1. CURRICULUM VITAE
PERSONAL DATA :
Name : Ahmed Hussein Bayoumi Saleh.
Address : 7 El Shiekh Malik - Square St. El-Marg, Cairo, Egypt.
Email :ahmed_ hussin23@yahoo .com
info@odce-eng.com
hussien_saleh_a@yahoo.com
Our Site : www.odce-eng.com
Telephone No. : (00202) 28717163- (00202)28732128- (00202) 28714051.
Mobil :(002)01061057792–(002)01111037777-(002)01159008618-
(002)01005115530
Date Of Birth : 17-2-1954.
Marital Status : Married.
Proposed Position : Instrumentation and control/electrical Consultant Engineer.
Nationality : Egyptian.
Dedicated Tasks Assigned (Design ,Supervision and Maintenance ):
Instrumentation and control system for petroleum plants.
Instrumentation and control for gas production.
Plants and pipelines (L.P.G & Natural Gas).
Plants and pipelines for petroleum platforms.
Plants and pipelines for petroleum off shore works.
Plants and pipelines for petroleum on shore work..
Instrumentation and control for hazard area classification.
Instrumentation and control for measuring skids and flow meters skids.
Instrumentation and control system for pharmaceutical plants.
Instrumentation and control system for petro-chemical plants.
Instrumentation and control system for chemical plants.
Instrumentation and control system for industrial plants.
Instrumentation and control for production lines.
Instrumentation and control for cleaning areas (inter lock, access control … etc).
Instrumentation and control for acids and alkalines.
Instrumentation and control system for electrical stations.
Instrumentation and control system for electrical network.
Instrumentation and control system for electrical R.M.U’s.
Instrumentation and control system for electrical transformers.
Instrumentation and control for electrical (M.C.C) system.
Instrumentation and control for electrical (U.P.S) system.
Instrumentation and control for electric intelligent metering system (on electrical power
copper cable).
Instrumentation and control for RTU’s radio system.
Instrumentation and control potable water wells field.
Instrumentation and control potable water stations.
Instrumentation and control water treatment stations and network.
Instrumentation and control wastewater stations and network.
Control system for D.C.S & PLC & SCADA system.
Control system for computer system network. LAN & WAN and communication system
(copper and fiber).
Instrumentation and control system for pneumatic and hydraulic tubing signal.
Control system for motors and single line diagram.
Control system for HVAC.
Control system for building and resorts (B.M.S)
- 1 -
2. Instrumentation and control for elevators, escalator and dumbwaiters.
Control system for airports and banks.
Boarding and disembarking routing system.
Automated boarder control system..
Comparison between check in and board passenger system.
People flow counting system.
Queuing system.
Instrumentation and automatic control system for cold stores.
Calculation heat tracing system.
QUALIFICATIONS :
B.S.C. Electronics and Communications May 1977.
Estimation (good) percentage 70.11 %
Helwan University.
Faculty of Engineering and Technology, Egypt.
Certificate consultant Engineer (957/4) from Engineering
Syndicate.
KEY QUALIFICATION:
Engineer Ahmed is well experienced in the field of electrical, instrumentation, communication, PLC,
DCS, BMS, SCADA system and control engineer for than 35 years. He acquired vast experience
through his work in the various projects in Egypt and overseas. His responsibilities covered design,
check and supervision of electrical, instrumentation and control works, in refineries petroleum plants,
petrochemical plants, chemical plants, industrial plants, water stations, waste water station, pump pit,
buildings, pipelines, infrastructure and electrical station network.
His experience extends to redesign, estimation, check preparation of import specification and
procurement of required materials, preparation of construction schedules, resolving of technical
problems that may arise during construction. His duties includes inspection, preparation
maintenance program, calibration instrumentation, loop test, trouble shooting, pre-
commissioning, start up and operation.
LANGUAGES:
•Arabic language ( mother tongue ) ( Excellent ).
•English language ( Good ).
TRAINING COURSES:
•Automatic control concepts (Foxboro Company) 1983 (Cairo).
