An Assessment of Material Management on Building
Construction Sites
Calistus Ayegba
Department of Building, School of Environmental Technology Federal university of Technology Minna
calistus.ayegba@futminna.edu.ng
Abstract
The paper considers the management of materials on building construction sites. In the study, method of material
procurement practice on construction site, factors affecting material management on building construction site as
well as causes wastages on construction sites were determined. The study further Suggest measures for effective
material management in construction site. Data for the study was obtained through a structured questionnaire
administered to respondents in ten different construction sites and head offices of the construction companies in
charge of the sites in Minna metropolis Niger State. Findings reveal that, 31% of respondents organization
procure materials for sites by head office provisions without site requisition, 64% of respondents organization
procure materials for sites by head office provisions with site requisition and 5% of respondents organization
procure materials for sites by through direct purchase by site manager or engineer. The respondent identified the
following as the main causes of material wastage on building construction sites: Damage by mishandling,
inadequate storage facilities on site, delay in material supply, inadequate supervision, poor site security, Weather
and other natural occurrence, Rework, alteration of designs, over ordering of construction materials, theft and
Vandalism. Based on the findings in the work, appropriate recommendations were being made for effective
material management on building construction sites.
Key words: Building materials, Wastes, Managements, Construction Sites.
1. Introduction
Cost wise all constriction works depend on two factors, namely, cost of materials and cost of labour and
According to Khyomesh (2011), 30 to 70 percent of project cost is consumed by material with about 30 to 40
percent of labor. But labour cost is nearly the same for good construction work as well as bad construction;
therefore attention should mainly be directed to the cost of materials and management of materials.
Waste of construction materials on site refers to the difference between materials delivered to construction site
and those that are actually used for the construction work (Onabule, 1991) hence from Onabule’s specification it
can be affirmed that construction waste are those materials supplied to site for construction and are not being
used in the actual construction constituents. This supports Seeley (1997) views that not all materials delivered to
construction sites are used for the purpose for which they are ordered. Furthermore, Formoso, Isatto, and Hirota
(1999), defined waste as “any losses produced by activities that generate direct or indirect cost but do not add
any value to the product”. Rational management of material to avoid waste is an important consideration for
reducing construction cost and construction duration. Therefore, there is a need for efficient materials
management in order to control productivity and cost in construction projects. Hence the overall objectives of
any on-site management activity should be directed to provide full-guard on construction materials and to
perform efficient usage of such materials (Mohammed and Anumba 2006).
Material management is the process that coordinates planning assessing the requirement sourcing, purchasing,
transporting, storing and controlling of materials, minimizing the wastage and optimizing the profitability by
reducing cost of material. The goal of material management is to ensure that materials are available at their point
of use when needed, the material management system attempts to ensure that the right quality and quantity of
materials are appropriately selected, purchased, delivered, and handled on site in a timely manner and at a
reasonable cost.
Most often contractors carry out project with little or no profit which is so due to procurement systems in which
the lowest bidder is often awarded the contract. In trying to cope with lowest bid contract and at the same time
avoid construction cost overruns contractors involves in the use of substandard elements, shoddy jobs through
use of cheap inexperience labour which most often results in building collapse, abandoned projects, and
liquidation of contractors. But researchers have continuously identified that efficient management of materials
can result in substantial savings in project costs, (khyomesh, 2011; AbdulRahman and Alidrisyi, 1994). So with
good construction material management construction cost overrun can be avoided profits can be made even with
the lowest bid and the various bad practices by contractors can be avoided. It is against this background that this
study is initiated for effective material management on construction sites.
Civil and Environmental Research www.iiste.org
ISSN 2224-5790 (Paper) ISSN 2225-0514 (Online)
Vol.3, No.5, 2013
19
2 .Objectives of the Study
1. determine method of material procurement practices on construction site
2. determine the causes of material wastage on building construction sites
3. identify the factors affecting effective material management on building construction site
