MEASUREMENT OF HORIZONTALANGLES:
 There are three methods of measuring horizontal angles:-
 i) Ordinary Method.
 ii) Repetition Method.
 iii) Reiteration Method.
MEASUREMENT OF HORIZONTAL ANGLES:
i) Ordinary Method. To measure horizontal angle AOB:-
i) Set up the theodolite at station point O
and level it accurately.
ii) Set the vernier A to the zero or 3600 of
the horizontal circle. Tighten the
upper clamp.
iii) Loosen the lower clamp. Turn the
instrument and direct the telescope
towards A to bisect it accurately with
the use of tangent screw. After
bisecting accurately check the reading
which must still read zero. Read the
vernier B and record both the
readings.
o
A B
HORIZONTAL ANGLE AOB
MEASUREMENT OF HORIZONTALANGLES:
iv) Loosen the upper clamp and turn the
telescope clockwise until line of sight
bisects point B on the right hand side.
Then tighten the upper clamp and
bisect it accurately by turning its
tangent screw.
v) Read both verniers. The reading of the
vernier a which was initially set at
zero gives the value of the angle AOB
directly and that of the other vernier
B by deducting 1800 .The mean of the
two vernier readings gives the value of
the required angle AOB.
o
A B
HORIZONTAL ANGLE AOB
MEASUREMENT OF HORIZONTAL ANGLES:
i) Ordinary Method. To measure horizontal angle AOB:-
vi) Change the face of the instrument
and repeat the whole process. The
mean of the two vernier readings gives
the second value of the angle AOB
which should be approximately or
exactly equal to the previous value.
vii) The mean of the two values of the
angle AOB ,one with face left and the
other with face right ,gives the
required angle free from all
instrumental errors.
o
A B
HORIZONTAL ANGLE
AOB
MEASUREMENT OF HORIZONTAL ANGLES:
ii) Repetition Method.
This method is used for very accurate
work. In this method ,the same angle
is added several times mechanically
and the correct value of the angle is
obtained by dividing the accumulated
reading by the no. of repetitions.
The No. of repetitions made usually in
this method is six, three with the face
left and three with the face right .In
this way ,angles can be measured to a
finer degree of accuracy than that
obtainable with the least count of the
vernier.
o
A B
HORIZONTAL ANGLE
AOB
MEASUREMENT OF HORIZONTAL ANGLES:
ii) Repetition Method.
To measure horizontal angle by
repetitions:-
i) Set up the theodolite at starting point
O and level it accurately.
ii) Measure The horizontal angle AOB.
iii) Loosen the lower clamp and turn the
telescope clock – wise until the object
(A) is sighted again. Bisect B
accurately by using the upper tangent
screw. The verniers will now read the
twice the value of the angle now.
o
A B
HORIZONTAL ANGLE
AOB
MEASUREMENT OF HORIZONTAL ANGLES:
iii) Reiteration Method.
o
A
B
Reiteration
Method
C
D
This method is another precise and
comparatively less tedious method
of measuring the horizontal angles.
It is generally preferred when
several angles are to be measured
at a particular station.
This method consists in measuring
several angles successively and
finally closing the horizon at the
starting point. The final reading of
the vernier A should be same as its
initial reading.
MEASUREMENT OF HORIZONTAL ANGLES:
iii) Reiteration Method.
o
A
B
Reiteration
Method
C
D
…If not ,the discrepancy is equally
distributed among all the
measured angles.
Procedure
Suppose it is required to measure
the angles AOB,BOC and COD.
Then to measure these angles by
repetition method :
i) Set up the instrument over
station point O and level it
accurately.
MEASUREMENT OF HORIZONTAL ANGLES:
iii) Reiteration Method.
o
A
B
Reiteration
Method
C
D
Procedure
ii) Direct the telescope towards
point A which is known as
referring object. Bisect it
accurately and check the reading
of vernier as 0 or 3600 . Loosen the
lower clamp and turn the telescope
clockwise to sight point B exactly.
Read the verniers again and The
mean reading will give the value of
angle AOB.
iii) Similarly bisect C & D
successively, read both verniers at-
MEASUREMENT OF HORIZONTAL ANGLES:
iii) Reiteration Method (contd.).
o
A
B
Reiteration
Method
C
D
Procedure. each bisection, find the
value of the angle BOC and COD.
iv) Finally close the horizon by sighting
towards the referring object (point A).
v) The vernier A should now read 3600.
If not note down the error .This error
occurs due to slip etc.
vi) If the error is small, it is equally
distributed among the several angles .If
large the readings should be discarded
and a new set of readings be taken.
MEASUREMENT OF VERTICAL ANGLES:
Vertical Angle : A vertical angle is an angle between the
inclined line of sight and the horizontal. It may be an
angle of elevation or depression according as the object is
above or below the horizontal plane.
A
B
O O
A
B
A
B
O
HORI. LINE
HORI.
LINE
β
HORI. LINE
VERTICAL ANGLE
Fig.a
Fig. b Fig. c
AOB= α+ β
AOB= α - β
β
β
α
α
α
MEASUREMENT OF VERTICAL ANGLES:
To Measure the Vertical Angle of an object A at a station O:
(i) Set up the theodolite at station point O and level it
accurately with reference to the altitude bubble.
(ii) Set the zero of vertical vernier exactly to the zero of the
vertical circle clamp and tangent screw.
(iii) Bring the bubble of the altitude level in the central position.
(iv)The line of sight is thus made horizontal and vernier still
reads zero.
(v) Loosen the vertical circle clamp screw and direct the
telescope towards the object A and sight it exactly by using
the vertical circle tangent screw.
MEASUREMENT OF VERTICAL ANGLES:
(v) Read both verniers on the vertical circle, The mean of
the two vernier readings gives the value of the required
angle.
(vi) Change the face of the instrument and repeat the
process. The mean of of the two vernier readings gives the
second value of the required angle.
(vii) The average of the two values of the angles thus
obtained, is the required value of the angle free from
instrumental errors.
MEASUREMENT OF VERTICAL ANGLES:
For measuring Vertical Angle between two points A &B
i) Sight A as before , and take the mean of the two vernier
readings at the vertical circle. Let it be α
ii) Similarly, sight B and take the mean of the two vernier
readings at the vertical circle. Let it be
iii) The sum or difference of these readings will give the value of
the vertical angle between A and B according as one of the points
is above and the other below the horizontal plane. or both points
are on the same side of the horizontal plane Fig b & c
β
Theodolite angle measurement

