Information Technology Project
Management, Seventh Edition
Note: See the text itself for full citations.
 Describe the concepts associated with the field of
managing projects and the phases of project
management
Information Technology Project
Management, Seventh Edition 2
 Many organizations today have a new or renewed
interest in project management
 Computer hardware, software, networks, and the
use of interdisciplinary and global work teams have
radically changed the work environment
Information Technology Project
Management, Seventh Edition 3
 Some people argue that building the Egyptian
pyramids was a project, as was building the Great
Wall of China
 Most people consider the Manhattan Project to
be the first project to use “modern” project
management
Information Technology Project
Management, Seventh Edition 4
 IT Projects have a terrible track record, as described in the
What Went Wrong?
 A 1995 Standish Group study (CHAOS) found that only
16.2% of IT projects were successful in meeting scope,
time, and cost goals; over 31% of IT projects were
canceled before completion
 A PricewaterhouseCoopers study found that overall half of
all projects fail and only 2.5% of corporations consistently
meet their targets for scope, time, and cost goals for all
types of project.
Information Technology Project
Management, Seventh Edition 5
 Better control of financial, physical, and human
resources
 Improved customer relations
 Shorter development times
 Lower costs
 Higher quality and increased reliability
 Higher profit margins
 Improved productivity
 Better internal coordination
Information Technology Project
Management, Seventh Edition 6
 A project is “a temporary endeavor undertaken
to create a unique product, service, or result”
 Projects end when their objectives have been
reached or the project has been terminated
 Projects can be large or small and take a short
or long time to complete
Information Technology Project
Management, Seventh Edition 7
 manufacturing cell phone cases:
◦ A cell phone company is interested in manufacturing a special cell
phone case for their newest model. This cell phone case is part of
a promotion to sell the phone. They begin four months from today.
Only 1200 of these special cases will be manufactured for
distribution during the promotion. After the promotion, no further
cases will be manufactured or distributed.
 is it temporary? 
 is it unique? 
 will the end of the project reach the project objectives? 
 manufacturing cell phone cases:
◦ The cell phone company has so much success with their promotional cell
phone cases that customer demand has convinced them to integrate this
case as part of their regular product offering. It will now be manufactured
along with the other five cases that are currently offered. The cases will
be manufactured until the customer demands for the phone drops.
 is it temporary? 
 is it unique? 
 will the end of the project reach the project objectives? 
◦ It is not a project; it is an operation work.
nformation Technology Project
Management, Sixth Edition
 Write down three examples of a project
 A team of students creates a smartphone
application and sells it online
 A company develops a driverless car
 A small software development team adds a new
feature to an internal software application for the
finance department
 A college upgrades its technology infrastructure to
provide wireless Internet access across the whole
campus
Information Technology Project
Management, Seventh Edition 11
 A project
◦ has a unique purpose
◦ is temporary
◦ requires resources, often from various areas
◦ should have a primary customer or sponsor
 The project sponsor usually provides the
direction and funding for the project
Information Technology Project
Management, Seventh Edition 12
 Every project is constrained in different ways by its
scope, time and cost goals.
◦ Scope: What is the project trying to accomplish? What
unique product or service does the customer or sponsor
expect from the project ?
◦ Time: How long should it take to complete the project?
What is the project schedule ?
◦ Cost: What should it cost to complete the project?
Information Technology Project
Management, Seventh Edition 14
Quality
 Project management is “the application of
knowledge, skills, tools and techniques to project
activities to meet project requirements”
 The art of organizing, leading, reporting and
completing a project through people
 Project managers strive to meet the triple
constraint (project scope, time, and cost goals)
and facilitate the entire process to meet the needs
and expectations of project stakeholders
Information Technology Project
Management, Seventh Edition 15
 Write down three typical project stakeholders
 Stakeholders are the people involved in
or affected by project activities
 Stakeholders include
◦ the project sponsor
◦ the project manager
◦ the project team
◦ support staff
◦ customers
◦ users
◦ suppliers
◦ opponents to the project
Information Technology Project
Management, Seventh Edition 17
 Identify Stakeholders
 Assess needs
 Define actions
 Establish communication channels
 Gather feedback
 Monitor and review
Information Technology Project
Management, Seventh Edition 19
 Knowledge areas describe the key competencies
that project managers must develop
 Project managers must have knowledge and skills
in all 10 knowledge areas (project integration,
scope, time, cost, quality, human resource,
communications, risk, procurement, and
stakeholder management)
Information Technology Project
Management, Seventh Edition 20
 There are several ways to define project success:
◦ The project met scope, time, and cost goals
◦ The project satisfied the customer/sponsor
◦ The results of the project met its main objective, such as
making or saving a certain amount of money, providing a
