Performance Verification Packet

                               Industrial Millwright V3




This performance verification is designed as one method to evaluate job skills and safe work habits of a participant. The
performance of the participant must be evaluated by an NCCER certified evaluator, at an NCCER authorized assessment
site and be approved by an NCCER accredited assessment center. For a Certified Plus credential, the version of the
assessment and performance verification must be the same.




                                       Last Updated: September 2009
                            National Center for Construction Education and Research
                                         rd
                             3600 NW 43 Street , Bldg. G • Gainesville, FL 32606
                                Telephone 352.334.0911 • Fax 352.334.0929
NCCER PERFORMANCE VERIFICATION HOW TO SHEET
                                                    INDUSTRIAL MILLWRIGHT V3


Participant

      1) Print your last name, first name, and social security number.
      2) Print your company name, current employer, and the state where your employer’s main
         office is located.
      3) In the space provided for “Participant Signature,” sign your name and enter the date you
         signed the form.


Performance Evaluator

      1) In the space provided for “Site Code,” enter the postal zip code of the location where the
         performance verification is being conducted.
      2) In the column provided for “Date,” enter the date the participant completed each of the
         tasks. This date is important because there may be times a participant does not complete
         the performance verification in one day.
      3) In the space provided for “Performance Evaluator,” sign your name.
      4) In the space provided for “Date,” next to your signature, list the date the participant
         successfully completed all of the tasks.

Administrator

      1) In the space provided for “Administrator,” sign your name. Your signature indicates that
         the performance evaluator is certified to conduct this performance verification and that it
         was conducted within the guidelines of the NCCER. Do not use a signature stamp.
      2) In the space provided for “Date”, next to your signature, list the date that this
         performance verification form is being sent to the NCCER for entry into the National
         Registry.
      3) In the space provided for “Accredited Assessment Center,” print the name of the
         accredited assessment center that is conducting this performance verification.




                                    Last Updated: September 2009
                         National Center for Construction Education and Research
                                      rd
                          3600 NW 43 Street , Bldg. G • Gainesville, FL 32606
                             Telephone 352.334.0911 • Fax 352.334.0929
NCCER PERFORMANCE VERIFICATION EVALUATOR CHECKLIST
                                              INDUSTRIAL MILLWRIGHT V3
Date
Completed       Task To Perform
__-__-__    1. Remove pump from casing
                •   Checked impeller condition
                •   Checked shaft and seal


__-__-__    2. Remove impeller backplate and seal
                •   Checked shaft run out
                •   Checked for seal failure
                •   Inspected back plate


__-__-__    3. Disassemble bearing housing
                •   Inspected shaft
                •   Checked for proper fit


__-__-__    4. Install shaft and bearings into housing
                •   Checked and verified proper fit
                •   Made sure all secondary seals, O-rings, etc., are in place

__-__-__    5. Install pump in casing
                •   Verified impeller clearance
                •   Verified seal setting after impeller clearance
                •   Proper specifications were met during installation




                            Last Updated: September 2009
               National Center for Construction Education and Research
                           rd
               36 00 NW 43    Street, Bldg. G• Gainesville, Florida 32606
                       Phone 352.334.0911 • Fax 352.334.0929
NCCER PERFORMANCE VERIFICATION CANDIDATE SUMMARY
                                                     INDUSTRIAL MILLWRIGHT V3
Objective
        The candidate will demonstrate the ability to remove, inspect, disassemble, rebuild, install and align a
        pump and record necessary information.
Scope
        This Performance Verification provides a means to observe and evaluate competencies in the
        following areas:
        • Removing pump from casing
        • Removing impeller back plate and seal
        • Disassembly of bearing housing
        • Installation of shafts and bearings into housing
        • Installation of a pump into casing

Materials Required
        •   PPE                                                     •   Machinist level
        •   Wrenches (combination)                                  •   Optical level
        •   Rigging equipment (i.e., sling,                         •   Shims (hard pack and precision shims)
            shackles, hoist, etc.)                                  •   Hand held mirror
        •   Pullers                                                 •   Dial indicators with chain or reverse
        •   Induction heater                                            alignment brackets
        •   250-degree temp-stick                                   •   Laser
        •   Various coupling types                                  •   Brass punch
        •   Emery cloth or Scotchbrite                              •   Pump Installed in Casing
        •   Flat file                                               •   Proper Measurement Tools
        •   Various bearing types                                   •   Pump Specification Sheet
        •   Allen wrenches                                          •   Hand / Power Tools
        •   Foundation and baseplates