Más contenido relacionado

La actualidad más candente

tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveyingMujeeb Muji
 
INTRODUCTION TO SURVEYING
INTRODUCTION TO SURVEYINGINTRODUCTION TO SURVEYING
INTRODUCTION TO SURVEYINGfarhana saiyed
 
Total station Surveying
Total station SurveyingTotal station Surveying
Total station SurveyingKiran M
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & RangingRakesh Verma
 
Structural analysis 2
Structural analysis   2Structural analysis   2
Structural analysis 2R VIJAYAKUMAR
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingDolat Ram
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying neharajpl
 
Angular measurement
Angular measurementAngular measurement
Angular measurementKarnav Rana
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levellingParimal Jha
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLatif Hyder Wadho
 

La actualidad más candente (20)

tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveying
 
INTRODUCTION TO SURVEYING
INTRODUCTION TO SURVEYINGINTRODUCTION TO SURVEYING
INTRODUCTION TO SURVEYING
 
Levelling
LevellingLevelling
Levelling
 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting ppt
 
Total station Surveying
Total station SurveyingTotal station Surveying
Total station Surveying
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
Structural analysis 2
Structural analysis   2Structural analysis   2
Structural analysis 2
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 
Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Theodolite survey
Theodolite surveyTheodolite survey
Theodolite survey
 