good return on investment, or simply making the
sponsors happy
Information Technology Project
Management, Seventh Edition 21
 Project managers work with project sponsors,
project team, and other people involved in a
project to meet project goals
 Program: group of related projects managed in a
coordinated way to obtain benefits and control not
available from managing them individually
 Program managers oversee programs; often act
as bosses for project managers
Information Technology Project
Management, Seventh Edition 22
Information Technology Project
Management, Seventh Edition 23
A portfolio refers to projects, programs,
sub-portfolios, and operations managed as a
group to achieve strategic objectives.
 Project portfolio management (PPM) is the centralized
management of an organization's projects. While these
projects may or may not be related, they are managed
under one umbrella (called a portfolio) to oversee and
manage any competing resources.
 Portfolio managers help their organizations make wise
investment decisions by helping to select and analyze
projects from a strategic perspective
Information Technology Project
Management, Seventh Edition 24
Information Technology Project
Management, Seventh Edition 25
Information Technology Project
Management, Seventh Edition 26
 Job descriptions vary, but most include
responsibilities like planning, scheduling,
coordinating, and working with people to achieve
project goals
Information Technology Project
Management, Seventh Edition 27
 Project managers need a wide variety of skills
 Project managers need both “hard” and “soft”
skills.
◦ Hard skills include product knowledge and knowing
how to use various project management tools and
techniques, and
◦ soft skills include being able to work with various
types of people
Information Technology Project
Management, Seventh Edition 28
Information Technology Project
Management, Seventh Edition 29
1. People skills
2. Leadership
3. Listening
4. Integrity, ethical behavior, consistent
5. Strong at building trust
6. Verbal communication
7. Strong at building teams
8. Conflict resolution, conflict management
9. Critical thinking, problem solving
10. Understands, balances priorities
 Effective project managers provide leadership by
example
 A leader focuses on long-term goals and big-
picture objectives while inspiring people to reach
those goals
 A manager deals with the day-to-day details of
meeting specific goals
 Project managers often take on the role of both
leader and manager
Information Technology Project
Management, Seventh Edition 30
Information Technology Project
Management, Seventh Edition 31
Skill Percentage of
Respondents
Programming and application development 60%
Project management 44%
Help desk/technical support 35%
Networking 35%
Business intelligence 23%
Data center 18%
Web 2.0 18%
Security 17%
Telecommunications 9%
 The profession of project management is growing
at a very rapid pace
 It is helpful to understand the history of the field,
the role of professional societies like the Project
Management Institute, and the growth in project
management software
Information Technology Project
Management, Seventh Edition 32
 Project management tools and techniques assist
project managers and their teams in various
aspects of project management
 Some specific ones include
◦ Project charter, scope statement, and WBS (scope)
◦ Gantt charts, network diagrams, critical path analysis,
critical chain scheduling (time)
◦ Cost estimates and earned value management (cost)
Information Technology Project
Management, Seventh Edition 33
Information Technology Project
Management, Seventh Edition 34
Information Technology Project
Management, Seventh Edition 35
 The Project Management Institute (PMI) is an
international professional society for project managers
founded in 1969
 PMI has continued to attract and retain members,
reporting more than 380,000 members worldwide by
2012
 There are communities of practices in many areas,
like information systems, financial services, and
health care
 Project management research and certification
programs continue to grow
 Students can join PMI at a reduced fee and earn the
Certified Associate in Project Management (CAPM)
certification(see www.pmi.org for details)
Information Technology Project
Management, Seventh Edition 36
 PMI provides certification as a Project
Management Professional (PMP)
 A PMP has documented sufficient project
experience, agreed to follow a code of ethics, and
passed the PMP exam
 The number of people earning PMP certification is
increasing quickly
 PMI and other organizations offer additional
certification programs (see Appendix B)
Information Technology Project
Management, Seventh Edition 37
 Ethics, loosely defined, is a set of principles that guide
our decision making based on personal values of what
is “right” and “wrong”
 Project managers often face ethical dilemmas
 In order to earn PMP certification, applicants must
agree to PMI’s Code of Ethics and Professional
Conduct
 Several questions on the PMP exam are related to
professional responsibility, including ethics
Information Technology Project
Management, Seventh Edition 38
 A project is a temporary endeavor undertaken to create
a unique product, service, or result
 Project management is the application of knowledge,
skills, tools, and techniques to project activities to meet
project requirements
 A program is a group of related projects managed in a
coordinated way
 Project portfolio management involves organizing and
managing projects and programs as a portfolio of
investments
 Project managers play a key role in helping projects
and organizations succeed
 The project management profession continues to grow
and mature
Information Technology Project
Management, Seventh Edition 39