•Spec – 200 control system (Foxboro Company) 1981 (U.S.A.).
•Instrumentation and control system for the chemical plants 1978 (Romania).
•Telephone control communication systems (Erexon Company) 1979 (Cairo – Egypt).
•Process control concepts (Industrial instrumentation services) 1984 (Cairo – Egypt).
•Course on CS3000R3 DCS (YOKOGAWA) in Saudi KAS 2008
•Course on PRO-SAFE maintenance (YOKOGAWA) in Saudi KAS 2008
•Course on PRO-SAFE engineering (YOKOGAWA) in Saudi KAS 2008
•Course on engineering boiler (SEEN TEC CO./DAELIM CO.) in Saudi KAS
2008
PROFESSIONAL EXPERIENCES
Our consultant office
Position : technical manager
Responsibilities
- 2 -
3. • Technical manager (private business)
Egypt from Jan. 2009 to present
Managing, Monitoring and flow up our projects under design, shop drawings and detail
engineering.
Managing, Monitoring and flow up the mark in EGYPT and the world.
SABIC COMPANIES (Saudi KAS)
IBN ZAHR COMPANY (Saudi European petrochemical company)
Position : control system engineer (from April 2007 to 2009 )
Department : Technical Support & QA department
Responsibilities :
• Support day to day activities for MTBE plants
• Develop new procedure for functional check for critical equipments and interlocks
• Study MTBE & PP Process
• Submit Daily & Weekly report effectively to Secretary timely.
• Ensure no Interlocks and by pass and weekly surveys done
• Review all Passwords for all the Control systems in IBN ZAHR and ensure it is
secure and controlled in save manner.
• Review phase wise Control Systems Back-ups documentations and ensure reviewed
documentation updated & well controlled.
• Ensure functional check list prepared
• for MTBE & PP Plants and documents stamped as controlled copies.
• Support to complete the PP-1 PP-II functional checks
• instrumentation loop functional check list
• instrumentation loop functional test
• test to prove that the equipment stands the environment and functions in the
manner expected
Egypt Maintenance Company (E.M.C)
(One of the Petroleum Company Jointure with Vetcouibel Company)
Position : Deputy Manager From June 2005 to April 2007)
Project : MIDOR Refinery ( Global Maintenance Project )
Location : Amerya Free Zone-Alexandria Egypt
Responsibilities:
• Managing, Monitoring and Developing Maintenance Activities
• Evaluating the work performance of the Maintenance Teams (Mechanical ,Instrumentation
and Electrical)
• Reporting all Activities ,giving the Technical support for the shift teams
• Communicating with site Manager at any Emergency plan
• Carrying out site Manager Responsibilities during his absence out of the Project site
Sabbour Associate Engineers, Architects, Planners:
• Position: Instrumentation and control engineer .
Egypt from June 1997 to June 2005
- 3 -
4. Responsibilities:
My responsibilities cover the design, check and supervision of electrical, instrumentation and
control for the following projects:
• Design and engineering of instrumentation, DCS system, MCC motor control center, control
system, piping system, heat tracing system for citric acid plant
Product 35 ton acid Crystallization per day24 hours work with fermentation system
• Instrumentation system consists of pressure transmitter, pressure gauge,
pressure switch, temperature transmitter, temperature gauge, temperature
switch, level transmitter, level switch, flow meter with all type, flow switch, PH
meter, conductivity meter, PO2 meter, control valves, relief valves, self active
valve, on off valve.
• DCS system consists of I/O’s cabinet with 283 analogue inputs, 120 analogue
outputs, 1370 digital inputs and 416 digital outputs with 7 operator stations
three printers and 85 continuous control.
• The M.C.C consists of 320 motors with various control circuits (same
direction on line or star delta starter and … etc) within various load from (1
KW to 37 KW)
• Pre-commissioning, commissioning and start up for Citric Acid Plant client
Citro – Misr Company
• FAT and SAT test for Citric Acid Plant client Citro – Misr Company
• Design and engineering of instrumentation and control systems for cold stores
at Bani-Sweef – Egypt
• Design and engineering of instrumentation and control systems for Sahl Hasheesh
project (Bectel Company),
- Fuel tank farm for engine generators 6 M.V.A power.
