SlideShare una empresa de Scribd logo
1 de 4
Descargar para leer sin conexión
1
RESUME
1 Name : Sri Ajit Kumar Das
2. Father’s name : Sri Anil Kumar Das
3. Date of Birth : 11th
November 1958
4. Communication Address : Indrakunj Apartment, 4th
floor, Flat no. 405, Main Road, Bhatia
Basti, Kadma, Jamshedpur, Jharkhand, Pin - 831005
5. Permanent Address : Do as above
6. Email Address : ajitdas93@gmail.com
7. Educational qualification : Passed Higher Secondary Examination from West Bengal Board of
Secondary Education in 1976
8. Technical Qualification : Passed Diploma in Electrical Engineering from West Bengal
Board of Engineering & Technical Education , in 1981.
9.Extra curricular : Knowledge in MS word, Excel , MS Project etc.
10.Present working Status : Deputy General Manager (Customer Services) in M/s DANIELI
INDIA LIMITED(Automation Division)
11. Present Activity : a) Project Execution Planning,
b) Tendering & Vender selection.
c) Project Co-Ordination with Design Engineering, Installation
Engineering department, Site Engineers & Respective Clientfor
Site Activities,
d) Planning & scheduling of Materials supply, Man power planning
for upgrading site progress.
e) Weekly Progress reviewing with Venders, Client & consultant.
Updating Site progress day to day.
f) Generating of site intervene report(if any) & review with higher
management for remedy with preventive action & for upgrading &
correctness in design & engineering issue in future.
g) Looking Job Quality & site safety & involve the execution person
for Safety Awareness.
h) Review & analysis the cause of delay of site execution progress
& find the remedy to overcome the delay to achieve targeted
schedule.
2
12. Experience : 34 years in project Planning, Erection & Commissioning &
Maintenance of Power distribution system, Electrical
Equipments, PLC, Drives, Safety system(CCTV, Fire Alarm
System), Maintaining Quality & Safety in Various Steel
Industries & others Project(Metro Rail Electrification, State
Fisheries Power Distribution).
i) : Associated with M/S Bombay Suburban Electric Supply Ltd,
Eastern Zone, Kolkata from July 1981 to April 1989. as a Site in
charge for the Supervision of installation & commissioning of
Power Distribution system at Rabindra Saravar substation of Metro
Railway project, Kolkata, State Fisheries project in Roychawk &
Shankarpur (Digha), West Bengal,
Maintenance of Electrical Distribution system of Roychak Fish
Harbor Project Under Kolkata Port Trust of India.
Holding responsibility of Project Planning, Co-ordination with
engineering, Design section, Client. Follow up with venders for
delivery of materials & Execution of site work,
ii) : Associated with M/S M.N.Dasur & Company (P) Limited from
May 1989 to April 2007. as RESIDENT ENGINEER
Key Role in M.N Dastur & Co (P) Ltd
a)Involve in site supervision in detail Engineering of electrical
Equipments, Installation of Electrical & Industrial Instruments,
Power distribution system, safety system(Fire Alarm & Fire
Fighting), Plant Monitoring system(CCTV),
b) Assistance for Execution of site erection job, handling of Venders
for execution & commissioning in various plants,
