MIXED URBAN DEVELOPMENT-OLD TOWN MOMBASA 02KUMARY .S. KIUNGA B02/36033/2013
PROJECT 6 MUD -OLD TOWN MOMBASA
1500mm high
parapet wall
Arched opening with 100x50mm 1:4 c/s moulding
all round ventilation and to gel the building into
the existing swahili street character
300x300mm by 1000mm
high mpingo frame pole
base to details
230x25mm thick decorative
mpingo Fascia Board
Decorative mpingo wood
mould varnished & curved to details
crown silicone water proofing solution paint on
5mm thickwhite cement coat on
12mm thick 1:4c/s mortar with water
proofing admixture.
4mm thick Glass roof with
internal wooden sunshading devices
450mm high Planter with
flower and seating space
around to detailsmahogany door to
schedule
Decorative mpingo wood
lattice for entrance defination
to details
100x175mm mangrove pergola
over sun basking area
Spanish tiles on 50x50mm battens
on 100x50 rafters joined and fixed
to details
25mm thick machine cut
mazera cladding fixed on 1:4 c/s
on masonry to architects details
1600x3000mm rectangular mpingo
casement window with internal insect
proof net to details
250 x 120mm thick concrete moulding
curved ,plastered and painted
to architects approval details
1600mmx3000 rectangular operable
mpingo window with insect proofnet to
to details
GL GL
Decorative mpingo wood
mould varnished & curved to details
Arched opening with 100x50mm 1:4 c/s moulding
all round ventilation and to gel the building into
the existing swahili street character
1:12 ramp to
details
GLGL
Entrance to BasementEntrance to Ground
parking
1500mm high parapet wall
with coping to details
Mpingo balcony rails
230x25mm decorative mpingo
Fascia Board treated painted
with 3 coats of clear varnish
Glass roof with internal wooden
sunshading devices
Planter with flower and
seating space
100x50mm 1:4 c/s
moulding around opening
1600x3000mm rectangular mpingo
casement window with internal insect
proof net to details
250 x 120mm thick concrete moulding
curved ,plastered and painted
to architects approval details
Spanish tiles on 50x50mm battens
on 100x50 rafters on 100 x 50mm wall
plate joined and fixed to details
75x 75 mm by900mm high
treated and varnished mpingo
balcony rails to details
25mm thick machine cut
mazera cladding fixed on 1:4 c/s
mortar on 3600mm high masonry
plinth to architects details
crown silicone water proofing solution paint on
5mm thickwhite cement coat on
12mm thick 1:4c/s mortar with water
proofing admixture.
250 x 120mm thick concrete moulding
curved ,plastered and painted
to architects approval details
30 deg Spanish tiles on 50x50mm battens
on 100x50 rafters on 100 x 50mm wall
plate joined and fixed to details
Arched opening with 100x50mm 1:4 c/s moulding
all round ventilation and to gel the building into
the existing swahili street character
GL GL
1500mm high parapet wall with
coping to details
Planter with flower and
seating space around
230x25mm decorative mpingo
Fascia Board treated painted
with 3 coats of clear varnish
Glass roof with internal wooden
sunshading devices
100x50mm 1:4 c/s
moulding around opening
1600x3000mm rectangular mpingo
casement window with internal insect
proof net to details
250 x 120mm thick concrete moulding
curved ,plastered and painted
to architects approval details
75x 75 mm by900mm high
treated and varnished mpingo
balcony rails to details
25mm thick machine cut
mazera cladding fixed on 1:4 c/s
mortar on 3600mm high masonry
plinth to architects details
crown silicone water proofing solution paint on
5mm thickwhite cement coat on
12mm thick 1:4c/s mortar with water
proofing admixture.