4. suggest measures for effective material management on building construction site.
3. Research Methodology
Data for the study was collected via a structured questionnaire designed to assess the views of respondents on
material management on building construction sites. Respondents were asked to rate their perceptions regarding
the level of importance of these strategies on a four point Likert ordinal scale where 4 = Strongly Agree, 3 =
Agree, 2 = Disagree and 1 = Strongly Disagree.
The study was carried out in Minna the Niger state capital. The questionnaires were administered to contractors
in their head offices and their representatives on construction sites. A total of 10 different contractors with their
respective construction sites were visited and 2 questionnaires each were administered at the head offices as well
as at the construction sites making a total of 40 questionnaires being distributed. Hinkel et al (1998) however
believes that the minimum sample size that allows normal distribution assumptions to be used rather than using a
t-distribution is 30. Hence the sample size of 40 is justifiable.
Data obtained from the survey were analysed using simple percentages and Relative importance Index (RII)
method. The Relative importance index (RII) was calculated using the formula: RII = ∑W÷A×N_
( Where W= the weight assigned to each strategy by the respondents, A = Highest weight
(which is 4 in this case), N = the total number of respondents. The limits of definition of RII were:
0< 0.25 = Strongly Disagree, 0 0.50 = Disagree, 0 0.75 = Agree
0 = Strongly Agree. A rank ordering of these variables were then assigned based on the
calculated RII.
4. Results and Interpretation
Table 1. Manner of Material Procurement Practice on Construction Site.
Response Frequency Percentage %
Head office provisions without site requisition 31% 10 27%
head office provisions with site requisition 64% 25 68%
direct purchase by site manager or engineer 5% 2 5%
Total 37 100%
Figure 1. Manner of Material Procurement Practices on Construction Site.
Table 1 shows the method of material procurement practices on construction sites. Results shows that 31% of
respondent’s organization procures materials for construction sites by head office provisions without site
Civil and Environmental Research www.iiste.org
ISSN 2224-5790 (Paper) ISSN 2225-0514 (Online)
Vol.3, No.5, 2013
20
requisition, 64% of respondent’s organization procure materials for construction sites by head office provisions
with site requisition and 5% of respondent’s organization procures materials for construction sites through direct
purchase by site manager or engineer. The low percentage of 5% of methods of procurement of materials for
construction sites by direct purchase by site manager or engineer is not surprising since such method is prone to
challenges of accountability and corruption. This results also endorses procurement of materials for construction
sites by head office provisions with site requisition as a better option than procurement without site requisition
which might amount to over supplying or under supplying materials leading to wastage or delay as the case may
be.
Table 2. Causes of Material Wastage on Building Construction Sites
S/NO Causes of material wastage on building construction
sites
4 3 2 1 RII Rank
Order
A Damage by mishandling and re-work due to poor
workmanship
23 8 5 1 0.86 1
B Inadequate storage facilities on site, 12 15 10 - 0.76 4
C Delay in material supply, 15 9 11 2 0.75 5
D Inadequate supervision, 18 15 4 - 0.85 2
E Poor site security, 14 17 6 - 0.80 3
F Weather and other natural occurrence, 5 9 12 11 0.55 9
G Alteration of designs, 7 11 18 1 0.66 7
H Over ordering of construction materials, 12 7 10 8 0.66 7
I Theft and Vandalism. 3 24 5 5 0.67 6
Table 2 gives the responses to the list of causes of material wastage on building construction sites. From the
results the relative index for all the list of causes of material wastage on building construction sites were all
greater than 0.5 which is an indication that respondents agree and strongly agree with the list of causes of
material wastage on building construction sites, with damage by handling and rework due to poor workmanship,
inadequate supervision and poor site security having higher relative index of 0.86, 0.85 and 0.8 and ranked 1st
,
2nd
and 3rd
respectively. This implies that damage by handling and rework due to poor workmanship; inadequate
supervision and poor site security are the main causes of material wastage on building construction sites
Table 3. Factors Affecting Effective Material Management on Building Construction Sites,
S/No Factors Affecting effective Material Management On
Sites
3 2 1 RII Rank
order
A Design changes 19 8 10 - 0.81 2
B Lack of proper work planning and scheduling 20 7 8 2 0.80 3
C Inefficient workforce 22 8 6 1 0.85 1
D Fraudulent practices / negligence and corrupt
practices
15 9 13 - 0.76 4
E Lack of security personnel 11 7 16 3 0.68 6
F Waste on construction site 6 15 13 3 0.66 7
G Storage facility 12 9 16 - 0.72 5
Table 3 shows the responses to the factors affecting effective material management on construction sites. From
the results, inefficient workforce, design changes and lack of proper planning and scheduling are the factors
ranked 1st
, 2nd