Más contenido relacionado

Similar a Chapter 1 (1).pptx

L01 introduction to pm
L01 introduction to pmL01 introduction to pm
L01 introduction to pmAsa Chan
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.pptnatisil1
 
چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه m.saboor nesar
 
Project Management Fundamentals Presentation.pptx
Project Management Fundamentals Presentation.pptxProject Management Fundamentals Presentation.pptx
Project Management Fundamentals Presentation.pptxasdf583697
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management OverviewTechNoleGirl
 
Project management by hamidun
Project management by hamidunProject management by hamidun
Project management by hamidunDr Hamidun Jaafar
 
Chapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.pptChapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.pptAhmadTawfigAlRadaide
 
1.2 Schwalbe Ch2.pptx
1.2 Schwalbe Ch2.pptx1.2 Schwalbe Ch2.pptx
1.2 Schwalbe Ch2.pptxAddayKhan
 
Information Technology Project Management - part 02
Information Technology Project Management - part 02Information Technology Project Management - part 02
Information Technology Project Management - part 02Rizwan Khurram
 
0. Foundations of project management (2).ppt
0. Foundations of project management (2).ppt0. Foundations of project management (2).ppt
0. Foundations of project management (2).pptAbelMuluqen
 
1 b. introduction to project management
1 b. introduction to project management1 b. introduction to project management
1 b. introduction to project managementDr.R. SELVAM
 
Introduction to ict project management
Introduction to ict project managementIntroduction to ict project management
Introduction to ict project managementmanproy
 
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Nurhazman Abdul Aziz
 
Project management for Ict Content by Group 3 Archimedes
Project management for Ict Content by Group 3 ArchimedesProject management for Ict Content by Group 3 Archimedes
Project management for Ict Content by Group 3 ArchimedesPrecious Panaligan
 

Similar a Chapter 1 (1).pptx (20)

L01 introduction to pm
L01 introduction to pmL01 introduction to pm
L01 introduction to pm
 
Cs244 w10ch1
Cs244 w10ch1Cs244 w10ch1
Cs244 w10ch1
 
Ch01
Ch01Ch01
Ch01
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.ppt
 
چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه
 
Project Management Fundamentals Presentation.pptx
Project Management Fundamentals Presentation.pptxProject Management Fundamentals Presentation.pptx
Project Management Fundamentals Presentation.pptx
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
01 ch1
01 ch101 ch1
01 ch1
 
Project management by hamidun
Project management by hamidunProject management by hamidun
Project management by hamidun
 
Chapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.pptChapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.ppt
 