30 deg Spanish tiles on 50x50mm battens
on 100x50 rafters on 100 x 50mm wall
plate joined and fixed to details
crown silicone water proofing solution paint on
5mm thickwhite cement coat on
12mm thick 1:4c/s mortar with water
proofing admixture.
D
D
C
C
B
B
A
A
1,5002,7003,0501503,4501503,4501503,4501501,500100
1,650
3,600
225x25mm thick
fascia board
25mm thick machine cut
mazera cladding fixed on 1:4 c/s
on masonry to architects details
+500
+3600
+7200
+10800
+14400
+3600
+7200
+14400
+10800
+500
pv pv
pv pv
pv pv
Lift car
Basement
Entrance Lobby
Lift Lobby
Lift Lobby
Lift Lobby
Refuse
Balcony
Balcony
Refuse
chute
1500mm high
parapet wall
Wooden balcony
rails
150mm thick
RC slab
Concrete Moulding
to details
Decorative
Facia Board
Decorative wooden
mould
Glass roof with internal wooden
sunshading devices
Planter with flower and
seating space around
RC stairs to details
Tread=300mm
Riser=150mm
1500mm high
parapet wall
Spanish roof tiles on 50x50mm battens
on 150x50mm raters @ 1000c/c on
100x50mm wall plate
D-06
2,0001503,4501503,0004501507,050150
200 1,100
200 1,350 150 75
Red spanish clay tiles
on 50 x50mm battens
1600X3000mm wooden casement window
with insect proof wire to schedule
75x 75 mm by900mm high
treated and varnished mpingo
balcony to details
250 x 120mm thick concrete moulding
curved ,plastered and painted
to architects approval details
Decorative mpingo wood
mould varnished & curved
to details
Planter with flower and
seating space around
175mm thick basement wall
with 100mm masonry protective
wall and 25mm thick mastic asphalt
Arched opening with 100x50mm
1:4 c/s moulding all round for
ventilation and to gel the building
into the existing swahili street
character
12mm thick 1:3C/s plaster on 200mm
thick masonry wall painted with 3 coats
emulsion paint to architect's approval
Raft foundation to SE's details
300mm rectangular
Mpingo wood Post
75mm thick moulding
around arched opening
+7200
+500
+3600
+10800
+14400
GL
Aluminium gutter box to approval
Truss bolted into parapet wall
230x25mm thick Decorated
mpingo fascia board
Aluminium flashing at junction
between wall and tiles
0.100
REVITAL
GL GL
24x150=3,600
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
02
03
01
XX
ZZ
YY
Glass roof with
internal sunshaded
devices to details
1200mm wide stairs
Tread=300mm
Riser=150
Solar water
heating system
1500mm high
parapet wall with
coping to details
steps up
Riser@150
Tread=250
30Deg Spanish
roof tiles
Concrete gutter
to details
Pergola over
lounge chair
SWIMMING POOL
Solar water
heating
10000ltrs
water tank
10000ltrs
water tank
GYM
Aerobics and
yoga terrace
Tread mill
Weight
machineWeight
Bench
Stationery
bicycleRowing
machine
Views to
Old port
mombasa
NDIA KUU STREET ELEVATION
SCALE 1:200
ELEVATION 01
SCALE 1:100
ELEVATION 02
SCALE 1:100
ELEVATION 03
SCALE 1:100
SECTION X-X
SCALE 1:100
SECTION Z-Z[BLOW UP]
SCALE 1:20
The elevation design was influenced and
guided by the exisitng ndia kuu street
character and pattern, in an effort to fit in
the new design without much
interferance to the neighbourhood/street
pattern the front facade has been
divided into four parts that projects onto
the street this relates to the the facades
size and scalebof the existing
neighbourhood buildings.
The building has a 3.6m plinth that is
finished with dark brown machine cut
mazeras with the upper part having
waterproof paint this gives the building a
color/material gradient with a dark plinth
that rises up to light upper level.
The building has a canopy with an
'eyebrow' that creates a human friendly
scale for pedestrians
THE ELEVATIONS
ROOF PLAN
SCALE 1:100