, and 3rd
with relative index of 0.85, 0.81 and 0.80 respectively. Fraudulent practices/negligence
and corrupt practices is ranked 4th
with relative index of 0.76, while storage facility, lack of security personnel
and waste on construction sites are ranked 5th
, 6th
, and 7th
with relative index of 0.72, 0.68 and 0.66 respectively.
Civil and Environmental Research www.iiste.org
ISSN 2224-5790 (Paper) ISSN 2225-0514 (Online)
Vol.3, No.5, 2013
21
Table 4. Measures for Effective Material Management on Building Construction Site
S/No Measures for effective material management on
Building Construction Site
4 3 2 1 RII Rank
Order
1 Employment of skilled craftsmen and operators 24 11 2 - 0.86 1
2 Training of both management and other staff. 16 15 4 2 0.80 2
3 Employment of store keeper and security
personnel
17 12 8 - 0.75 5
4 Procurement requisition to specify quality,
quantity and delivery time
12 13 10 - 0.76 4
5 Ensuring proper planning and scheduling of
building works
21 9 7 - 0.79 3
6 Introducing material management at the design
stage
16 6 13 2 0.68 6
7 Attention to weather conditions 6 12 15 4 0.55 7
Table 4 gives the responses to the measures for effective material management on building construction site with
employment of skilled craftsmen and operators and training of both management and other staff being the
measures ranked 1st
and 2nd
with relative index of 0.86 and 0.8 respectively. Ensuring proper planning and
scheduling of building works is ranked 3rd
with relative index of 0.79 while Procurement requisition to specify
quality, quantity and delivery time is ranked 4th
with relative index of 0.76. Employment of store keeper and
security personnel, introducing material management at the design stage and attention to weather conditions are
ranked 5th
, 6th
, and 7th
with relative index of 0.75, 0.68 and 0.55 respectively. The higher relative index values for
employment of skilled craftsmen and operators and training of both management and other staff as measures for
effective material management on building construction site supports earlier responds from table 3 where
inefficient workforce was being identified as the main factor affecting material management on building
construction sites.
5. Conclusion and Recommendations
The research has examined materials management on building construction sites. Findings shows that
procurement of materials with requisition from site is more common with the contractors and its best practice of
materials procurements for construction sites for effective materials management. The study also establish that
the following: damage by mishandling and re-work due to poor workmanship, inadequate storage facilities on
site, delay in material supply, inadequate supervision, poor site security, weather and other natural occurrence,
alteration of designs, over ordering of construction materials, theft and vandalism are the causes of material
wastage on building construction sites and the factors affecting effective material management on construction
sites are as follows: design changes, lack of proper work planning and scheduling, inefficient workforce,
fraudulent practices /negligence and corrupt practices, lack of security personnel, waste on construction site and
lack of or inadequate storage facility. Furthermore, the research identifies the following as measures for effective
material management on building construction site: employment of skilled craftsmen and operators, training of
both management and other staff, employment of store keeper and security personnel; procurement requisition to
specify quality, quantity and delivery time; ensuring proper planning and scheduling of building works,
introducing material management at the design stage and consideration of weather conditions.
The study recommends that Contractor should make provisions for training and retraining of management and
site personnel in order to improve their efficiency for effective material management and contractors should
ensure the use of skilled craftsmen for their works and provide efficient supervision with professionals to ensure
effective material management on building construction sites.
REFERENCES
Abdul-Rahman,.H. and Alidrisyi, M. N. (1994) “A Perspective of Material ManagementPractices in a Fast
Developing Economy; the case of Malaysia”.Construction Management and Economics.
Formoso,L.T., Isatto, E.L. and Hirota, E.H. (1999). Methods for Waste Control in the Building
Industry.Conference Proceedings organized by International Group for Lean Construction (IGLC) 26-
28 July, California.
Hinkel E; Wiersma, W and Jurs, S.G (1988): Applied Statistics for the Behavioural Sciences. Houghton, Mifflin,
Boston
Civil and Environmental Research www.iiste.org
ISSN 2224-5790 (Paper) ISSN 2225-0514 (Online)
Vol.3, No.5, 2013
22
Khyomesh V. Patel (2011) Construction material management on project sites.
Mohamed, S.F. &Anumba, C.J. (2006). Potential for improving site managementpractices through knowledge
management, Construction Innovation: Information,Process, Management.
Onabule, G.A. (1991). Options for Efficient Management of Construction Resources on ite. In Oluteju, B. (ed).
Effective Contract Management in the Construction Industry.
Seeley, I.H. (1997). Quantity Surveying Practice. London: Macmillan Press Ltd.