Angular measurement
Angular measurementAngular measurement
Angular measurement
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
Khosla theory
Khosla theoryKhosla theory
Khosla theory
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
 
Levelling
LevellingLevelling
Levelling
 
Basics of soil mechanics
Basics of soil mechanics   Basics of soil mechanics
Basics of soil mechanics
 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
 
Soil exploration part i
Soil exploration part  iSoil exploration part  i
Soil exploration part i
 
Contouring
ContouringContouring
Contouring
 

Similar a Theodolite angle measurement

Theodolite and Its Uses
Theodolite and Its UsesTheodolite and Its Uses
Theodolite and Its UsesAmitKumar8151
 
Unit No 2 Theodolite Surveying and Traversing.pptx
Unit No 2  Theodolite Surveying and Traversing.pptxUnit No 2  Theodolite Surveying and Traversing.pptx
Unit No 2 Theodolite Surveying and Traversing.pptxADCET, Ashta
 
Measuring of Horizontal angle Practical Part
Measuring of Horizontal angle Practical PartMeasuring of Horizontal angle Practical Part
Measuring of Horizontal angle Practical PartBahzad5
 
To Experimental Study for Comparison Theodolite and Total Station
To Experimental Study for Comparison Theodolite and Total Station To Experimental Study for Comparison Theodolite and Total Station
To Experimental Study for Comparison Theodolite and Total Station Agriculture Journal IJOEAR
 
Lecture 7 topographic related documents Survey
Lecture 7 topographic related documents  SurveyLecture 7 topographic related documents  Survey
Lecture 7 topographic related documents Survey40023ce
 
Ranging and types.pptx
Ranging and types.pptxRanging and types.pptx
Ranging and types.pptxAkashV75
 
Theodolite surveying part 1 (I scheme MSBTE)
Theodolite surveying part 1 (I scheme MSBTE)Theodolite surveying part 1 (I scheme MSBTE)
Theodolite surveying part 1 (I scheme MSBTE)Naufil Sayyad
 
Theodolite seting up.pdf
Theodolite seting up.pdfTheodolite seting up.pdf
Theodolite seting up.pdfAlwandBarzani
 
Theodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.pptTheodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.pptUjasPandya2
 
Theodolite_surveying.ppt
Theodolite_surveying.pptTheodolite_surveying.ppt
Theodolite_surveying.pptsivaganesan23
 
Survey Camp Manali ppt
Survey Camp Manali pptSurvey Camp Manali ppt
Survey Camp Manali pptAshfaq Khan
 
Survey camp report(civil 3 rd year)
Survey camp report(civil 3 rd year) Survey camp report(civil 3 rd year)
Survey camp report(civil 3 rd year) ashishcivil098
 
Theodolite surveying part2
Theodolite surveying part2Theodolite surveying part2
Theodolite surveying part2Naufil Sayyad
 
COMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYINGCOMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYINGLavanya Singh
 
Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying SHAMJITH KM
 
ASU(CE4G)-Theodolite (1).ppt
ASU(CE4G)-Theodolite (1).pptASU(CE4G)-Theodolite (1).ppt
ASU(CE4G)-Theodolite (1).pptRESHMAFEGADE
 

Similar a Theodolite angle measurement (20)

Theodolite and Its Uses
Theodolite and Its UsesTheodolite and Its Uses
Theodolite and Its Uses
 
Unit No 2 Theodolite Surveying and Traversing.pptx
Unit No 2  Theodolite Surveying and Traversing.pptxUnit No 2  Theodolite Surveying and Traversing.pptx
Unit No 2 Theodolite Surveying and Traversing.pptx
 
Measuring of Horizontal angle Practical Part
Measuring of Horizontal angle Practical PartMeasuring of Horizontal angle Practical Part
Measuring of Horizontal angle Practical Part
 