01 itpm6
01 itpm601 itpm6
01 itpm6
 
1.2 Schwalbe Ch2.pptx
1.2 Schwalbe Ch2.pptx1.2 Schwalbe Ch2.pptx
1.2 Schwalbe Ch2.pptx
 
Information Technology Project Management - part 02
Information Technology Project Management - part 02Information Technology Project Management - part 02
Information Technology Project Management - part 02
 
0. Foundations of project management (2).ppt
0. Foundations of project management (2).ppt0. Foundations of project management (2).ppt
0. Foundations of project management (2).ppt
 
1 ch1
1 ch11 ch1
1 ch1
 
1 b. introduction to project management
1 b. introduction to project management1 b. introduction to project management
1 b. introduction to project management
 
Lecture 2
Lecture 2Lecture 2
Lecture 2
 
Introduction to ict project management
Introduction to ict project managementIntroduction to ict project management
Introduction to ict project management
 
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
 
Project management for Ict Content by Group 3 Archimedes
Project management for Ict Content by Group 3 ArchimedesProject management for Ict Content by Group 3 Archimedes
Project management for Ict Content by Group 3 Archimedes
 

Último

Brighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingBrighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingNeil Barnes
 
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...Suhani Kapoor
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfLars Albertsson
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998YohFuh
 
Delhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfSocial Samosa
 
Introduction-to-Machine-Learning (1).pptx
Introduction-to-Machine-Learning (1).pptxIntroduction-to-Machine-Learning (1).pptx
Introduction-to-Machine-Learning (1).pptxfirstjob4
 
Smarteg dropshipping via API with DroFx.pptx
Smarteg dropshipping via API with DroFx.pptxSmarteg dropshipping via API with DroFx.pptx
Smarteg dropshipping via API with DroFx.pptxolyaivanovalion
 
Ukraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSUkraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSAishani27
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdfMarket Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdfRachmat Ramadhan H
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfMarinCaroMartnezBerg
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxEmmanuel Dauda
 
Log Analysis using OSSEC sasoasasasas.pptx
Log Analysis using OSSEC sasoasasasas.pptxLog Analysis using OSSEC sasoasasasas.pptx
Log Analysis using OSSEC sasoasasasas.pptxJohnnyPlasten
 
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一ffjhghh
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfLars Albertsson
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAroojKhan71
 

Último (20)

Brighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingBrighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data Storytelling
 
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdf
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998
 
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
 
Delhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
 
Introduction-to-Machine-Learning (1).pptx
Introduction-to-Machine-Learning (1).pptxIntroduction-to-Machine-Learning (1).pptx
Introduction-to-Machine-Learning (1).pptx
 
Smarteg dropshipping via API with DroFx.pptx
Smarteg dropshipping via API with DroFx.pptxSmarteg dropshipping via API with DroFx.pptx
Smarteg dropshipping via API with DroFx.pptx
 
Ukraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSUkraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICS
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
 
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdfMarket Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
 
E-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptxE-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptx
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdf
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptx
 
Log Analysis using OSSEC sasoasasasas.pptx
Log Analysis using OSSEC sasoasasasas.pptxLog Analysis using OSSEC sasoasasasas.pptx
Log Analysis using OSSEC sasoasasasas.pptx
 
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdf
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
 