- This project 32 tourist village each village approximate 600 room.
• Design and engineering of instrumentation and control systems & SCADA system for
Nouadhibou water station project in Africa (Republic Islamic Mauritania) (SONELEC
Company).
• The project consists of wells area about 18 wells new and 10 wells old. Tanks
area one elevated tank new and one old water pump station. Main water supply
station.
• Instrumentation system consists of pressure transmitter, pressure gauge, level
transmitter, level switch, flow meter, PH meter, conductivity meter, motorizing
valve, cable tray cable with junction boxes and RTU’s with built in Radio
system (Data logger).
• SCADA system consists of Radio system for send and receive data, software
package, master antenna, server, CPU unit, screens, printer cabinet I/O’s.
• Check and study electrical network (single line diagram ) with PLC’s for AL
AHRAM print press in sixth of October city (3M.V.A power).
• Design and engineering of (M C C ) motor control Center electrical control
for Dextro Misr company (Anhydrous glucose crystals and syrup plant) 280
motors with various circuit (total power 3 M.V.A)
• Design and engineering and consultancy on maintenance of electrical, renovation the
press PLC and B.M.S system in Central Bank of Egypt – Monetary printing house -
Securities value- Press– Al Harm street Giza -Cairo – Egypt
• Design and engineering of (B.M.S) Building management system for multiple use
complex consists of shopping mall, five star Hotel (Movinpic Management), convention and
cultural center in media production city sixth of October City – Cairo, the system consists
of :
- 4 -
5. - Air handling unit (A.H.V)
- Fan coil unit (F.C.U)
- A/C system.
- Chiller system.
- Ventilation system.
- Fire fighting and fire alarm systems.
- Water tanks and feeding water pumps.
- Electrical systems power network, generators transformers.
- Security and C.C.T.V systems.
- Power saving system room offices, corridors balconies.
- Elevators system.
- Telephone system.
- T.V network.
- Boilers, heat exchanger and fuel system.
- Irrigation system for landscape.
- Swimming pool system.
- Guest room services system.
- Sewage system sump pit and pumps.
- Sound system.
• Design and engineering of (B.M.S) system for IBROTEL Hotel in Shal
Hasheesh in Hergadah City. The system consists of:
- Air handling unit (A.H.V)
- Fan coil u nit (F.C.U)
- A/C system.
- Chiller system.
- Ventilation system.
- Fire fighting and fire alarm systems.
- Water tanks and feeding water pumps.
- Electrical systems power network, generators transformers.
- Security and C.C.T.V systems.
- Power saving system room offices, corridors balconies.
- Elevators system.
- Telephone system.
- T.V network.
- Boilers, heat exchanger and fuel system.
- Irrigation system for landscape.
- Swimming pool system.
- Guest room services system.
- Sewage system sump pit and pumps.
- Sound system.
• Check and consulting of Instrumentation and control system for Shell
Marketing Egypt fuel Depot Mostorod (SFD)The project consists of:
- FiVe fixed roof tanks with volume 1100m3 (two tanks gas oil & one
tank gasoline 80 and two tanks gasoline 90)
- Three production pumps for gas oil, gasoline 80 and gasoline 90 each
pumps with 38Kw power supply.
- One standby pump with automatic control circuit for three production
pumps.
- Metering system bottom loading and top loading with computer
system.
• Check and supervision of elevators, escalators, dumbwaiters HVAC system
and under system in Arkadia Building 176 flat and 500 shop.
- 5 -
6. The building consists of 17 elevators
one dumbwaiter, three panorama (17
persons in each) three package (1100
Kg) eleven persons (11 persons in
each) 13 escalators 9800 person in one
hours (type Mitsubshi – Japan)
- HVAC system (chillers, towers, pumps
and pumping network)
- Drinking water system.
