1. Production Schedule for Horror Trailer
Date Location Props Characters Scenes
04/01/2011 Negus corridor Ouija Board, Jared, 1
and classroom Michelle, Sam,
Ava
06/01/2011 By the school Phone, torches Ava, Michelle 2
lockers
07/01/2011 Staircase Alcohol, Sam, Michelle 3
Cigarettes,
torches
11/01/2011 In the gym hall Components to All characters 4
doing the Ouija the Ouija
Board Board, alcohol,
cigarettes,
torches
13/01/2011 School toilets Cigarette, Ava 5
torches
16/01/2011 Various Camera, Jared, 6
locations- torches Michelle, Sam
chase scene
21/01/2011 Corridor Camera Ava 7
Production Schedule analysis
As a collective we collaborated and conduced that shooting our scenes would be more
suitable during January. This is because of the upcoming Christmas holidays break, as
our trailer is based in a school which is likely to be closed. Therefore, so that we
could produce a more efficient trailer we decided to produce it during a more subtle
period. Furthermore, in relation to the dates, we thought that it would be best to put a
gap between the dates, thus enabling us to review our production and make sure that it
is going according to plan. To conduce, I think that by implementing this production
schedule we will be more organized and time saving, leaving us with more time to use
Photoshop.