Chapter 1 (1).pptx

  • 1. Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
  • 2.  Describe the concepts associated with the field of managing projects and the phases of project management Information Technology Project Management, Seventh Edition 2
  • 3.  Many organizations today have a new or renewed interest in project management  Computer hardware, software, networks, and the use of interdisciplinary and global work teams have radically changed the work environment Information Technology Project Management, Seventh Edition 3
  • 4.  Some people argue that building the Egyptian pyramids was a project, as was building the Great Wall of China  Most people consider the Manhattan Project to be the first project to use “modern” project management Information Technology Project Management, Seventh Edition 4
  • 5.  IT Projects have a terrible track record, as described in the What Went Wrong?  A 1995 Standish Group study (CHAOS) found that only 16.2% of IT projects were successful in meeting scope, time, and cost goals; over 31% of IT projects were canceled before completion  A PricewaterhouseCoopers study found that overall half of all projects fail and only 2.5% of corporations consistently meet their targets for scope, time, and cost goals for all types of project. Information Technology Project Management, Seventh Edition 5
  • 6.  Better control of financial, physical, and human resources  Improved customer relations  Shorter development times  Lower costs  Higher quality and increased reliability  Higher profit margins  Improved productivity  Better internal coordination Information Technology Project Management, Seventh Edition 6
  • 7.  A project is “a temporary endeavor undertaken to create a unique product, service, or result”  Projects end when their objectives have been reached or the project has been terminated  Projects can be large or small and take a short or long time to complete Information Technology Project Management, Seventh Edition 7
  • 8.  manufacturing cell phone cases: ◦ A cell phone company is interested in manufacturing a special cell phone case for their newest model. This cell phone case is part of a promotion to sell the phone. They begin four months from today. Only 1200 of these special cases will be manufactured for distribution during the promotion. After the promotion, no further cases will be manufactured or distributed.  is it temporary?   is it unique?   will the end of the project reach the project objectives? 
  • 9.  manufacturing cell phone cases: ◦ The cell phone company has so much success with their promotional cell phone cases that customer demand has convinced them to integrate this case as part of their regular product offering. It will now be manufactured along with the other five cases that are currently offered. The cases will be manufactured until the customer demands for the phone drops.  is it temporary?   is it unique?   will the end of the project reach the project objectives?  ◦ It is not a project; it is an operation work. nformation Technology Project Management, Sixth Edition
  • 10.  Write down three examples of a project
  • 11.  A team of students creates a smartphone application and sells it online  A company develops a driverless car  A small software development team adds a new feature to an internal software application for the finance department  A college upgrades its technology infrastructure to provide wireless Internet access across the whole campus Information Technology Project Management, Seventh Edition 11
  • 12.  A project ◦ has a unique purpose ◦ is temporary ◦ requires resources, often from various areas ◦ should have a primary customer or sponsor  The project sponsor usually provides the direction and funding for the project Information Technology Project Management, Seventh Edition 12
  • 13.  Every project is constrained in different ways by its scope, time and cost goals. ◦ Scope: What is the project trying to accomplish? What unique product or service does the customer or sponsor expect from the project ? ◦ Time: How long should it take to complete the project? What is the project schedule ? ◦ Cost: What should it cost to complete the project?
  • 14. Information Technology Project Management, Seventh Edition 14 Quality
  • 15.  Project management is “the application of knowledge, skills, tools and techniques to project activities to meet project requirements”  The art of organizing, leading, reporting and completing a project through people  Project managers strive to meet the triple constraint (project scope, time, and cost goals) and facilitate the entire process to meet the needs and expectations of project stakeholders Information Technology Project Management, Seventh Edition 15
  • 16.  Write down three typical project stakeholders
  • 17.  Stakeholders are the people involved in or affected by project activities  Stakeholders include ◦ the project sponsor ◦ the project manager ◦ the project team ◦ support staff ◦ customers ◦ users ◦ suppliers ◦ opponents to the project Information Technology Project Management, Seventh Edition 17
  • 18.  Identify Stakeholders  Assess needs  Define actions  Establish communication channels  Gather feedback  Monitor and review
  • 20.  Knowledge areas describe the key competencies that project managers must develop  Project managers must have knowledge and skills in all 10 knowledge areas (project integration, scope, time, cost, quality, human resource, communications, risk, procurement, and stakeholder management) Information Technology Project Management, Seventh Edition 20