• Check and supervision of three elevators one package and two person in Ahram Al Galaa
news paper building in Cairo down city. (type Otis Frensh)
• Check and supervision of 12 elevators (6 persons of each) persons in Al Abasia
residential building in Cairo Downtown. (type Mittur AUFZUGTEILE GMBH Co. –
Germany)
• Check HVAC B.M.S and control system for Lactam production building Bristol
Myer Squibb Egypt Renovation project. The project consists of system six air handling
units and A/C system
• Check HVAC control system for Saridar Building, the system consists of two
chiller and one stand by: 216 fan coil unit (F.C.U)
• Design and engineering of (B.M.S) and control system for national bank of Egypt
– Cairo Plaza, the building consists of 37 floors (800 m2 area floor)The system consists
of:
- Air handling unit.
- A/C system
- Chiller system
- Ventilation system
- Fire fighting and fire alarm system.
- Water tanks and feeding water pumps.
- Electric energy systems power network, generations,
transformers regulator and (U.P.S)
- Security intrusion and C.C.T.V system.
- Power saving system offices and corridors.
- Elevators system
- Telephone system
- Boilers, heat exchanger and fuel system.
Design and engineering of uninterruptible power supply
(U.P.S) system for national Bank of Egypt – Cairo Plaza
building; The system consists of:
- Two (U.P.S) separate source each one consists of two
U.P.S unit 125 KVA with parallel cabinet for share load
from 10% to 200%.
- Three static transfer switch (S.TS), 150 A on three critical
load.
a) Visa card control system
b) Main computer control system
c) Some PC’s and critical loads.
• Design and engineering of (B.M.S) system for HVAC for Central Bank of Egypt –
main building in Cairo down town, the system consists of:
- Air handling unit (AHU).
- A/C system.
- Chiller system.
- Ventilation system.
- 6 -
7. - F.C.U
- Check and supervision and startup of (16) elevators and (2)
escalators.
• Check and supervision of (B.M.S) for Ismailia Canal Zone Regional Control Center
(CANRCC) building the contractor ABB the consultant Carl Bro International.
• Work as a part time engineer in Sabbour Associates for Gazza airport and testing
hanger in Cairo airport.
• Design and engineering of instrumentation and control of B.M.S system for Astra
Zeneca Pharmaceutical plant in 6th
of October City – Egypt total plant area 15000m2
.
• Design and engineering of instrumentation and control of B.M.S system for Social
Service Center in Mekkah – KSA, total area 33000m2
.
• Design and engineering of instrumentation and control system HVAC control system,
PLC and inter look door in sterile areas for New Misr Pharmaceutical Plant in Abu
Zaabal – Cairo - Egypt.
• Design and engineering of power saving system for KAN El Khalily Project. The
project consists of (200) shops in Khan El Khalily area – Cairo – Egypt.
• Design and engineering of instrumentation and control system for El Baragil Waste
Water Lifting Station – Cairo – Egypt. The station consists of (3) pump each of
discharge 500 liter per second.
• Check and supervision and startup of one elevator (6) person – 450Kg load, (1)meter
per second, VVVF system in Cairo House Project total area 700m2
.
• Design and engineering and consultation of B.M.S system in National Bank of
Egypt Club – Nasr City – Cairo – Egypt.
• Management and team design group leader of (10) health facilities in Menoifia
Govrnorate
RE.DE. Egypt Company (Resources Development):
• Position: Instrumentation and control technical support manager.
Egypt from August 1995 to June 1997.
Responsibilities:
• Check, study and technical support for Agar instrumentation in
GUPCO company.
• Agar instrumentation consists of Hydrocarbon, water measurement and
control 0-100 % oil and water monitors, interface detector system, water
dump valve, tank profiler static oil skimmer, oil on water monitoring
systems, AGAR system on separators application, desalter & dehydrator
concentration control application, application wash/ slop tank system,
application automatic dewatering of storage tanks.
♦Check, study and technical support for Bettis Actuators and controls in
GUPCO Company.