Time Required
        Based on Job Site specifications and equipment

Tasks
•  Remove pump from casing
       Check condition
       Check shaft and seal
• Remove impeller backplate and seal
       Check shaft
       Check seal
Disassemble bearing housing
       Inspect shaft
       Check for proper fit
• Install shaft and bearings in housing
       Check for proper fit
       Make sure all secondary seals, O-rings, etc., are in place
• Install pump in casing
       Verify proper clearances

                                Last Updated: September 2009
                   National Center for Construction Education and Research
                               rd
                   36 00 NW 43    Street, Bldg. G• Gainesville, Florida 32606
                           Phone 352.334.0911 • Fax 352.334.0929
NCCER PERFORMANCE VERIFICATION SUBMISSION FORM
                                                                               INDUSTRIAL MILLWRIGHT V3
                                                                                  PVMLWR15_03 CRAFT



   Candidate information


   Last Name                                           First Name                    Social Security Number



   Employer/Company Name                               State                         Site Code

   Evaluator


   Last Name                                           First Name                    Social Security Number

   TASK        TASK                                                               DATE           START        END
  NUMBER                                                                        (MM/DD/YY)        TIME        TIME
     01        Remove pump from casing (15404-08)
       02      Remove impeller backplate and seal (15304-08)
       03      Disassemble bearing housing (15306-08)
       04      Install shaft and bearings in housing (15306-08)
       05      Install pump in casing (15405-08)




Consent/Release: I, the undersigned, do hereby authorize the National Center for Construction Education and
                 Research (NCCER) to release the information and results attained through the administration of
                 the National Craft Assessment and Certification Program (NCACP) to the organization
                 referenced below, and acknowledge that the employer noted above is my present employer.



Accredited Assessment Center: ___________________

Participant:                                                                        Date:

Performance Evaluator:                                                              Date:

Primary Administrator:                                                              Date:




                                   Last Updated: September 2009
                                      Return Completed Form To:
                                            NCCER Registry
                         36 00 NW 43rd St. Bldg . G • Gai nes vill e, Flor ida 32606
                                    Phone 352-334-0911 • Fax 352-334-0929

Más contenido relacionado

Similar a Millwright Entire Packet

vijay_Resume
vijay_Resumevijay_Resume
vijay_Resume
Vzu viji
 
Complete March 2015 CV-2
Complete March 2015 CV-2Complete March 2015 CV-2
Complete March 2015 CV-2
Tim Jones
 
Chidambaram_QAQC(Piping)
Chidambaram_QAQC(Piping)Chidambaram_QAQC(Piping)
Chidambaram_QAQC(Piping)
CHIDAMBARAM S
 
Resumes_20160910225901
Resumes_20160910225901Resumes_20160910225901
Resumes_20160910225901
Jason Bellotti
 
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdfStandard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
ParmeshworVetwal1
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
Mohsin Iqubal
 

Similar a Millwright Entire Packet (20)

vijay_Resume
vijay_Resumevijay_Resume
vijay_Resume
 
Kannan new (autosaved)
Kannan new (autosaved)Kannan new (autosaved)
Kannan new (autosaved)
 
Complete March 2015 CV-2
Complete March 2015 CV-2Complete March 2015 CV-2
Complete March 2015 CV-2
 
ANAND CV
ANAND CVANAND CV
ANAND CV
 
QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTS
 
MWI CV3
MWI CV3MWI CV3
MWI CV3
 
Chidambaram_QAQC(Piping)
Chidambaram_QAQC(Piping)Chidambaram_QAQC(Piping)
Chidambaram_QAQC(Piping)
 
The ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact OutcomesThe ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact Outcomes
 
Jijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )docJijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )doc
 
BGAS_RESUME_2-2
BGAS_RESUME_2-2BGAS_RESUME_2-2
BGAS_RESUME_2-2
 
Nagarajan Saravanan
Nagarajan SaravananNagarajan Saravanan
Nagarajan Saravanan
 
The ROI of Improved Injection Molding Process Flow
The ROI of Improved Injection Molding Process FlowThe ROI of Improved Injection Molding Process Flow
The ROI of Improved Injection Molding Process Flow
 
Dr. ajmal nasir
Dr. ajmal nasirDr. ajmal nasir
Dr. ajmal nasir
 
Resumes_20160910225901
Resumes_20160910225901Resumes_20160910225901
Resumes_20160910225901
 
User specification requirements (urs) rash
User specification requirements (urs) rashUser specification requirements (urs) rash
User specification requirements (urs) rash
 