  • 21.  There are several ways to define project success: ◦ The project met scope, time, and cost goals ◦ The project satisfied the customer/sponsor ◦ The results of the project met its main objective, such as making or saving a certain amount of money, providing a good return on investment, or simply making the sponsors happy Information Technology Project Management, Seventh Edition 21
  • 22.  Project managers work with project sponsors, project team, and other people involved in a project to meet project goals  Program: group of related projects managed in a coordinated way to obtain benefits and control not available from managing them individually  Program managers oversee programs; often act as bosses for project managers Information Technology Project Management, Seventh Edition 22
  • 23. Information Technology Project Management, Seventh Edition 23 A portfolio refers to projects, programs, sub-portfolios, and operations managed as a group to achieve strategic objectives.
  • 24.  Project portfolio management (PPM) is the centralized management of an organization's projects. While these projects may or may not be related, they are managed under one umbrella (called a portfolio) to oversee and manage any competing resources.  Portfolio managers help their organizations make wise investment decisions by helping to select and analyze projects from a strategic perspective Information Technology Project Management, Seventh Edition 24
  • 27.  Job descriptions vary, but most include responsibilities like planning, scheduling, coordinating, and working with people to achieve project goals Information Technology Project Management, Seventh Edition 27
  • 28.  Project managers need a wide variety of skills  Project managers need both “hard” and “soft” skills. ◦ Hard skills include product knowledge and knowing how to use various project management tools and techniques, and ◦ soft skills include being able to work with various types of people Information Technology Project Management, Seventh Edition 28
  • 29. Information Technology Project Management, Seventh Edition 29 1. People skills 2. Leadership 3. Listening 4. Integrity, ethical behavior, consistent 5. Strong at building trust 6. Verbal communication 7. Strong at building teams 8. Conflict resolution, conflict management 9. Critical thinking, problem solving 10. Understands, balances priorities
  • 30.  Effective project managers provide leadership by example  A leader focuses on long-term goals and big- picture objectives while inspiring people to reach those goals  A manager deals with the day-to-day details of meeting specific goals  Project managers often take on the role of both leader and manager Information Technology Project Management, Seventh Edition 30
  • 31. Information Technology Project Management, Seventh Edition 31 Skill Percentage of Respondents Programming and application development 60% Project management 44% Help desk/technical support 35% Networking 35% Business intelligence 23% Data center 18% Web 2.0 18% Security 17% Telecommunications 9%
  • 32.  The profession of project management is growing at a very rapid pace  It is helpful to understand the history of the field, the role of professional societies like the Project Management Institute, and the growth in project management software Information Technology Project Management, Seventh Edition 32
  • 33.  Project management tools and techniques assist project managers and their teams in various aspects of project management  Some specific ones include ◦ Project charter, scope statement, and WBS (scope) ◦ Gantt charts, network diagrams, critical path analysis, critical chain scheduling (time) ◦ Cost estimates and earned value management (cost) Information Technology Project Management, Seventh Edition 33
  • 36.  The Project Management Institute (PMI) is an international professional society for project managers founded in 1969  PMI has continued to attract and retain members, reporting more than 380,000 members worldwide by 2012  There are communities of practices in many areas, like information systems, financial services, and health care  Project management research and certification programs continue to grow  Students can join PMI at a reduced fee and earn the Certified Associate in Project Management (CAPM) certification(see www.pmi.org for details) Information Technology Project Management, Seventh Edition 36
  • 37.  PMI provides certification as a Project Management Professional (PMP)  A PMP has documented sufficient project experience, agreed to follow a code of ethics, and passed the PMP exam  The number of people earning PMP certification is increasing quickly  PMI and other organizations offer additional certification programs (see Appendix B) Information Technology Project Management, Seventh Edition 37
  • 38.  Ethics, loosely defined, is a set of principles that guide our decision making based on personal values of what is “right” and “wrong”  Project managers often face ethical dilemmas  In order to earn PMP certification, applicants must agree to PMI’s Code of Ethics and Professional Conduct  Several questions on the PMP exam are related to professional responsibility, including ethics Information Technology Project Management, Seventh Edition 38
  • 39.  A project is a temporary endeavor undertaken to create a unique product, service, or result  Project management is the application of knowledge, skills, tools, and techniques to project activities to meet project requirements  A program is a group of related projects managed in a coordinated way  Project portfolio management involves organizing and managing projects and programs as a portfolio of investments  Project managers play a key role in helping projects and organizations succeed  The project management profession continues to grow and mature Information Technology Project Management, Seventh Edition 39