- 7 -
8. • Bettis Actuators and controls consists of valve actuator pneumatic,
hydraulic, gas, hydraulic, rotary, linear, Bettis of T-Lock, line break
detection system, Bettie switch, solenoid, pneumatic positioners and
monitoring system with indicator.
♦Check, study and technical support for Norriseal instrumentation
controls and control valves
• Norriseal instrumentation consists of level controller, back mounted
liquid level controller, electric level switch, pneumatic liquid level switch,
vertical chamber, liquid level sensor displacement type with torque tube,
dual displacer metering kit, control valve, motor valve, three way two
position valve three way three position valve, pneumatic indicating
pressure and temperature controllers and transmitters, instrument air
regulators pilot light safety (PLS) control, “flo-lift” piston check valve air
and gas compressor service valve positioners.
ESSO SUEZ Inc. Egypt East Zeit Plat Form:
*0 Position: Instrumentation and control engineer
Egypt from May 1995 to August. 1995.
Responsibilities:
• Maintenance, permanent maintenance, preventive maintenance and
program maintenance for platform .
• Platform consists of platform, sub marine pipelines, oil plant, gas plant and
sweetening plant, cathodic protection system.
• Instrumentation and control systems consists of pressure transmitter,
pressure gauge, temperature transmitter, temperature gauge, temperature
switch, level controller, control valve, gas detector, control room,
instrument panel, monitoring panel, flow meter, level transmitter, controller
indicator, rectifier units, anodes connections .
MEJDAF Establishment:
• Position: Instrumentation and control engineer
Saudi (KAS) from September 1993 to May 1995
Responsibilities:
• Study marketing, sales representative and technical support of
instrumentation, high technology electronic equipment, test equipment,
measurement equipment, calibration applications equipment and all
electronic accessories.
• Instrumentation and electronic equipment consists of oscilloscopes, scope
meter, test tools, multi meter and voltmeter, counters and timers, data
acquisition, digital thermometers, LAN products, calibrations and
standards, logic analyzers, digital test tools, instrumentation systems,
power supplies, signal sources, video and audio test equipment, electronic
accessories.
• Solid connection with petroleum and petrochemical area as Saudi Aramco,
Al-Jubial petrochemical, Eastern petrochemical, Saudi formaldeh company
- 8 -
9. petrokemya, belleli Saudi heavy industrial, royal Saudi noval forces king
Abdul Aziz naval base, ACAP Arabia limited company, lutuatt
international hospitals, Saudi iron and steel company. King Fahd military
medical complex DHARAN, zamil steel buildings company LTD.
ALKAYRAWAN Company for Contracting Construction for Electrical and Instrumentation
:
*1 Position: Technical manager (private business)
Egypt from Jan. 1989 to September 1993.
Responsibilities:
• Maintenance, permanent maintenance, preventive maintenance and
program maintenance for EL-IRAK SOSy fitting cast iron plant in tens of
Ramadan City.
• The fitting cast iron plant consists of cast iron furnace system, sanding
plant for die casting process, molding line, cooling line, crushing line, sand
blasting, chemical treatment heat treatments.
• Instrumentation, control, motor control center and PLC’s system, consists
of sand level instrument, belt, instruments, temperature sensor pressure
switch, pressure transmitter limit switch cam switch, vibration switch,
torque limit switch axial removed switch, heater switch, torque limit switch
axial removed switch, heater switch, control panel, PLC’s, U.P.S system,
power panel, motor control circuit, connection with PLC’s, full automatic
control system, heater unit control for handling, gear switch, transformers,
temperature control unit.
♦Installation, pre-commissioning, commissioning and start up of
instrumentation and control system for some measuring skid and flow
meters.
• This installation for some petroleum company as Badr petroleum
company (BAPET co), Geisum oil company and Gulf of Suez petroleum
company.
♦Installation activities point.
Installation of material take off (MTO).
Visual checking of instruments when received at site.
Instrument setting and calibration.
Instrument installation including impulse lines air supply.
Pneumatic signal tubing.
Electrical hookup.
Installation and wiring of instrument junction boxes.
Installation and wiring of instrument panels and console.
Interconnection of instrument equipments.