Más contenido relacionado

La actualidad más candente

IRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
Application of ABC Analysis for Material Management of a Residential Building
Application of ABC Analysis for Material Management of a Residential BuildingApplication of ABC Analysis for Material Management of a Residential Building
Application of ABC Analysis for Material Management of a Residential BuildingIRJET Journal
 
Planning of materials in Construction Project management
Planning of materials in Construction Project managementPlanning of materials in Construction Project management
Planning of materials in Construction Project managementAravind Samala
 
Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...A Makwana
 
5 steps to better construction materials tracking
5 steps to better construction materials tracking5 steps to better construction materials tracking
5 steps to better construction materials trackingVeera Huovinen
 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material ManagementPriya Ramaraj
 
Material Management: Inventory Control & QC Techniques
Material Management: Inventory Control & QC TechniquesMaterial Management: Inventory Control & QC Techniques
Material Management: Inventory Control & QC TechniquesS.Vijaya Bhaskar
 
Scope and functons of materals management
Scope and functons of materals managementScope and functons of materals management
Scope and functons of materals managementSunil kushwaha
 
Material Management and ABC analysis
Material Management and ABC analysisMaterial Management and ABC analysis
Material Management and ABC analysisDr. Sonal Mandhotra
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...IRJET Journal
 
IRJET- Efficient Techniques of Construction Material Management in Constr...
IRJET-  	  Efficient Techniques of Construction Material Management in Constr...IRJET-  	  Efficient Techniques of Construction Material Management in Constr...
IRJET- Efficient Techniques of Construction Material Management in Constr...IRJET Journal
 
Materials management
Materials managementMaterials management
Materials managementARUNAYESUDAS
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...eSAT Journals
 

La actualidad más candente (18)

IRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction Projects
 
Application of ABC Analysis for Material Management of a Residential Building
Application of ABC Analysis for Material Management of a Residential BuildingApplication of ABC Analysis for Material Management of a Residential Building
Application of ABC Analysis for Material Management of a Residential Building
 
Planning of materials in Construction Project management
Planning of materials in Construction Project managementPlanning of materials in Construction Project management
Planning of materials in Construction Project management
 
Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...
 
5 steps to better construction materials tracking
5 steps to better construction materials tracking5 steps to better construction materials tracking
5 steps to better construction materials tracking
 
Module :- 8 material management
Module :- 8 material managementModule :- 8 material management
Module :- 8 material management
 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material Management
 
Materials management
Materials managementMaterials management
Materials management
 
Material Management: Inventory Control & QC Techniques
Material Management: Inventory Control & QC TechniquesMaterial Management: Inventory Control & QC Techniques
Material Management: Inventory Control & QC Techniques
 
Scope and functons of materals management
Scope and functons of materals managementScope and functons of materals management
Scope and functons of materals management
 
Material Management and ABC analysis
Material Management and ABC analysisMaterial Management and ABC analysis
Material Management and ABC analysis
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
 
Material management
Material managementMaterial management
Material management
 
Developing a Multiple-Criteria Decision Methodology for the Make-or-Buy Problem
Developing a Multiple-Criteria Decision Methodology for the Make-or-Buy ProblemDeveloping a Multiple-Criteria Decision Methodology for the Make-or-Buy Problem
Developing a Multiple-Criteria Decision Methodology for the Make-or-Buy Problem
 
IRJET- Efficient Techniques of Construction Material Management in Constr...
IRJET-  	  Efficient Techniques of Construction Material Management in Constr...IRJET-  	  Efficient Techniques of Construction Material Management in Constr...
IRJET- Efficient Techniques of Construction Material Management in Constr...
 
Materials management
Materials managementMaterials management
Materials management
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...
 
Material management
Material managementMaterial management
Material management
 

Similar a An assessment of material management on building construction sites

Assessment of materials waste in the construction industry: A view of Constru...
Assessment of materials waste in the construction industry: A view of Constru...Assessment of materials waste in the construction industry: A view of Constru...
Assessment of materials waste in the construction industry: A view of Constru...theijes
 
Analytical Study between Construction Material Wastage and Time Overrun
Analytical Study between Construction Material Wastage and Time OverrunAnalytical Study between Construction Material Wastage and Time Overrun
Analytical Study between Construction Material Wastage and Time Overrunijtsrd
 
Management for Construction Materials and Control of Construction Waste in Co...
Management for Construction Materials and Control of Construction Waste in Co...Management for Construction Materials and Control of Construction Waste in Co...
Management for Construction Materials and Control of Construction Waste in Co...IJERA Editor
 
Attitude of Construction Participants on Building Materials Wastage
Attitude of Construction Participants on Building Materials WastageAttitude of Construction Participants on Building Materials Wastage
Attitude of Construction Participants on Building Materials WastageIRJET Journal
 
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRYA REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRYIRJET Journal
 
Identification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIdentification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIRJET Journal
 
Investigation of material waste incurred in the construction projects at karb...
Investigation of material waste incurred in the construction projects at karb...Investigation of material waste incurred in the construction projects at karb...
Investigation of material waste incurred in the construction projects at karb...IAEME Publication
 
Source Identification and Minimization of Waste in Building Construction Usin...
Source Identification and Minimization of Waste in Building Construction Usin...Source Identification and Minimization of Waste in Building Construction Usin...
Source Identification and Minimization of Waste in Building Construction Usin...A Makwana
 
Evaluation of factors affecting residential building maintenance in nigeria u...
Evaluation of factors affecting residential building maintenance in nigeria u...Evaluation of factors affecting residential building maintenance in nigeria u...
Evaluation of factors affecting residential building maintenance in nigeria u...Alexander Decker
 