Salehuddin case study procurement and contract management
Salehuddin case study procurement and contract managementSalehuddin case study procurement and contract management
Salehuddin case study procurement and contract management
 
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdfStandard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
 
Mani cv
Mani   cvMani   cv
Mani cv
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
CV_Balaji 2016
CV_Balaji 2016CV_Balaji 2016
CV_Balaji 2016
 

Más de AmericanMillwright

Más de AmericanMillwright (20)

Steam Turbinesforcombinedcycle
Steam TurbinesforcombinedcycleSteam Turbinesforcombinedcycle
Steam Turbinesforcombinedcycle
 
10 Inch Diameter
10 Inch Diameter10 Inch Diameter
10 Inch Diameter
 
How To Use A Transit Final2
How To Use A Transit Final2How To Use A Transit Final2
How To Use A Transit Final2
 
Ge Steam Turbinesfor Industrial
Ge Steam Turbinesfor IndustrialGe Steam Turbinesfor Industrial
Ge Steam Turbinesfor Industrial
 
Ge Steam Turbine Products
Ge Steam Turbine ProductsGe Steam Turbine Products
Ge Steam Turbine Products
 
Inch To Millimeter Conversion Table
Inch To Millimeter Conversion TableInch To Millimeter Conversion Table
Inch To Millimeter Conversion Table
 
Layout Basics I Ne
Layout Basics I NeLayout Basics I Ne
Layout Basics I Ne
 
Metric & Inch Equivalent
Metric & Inch EquivalentMetric & Inch Equivalent
Metric & Inch Equivalent
 
Millimeter Tap Drill Sizes
Millimeter Tap Drill SizesMillimeter Tap Drill Sizes
Millimeter Tap Drill Sizes
 
Millimeter To Inch Conversion Table
Millimeter To Inch Conversion TableMillimeter To Inch Conversion Table
Millimeter To Inch Conversion Table
 
Siemens1000 Mw
Siemens1000 MwSiemens1000 Mw
Siemens1000 Mw
 
Siemens Fuel Gasifier
Siemens Fuel GasifierSiemens Fuel Gasifier
Siemens Fuel Gasifier
 
Siemens Gas Turbine4000 F
Siemens Gas Turbine4000 FSiemens Gas Turbine4000 F
Siemens Gas Turbine4000 F
 
Soft Foot
Soft FootSoft Foot
Soft Foot
 
Ge Combined Cycle
Ge Combined CycleGe Combined Cycle
Ge Combined Cycle
 
Easy Laser Shaft Alignment Worksheet
Easy Laser   Shaft Alignment WorksheetEasy Laser   Shaft Alignment Worksheet
Easy Laser Shaft Alignment Worksheet
 
Decimal Equivalents Of Number Size Drills
Decimal Equivalents Of Number Size DrillsDecimal Equivalents Of Number Size Drills
Decimal Equivalents Of Number Size Drills
 