To Experimental Study for Comparison Theodolite and Total Station
To Experimental Study for Comparison Theodolite and Total Station To Experimental Study for Comparison Theodolite and Total Station
To Experimental Study for Comparison Theodolite and Total Station
 
Lecture 7 topographic related documents Survey
Lecture 7 topographic related documents  SurveyLecture 7 topographic related documents  Survey
Lecture 7 topographic related documents Survey
 
Surveying Lab II Manual
Surveying Lab II ManualSurveying Lab II Manual
Surveying Lab II Manual
 
Ranging and types.pptx
Ranging and types.pptxRanging and types.pptx
Ranging and types.pptx
 
Theodolite surveying part 1 (I scheme MSBTE)
Theodolite surveying part 1 (I scheme MSBTE)Theodolite surveying part 1 (I scheme MSBTE)
Theodolite surveying part 1 (I scheme MSBTE)
 
Theodolite seting up.pdf
Theodolite seting up.pdfTheodolite seting up.pdf
Theodolite seting up.pdf
 
Theodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.pptTheodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.ppt
 
Theodolite_surveying.ppt
Theodolite_surveying.pptTheodolite_surveying.ppt
Theodolite_surveying.ppt
 
Survey Camp Manali ppt
Survey Camp Manali pptSurvey Camp Manali ppt
Survey Camp Manali ppt
 
Survey camp report(civil 3 rd year)
Survey camp report(civil 3 rd year) Survey camp report(civil 3 rd year)
Survey camp report(civil 3 rd year)
 
travesing.pdf
travesing.pdftravesing.pdf
travesing.pdf
 
chapter 4angle.pdf
chapter 4angle.pdfchapter 4angle.pdf
chapter 4angle.pdf
 
Theodolite surveying part2
Theodolite surveying part2Theodolite surveying part2
Theodolite surveying part2
 
Theodolite .ppt
Theodolite .pptTheodolite .ppt
Theodolite .ppt
 
COMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYINGCOMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYING
 
Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying
 
ASU(CE4G)-Theodolite (1).ppt
ASU(CE4G)-Theodolite (1).pptASU(CE4G)-Theodolite (1).ppt
ASU(CE4G)-Theodolite (1).ppt
 

Más de Mujeeb Muji

Axial flow reaction turbines/ Kaplan Turbine
Axial flow reaction turbines/ Kaplan TurbineAxial flow reaction turbines/ Kaplan Turbine
Axial flow reaction turbines/ Kaplan TurbineMujeeb Muji
 
Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1Mujeeb Muji
 
Fluids mechanics class 1 -Module 1
Fluids mechanics class 1 -Module 1Fluids mechanics class 1 -Module 1
Fluids mechanics class 1 -Module 1Mujeeb Muji
 
Compass surveying
Compass surveyingCompass surveying
Compass surveyingMujeeb Muji
 
Theodolitetraversing
TheodolitetraversingTheodolitetraversing
TheodolitetraversingMujeeb Muji
 
Perpendicular Offset
Perpendicular Offset Perpendicular Offset
Perpendicular Offset Mujeeb Muji
 
Reciprocal ranging or Indirect Ranging
Reciprocal ranging or Indirect RangingReciprocal ranging or Indirect Ranging
Reciprocal ranging or Indirect RangingMujeeb Muji
 
Introduction on instruments used for chaining
Introduction on instruments used for chainingIntroduction on instruments used for chaining
Introduction on instruments used for chainingMujeeb Muji
 
Aerial Photogrammetry
Aerial Photogrammetry Aerial Photogrammetry
Aerial Photogrammetry Mujeeb Muji
 
Glass powder replacement for cement.by ananth k p coorg
Glass powder replacement for cement.by ananth k p coorgGlass powder replacement for cement.by ananth k p coorg
Glass powder replacement for cement.by ananth k p coorgMujeeb Muji
 