Loop testing (consulting test and operational test).
Pre-commissioning assistance.
This is applicable to electronic and pneumatic instruments.
Pressure and leak test of impulse lines, instrument air tubing and
pneumatic signal tubing.
Preparation of as built drawings related to the instrumentation.
Cable laying, testing and termination.
Coordination with other contractors and other disciplines in the site.
Supervision of working teams with close observation and control of time
schedule and materials.
♦Document list needed for installation:
- Hook up drawings.
- Loop diagrams.
- 9 -
10. - Instrument lay out.
- Instrument cable routing.
- P & ID.
- Piping and instrument.
- Instrument index.
- Wiring and interconnection diagram.
- Schematic diagram.
- Instrument specification and data sheets.
- Vendor instruction manual.
Petroleum & Industrial Consulting Services Company Mostafa Fahmy (PICS):
*2 Position: Technical manager.
Egypt from 1986 to 1989.
Responsibilities:
- Consulting, study, check and technical support of petroleum
instrumentation and control system.
- Consultation and solid connection with all petroleum companies in
petroleum sector.
Petrojet Company (Petroleum Projects and Technical Consultation):
*3 Position: Instrumentation and control engineer
Egypt from 1981 to 1986.
Responsibilities:
*4 Installation, pre-commissioning, commissioning and start up for water
station pressurized vessel and antenna T.V. network in Sumed
Company City, this project is blending to Sumed Company in Suez
City. - This city consists of 40 buildings each building 8 flat and 12
villa.
*5 Installation, pre-commissioning, commissioning and start up of
instrumentation and control systems for Tamoh – Dahshour gas line
20” (L.P.G).liquid pressure gas and Tamoh gas filling station with
cathodic protection system..
*6 Instrumentation system consists of pressure transmitter pressure
gauge, pressure switch, temperature transmitters, temperature gauge,
temperature switch, flow meter control valves, line break device,
recorder (paper) controller, inductor, monitoring lamps, control
system, cabling, cable tray, erection control panel.
*7 This project belong Petro gas Company – Egypt.
♦Installation, pre-commissioning, commissioning and start up of
instrumentation and control systems for SUEZ-Tibben. Gas line 30”
(natural gas) with cathodic protection system.
*8 Instrumentation system consists of 6 line break device closed when
pressure change fast (for line break).
*9 This project belong (P.P.C.) petroleum piping company – Egypt.
♦Installation, pre-commissioning, commissioning and start up of
instrumentation and control systems for Tibben Natural gas main
compressors station.
*10 Compressors station consists of 4 compressors unit, 2 compressor
for future, control room battery room, U.P.S system and main
distribution lines.
- 10 -
11. *11 Instrumentation system consists of operator local panel for each
compressor pneumatic system, pressure transmitter, pressure switch,
pressure gauge, temperature transmitter, temperature switch,
temperature gauge, control valve, flow meter, cabling cable tray,
control room panel spec 200 system Foxboro company for hazard area
classification (intrinsically safe system), paper recorder, controller,
inductor monitoring lamp.
*12 This project belong (P.P.C.) petroleum piping company – Egypt.
♦ Installation, pre-commissioning, commissioning and start up of
instrumentation and control systems for Natural gas line inlet to Tibben,
Helwan, Naser City and Hilupolis main power station.
*13 Instrumentation system consists of digital flow meter turbine type
with, temperature sensor and pressure sensor dannial manufacturer,
level transmitter, temperature transmitter, pressure gauge temperature
gauge.
*14 This metering system belong (P.P.C.) petroleum piping company –
Egypt.
♦ Installation, pre-commissioning, commissioning and start up of
instrumentation and control systems for two tanks 100000 ton crude oil in
AL-Ain Al-Sokhna area behind Sumed Company.
*15 Instrumentation system consists of motorizing valve 60” size, tank
gauging for measuring level, pressure gauge, temperature gauge,
cabling, cable tray, fire fighting system with temperature sensor on
roof tank, electrical panel and inductors.
*16 This project belong (P.P.C.) petroleum piping company – Egypt.