c) On behalf of Client Participate in Tender opening, Tabulation of
venders technical & price bid comparison ,
d)Analysis of Venders Technical & Price Bid & handed over to
Client all doc with advisory comments/ Suggestion for Final
Negotiation of price Bid /resubmission of final Price Bid.
e) Making Execution & Materials delivery Schedule
f) Conducting Weekly Site Execution review meeting with Client &
Venders.
g) Monitoring Site progress day by day as per work schedule.
h) Sorted out site hindrance and analysis work delay (if any) & trying
to sorted out with Higher management of company and Client.
i) Quality & Safety control.
Plant Worked -
a) Wire Rod Mill , Light & Medium Marchent Mill at
Visakhapatnam steel plant from May 1989 to April 1991.
3
b) RMHS (Raw materials & handling system), Sinter Plant, Lime
Calcining Plant, LD Shop II, Gas Mixing Station, Ladle Furnace
& Billet Caster at TATA STEEL in Jamshedpur from May1991 to
March 2007
iii) : Associated with M/S DANIELI INDIA LIMITED since April 2007
& worked as Electrical & Instrument Incharge(AGM) in Turn
Key Project of MYINGYAN Steel plant Under Govt of Myanmar
(Myanmar Economic Corporation) for Supervision of execution &
commissioning of :
a) Electric Arc Furnace (EAF),
b) Ladle Furnace (LRF),
c) Continuous Casting Mill(CCM),
d) Raw Materials Handling system (RMHS).
e)Thin Slab Caster & VD from April 2007 to November 2011.
iv) : Worked as Site In charge, DGM(Electrical, Instruments, safety
appliances like CCTV, Fire Alarm & Fire Fighting system ) &
Completed Power Distribution System, safety system (CCTV, Fire
Alarm system) for Sri City Project (A Fabrication & Manufacturing
unit of Caster M/c, Furnace Shell, Roller Table of Caster of Steel
Industries from December 2011 to Jan2013.
v) : Worked as Site In charge DGM (Electrical, Instruments, safety
appliances like CCTV, Fire Alarm & Fire Fighting system ) & Co
ordination & detail supervision of Engineering & Materials
Management of Structural Mill of Vizag steel plant from February
2013 to Oct 2014.
vi) : Worked as Site In charge,DGM(Electrical, Instruments, safety
appliances like CCTV, Fire Alarm & Fire Fighting system ) & detail
supervision of Engineering & Materials Management &
commissioned the Six HI Rewinding Line. Push Pull Pickling Line
at ABUL KHAIR STEEL PLANT at BANGLADESH from
December 2014 to July 2015.for PUSH PULL PICKLING LINE &
REWINDING LINE.
KEY Role in Danieli India Ltd:
a)Execution & Commission assistance
b) Man Power Arrangement
c) Materials supply monitoring
d) Preparing Erection & Materials delivery Schedule,
e) Monitoring of Job Schedule,
f) weekly review meeting with Client & Venders
g) Day to day reporting Head office regarding site progress status,
materials Delivery Status.
4
h) Analysis and review delay of Materials delivery, manpower & Site
intervene & trying to shorted out with Higher management.
i) Conducting Monthly meeting with Higher management of Client &
continuously in touch with client for expedite project schedule.
13. Salary drawn : Annual CTC 20Lac 75 thousand + perks
14. Expected Salary : Annual CTC 25 Lacs + Perks.(Negotiable)
Yours Truly
Ajit Kumar Das
Dated 31/03/2016
Mobile No. +91-9091373447
+91-9679685232