Más contenido relacionado

La actualidad más candente

Zaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAI
Zaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAIZaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAI
Zaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAIDijo Mathews
 
Case study on Bank of America Tower, KUET BECM 2k15.
Case study on Bank of America Tower, KUET BECM 2k15.Case study on Bank of America Tower, KUET BECM 2k15.
Case study on Bank of America Tower, KUET BECM 2k15.Arafat Akash
 
Literature study on hotels (1) (2).pptx
Literature study on hotels (1) (2).pptxLiterature study on hotels (1) (2).pptx
Literature study on hotels (1) (2).pptxsamikshabisht3
 
Miguel Yon Architecture Portfolio
Miguel Yon Architecture PortfolioMiguel Yon Architecture Portfolio
Miguel Yon Architecture Portfolioyonmoll
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use buildingshabbirtg
 
Case study - Hotel Silicrest
Case study - Hotel SilicrestCase study - Hotel Silicrest
Case study - Hotel Silicrestnainadesh
 
Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Adila Zaas
 
High-Rise Iconic Buildings
High-Rise Iconic BuildingsHigh-Rise Iconic Buildings
High-Rise Iconic BuildingsDania Abdel-aziz
 
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDYBUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDYAgrima Garg
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
 
MIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSMIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSJayashreeIyer14
 
Hotel taj vivanta Vadodara
Hotel taj vivanta VadodaraHotel taj vivanta Vadodara
Hotel taj vivanta VadodaraZuber Memon
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasSustainable Performance Institute
 
Master plan-Architecture school 4th yr project 3
Master plan-Architecture school 4th yr project 3Master plan-Architecture school 4th yr project 3
Master plan-Architecture school 4th yr project 3Aden Saitabau Kumary
 
Council house 2 sustainable building example
Council house 2 sustainable building exampleCouncil house 2 sustainable building example
Council house 2 sustainable building exampleUET Lahore
 

La actualidad más candente (20)

Zaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAI
Zaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAIZaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAI
Zaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAI
 
Case study on Bank of America Tower, KUET BECM 2k15.
Case study on Bank of America Tower, KUET BECM 2k15.Case study on Bank of America Tower, KUET BECM 2k15.
Case study on Bank of America Tower, KUET BECM 2k15.
 
Literature study on hotels (1) (2).pptx
Literature study on hotels (1) (2).pptxLiterature study on hotels (1) (2).pptx
Literature study on hotels (1) (2).pptx
 
SITE for library, JAMIA MILLIA ISLAMIA
SITE for library, JAMIA MILLIA ISLAMIASITE for library, JAMIA MILLIA ISLAMIA
SITE for library, JAMIA MILLIA ISLAMIA
 
Miguel Yon Architecture Portfolio
Miguel Yon Architecture PortfolioMiguel Yon Architecture Portfolio
Miguel Yon Architecture Portfolio
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use building
 
Case study - Hotel Silicrest
Case study - Hotel SilicrestCase study - Hotel Silicrest
Case study - Hotel Silicrest
 
Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report
 
High-Rise Iconic Buildings
High-Rise Iconic BuildingsHigh-Rise Iconic Buildings
High-Rise Iconic Buildings
 
KOHINOOR SQUARE.pdf
KOHINOOR SQUARE.pdfKOHINOOR SQUARE.pdf
KOHINOOR SQUARE.pdf
 
School Design
School Design School Design
School Design
 
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDYBUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 
MIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSMIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICS
 
Hotel taj vivanta Vadodara
Hotel taj vivanta VadodaraHotel taj vivanta Vadodara
Hotel taj vivanta Vadodara
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
 
Master plan-Architecture school 4th yr project 3
Master plan-Architecture school 4th yr project 3Master plan-Architecture school 4th yr project 3
Master plan-Architecture school 4th yr project 3
 
Council house 2 sustainable building example
Council house 2 sustainable building exampleCouncil house 2 sustainable building example
Council house 2 sustainable building example
 
geoffrey bawa
geoffrey bawageoffrey bawa
geoffrey bawa
 
Case study on Apartment
Case study on ApartmentCase study on Apartment
Case study on Apartment
 

Destacado

Day in a life in Moshi, Tanzania
Day in a life in Moshi, TanzaniaDay in a life in Moshi, Tanzania
Day in a life in Moshi, Tanzanialvincentvaughan
 
Apostila ibutg
Apostila ibutgApostila ibutg
Apostila ibutgElba2015
 
Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3Aden Saitabau Kumary
 
Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3Aden Saitabau Kumary
 
English ii presentation
English ii presentationEnglish ii presentation
English ii presentationHarwinder Girn
 