Más de Mujeeb Muji (13)

Axial flow reaction turbines/ Kaplan Turbine
Axial flow reaction turbines/ Kaplan TurbineAxial flow reaction turbines/ Kaplan Turbine
Axial flow reaction turbines/ Kaplan Turbine
 
Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1
 
Fluids mechanics class 1 -Module 1
Fluids mechanics class 1 -Module 1Fluids mechanics class 1 -Module 1
Fluids mechanics class 1 -Module 1
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
levelling
levellinglevelling
levelling
 
Theodolitetraversing
TheodolitetraversingTheodolitetraversing
Theodolitetraversing
 
Perpendicular Offset
Perpendicular Offset Perpendicular Offset
Perpendicular Offset
 
Reciprocal ranging or Indirect Ranging
Reciprocal ranging or Indirect RangingReciprocal ranging or Indirect Ranging
Reciprocal ranging or Indirect Ranging
 
Direct Ranging
Direct RangingDirect Ranging
Direct Ranging
 
Introduction on instruments used for chaining
Introduction on instruments used for chainingIntroduction on instruments used for chaining
Introduction on instruments used for chaining
 
Aerial Photogrammetry
Aerial Photogrammetry Aerial Photogrammetry
Aerial Photogrammetry
 
Field Astronomy
Field AstronomyField Astronomy
Field Astronomy
 
Glass powder replacement for cement.by ananth k p coorg
Glass powder replacement for cement.by ananth k p coorgGlass powder replacement for cement.by ananth k p coorg
Glass powder replacement for cement.by ananth k p coorg
 