A Review on Waste Material Minimization in Construction Industry
A Review on Waste Material Minimization in Construction IndustryA Review on Waste Material Minimization in Construction Industry
A Review on Waste Material Minimization in Construction IndustryIRJET Journal
 
journalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdfjournalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdfKarthikeyanP288430
 
IRJET- Role of Construction Waste Material Management in Construction Ind...
IRJET-  	  Role of Construction Waste Material Management in Construction Ind...IRJET-  	  Role of Construction Waste Material Management in Construction Ind...
IRJET- Role of Construction Waste Material Management in Construction Ind...IRJET Journal
 
IRJET- A Review Paper on Lean Management in Construction Sites
IRJET-  	  A Review Paper on Lean Management in Construction SitesIRJET-  	  A Review Paper on Lean Management in Construction Sites
IRJET- A Review Paper on Lean Management in Construction SitesIRJET Journal
 
Cost _ Time Control in Construction Projects- Part -3.pdf
Cost _ Time Control in Construction Projects- Part -3.pdfCost _ Time Control in Construction Projects- Part -3.pdf
Cost _ Time Control in Construction Projects- Part -3.pdfYohannesBizuneheWeld
 
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...IRJET Journal
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
Dhrumil pandya Maintance
Dhrumil pandya  Maintance  Dhrumil pandya  Maintance
Dhrumil pandya Maintance Dhrumil Pandya
 
An empirical study on key determinants of construction Delay
An empirical study on key determinants of construction DelayAn empirical study on key determinants of construction Delay
An empirical study on key determinants of construction DelayIRJET Journal
 

Similar a An assessment of material management on building construction sites (20)

Assessment of materials waste in the construction industry: A view of Constru...
Assessment of materials waste in the construction industry: A view of Constru...Assessment of materials waste in the construction industry: A view of Constru...
Assessment of materials waste in the construction industry: A view of Constru...
 
Analytical Study between Construction Material Wastage and Time Overrun
Analytical Study between Construction Material Wastage and Time OverrunAnalytical Study between Construction Material Wastage and Time Overrun
Analytical Study between Construction Material Wastage and Time Overrun
 
Management for Construction Materials and Control of Construction Waste in Co...
Management for Construction Materials and Control of Construction Waste in Co...Management for Construction Materials and Control of Construction Waste in Co...
Management for Construction Materials and Control of Construction Waste in Co...
 
Attitude of Construction Participants on Building Materials Wastage
Attitude of Construction Participants on Building Materials WastageAttitude of Construction Participants on Building Materials Wastage
Attitude of Construction Participants on Building Materials Wastage
 
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRYA REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
 
Identification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIdentification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building Construction
 
Investigation of material waste incurred in the construction projects at karb...
Investigation of material waste incurred in the construction projects at karb...Investigation of material waste incurred in the construction projects at karb...
Investigation of material waste incurred in the construction projects at karb...
 
H0341034041
H0341034041H0341034041
H0341034041
 
Source Identification and Minimization of Waste in Building Construction Usin...
Source Identification and Minimization of Waste in Building Construction Usin...Source Identification and Minimization of Waste in Building Construction Usin...
Source Identification and Minimization of Waste in Building Construction Usin...
 
Evaluation of factors affecting residential building maintenance in nigeria u...
Evaluation of factors affecting residential building maintenance in nigeria u...Evaluation of factors affecting residential building maintenance in nigeria u...
Evaluation of factors affecting residential building maintenance in nigeria u...
 
A Review on Waste Material Minimization in Construction Industry
A Review on Waste Material Minimization in Construction IndustryA Review on Waste Material Minimization in Construction Industry
A Review on Waste Material Minimization in Construction Industry
 
journalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdfjournalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdf
 
IRJET- Role of Construction Waste Material Management in Construction Ind...
IRJET-  	  Role of Construction Waste Material Management in Construction Ind...IRJET-  	  Role of Construction Waste Material Management in Construction Ind...
IRJET- Role of Construction Waste Material Management in Construction Ind...
 