Dewan Tunku Canselor compilation
Dewan Tunku Canselor compilationDewan Tunku Canselor compilation
Dewan Tunku Canselor compilationCarlson Ko
 
Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)
Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)
Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)guimera
 
M2 project assignment aug 2015
M2 project assignment aug 2015M2 project assignment aug 2015
M2 project assignment aug 2015Momo Poyi
 
The art of drinking …in paintings
The art of drinking …in paintingsThe art of drinking …in paintings
The art of drinking …in paintingsguimera
 
The Birth of Venus in paintings
The Birth of Venus in paintingsThe Birth of Venus in paintings
The Birth of Venus in paintingsguimera
 
Cupid and Psyche_ Paintings
Cupid and Psyche_ PaintingsCupid and Psyche_ Paintings
Cupid and Psyche_ Paintingsguimera
 
The greatest picnics in paintings
The greatest picnics in paintingsThe greatest picnics in paintings
The greatest picnics in paintingsguimera
 
Architecture drawing presentation
Architecture drawing presentationArchitecture drawing presentation
Architecture drawing presentationCarlson Ko
 

Destacado (19)

Tanzania presentation
Tanzania presentationTanzania presentation
Tanzania presentation
 
Day in a life in Moshi, Tanzania
Day in a life in Moshi, TanzaniaDay in a life in Moshi, Tanzania
Day in a life in Moshi, Tanzania
 
Apostila ibutg
Apostila ibutgApostila ibutg
Apostila ibutg
 
Sections and details
Sections and detailsSections and details
Sections and details
 
Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3
 
Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3
 
English ii presentation
English ii presentationEnglish ii presentation
English ii presentation
 
Dewan Tunku Canselor compilation
Dewan Tunku Canselor compilationDewan Tunku Canselor compilation
Dewan Tunku Canselor compilation
 
Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)
Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)
Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)
 
Master plan sheet 2 b
Master plan sheet 2 bMaster plan sheet 2 b
Master plan sheet 2 b
 
M2 project assignment aug 2015
M2 project assignment aug 2015M2 project assignment aug 2015
M2 project assignment aug 2015
 
Introduction to research methods
Introduction to research methods Introduction to research methods
Introduction to research methods
 
The art of drinking …in paintings
The art of drinking …in paintingsThe art of drinking …in paintings
The art of drinking …in paintings
 
The Birth of Venus in paintings
The Birth of Venus in paintingsThe Birth of Venus in paintings
The Birth of Venus in paintings
 
One way slab design 10.01.03.162
One way slab design 10.01.03.162One way slab design 10.01.03.162
One way slab design 10.01.03.162
 
Cupid and Psyche_ Paintings
Cupid and Psyche_ PaintingsCupid and Psyche_ Paintings
Cupid and Psyche_ Paintings
 
urban design project 3
urban design project 3urban design project 3
urban design project 3
 
The greatest picnics in paintings
The greatest picnics in paintingsThe greatest picnics in paintings
The greatest picnics in paintings
 
Architecture drawing presentation
Architecture drawing presentationArchitecture drawing presentation
Architecture drawing presentation
 

Similar a Elevations & sections

Adenta renovation finishes schedule
Adenta renovation finishes scheduleAdenta renovation finishes schedule
Adenta renovation finishes scheduleNana Barima
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlowTej Raj Upreti
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 
Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Trevain Bechan
 
section and detail sheet1
section and detail sheet1section and detail sheet1
section and detail sheet1Jacob Dobson
 
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSMill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSSin Byrne
 
Mauritius Freeport Development
Mauritius Freeport DevelopmentMauritius Freeport Development
Mauritius Freeport DevelopmentTrevain Bechan
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaAaron Kaira
 
Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01Trevain Bechan
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSSin Byrne
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updatedArthur Wilson
 
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ PharmacySheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ PharmacyConor McEvoy
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
Third Year Surgery Project
Third Year Surgery ProjectThird Year Surgery Project
Third Year Surgery Projectdanburge
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSSin Byrne
 

Similar a Elevations & sections (20)