Último

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 

Último (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 

Theodolite angle measurement

  • 1. MEASUREMENT OF HORIZONTALANGLES:  There are three methods of measuring horizontal angles:-  i) Ordinary Method.  ii) Repetition Method.  iii) Reiteration Method.
  • 2. MEASUREMENT OF HORIZONTAL ANGLES: i) Ordinary Method. To measure horizontal angle AOB:- i) Set up the theodolite at station point O and level it accurately. ii) Set the vernier A to the zero or 3600 of the horizontal circle. Tighten the upper clamp. iii) Loosen the lower clamp. Turn the instrument and direct the telescope towards A to bisect it accurately with the use of tangent screw. After bisecting accurately check the reading which must still read zero. Read the vernier B and record both the readings. o A B HORIZONTAL ANGLE AOB
  • 3. MEASUREMENT OF HORIZONTALANGLES: iv) Loosen the upper clamp and turn the telescope clockwise until line of sight bisects point B on the right hand side. Then tighten the upper clamp and bisect it accurately by turning its tangent screw. v) Read both verniers. The reading of the vernier a which was initially set at zero gives the value of the angle AOB directly and that of the other vernier B by deducting 1800 .The mean of the two vernier readings gives the value of the required angle AOB. o A B HORIZONTAL ANGLE AOB
  • 4. MEASUREMENT OF HORIZONTAL ANGLES: i) Ordinary Method. To measure horizontal angle AOB:- vi) Change the face of the instrument and repeat the whole process. The mean of the two vernier readings gives the second value of the angle AOB which should be approximately or exactly equal to the previous value. vii) The mean of the two values of the angle AOB ,one with face left and the other with face right ,gives the required angle free from all instrumental errors. o A B HORIZONTAL ANGLE AOB
  • 5. MEASUREMENT OF HORIZONTAL ANGLES: ii) Repetition Method. This method is used for very accurate work. In this method ,the same angle is added several times mechanically and the correct value of the angle is obtained by dividing the accumulated reading by the no. of repetitions. The No. of repetitions made usually in this method is six, three with the face left and three with the face right .In this way ,angles can be measured to a finer degree of accuracy than that obtainable with the least count of the vernier. o A B HORIZONTAL ANGLE AOB
  • 6. MEASUREMENT OF HORIZONTAL ANGLES: ii) Repetition Method. To measure horizontal angle by repetitions:- i) Set up the theodolite at starting point O and level it accurately. ii) Measure The horizontal angle AOB. iii) Loosen the lower clamp and turn the telescope clock – wise until the object (A) is sighted again. Bisect B accurately by using the upper tangent screw. The verniers will now read the twice the value of the angle now. o A B HORIZONTAL ANGLE AOB
  • 7. MEASUREMENT OF HORIZONTAL ANGLES: iii) Reiteration Method. o A B Reiteration Method C D This method is another precise and comparatively less tedious method of measuring the horizontal angles. It is generally preferred when several angles are to be measured at a particular station. This method consists in measuring several angles successively and finally closing the horizon at the starting point. The final reading of the vernier A should be same as its initial reading.
  • 8. MEASUREMENT OF HORIZONTAL ANGLES: iii) Reiteration Method. o A B Reiteration Method C D …If not ,the discrepancy is equally distributed among all the measured angles. Procedure Suppose it is required to measure the angles AOB,BOC and COD. Then to measure these angles by repetition method : i) Set up the instrument over station point O and level it accurately.
  • 9. MEASUREMENT OF HORIZONTAL ANGLES: iii) Reiteration Method. o A B Reiteration Method C D Procedure ii) Direct the telescope towards point A which is known as referring object. Bisect it accurately and check the reading of vernier as 0 or 3600 . Loosen the lower clamp and turn the telescope clockwise to sight point B exactly. Read the verniers again and The mean reading will give the value of angle AOB. iii) Similarly bisect C & D successively, read both verniers at-
  • 10. MEASUREMENT OF HORIZONTAL ANGLES: iii) Reiteration Method (contd.). o A B Reiteration Method C D Procedure. each bisection, find the value of the angle BOC and COD. iv) Finally close the horizon by sighting towards the referring object (point A). v) The vernier A should now read 3600. If not note down the error .This error occurs due to slip etc. vi) If the error is small, it is equally distributed among the several angles .If large the readings should be discarded and a new set of readings be taken.
  • 11. MEASUREMENT OF VERTICAL ANGLES: Vertical Angle : A vertical angle is an angle between the inclined line of sight and the horizontal. It may be an angle of elevation or depression according as the object is above or below the horizontal plane. A B O O A B A B O HORI. LINE HORI. LINE β HORI. LINE VERTICAL ANGLE Fig.a Fig. b Fig. c AOB= α+ β AOB= α - β β β α α α
  • 12. MEASUREMENT OF VERTICAL ANGLES: To Measure the Vertical Angle of an object A at a station O: (i) Set up the theodolite at station point O and level it accurately with reference to the altitude bubble. (ii) Set the zero of vertical vernier exactly to the zero of the vertical circle clamp and tangent screw. (iii) Bring the bubble of the altitude level in the central position. (iv)The line of sight is thus made horizontal and vernier still reads zero. (v) Loosen the vertical circle clamp screw and direct the telescope towards the object A and sight it exactly by using the vertical circle tangent screw.
  • 13. MEASUREMENT OF VERTICAL ANGLES: (v) Read both verniers on the vertical circle, The mean of the two vernier readings gives the value of the required angle. (vi) Change the face of the instrument and repeat the process. The mean of of the two vernier readings gives the second value of the required angle. (vii) The average of the two values of the angles thus obtained, is the required value of the angle free from instrumental errors.
  • 14. MEASUREMENT OF VERTICAL ANGLES: For measuring Vertical Angle between two points A &B i) Sight A as before , and take the mean of the two vernier readings at the vertical circle. Let it be α ii) Similarly, sight B and take the mean of the two vernier readings at the vertical circle. Let it be iii) The sum or difference of these readings will give the value of the vertical angle between A and B according as one of the points is above and the other below the horizontal plane. or both points are on the same side of the horizontal plane Fig b & c β