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

DHEERAJ SHARMA RESUME(1)(1)
DHEERAJ SHARMA RESUME(1)(1)DHEERAJ SHARMA RESUME(1)(1)
DHEERAJ SHARMA RESUME(1)(1)
 
G.N Engineering
G.N EngineeringG.N Engineering
G.N Engineering
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
CV of JA
CV of JACV of JA
CV of JA
 
BIO-DATA (A)
BIO-DATA (A)BIO-DATA (A)
BIO-DATA (A)
 
Eddie Resume 2015 (1)
Eddie Resume 2015 (1)Eddie Resume 2015 (1)
Eddie Resume 2015 (1)
 
Manish_Sagar 4 Year
Manish_Sagar 4 YearManish_Sagar 4 Year
Manish_Sagar 4 Year
 
A K GUPTA (B.E Mech)
A K GUPTA (B.E Mech)A K GUPTA (B.E Mech)
A K GUPTA (B.E Mech)
 
Pradeep resume feb 2017
Pradeep resume feb 2017Pradeep resume feb 2017
Pradeep resume feb 2017
 
MANIMARAN
MANIMARANMANIMARAN
MANIMARAN
 
Karthick
KarthickKarthick
Karthick
 
PIPING ENGINEER_CV2017
PIPING ENGINEER_CV2017PIPING ENGINEER_CV2017
PIPING ENGINEER_CV2017
 
Resume
ResumeResume
Resume
 
RESUME_sushil__latest_
RESUME_sushil__latest_RESUME_sushil__latest_
RESUME_sushil__latest_
 
CV-Goutam Sen
CV-Goutam SenCV-Goutam Sen
CV-Goutam Sen
 
G K M Jafar_UAE
G K M Jafar_UAEG K M Jafar_UAE
G K M Jafar_UAE
 
cv of nirav parmar-sr.civil engg
cv of nirav parmar-sr.civil enggcv of nirav parmar-sr.civil engg
cv of nirav parmar-sr.civil engg
 
CV 29.11.2014
CV 29.11.2014CV 29.11.2014
CV 29.11.2014
 
Shabd saran sahu
Shabd saran sahuShabd saran sahu
Shabd saran sahu
 
Cv goutam sen (1)
Cv goutam sen (1)Cv goutam sen (1)
Cv goutam sen (1)
 

Destacado

Destacado (19)

Promotion Email
Promotion EmailPromotion Email
Promotion Email
 
16_07-11_PR_Traverse Announces Collaboration with SUNY Upstate_FINAL
16_07-11_PR_Traverse Announces Collaboration with SUNY Upstate_FINAL16_07-11_PR_Traverse Announces Collaboration with SUNY Upstate_FINAL
16_07-11_PR_Traverse Announces Collaboration with SUNY Upstate_FINAL
 
Managing Your Household Shouldn't Be this Hard
Managing Your Household Shouldn't Be this HardManaging Your Household Shouldn't Be this Hard
Managing Your Household Shouldn't Be this Hard
 
4 voice
4 voice 4 voice
4 voice
 
Trabajos
TrabajosTrabajos
Trabajos
 
תפריט ינואר 2013 1 1
תפריט ינואר 2013 1 1תפריט ינואר 2013 1 1
תפריט ינואר 2013 1 1
 
awsSolutionsArchitect_AE
awsSolutionsArchitect_AEawsSolutionsArchitect_AE
awsSolutionsArchitect_AE
 
CAPTURED Treatment
CAPTURED TreatmentCAPTURED Treatment
CAPTURED Treatment
 
Prezentation odessa electrotechnika____
Prezentation odessa electrotechnika____Prezentation odessa electrotechnika____
Prezentation odessa electrotechnika____
 
El sueño del celta completo
El sueño del celta   completoEl sueño del celta   completo
El sueño del celta completo
 
Wilcox megan final_proposaland_4wireframes
Wilcox megan final_proposaland_4wireframesWilcox megan final_proposaland_4wireframes
Wilcox megan final_proposaland_4wireframes
 
5
55
5
 
El impacto de la familia en la sociedad
El impacto de la familia en la sociedadEl impacto de la familia en la sociedad
El impacto de la familia en la sociedad
 
Micro
MicroMicro
Micro
 
A pesar de todo...
A pesar de todo...A pesar de todo...
A pesar de todo...
 
Mobile App Development Company In India - Brill Mindz Technology
Mobile App Development Company In India - Brill Mindz TechnologyMobile App Development Company In India - Brill Mindz Technology
Mobile App Development Company In India - Brill Mindz Technology
 
Px basic
Px basicPx basic
Px basic
 
WCEE2012_1941
WCEE2012_1941WCEE2012_1941
WCEE2012_1941
 
area de tecnologia e informatica
area de tecnologia e informatica area de tecnologia e informatica
area de tecnologia e informatica
 

Similar a RESUME (AjitDas) (20)

Sravan resume
Sravan resume Sravan resume
Sravan resume
 
RESUME-1
RESUME-1RESUME-1
RESUME-1
 
Resume - Lingasami K
Resume - Lingasami KResume - Lingasami K
Resume - Lingasami K
 