Adenta renovation finishes schedule
Adenta renovation finishes scheduleAdenta renovation finishes schedule
Adenta renovation finishes schedule
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlow
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02
 
section and detail sheet1
section and detail sheet1section and detail sheet1
section and detail sheet1
 
House Carol Submission
House Carol SubmissionHouse Carol Submission
House Carol Submission
 
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSMill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
 
Mauritius Freeport Development
Mauritius Freeport DevelopmentMauritius Freeport Development
Mauritius Freeport Development
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron Kaira
 
portfolio_linework
portfolio_lineworkportfolio_linework
portfolio_linework
 
Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01
 
Project1
Project1Project1
Project1
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
 
Wall Plans
Wall PlansWall Plans
Wall Plans
 
final dcc
final dccfinal dcc
final dcc
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updated
 
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ PharmacySheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
Third Year Surgery Project
Third Year Surgery ProjectThird Year Surgery Project
Third Year Surgery Project
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
 

Último

Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 

Último (20)

Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 

Elevations & sections

  • 1. GSPublisherVersion 0.0.100.100 N MIXED URBAN DEVELOPMENT-OLD TOWN MOMBASA 02KUMARY .S. KIUNGA B02/36033/2013 PROJECT 6 MUD -OLD TOWN MOMBASA 1500mm high parapet wall Arched opening with 100x50mm 1:4 c/s moulding all round ventilation and to gel the building into the existing swahili street character 300x300mm by 1000mm high mpingo frame pole base to details 230x25mm thick decorative mpingo Fascia Board Decorative mpingo wood mould varnished & curved to details crown silicone water proofing solution paint on 5mm thickwhite cement coat on 12mm thick 1:4c/s mortar with water proofing admixture. 4mm thick Glass roof with internal wooden sunshading devices 450mm high Planter with flower and seating space around to detailsmahogany door to schedule Decorative mpingo wood lattice for entrance defination to details 100x175mm mangrove pergola over sun basking area Spanish tiles on 50x50mm battens on 100x50 rafters joined and fixed to details 25mm thick machine cut mazera cladding fixed on 1:4 c/s on masonry to architects details 1600x3000mm rectangular mpingo casement window with internal insect proof net to details 250 x 120mm thick concrete moulding curved ,plastered and painted to architects approval details 1600mmx3000 rectangular operable mpingo window with insect proofnet to to details GL GL Decorative mpingo wood mould varnished & curved to details Arched opening with 100x50mm 1:4 c/s moulding all round ventilation and to gel the building into the existing swahili street character 1:12 ramp to details GLGL Entrance to BasementEntrance to Ground parking 1500mm high parapet wall with coping to details Mpingo balcony rails 230x25mm decorative mpingo Fascia Board treated painted with 3 coats of clear varnish Glass roof with internal wooden sunshading devices Planter with flower and seating space 100x50mm 1:4 c/s moulding around opening 1600x3000mm rectangular mpingo casement window with internal insect proof net to details 250 x 120mm thick concrete moulding curved ,plastered and painted to architects approval details Spanish tiles on 50x50mm battens on 100x50 rafters on 100 x 50mm wall plate joined and fixed to details 75x 75 mm by900mm high treated and varnished mpingo balcony rails to details 25mm thick machine cut mazera cladding fixed on 1:4 c/s mortar on 3600mm high masonry plinth to architects details crown silicone water proofing solution paint on 5mm thickwhite cement coat on 12mm thick 1:4c/s mortar with water proofing admixture. 