IRJET- A Review Paper on Lean Management in Construction Sites
IRJET-  	  A Review Paper on Lean Management in Construction SitesIRJET-  	  A Review Paper on Lean Management in Construction Sites
IRJET- A Review Paper on Lean Management in Construction Sites
 
Cost _ Time Control in Construction Projects- Part -3.pdf
Cost _ Time Control in Construction Projects- Part -3.pdfCost _ Time Control in Construction Projects- Part -3.pdf
Cost _ Time Control in Construction Projects- Part -3.pdf
 
D0482326
D0482326D0482326
D0482326
 
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
Dhrumil pandya Maintance
Dhrumil pandya  Maintance  Dhrumil pandya  Maintance
Dhrumil pandya Maintance
 
An empirical study on key determinants of construction Delay
An empirical study on key determinants of construction DelayAn empirical study on key determinants of construction Delay
An empirical study on key determinants of construction Delay
 

Más de Alexander Decker

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Alexander Decker
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inAlexander Decker
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesAlexander Decker
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksAlexander Decker
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dAlexander Decker
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceAlexander Decker
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifhamAlexander Decker
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaAlexander Decker
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenAlexander Decker
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksAlexander Decker
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget forAlexander Decker
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabAlexander Decker
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...Alexander Decker
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalAlexander Decker
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesAlexander Decker
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbAlexander Decker
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloudAlexander Decker
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveragedAlexander Decker
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenyaAlexander Decker
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health ofAlexander Decker
 

Más de Alexander Decker (20)

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale in
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websites
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banks
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized d
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistance
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifham
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibia
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school children
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banks
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget for
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjab
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incremental
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniques
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo db
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloud
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveraged
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenya
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health of
 

Último

Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 

Último (20)

Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 

An assessment of material management on building construction sites

  • 1. Civil and Environmental Research www.iiste.org ISSN 2224-5790 (Paper) ISSN 2225-0514 (Online) Vol.3, No.5, 2013 18 An Assessment of Material Management on Building Construction Sites Calistus Ayegba Department of Building, School of Environmental Technology Federal university of Technology Minna calistus.ayegba@futminna.edu.ng Abstract The paper considers the management of materials on building construction sites. In the study, method of material procurement practice on construction site, factors affecting material management on building construction site as well as causes wastages on construction sites were determined. The study further Suggest measures for effective material management in construction site. Data for the study was obtained through a structured questionnaire administered to respondents in ten different construction sites and head offices of the construction companies in charge of the sites in Minna metropolis Niger State. Findings reveal that, 31% of respondents organization procure materials for sites by head office provisions without site requisition, 64% of respondents organization procure materials for sites by head office provisions with site requisition and 5% of respondents organization procure materials for sites by through direct purchase by site manager or engineer. The respondent identified the following as the main causes of material wastage on building construction sites: Damage by mishandling, inadequate storage facilities on site, delay in material supply, inadequate supervision, poor site security, Weather and other natural occurrence, Rework, alteration of designs, over ordering of construction materials, theft and Vandalism. Based on the findings in the work, appropriate recommendations were being made for effective material management on building construction sites. Key words: Building materials, Wastes, Managements, Construction Sites. 1. Introduction Cost wise all constriction works depend on two factors, namely, cost of materials and cost of labour and According to Khyomesh (2011), 30 to 70 percent of project cost is consumed by material with about 30 to 40 percent of labor. But labour cost is nearly the same for good construction work as well as bad construction; therefore attention should mainly be directed to the cost of materials and management of materials. Waste of construction materials on site refers to the difference between materials delivered to construction site and those that are actually used for the construction work (Onabule, 1991) hence from Onabule’s specification it can be affirmed that construction waste are those materials supplied to site for construction and are not being used in the actual construction constituents. This supports Seeley (1997) views that not all materials delivered to construction sites are used for the purpose for which they are ordered. Furthermore, Formoso, Isatto, and Hirota (1999), defined waste as “any losses produced by activities that generate direct or indirect cost but do not add any value to the product”. Rational management of material to avoid waste is an important consideration for reducing construction cost and construction duration. Therefore, there is a need for efficient materials management in order to control productivity and cost in construction projects. Hence the overall objectives of any on-site management activity should be directed to provide full-guard on construction materials and to perform efficient usage of such materials (Mohammed and Anumba 2006). Material management is the process that coordinates planning assessing the requirement sourcing, purchasing, transporting, storing and controlling of materials, minimizing the wastage and optimizing the profitability by reducing cost of material. The goal of material management is to ensure that materials are available at their point of use when needed, the material management system attempts to ensure that the right quality and quantity of materials are appropriately selected, purchased, delivered, and handled on site in a timely manner and at a reasonable cost. Most often contractors carry out project with little or no profit which is so due to procurement systems in which the lowest bidder is often awarded the contract. In trying to cope with lowest bid contract and at the same time avoid construction cost overruns contractors involves in the use of substandard elements, shoddy jobs through use of cheap inexperience labour which most often results in building collapse, abandoned projects, and liquidation of contractors. But researchers have continuously identified that efficient management of materials can result in substantial savings in project costs, (khyomesh, 2011; AbdulRahman and Alidrisyi, 1994). So with good construction material management construction cost overrun can be avoided profits can be made even with the lowest bid and the various bad practices by contractors can be avoided. It is against this background that this study is initiated for effective material management on construction sites.
  • 2. Civil and Environmental Research www.iiste.org ISSN 2224-5790 (Paper) ISSN 2225-0514 (Online) Vol.3, No.5, 2013 19 2 .Objectives of the Study 1. determine method of material procurement practices on construction site 2. determine the causes of material wastage on building construction sites 3. identify the factors affecting effective material management on building construction site 4. suggest measures for effective material management on building construction site. 3. Research Methodology Data for the study was collected via a structured questionnaire designed to assess the views of respondents on material management on building construction sites. Respondents were asked to rate their perceptions regarding the level of importance of these strategies on a four point Likert ordinal scale where 4 = Strongly Agree, 3 = Agree, 2 = Disagree and 1 = Strongly Disagree. The study was carried out in Minna the Niger state capital. The questionnaires were administered to contractors in their head offices and their representatives on construction sites. A total of 10 different contractors with their respective construction sites were visited and 2 questionnaires each were administered at the head offices as well as at the construction sites making a total of 40 questionnaires being distributed. Hinkel et al (1998) however believes that the minimum sample size that allows normal distribution assumptions to be used rather than using a t-distribution is 30. Hence the sample size of 40 is justifiable. Data obtained from the survey were analysed using simple percentages and Relative importance Index (RII) method. The Relative importance index (RII) was calculated using the formula: RII = ∑W÷A×N_ ( Where W= the weight assigned to each strategy by the respondents, A = Highest weight (which is 4 in this case), N = the total number of respondents. The limits of definition of RII were: 0< 0.25 = Strongly Disagree, 0 0.50 = Disagree, 0 0.75 = Agree 0 = Strongly Agree. A rank ordering of these variables were then assigned based on the calculated RII. 4. Results and Interpretation Table 1. Manner of Material Procurement Practice on Construction Site. Response Frequency Percentage % Head office provisions without site requisition 31% 10 27% head office provisions with site requisition 64% 25 68% direct purchase by site manager or engineer 5% 2 5% Total 37 100% Figure 1. Manner of Material Procurement Practices on Construction Site. Table 1 shows the method of material procurement practices on construction sites. Results shows that 31% of respondent’s organization procures materials for construction sites by head office provisions without site