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1
 
Ashutosh Mishra DOC
Ashutosh Mishra DOCAshutosh Mishra DOC
Ashutosh Mishra DOC
 
Resume HNP Updated
Resume HNP UpdatedResume HNP Updated
Resume HNP Updated
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Rajbir Singh-2
Rajbir Singh-2Rajbir Singh-2
Rajbir Singh-2
 
Brief Profile_Aug-15
Brief Profile_Aug-15Brief Profile_Aug-15
Brief Profile_Aug-15
 
Sudarsang electrical designer
Sudarsang electrical designerSudarsang electrical designer
Sudarsang electrical designer
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
Madhankumar 1984..
Madhankumar 1984..Madhankumar 1984..
Madhankumar 1984..
 
PM_SSN_Steel.
PM_SSN_Steel.PM_SSN_Steel.
PM_SSN_Steel.
 
Muneesh Gupta ( CV )
Muneesh Gupta ( CV )Muneesh Gupta ( CV )
Muneesh Gupta ( CV )
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
Resume - Shobhit
Resume - ShobhitResume - Shobhit
Resume - Shobhit
 
Jagadeesh Dambal_Resume
Jagadeesh Dambal_ResumeJagadeesh Dambal_Resume
Jagadeesh Dambal_Resume
 
EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 

RESUME (AjitDas)