Carbon Capture
Carbon CaptureCarbon Capture
Carbon Capture
 
Compressor Valves
Compressor ValvesCompressor Valves
Compressor Valves
 
Coal Reburning
Coal ReburningCoal Reburning
Coal Reburning
 

Millwright Entire Packet

  • 1. Performance Verification Packet Industrial Millwright V3 This performance verification is designed as one method to evaluate job skills and safe work habits of a participant. The performance of the participant must be evaluated by an NCCER certified evaluator, at an NCCER authorized assessment site and be approved by an NCCER accredited assessment center. For a Certified Plus credential, the version of the assessment and performance verification must be the same. Last Updated: September 2009 National Center for Construction Education and Research rd 3600 NW 43 Street , Bldg. G • Gainesville, FL 32606 Telephone 352.334.0911 • Fax 352.334.0929
  • 2. NCCER PERFORMANCE VERIFICATION HOW TO SHEET INDUSTRIAL MILLWRIGHT V3 Participant 1) Print your last name, first name, and social security number. 2) Print your company name, current employer, and the state where your employer’s main office is located. 3) In the space provided for “Participant Signature,” sign your name and enter the date you signed the form. Performance Evaluator 1) In the space provided for “Site Code,” enter the postal zip code of the location where the performance verification is being conducted. 2) In the column provided for “Date,” enter the date the participant completed each of the tasks. This date is important because there may be times a participant does not complete the performance verification in one day. 3) In the space provided for “Performance Evaluator,” sign your name. 4) In the space provided for “Date,” next to your signature, list the date the participant successfully completed all of the tasks. Administrator 1) In the space provided for “Administrator,” sign your name. Your signature indicates that the performance evaluator is certified to conduct this performance verification and that it was conducted within the guidelines of the NCCER. Do not use a signature stamp. 2) In the space provided for “Date”, next to your signature, list the date that this performance verification form is being sent to the NCCER for entry into the National Registry. 3) In the space provided for “Accredited Assessment Center,” print the name of the accredited assessment center that is conducting this performance verification. Last Updated: September 2009 National Center for Construction Education and Research rd 3600 NW 43 Street , Bldg. G • Gainesville, FL 32606 Telephone 352.334.0911 • Fax 352.334.0929
  • 3. NCCER PERFORMANCE VERIFICATION EVALUATOR CHECKLIST INDUSTRIAL MILLWRIGHT V3 Date Completed Task To Perform __-__-__ 1. Remove pump from casing • Checked impeller condition • Checked shaft and seal __-__-__ 2. Remove impeller backplate and seal • Checked shaft run out • Checked for seal failure • Inspected back plate __-__-__ 3. Disassemble bearing housing • Inspected shaft • Checked for proper fit __-__-__ 4. Install shaft and bearings into housing • Checked and verified proper fit • Made sure all secondary seals, O-rings, etc., are in place __-__-__ 5. Install pump in casing • Verified impeller clearance • Verified seal setting after impeller clearance • Proper specifications were met during installation Last Updated: September 2009 National Center for Construction Education and Research rd 36 00 NW 43 Street, Bldg. G• Gainesville, Florida 32606 Phone 352.334.0911 • Fax 352.334.0929
  • 4. NCCER PERFORMANCE VERIFICATION CANDIDATE SUMMARY INDUSTRIAL MILLWRIGHT V3 Objective The candidate will demonstrate the ability to remove, inspect, disassemble, rebuild, install and align a pump and record necessary information. Scope This Performance Verification provides a means to observe and evaluate competencies in the following areas: • Removing pump from casing • Removing impeller back plate and seal • Disassembly of bearing housing • Installation of shafts and bearings into housing • Installation of a pump into casing Materials Required • PPE • Machinist level • Wrenches (combination) • Optical level • Rigging equipment (i.e., sling, • Shims (hard pack and precision shims) shackles, hoist, etc.) • Hand held mirror • Pullers • Dial indicators with chain or reverse • Induction heater alignment brackets • 250-degree temp-stick • Laser • Various coupling types • Brass punch • Emery cloth or Scotchbrite • Pump Installed in Casing • Flat file • Proper Measurement Tools • Various bearing types • Pump Specification Sheet • Allen wrenches • Hand / Power Tools • Foundation and baseplates Time Required Based on Job Site specifications and equipment Tasks • Remove pump from casing Check condition Check shaft and seal • Remove impeller backplate and seal Check shaft Check seal Disassemble bearing housing Inspect shaft Check for proper fit • Install shaft and bearings in housing Check for proper fit Make sure all secondary seals, O-rings, etc., are in place • Install pump in casing Verify proper clearances Last Updated: September 2009 National Center for Construction Education and Research rd 36 00 NW 43 Street, Bldg. G• Gainesville, Florida 32606 Phone 352.334.0911 • Fax 352.334.0929
  • 5. NCCER PERFORMANCE VERIFICATION SUBMISSION FORM INDUSTRIAL MILLWRIGHT V3 PVMLWR15_03 CRAFT Candidate information Last Name First Name Social Security Number Employer/Company Name State Site Code Evaluator Last Name First Name Social Security Number TASK TASK DATE START END NUMBER (MM/DD/YY) TIME TIME 01 Remove pump from casing (15404-08) 02 Remove impeller backplate and seal (15304-08) 03 Disassemble bearing housing (15306-08) 04 Install shaft and bearings in housing (15306-08) 05 Install pump in casing (15405-08) Consent/Release: I, the undersigned, do hereby authorize the National Center for Construction Education and Research (NCCER) to release the information and results attained through the administration of the National Craft Assessment and Certification Program (NCACP) to the organization referenced below, and acknowledge that the employer noted above is my present employer. Accredited Assessment Center: ___________________ Participant: Date: Performance Evaluator: Date: Primary Administrator: Date: Last Updated: September 2009 Return Completed Form To: NCCER Registry 36 00 NW 43rd St. Bldg . G • Gai nes vill e, Flor ida 32606 Phone 352-334-0911 • Fax 352-334-0929