distribution transformer as well 33KVA transformer, and dry type, cast resin transformer in different countries Egypt, Zambia, Camron; Ghana and Syria, and I having knowledge of Quality assurance ISO 9000-14000 Series, - I have installed two transformers plants in different countries in Egypt and Zambia, For all electro mechincal works, foundation and start up - Solid Experience in Electrical Engineering within extensive process automation projects, perform hardware engineering (with regard to electrical installation and commission including control cabinets, field components, PLC and measuring and control equipment). - Transformer instaltion and commission KEY STRENGTHS -Order Hardware (after approval by the project coordinator hardware). -Administer electrical drawings and other electrical engineering documents during the current project. -Offer support at electrical malfunctions project hand over to service in the sphere of electrical installation EDUCATION • Academic Degree : Graduate Diploma in Global Business
  • 2. University : Eslsca Business school 2016 Academic Degree : Bachelor Of Electrical Engineering Year of Graduation : May, 2003. University : Zagazig Major : Elecrical Power and Machines. Overall Grade : Very Good. General Rank : The 3rd. Graduation Project : Load Flow. Project Grade : Excellent. LANGUAGE SKILLS Arabic : Mother Tongue. English : Very Good COMPUTER SKILLS Operating System : WindowsXP, Vista, 7. Fluent use of : MS Office XP (Excel, Word, Power point). Fluent use of : AutoCAD (2D). 2
  • 3. TRAINING MBA : I am studing MBA now PLC :Siemens (Basic) step 7(300&400) from Auto Tack Company. PLC: Siemens (Advanced) step 7(300&400) from Auto Tack Company. PLC : Fatack & SCADA system from Industrial System Company. Automatic control : From Industrial System Company. CAREER HISTORY ` (1) Elsewedy Cables Group A :- Elsewedy Transformer Egypt • Company : Elsewedy Transformers. (Egypt) • From-To : Dec 20011 – up to now • Field : Transformers • Title : Installation manager • Summary of Work Done :- a) I responsed and commissing for more than 30 transfomers 125MVA , 220KV b) I responsed and commissing for more than 100 transfomers 40MVA , 66/11 KV In different countiers (Egypt, UAE, Zambia, Cameron and Ghana) c) Response for all installation of transformers (Power Transformer, Distribution transformer Dry and oil) b) Response for commissioning of transformer 3
  • 4. c)Prepare ISO documents for after sales department. d) Ensures that After sales technicians are adequately trained, so that the after sales program can be accomplished in a safe, timely and cost-effective manner. B :- Elsewedy Zambia • Company : Elsewedy Electic Zambia LTD. (Zambia) • From-To : January 2009- Dec 2011 • Field : Transformers and Energy Meters Factory • Title : Maintenance and After Sales Services Manager • Summary of Work Done :- I have established whole plant (Transformer and Energy meters Factories) d) Plant installation and commissioning e) Prepare the action plane for Electromechanical work f) Response for all Electromechanical works such as Electrical installation, Air network, fire fight network, machines foundations, Cranes installation and Earthing system. g) Prepare the plant maintenance program based on best practices on planning/scheduling and preventive /predictive maintenance (production machinery, power generating equipment, utilities equipment, moving equipment, building maintenance including electrical wiring and controls, painting, heating/cooling and ventilation….). h) Analyzes data and makes recommendations for improving plan operations and solving maintenance-related problems (Troubleshooting maintenance) i) Monitors operation of plant equipment & systems and modification of machinery equipments. j) Establishes and maintains a computerized maintenance management (Excel) for tracking work orders, spare parts, and maintenance history of plant equipment. 4
  • 5. k) Monitors the use and inventories of spare parts, maintenance supplies and equipment, and initiates reordering when necessary. l) Coordinates with the Administrative Department on request and reception of spare parts and supplies m) Maintains and updates operating and training manuals and technical catalogues of all the plant equipment for the maintenance department. n) Ensures that maintenance technicians are adequately trained, equipped and motivated so that the maintenance program can be accomplished in a safe, timely and cost-effective manner. o) Ensures that all maintenance technicians are trained on the most updated version of the operating procedures p) Communicates regularly with all maintenance technicians, both individually and in group, to ensure good two-way communication concerning maintenance issues. q) Supervises plant maintenance personnel and inspects regularly their work. r) Response for all installation and maintenance of transformers (Power Transformer, Distribution transformer Dry and oil) s) Prepare ISO documents for Maintance and after sales department. C :- Elsewedy Egypt • Company : Elsewedy Transformers. (Egypt) • From-To : January 2008 - January 2009 • Field : Transformers • Title : Electrical maintenance head section • Summary of Work Done :- a) Attend the primary installation works and machines commissioning 5
  • 6. b) Response for all Electrical works such as install Medium voltage, low voltage panels, lighting system, cable try and running cables. c) Prepare the action plane for Electric work d) Prepare the plant maintenance program (Electric Preventive maintenance) e) Troubleshooting maintenance f) Order Electric spare parts (2) Oriental weavers Group • Company : International Factory (Egypt) • From-To : January 2007- January 2008 • Field : Carpets • Title : Maintenance Head shift Engineer • Summary of Work Done :- a) Troubleshooting maintenance b) Electrical installation work c) Carrying out protective maintenance (3) El Eslamya For Plastic • Company : El Eslamya Factory (Egypt) • From-To : January 2006- January 2007 6
  • 7. • Field : Injection and Blowing Machines • Title : Shift maintenance and operation Engineer • Summary of Work Done :- a) Troubleshooting maintenance b) Electrical installation work c) Carrying out protective maintenance d) The operation of the machines (4) ElSadak For Construction • Company : ElSadak Company (Egypt) • From-To : June 2004- January 2006 • Field : Construction • Title : Electrical site Engineer • Summary of Work Done :- Response for all Electrical works such as install Medium voltage, low Voltage panels, lighting system and running cables. WORK EXPERIENCE a) Familiar with motors information AC/DC b) (AC& DC) Drives c) PLC programming and troubleshooting (Siemens, LG, Mitsubishi and Omron) 7
  • 8. d) Integrate the medium voltage and low voltage panels with the system e) Design and repair the control circuits f) Planning Schedule Maintenance g) Creative thinking and problem solving h) Design and modification of machinery equipments i) Preparing ISO documents of maintenance and after sales departments j) Maintenance power transformers k) Maintenance oil transformers l) Maintenance Dry transformers PERSONAL DATA Date of Birth : 27th of April, 1981. Current Address : 10th of Ramadan City - Elsharkia - Egypt Marital Status : Married. Military Status : Done. Nationality : Egyption. Sex : Male. Religion : Muslium. Passport no. : A14805515 Driving license : 4 wheel light vehicle Egypt . 8