♦ Installation, pre-commissioning, commissioning and start up of
instrumentation and control systems for main gas plant in Shuker (field
site) (L.P.G.).
*17 Gas plant consists of spherical tank area, gas pump station, gas
plant.
*18 Instrumentation system consists of pressure gauge, pressure
transmitter, temperature transmitter, and gauge, motorizing valves for
spherical tanks cabling system, flow meter, cabling, cable tray, control
panel and controller system.
*19 This project belong to GUPCO company in Shuker.
♦ Installation, pre-commissioning, commissioning and start up of
instrumentation and control systems for L.P.G. liquid pressure gas Berth
in Shuker.
*20 Instrumentation system consists of Automatic break shut off
submarine pneumatic system air power supply (air bottle).
*21 This project belong to GUPCO company in Shuker.
Natural gas main compressors station.
♦Maintenance and program maintenance of instrumentation and control
system for injection platform water stations (Wady Fern Field).
*22 Instrumentation system consists of monitoring for pump station
and motor control center, pressure transmitter, pressure switch,
pressure gauge level transmitter, control panel.
*23 This project belong SUCO company in Egypt.
- 11 -
12. ♦Static pressure test for two piping lines MAZOUT line and gas line from
Abu Sultan electric station to Port Said electric station.
*24 The static pressure test consists of pushing a brush with sensor and
filling the line by water making a line vent after this pressure increase
by dead weight tester and measuring static pressure and temperature
within one day (24 hours) and check temperature compensation.
*25 This project belong (P.P.C.) petroleum piping company.
*26
Abu-Zaabal Fertilizer & Chemical Company:
*27 Position: Instrumentation and control engineer
Egypt from September 1977 to March 1981
Responsibilities:
- Installation, pre-commissioning, commissioning and start up and control
systems for acid plant (unit four) .
*28 This acid plant consists of furnace system, economizer reactor with
catalyst acid tower, cooling system, storage tanks, steam boiler
system, 16 ton / hr, condensate system water treatment system, steam
turbine generator four mega watt – hours.
*29 Instrumentation and control system consists of pressure
transmitter, pressure switch, pressure gauge, temperature transmitters,
temperature switch, temperature gauge, PH meter, conductivity meter
level transmitter, control valve, on – off valve, flow meter, control
panel, cabling and cable tray, piping for pneumatic system, pneumatic
instrument sensor and indicator.
*30 Plant product H2SO4 Sulphuric acid 300 ton per day – boiler 16
ton – turbine generator 4 mega watt – hours.
- Installation, pre-commissioning, commissioning and start up and
control systems for water treatment unit (20 ton per hours).
- Instrumentation control system consists of pressure transmitter,
pressure switch, pressure gauge, temperature, PH meter,
conductivity meter level transmitter, control valve, on-off valve,
flow meter, control panel, cabling and cable tray.
- Maintenance and program maintenance of instrumentation and
control system for fertilizer plants.
- Maintenance and program maintenance of instrumentation and
control system for Phosphoric acid plant
- Maintenance and program maintenance of instrumentation and
control system for fertilizer pilot plant
- Maintenance and program maintenance of instrumentation and
control system for phosphate mines in AL SABAAYA Area in
Egypt.
- Installation, Maintenance and program maintenance of
instrumentation and control system for the phosphate concentration
pilot plant in AL SABAAYA Area in Egypt.
- Instrumentation and control consists of acid concentration unit, belt
conveyer, weight system, filling system, and so on.
- 12 -
13. Dear Sirs,
I have the honor to apply to your company as instrumentation/electric and control
engineer. I have more than thirty five years of hands an experience in this field twenty
years in petroleum and petrochemical and ten years in industrial, chemical plants and
infrastructure my experience in design, construction and maintenance engineer of
pneumatic, electric and electronic instrument systems, with particular strength in the
construction, installation activities including calibration, installation loop testing, trouble
shooting, commissioning, pre-commissioning, start up and operation.
Sincerely yours,,
Eng. Ahmed Hussein
- 13 -