  • 1. 1 RESUME 1 Name : Sri Ajit Kumar Das 2. Father’s name : Sri Anil Kumar Das 3. Date of Birth : 11th November 1958 4. Communication Address : Indrakunj Apartment, 4th floor, Flat no. 405, Main Road, Bhatia Basti, Kadma, Jamshedpur, Jharkhand, Pin - 831005 5. Permanent Address : Do as above 6. Email Address : ajitdas93@gmail.com 7. Educational qualification : Passed Higher Secondary Examination from West Bengal Board of Secondary Education in 1976 8. Technical Qualification : Passed Diploma in Electrical Engineering from West Bengal Board of Engineering & Technical Education , in 1981. 9.Extra curricular : Knowledge in MS word, Excel , MS Project etc. 10.Present working Status : Deputy General Manager (Customer Services) in M/s DANIELI INDIA LIMITED(Automation Division) 11. Present Activity : a) Project Execution Planning, b) Tendering & Vender selection. c) Project Co-Ordination with Design Engineering, Installation Engineering department, Site Engineers & Respective Clientfor Site Activities, d) Planning & scheduling of Materials supply, Man power planning for upgrading site progress. e) Weekly Progress reviewing with Venders, Client & consultant. Updating Site progress day to day. f) Generating of site intervene report(if any) & review with higher management for remedy with preventive action & for upgrading & correctness in design & engineering issue in future. g) Looking Job Quality & site safety & involve the execution person for Safety Awareness. h) Review & analysis the cause of delay of site execution progress & find the remedy to overcome the delay to achieve targeted schedule.
  • 2. 2 12. Experience : 34 years in project Planning, Erection & Commissioning & Maintenance of Power distribution system, Electrical Equipments, PLC, Drives, Safety system(CCTV, Fire Alarm System), Maintaining Quality & Safety in Various Steel Industries & others Project(Metro Rail Electrification, State Fisheries Power Distribution). i) : Associated with M/S Bombay Suburban Electric Supply Ltd, Eastern Zone, Kolkata from July 1981 to April 1989. as a Site in charge for the Supervision of installation & commissioning of Power Distribution system at Rabindra Saravar substation of Metro Railway project, Kolkata, State Fisheries project in Roychawk & Shankarpur (Digha), West Bengal, Maintenance of Electrical Distribution system of Roychak Fish Harbor Project Under Kolkata Port Trust of India. Holding responsibility of Project Planning, Co-ordination with engineering, Design section, Client. Follow up with venders for delivery of materials & Execution of site work, ii) : Associated with M/S M.N.Dasur & Company (P) Limited from May 1989 to April 2007. as RESIDENT ENGINEER Key Role in M.N Dastur & Co (P) Ltd a)Involve in site supervision in detail Engineering of electrical Equipments, Installation of Electrical & Industrial Instruments, Power distribution system, safety system(Fire Alarm & Fire Fighting), Plant Monitoring system(CCTV), b) Assistance for Execution of site erection job, handling of Venders for execution & commissioning in various plants, c) On behalf of Client Participate in Tender opening, Tabulation of venders technical & price bid comparison , d)Analysis of Venders Technical & Price Bid & handed over to Client all doc with advisory comments/ Suggestion for Final Negotiation of price Bid /resubmission of final Price Bid. e) Making Execution & Materials delivery Schedule f) Conducting Weekly Site Execution review meeting with Client & Venders. g) Monitoring Site progress day by day as per work schedule. h) Sorted out site hindrance and analysis work delay (if any) & trying to sorted out with Higher management of company and Client. i) Quality & Safety control. Plant Worked - a) Wire Rod Mill , Light & Medium Marchent Mill at Visakhapatnam steel plant from May 1989 to April 1991.
  • 3. 3 b) RMHS (Raw materials & handling system), Sinter Plant, Lime Calcining Plant, LD Shop II, Gas Mixing Station, Ladle Furnace & Billet Caster at TATA STEEL in Jamshedpur from May1991 to March 2007 iii) : Associated with M/S DANIELI INDIA LIMITED since April 2007 & worked as Electrical & Instrument Incharge(AGM) in Turn Key Project of MYINGYAN Steel plant Under Govt of Myanmar (Myanmar Economic Corporation) for Supervision of execution & commissioning of : a) Electric Arc Furnace (EAF), b) Ladle Furnace (LRF), c) Continuous Casting Mill(CCM), d) Raw Materials Handling system (RMHS). e)Thin Slab Caster & VD from April 2007 to November 2011. iv) : Worked as Site In charge, DGM(Electrical, Instruments, safety appliances like CCTV, Fire Alarm & Fire Fighting system ) & Completed Power Distribution System, safety system (CCTV, Fire Alarm system) for Sri City Project (A Fabrication & Manufacturing unit of Caster M/c, Furnace Shell, Roller Table of Caster of Steel Industries from December 2011 to Jan2013. v) : Worked as Site In charge DGM (Electrical, Instruments, safety appliances like CCTV, Fire Alarm & Fire Fighting system ) & Co ordination & detail supervision of Engineering & Materials Management of Structural Mill of Vizag steel plant from February 2013 to Oct 2014. vi) : Worked as Site In charge,DGM(Electrical, Instruments, safety appliances like CCTV, Fire Alarm & Fire Fighting system ) & detail supervision of Engineering & Materials Management & commissioned the Six HI Rewinding Line. Push Pull Pickling Line at ABUL KHAIR STEEL PLANT at BANGLADESH from December 2014 to July 2015.for PUSH PULL PICKLING LINE & REWINDING LINE. KEY Role in Danieli India Ltd: a)Execution & Commission assistance b) Man Power Arrangement c) Materials supply monitoring d) Preparing Erection & Materials delivery Schedule, e) Monitoring of Job Schedule, f) weekly review meeting with Client & Venders g) Day to day reporting Head office regarding site progress status, materials Delivery Status.
  • 4. 4 h) Analysis and review delay of Materials delivery, manpower & Site intervene & trying to shorted out with Higher management. i) Conducting Monthly meeting with Higher management of Client & continuously in touch with client for expedite project schedule. 13. Salary drawn : Annual CTC 20Lac 75 thousand + perks 14. Expected Salary : Annual CTC 25 Lacs + Perks.(Negotiable) Yours Truly Ajit Kumar Das Dated 31/03/2016 Mobile No. +91-9091373447 +91-9679685232