250 x 120mm thick concrete moulding curved ,plastered and painted to architects approval details 30 deg Spanish tiles on 50x50mm battens on 100x50 rafters on 100 x 50mm wall plate joined and fixed to details Arched opening with 100x50mm 1:4 c/s moulding all round ventilation and to gel the building into the existing swahili street character GL GL 1500mm high parapet wall with coping to details Planter with flower and seating space around 230x25mm decorative mpingo Fascia Board treated painted with 3 coats of clear varnish Glass roof with internal wooden sunshading devices 100x50mm 1:4 c/s moulding around opening 1600x3000mm rectangular mpingo casement window with internal insect proof net to details 250 x 120mm thick concrete moulding curved ,plastered and painted to architects approval details 75x 75 mm by900mm high treated and varnished mpingo balcony rails to details 25mm thick machine cut mazera cladding fixed on 1:4 c/s mortar on 3600mm high masonry plinth to architects details crown silicone water proofing solution paint on 5mm thickwhite cement coat on 12mm thick 1:4c/s mortar with water proofing admixture. 30 deg Spanish tiles on 50x50mm battens on 100x50 rafters on 100 x 50mm wall plate joined and fixed to details crown silicone water proofing solution paint on 5mm thickwhite cement coat on 12mm thick 1:4c/s mortar with water proofing admixture. D D C C B B A A 1,5002,7003,0501503,4501503,4501503,4501501,500100 1,650 3,600 225x25mm thick fascia board 25mm thick machine cut mazera cladding fixed on 1:4 c/s on masonry to architects details +500 +3600 +7200 +10800 +14400 +3600 +7200 +14400 +10800 +500 pv pv pv pv pv pv Lift car Basement Entrance Lobby Lift Lobby Lift Lobby Lift Lobby Refuse Balcony Balcony Refuse chute 1500mm high parapet wall Wooden balcony rails 150mm thick RC slab Concrete Moulding to details Decorative Facia Board Decorative wooden mould Glass roof with internal wooden sunshading devices Planter with flower and seating space around RC stairs to details Tread=300mm Riser=150mm 1500mm high parapet wall Spanish roof tiles on 50x50mm battens on 150x50mm raters @ 1000c/c on 100x50mm wall plate D-06 2,0001503,4501503,0004501507,050150 200 1,100 200 1,350 150 75 Red spanish clay tiles on 50 x50mm battens 1600X3000mm wooden casement window with insect proof wire to schedule 75x 75 mm by900mm high treated and varnished mpingo balcony to details 250 x 120mm thick concrete moulding curved ,plastered and painted to architects approval details Decorative mpingo wood mould varnished & curved to details Planter with flower and seating space around 175mm thick basement wall with 100mm masonry protective wall and 25mm thick mastic asphalt Arched opening with 100x50mm 1:4 c/s moulding all round for ventilation and to gel the building into the existing swahili street character 12mm thick 1:3C/s plaster on 200mm thick masonry wall painted with 3 coats emulsion paint to architect's approval Raft foundation to SE's details 300mm rectangular Mpingo wood Post 75mm thick moulding around arched opening +7200 +500 +3600 +10800 +14400 GL Aluminium gutter box to approval Truss bolted into parapet wall 230x25mm thick Decorated mpingo fascia board Aluminium flashing at junction between wall and tiles 0.100 REVITAL GL GL 24x150=3,600 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 02 03 01 XX ZZ YY Glass roof with internal sunshaded devices to details 1200mm wide stairs Tread=300mm Riser=150 Solar water heating system 1500mm high parapet wall with coping to details steps up Riser@150 Tread=250 30Deg Spanish roof tiles Concrete gutter to details Pergola over lounge chair SWIMMING POOL Solar water heating 10000ltrs water tank 10000ltrs water tank GYM Aerobics and yoga terrace Tread mill Weight machineWeight Bench Stationery bicycleRowing machine Views to Old port mombasa NDIA KUU STREET ELEVATION SCALE 1:200 ELEVATION 01 SCALE 1:100 ELEVATION 02 SCALE 1:100 ELEVATION 03 SCALE 1:100 SECTION X-X SCALE 1:100 SECTION Z-Z[BLOW UP] SCALE 1:20 The elevation design was influenced and guided by the exisitng ndia kuu street character and pattern, in an effort to fit in the new design without much interferance to the neighbourhood/street pattern the front facade has been divided into four parts that projects onto the street this relates to the the facades size and scalebof the existing neighbourhood buildings. The building has a 3.6m plinth that is finished with dark brown machine cut mazeras with the upper part having waterproof paint this gives the building a color/material gradient with a dark plinth that rises up to light upper level. The building has a canopy with an 'eyebrow' that creates a human friendly scale for pedestrians THE ELEVATIONS ROOF PLAN SCALE 1:100