  • 3. Civil and Environmental Research www.iiste.org ISSN 2224-5790 (Paper) ISSN 2225-0514 (Online) Vol.3, No.5, 2013 20 requisition, 64% of respondent’s organization procure materials for construction sites by head office provisions with site requisition and 5% of respondent’s organization procures materials for construction sites through direct purchase by site manager or engineer. The low percentage of 5% of methods of procurement of materials for construction sites by direct purchase by site manager or engineer is not surprising since such method is prone to challenges of accountability and corruption. This results also endorses procurement of materials for construction sites by head office provisions with site requisition as a better option than procurement without site requisition which might amount to over supplying or under supplying materials leading to wastage or delay as the case may be. Table 2. Causes of Material Wastage on Building Construction Sites S/NO Causes of material wastage on building construction sites 4 3 2 1 RII Rank Order A Damage by mishandling and re-work due to poor workmanship 23 8 5 1 0.86 1 B Inadequate storage facilities on site, 12 15 10 - 0.76 4 C Delay in material supply, 15 9 11 2 0.75 5 D Inadequate supervision, 18 15 4 - 0.85 2 E Poor site security, 14 17 6 - 0.80 3 F Weather and other natural occurrence, 5 9 12 11 0.55 9 G Alteration of designs, 7 11 18 1 0.66 7 H Over ordering of construction materials, 12 7 10 8 0.66 7 I Theft and Vandalism. 3 24 5 5 0.67 6 Table 2 gives the responses to the list of causes of material wastage on building construction sites. From the results the relative index for all the list of causes of material wastage on building construction sites were all greater than 0.5 which is an indication that respondents agree and strongly agree with the list of causes of material wastage on building construction sites, with damage by handling and rework due to poor workmanship, inadequate supervision and poor site security having higher relative index of 0.86, 0.85 and 0.8 and ranked 1st , 2nd and 3rd respectively. This implies that damage by handling and rework due to poor workmanship; inadequate supervision and poor site security are the main causes of material wastage on building construction sites Table 3. Factors Affecting Effective Material Management on Building Construction Sites, S/No Factors Affecting effective Material Management On Sites 3 2 1 RII Rank order A Design changes 19 8 10 - 0.81 2 B Lack of proper work planning and scheduling 20 7 8 2 0.80 3 C Inefficient workforce 22 8 6 1 0.85 1 D Fraudulent practices / negligence and corrupt practices 15 9 13 - 0.76 4 E Lack of security personnel 11 7 16 3 0.68 6 F Waste on construction site 6 15 13 3 0.66 7 G Storage facility 12 9 16 - 0.72 5 Table 3 shows the responses to the factors affecting effective material management on construction sites. From the results, inefficient workforce, design changes and lack of proper planning and scheduling are the factors ranked 1st , 2nd , and 3rd with relative index of 0.85, 0.81 and 0.80 respectively. Fraudulent practices/negligence and corrupt practices is ranked 4th with relative index of 0.76, while storage facility, lack of security personnel and waste on construction sites are ranked 5th , 6th , and 7th with relative index of 0.72, 0.68 and 0.66 respectively.
  • 4. Civil and Environmental Research www.iiste.org ISSN 2224-5790 (Paper) ISSN 2225-0514 (Online) Vol.3, No.5, 2013 21 Table 4. Measures for Effective Material Management on Building Construction Site S/No Measures for effective material management on Building Construction Site 4 3 2 1 RII Rank Order 1 Employment of skilled craftsmen and operators 24 11 2 - 0.86 1 2 Training of both management and other staff. 16 15 4 2 0.80 2 3 Employment of store keeper and security personnel 17 12 8 - 0.75 5 4 Procurement requisition to specify quality, quantity and delivery time 12 13 10 - 0.76 4 5 Ensuring proper planning and scheduling of building works 21 9 7 - 0.79 3 6 Introducing material management at the design stage 16 6 13 2 0.68 6 7 Attention to weather conditions 6 12 15 4 0.55 7 Table 4 gives the responses to the measures for effective material management on building construction site with employment of skilled craftsmen and operators and training of both management and other staff being the measures ranked 1st and 2nd with relative index of 0.86 and 0.8 respectively. Ensuring proper planning and scheduling of building works is ranked 3rd with relative index of 0.79 while Procurement requisition to specify quality, quantity and delivery time is ranked 4th with relative index of 0.76. Employment of store keeper and security personnel, introducing material management at the design stage and attention to weather conditions are ranked 5th , 6th , and 7th with relative index of 0.75, 0.68 and 0.55 respectively. The higher relative index values for employment of skilled craftsmen and operators and training of both management and other staff as measures for effective material management on building construction site supports earlier responds from table 3 where inefficient workforce was being identified as the main factor affecting material management on building construction sites. 5. Conclusion and Recommendations The research has examined materials management on building construction sites. Findings shows that procurement of materials with requisition from site is more common with the contractors and its best practice of materials procurements for construction sites for effective materials management. The study also establish that the following: damage by mishandling and re-work due to poor workmanship, inadequate storage facilities on site, delay in material supply, inadequate supervision, poor site security, weather and other natural occurrence, alteration of designs, over ordering of construction materials, theft and vandalism are the causes of material wastage on building construction sites and the factors affecting effective material management on construction sites are as follows: design changes, lack of proper work planning and scheduling, inefficient workforce, fraudulent practices /negligence and corrupt practices, lack of security personnel, waste on construction site and lack of or inadequate storage facility. Furthermore, the research identifies the following as measures for effective material management on building construction site: employment of skilled craftsmen and operators, training of both management and other staff, employment of store keeper and security personnel; procurement requisition to specify quality, quantity and delivery time; ensuring proper planning and scheduling of building works, introducing material management at the design stage and consideration of weather conditions. The study recommends that Contractor should make provisions for training and retraining of management and site personnel in order to improve their efficiency for effective material management and contractors should ensure the use of skilled craftsmen for their works and provide efficient supervision with professionals to ensure effective material management on building construction sites. REFERENCES Abdul-Rahman,.H. and Alidrisyi, M. N. (1994) “A Perspective of Material ManagementPractices in a Fast Developing Economy; the case of Malaysia”.Construction Management and Economics. Formoso,L.T., Isatto, E.L. and Hirota, E.H. (1999). Methods for Waste Control in the Building Industry.Conference Proceedings organized by International Group for Lean Construction (IGLC) 26- 28 July, California. Hinkel E; Wiersma, W and Jurs, S.G (1988): Applied Statistics for the Behavioural Sciences. Houghton, Mifflin, Boston
  • 5. Civil and Environmental Research www.iiste.org ISSN 2224-5790 (Paper) ISSN 2225-0514 (Online) Vol.3, No.5, 2013 22 Khyomesh V. Patel (2011) Construction material management on project sites. Mohamed, S.F. &Anumba, C.J. (2006). Potential for improving site managementpractices through knowledge management, Construction Innovation: Information,Process, Management. Onabule, G.A. (1991). Options for Efficient Management of Construction Resources on ite. In Oluteju, B. (ed). Effective Contract Management in the Construction Industry. Seeley, I.H. (1997). Quantity Surveying Practice. London: Macmillan Press Ltd.